Addendum #1 to Supplying and Installing Playground Equipment and Related Site Work at Churchill School Scope of Work: The following tasks are included in the base bid for Churchill Elementary School 1. Supply and install Landscape Structures playground equipment and Surface America Surfacing for Churchill Elementary in strict accordance with the attached specifications and plans. 2. Re install equipment listed as “existing” shown in lite green on the site plan. This equipment will be supplied by owner. 3. Install base preparation for poured in place surfacing utilizing Crushed Stone 4. The Contractor shall be responsible for removing and disposing all debris and packing materials from the job site. 5. Contractor shall exercise care so as not to damage existing grass, walks, or other School District property during the performance of its contract. Contractor shall repair or replace any damaged grass or material should damage occur during construction. Quarry process, crushed limestone... such as is used under asphalt roads. A homogeneous mixture of fine and medium stone is compacted by tamping and/or rolling to provide an even plane. The crushed stone base must be tightly compacted and smooth. . 95% Standard Proctor Compaction (as per ASTM Test) is of critical importance. Stone for the base MUST be crushed so it compacts to the above standard, and should be a homogeneous mix of the following sizes: Minimum depth of crushed stone base should be 5”. A filter fabric is necessary for crushed stone bases only when Tiles are installed. It is not used with Poured-In-Place or TurfTop systems. Typar 3401 or compatible filter fabrics are acceptable for Tile installations. Sieve Size 1” 5/8” 1/4” #4 #8 #30 #200 % Passing by Weight 90-100 50-80 30-50 15-35 10-30 3-5 0-3 6. Supply and install Poured-in-Place surfacing, in accordance with the attached specifications and plans. All bids shall include shipping, unloading and complete installation. 7. Supply and Installation of 124 Cubic Yards of playground mulch in accordance with the attached specifications and plans 8. The Contractor shall be responsible for removing and disposing concrete footings for existing playground, swings, and independent items, located on the east side of the building. The structure and swings will be removed by others, cut off to the finished grade. An aerial view of the existing structure and area has been included. 9. Contractor shall exercise care so as not to damage existing grass, walks, or other Park District property during the performance of its contract. Contractor shall repair or replace any damaged grass or material, should damage occur during construction. The Contractor shall be responsible for removing and disposing all debris and packing material from the job site. 10.Supplier shall inspect playground equipment after completion of installation and shall notify the School District of any installation errors or omissions. The certification letter shall state that there are no installation errors if none are found. The following tasks are to be proposed as alternate item: 1. Supply and Install poured in place for the entire site at Churchill Elementary in accordance with the attached plans and specifications. 2. Supply and Install a additional 2,688 square feet of crushed stone according to the attached plans and specification. Equipment List Component Provided YES / NO CHURCHILL SCHOOL GLEN ELLYN, IL OPTION 1 REVISED PLAYSHAPER COMPONENT SYSTEM QTY. NO. DESCRIPTION 2-5 Year Olds Play Equipment 1 1 1 1 1 1 1 1 1 1 1 1 2 1 4 3 1 2 1 1 143480 A 153021 B 185863 A 119981 A 160424 A 185862 C 173586 A 144984 A 119977 A 173587 A 111239 A 111237 A 117495 A 179362 A 111396 A 111397 F 111397 E 111397 D 171569 A 171570 A SpyroSlide Off 48"Dk DB Deck Link 2 Steps Mushroom Stepper 16"Deck w/1 Rec WG HH, DB, Lt HH Step Deck DB The Stepper Rock Climber DB Only Wood Plank Wiggle Ladder 48"Deck DB Recycled Wood-Grain Lumber Panel Above Deck Storefront Panel Handbar Tree House Roof Square Deck Extension Square Tenderdeck Triangular Tenderdeck Tri-Deck Kick Plate 8"Rise 145"Post For Roof DB 82"Post DB 90"Post DB 98"Post DB Mushroom Stepper 10"Height DB Only Mushroom Stepper 16"Height DB Only Substituted Items 1 173596 A Log Balance Beam DB Subtotal Freestanding Play Components 1 1 1 4 1 3 1 164147 A 113211 A 164149 A 111397 H 173591 A 152179 A 186490 A Bongo Reach Panel Ground Level Chimes Panel Ground Level Ring A Bell Reach Panel Ground Level 69"Post DB OmniSpin Spinner Surface Mount Saddle Spinner DB 12"Height We-saw DB Only Surface America PlayBound Poured in Place BASE BID Combination 3 1/2" thick (1021 sq t), 2" thick (1,039 sq ft) and 1 3/4" thick (1,039 sq ft) (thicknesses are subject to a nominal variation) system with top suface in 50% color/ 50% black speckled mix. Includes standard aromatic. Includes freight and installation. 3,099 Sq. Ft Notes: * * * * * * * * * * Poured-in-Place 3-1/2" thick poured-in-place system meets 8' critical fall height. 2" thick poured-in-place system meets 5' critical fall height. 1 3/4" thick poured-in-place system meets 4' critical fall height. Surface America quotes are based on thickness/criticall fall height performances as tested by an accredited laboratory. The above surfacing price includes shipping and installation but does not include any base construction or preparation. Surface America poured-in-place system is IPEMA certified. Quote does not include security that is needed to protect the surfacing during curing time. Purchaser shall be responsible for security, as needed, to prevent vandalism and/or damage of any type to the surface during intallation process, curing time, and after the installation is completed. With Certain EPDM rubber colors, Surface America recommends aliphatic (non-yellowing) binder be considered, however this is an additional charge. Adding aliphatic binder will carry a 10-year warranty. Surface America recommends the following colors be used as accent colors only: Teal, Yellow, Purple and Primary Red. If one of the listed coors is selected for more than 25% of the top surface, additional charges may need to be added. Price valid 120 days from day quote is provided. PlayBound Poured in Place ALTERNATE Combination 3 1/2" thick (1,829 sq t), 3" thick (1,860 sq ft), 2" thick (1,039 sq ft) and 1 3/4" thick (1,039 sq ft) (thicknesses are subject to a nominal variation) system with top surface in 50% color/50% black speckled mix. Includes standard aromatic. Includes freight and installation. 5,767 Sq Ft Notes: * * * * * * * * * Poured-in-Place 3-1/2" thick poured-in-place system meets 8' critical fall height. 2" thick poured-in-place system meets 5' critical fall height. 1 3/4" thick poured-in-place system meets 4' critical fall height. Surface America quotes are based on thickness/criticall fall height performances as tested by an accredited laboratory. The above surfacing price includes shipping and installation but does not include any base construction or preparation. Surface America poured-in-place system is IPEMA certified. Quote does not include security that is needed to protect the surfacing during curing time. Purchaser shall be responsible for security, as needed, to prevent vandalism and/or damage of any type to the surface during intallation process, curing time, and after the installation is completed. With Certain EPDM rubber colors, Surface America recommends aliphatic (non-yellowing) binder be considered, however this is an additional charge. Adding aliphatic binder will carry a 10-year warranty. Surface America recommends the following colors be used as accent colors only: Teal, Yellow, Purple and Primary Red. If one of the listed coors is selected for more than 25% of the top surface, additional charges may need to be added.
© Copyright 2026 Paperzz