Appendix A2: Form to document uses, operational conditions and risk management measures Company ________________________Department_________________________________________ Process___Formulation of XY_____________________________________________________ Date_xx.yy.zzzz______________Signature__Arnold Becker____________ Formulation of cleaning agent XY, number of batches/d (1-2) and of production Processes days/a (100) Process line 1 Substances used: i-propanol 100 %, NaOH 50 % solution Process steps Step 1. Delivery and storage of raw materials Step 2. Transfer of raw materials into process Step 3. Loading, mixing Step 4. Packaging Step 5. Quality control: samples from raw materials Step 5. Quality control: samples from products Step 6. Analysis in lab Step 7. Cleaning and maintenance Step 8. Waste management Physical state (solid/liquid/gas) Stored in a storage house with general ventilation in 3 m³ and NaOH-solutions (50%) in 1 m³ barrels i-Propanol (500 l) and NaOH-solution (50 l) are transferred via enclosed lines to a process tank located in a separate process room with general ventilation Mixing (product volume 1000 l) in a process tank (2000 l), the cap closed during mixing Product is packed to bottles (10 l) from the process tank by using the tap attached to the tank in the process room liquid liquid 300 l/d, 30 t/a 50 l/d, 5 t/a Amounts used (kg/d, t/a) Room temperature Room temperature Temperature of substance i-propanol 30%, natriumhydroxide 2,5% Concentration in the product (%) steps 2-5, 7-8 indoors Indoors / outdoors Exposure duration (h/d) and frequency (d/a) Step 1. Delivery and storage of raw materials Step 2. Loading of raw materials Step 3. Mixing Step 4. Packaging Step 5. Quality control: samples from raw materials Step 5. Quality control: samples from products Step 6. Analysis in lab Step 7. Cleaning and maintenance Step 8. Waste management 1-4 h/week 15 - 60 min/d, 100 d/a 1-4 h/d, 100 d/a 4-6 h/d, 100 d/a 15 min/week 1-4 h/week 15-60 min/d, 100 d/a 1-4 h/d, 100 d/a 4-6 h/d, 100 d/a - 15 - 60 min/d, 100 d/a 15 - 60 min/d, 100 d/a 1 h/d, 100 d/a 3 h/ week, 100 d/a 15 - 60 min/d, 100 d/a 15 - 60 min/d, 100 d/a 1 h/d 100 d/a 3 h/ week, 100 d/a Risk management measures (technical) Steps 2-5,7 Production hall and step 6 laboratory: 5 times/h Step 6. laboratory: fume cupboard, efficiency x % General ventilation (times/h) Local exhaust (efficiency %) Other Personal protective equipments Eyes and face Skin, hands (type) Skin, protective clothing, other body parts Breathing protection Steps 2-3, 5-6,8: safety glasses, Step 4: face shield, Step 7: goggles Steps 2-6,8: Nitrile gloves / EN374, Step 7: PVC gloves / EN374 Step 7: Apron, boots, other process steps: safety shoes - 1/1
© Copyright 2026 Paperzz