ADDENDUM No. 1 MSEC Wastewater Treatment Plant #2 MBESI No. 10260076 June 6, 2016 The following are changes, clarifications and responses to questions from Bidders: 1. Question: What is the Engineer's Estimate for the project? Response: A rough estimate of work to be provided under this project (not include the equipment to be provided by the Owner) is $1,000,000. 2. Question: Is the Owner public or private? Response: The Owner is a private entity. 3. Question: Were Contractors invited to bid this project or can any contractor bid the project? If invited, can the list of invited Contractor's be provided? Response: Yes, any Contractor may bid this project. However, we have only sent notices to specific Contractors. The Contractors that received a notification of this project are as follows: Bryan Construction Company Dudley Construction Ltd. JTR Constructors, Inc. R+B Group, Inc. CSA Construction, Inc. LEM Construction Co. N&S Construction Co., L.P. T&C Construction, Ltd. 4. Question: Is a bid bond required? Response: A bid bond is not required. 5. Question: Is retainage 5% or 10%? Response: Retainage for this project is 10%. Article 21 of Section 00100 should read as follows: “From each partial payment made to the CONTRACTOR, an amount equal to ten (10) percent will be retained until 30-days after the completion of all Work to the satisfaction of the Owner and Engineer.” 6. Question: Can bid date be change to provide additional time? Response: The bid date has been changed to 4:00 p.m., Friday, June 24, 2016. MSEC Wastewater Treatment Plant #2 MBESI No. 10260076 Addendum No. 1 Page 1 of 2 7. Question: Contract time is 180 days. Can this be increased and is there a deadline that has to be met? Response: The Contract Time may be increased to the extent the wastewater treatment plant has to be operational by the end of February 2017. 8. Question: Has the process equipment been orders or will it be ordered by the Owner once the construction contract is executed? If the latter, we may not get the equipment for 6 months. Response: The equipment to be provided by the Owner has not been ordered at this time. The equipment will be ordered upon review of the bids. We understand that the equipment may not arrive on site until late fall; however, a large portion of the project can be under way and near completion. Most of the equipment will only require the connection of a few pipes and power (i.e. the equipment is not needed for a majority of the construction work.) 9. Question: The bid form is lengthy. Could the bid form be shortened to a lump sum? Is the breakdown needed on the bid day? Response: The project is a lump sum bid. Item 5.01 of the Bid Proposal (Section 00300) is the lump sum base bid for which the project will be awarded. Item 5.02 Base Bid Unit Price Breakdown is where we would like to see how project costs are distributed throughout the project. It would be greatly appreciated if Item 5.02 could be completed before the bid due date, but is not a requirement. However, the successful bidders will be required to complete Item 5.02 prior to execution of the agreement/contract. 10. Question: Since the Owner is providing most of the process equipment, could the actual manufacturer's scope be made available so we are award of their inclusions and exclusion? Response: The manufacturer's scope for this project is attached as Attachment “A”. 11. Question: Can any of the indemnification clauses be modified? Response: The Owner requests that the indemnification clauses remain unchanged. However, if modification to the indemnification clauses are requested, the bidder shall provide said modifications to J. Dale Browne, Jr., P.E. at [email protected] in pdf and Word formats entitled “Requested Indemnification Clause Modifications” and shall be received by 10:00 a.m., Monday, June 20th. The pdf attachment shall specifically state which indemnification clause is to be modified (i.e. reference Contact Document section, item number, etc.) and proposed rewording of the indemnification clause. All efforts will be made to responded back to the respective bidder by 5:00 p.m., Thursday, June 23rd as to the acceptance, rejection, or additional modifications are approved. J. Dale Browne, Jr., P.E. 06/06/16 Date McClure & Browne Engineering/Survey, Inc. Firm Reg. No. F-458 MSEC Wastewater Treatment Plant #2 MBESI No. 10260076 Addendum No. 1 Page 2 of 2 = Aqua-Aerobic Supply = Aqua-Aerobic Supply = Aqua-Aerobic Supply = Aqua-Aerobic Supply = Aqua-Aerobic Supply = Aqua-Aerobic Supply
© Copyright 2026 Paperzz