Lessons Learned from the TE P C O Nuclear Power Scandal Hiroyuki K uroda M anager Corporate Co m m unications Dept. Tokyo Electric Po w er Com pany (T EPC O) Sum m a ry of a Series of C a ses of M i sconduct July 2000: MITI asked TEP C O to inquire inappropriate handling of maintenance records and reports M ay 2002: GE inform ed T EPC O that inspection records might also have been inappropriately handled June 2002: TEPC O set Internal Investigative Com mittee and checked 29 cases by GE btw 1986 and 2001 T EPC O found 16 cases of misconduct and reported to NIS A P C V Leakage Tests Sep. 2002: A newspaper reported inappropriate conduct of leak test in P C V in U nit 1 in Fukushima Daiichi N PS. A investigation team of external lawyers formed by T EPC O found inappropriate actions during the leak test in 1991 and 1992. Background to C a ses of M i sconduct (1) Deficiencies in fitness for service - technical standards were established on an‘as-constructed’basis Background to C a ses of M i sconduct (2) Nuclear engineers’over-confidence of their nuclear knowledge - The engineers’conservative m entality to avoid reporting problems to the national governm ent as long as they believed that safety was secured Internal Factors Resulting in M i sconduct Problems in Quality Assurance System Problems in Observance of the Code of Ethics and Corporate Culture Inadequacy of Safety Culture C o nsequences of M i sconduct Dam aged public trust to ward TEPC O Forced to shut do w n 17 nuclear reactors for safety inspection Possibility of po wer shortage in sum m er 2003 To Prevent Similar Incidents (1) “Create a mechanism that does not permit people to perform any dishonest act, and create a culture that encourages people to refrain from performing any dishonest act.” To Prevent Similar Incidents (2) Improvem e nt in the Quality Assurance System To Prevent Similar Incidents (3) T E P C O set up internal audit function -the N uclear Q uality M anagem ent Departm ent -the Nuclear Safety and Q uality Assurance Conference To Prevent Similar Incidents (4) Strict Observance of the Code of Ethics and Reforms in Corporate Culture -formed Business Ethics Task Force for co mpliance -rewrote the Corporate Code of Conduct To Regain Public Trust (1) Set up local liaison meetings around N P S K a shiw a zaki-Kariw a N P S M eetings: held once a month since M ay 2003 M e m bers: opinion leaders, anti-nuclear activist, etc. Secretariat: Kashiwazaki City Official website: http://w w w.tiikinokai.jp/ (only in Japanese) To Regain Public Trust (2) Three Progra ms Thorough enforce m ent of safety m anagem ent Boosting of com m unications with cooperating co mpanies Thorough disclosure of information T h orough disclosure of inform a tion ¾ Improved the disclosure standard of nuclear incidents in TEPC O (Novem b er 2003) Increase in the num b ers of press releases 30 K ash iw azak iK ariw a 25 20 F u k u sh im a D aiich i 15 F u k u sh im a D ain i 10 5 20 0 4/ 2 4/ 1 0 20 3/ 12 0 20 20 0 3/ 2 3/ 1 0 20 20 0 2/ 12 0 Disclosure on the website (1) On the TEPC O W ebsite: w w w.tepco.co.jp (in Japanese) -topics, nuclear data, press releases, etc - New content On dem and video titled“I work at a NPS” English version: ww w.tepco.co.jp/en/ will be relaunched on M arch 27, 2004. It will have topics, nuclear update and press releases Disclosure on the website (2) On the website of nuclear po wer stations: w w w.tepco.co.jp/fukushima1-np/ ww w.tepco.co.jp/fukushima2-np/ ww w.tepco.co.jp/kk-np (all only in Japanese) - operation status - radiation data on real tim e base - activities with local co m m unity - press release - minor troubles Lessons Learned from the Scandal (1) Share nuclear information (even minor information) with stakeholders Share nuclear infor m ation with stakeholders Local governm ents (prefecture, city, village) Local Com m unity M e d ia Lessons Learned from the Scandal (2) More co m m unication with local co m m unity Li st en Part i ci pat e in T he voice of local residents Local activities
© Copyright 2026 Paperzz