Tech Dome Penang. Project Notes
Project Description:
Completion date:
This project is nearing completion, opening the beginning of June 2016. It is a project in which I contracted to Science Alive
Exhibits ltd who in turn have contracted to Tech Dome Penang to build 101 exhibits here and provide exhibition design.
mid 2016
Tim Stephenson Design’s Involvement.
My role is as Exhibition Designer. In that role I have:
• Worked out the layout for a predetermined set of exhibits.
• Designed the visual look of the exhibition galleries and divided the space.
• Designed and documented the interior fitout for the exhibition space. That includes full working drawings,
specifications and production ready CNC files for that to be built by contractors in Malaysia.
• Designed and documented the modular exhibit table to be used on most of the exhibits. This includes full working
drawings,specifications and production ready CNC files for that to be built by contractors in Malaysia.
• Produced and delivered various presentations.
• Designed and produced print ready files for all the explanatory exhibit graphic panels from content supplied by Science
Alive.
• Design for electronic orientation signage.
• Design storyboard / template for interactive boards.
• Designed a detailed lighting plan for implementation by contractors in Penang.
• Detailed a mechanical and electrical layout for implementation by contractors in Penang.
• Because I have traveled to site a several times I have become the main point of contact with the client and have therefore
handled many other tasks outside of my original brief.
Video File
As space is limited I will attach a dropbox link to an overview presentation. Note this was done at very short notice so is a little
rough around the edges in some places. But it does give a good feel for the project in a short time.
https://www.dropbox.com/s/96vxlcg8btcmukz/TD-CM-Presenation.mp4?dl=0
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Project Notes
fax: +64 3 3272346
Layout Number
TD 01
Mezzanine Floor
Concept - gallery dividers and towers
Tech Dome is built in a 44m diameter
Dome with a mezzanine.
There is also a large annex for cafe, two
temporary exhibit spaces, kids discover
area, observatory classrooms and labs.
For the purposes of this I have confined it
to the dome area.
Main Floor
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Concept Sketches -1
fax: +64 3 3272346
Layout Number
TD 02
Project on these panels
lighting
Hexagonal Screens
Hexagonal Towers
Space efficient layout of exhibits.
Provides lighting ( a challenge in this space)
Provide theming graphics,
Can be relatively easily repositioned.
Distribute power and data.
Easy to re-theme.
Mounting of some exhibits and graphic panels
Divide gallery space
Provide Theming Graphics,
Can be relativly easily repositioned.
Projection for moving images.
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Concept Sketches - 2
fax: +64 3 3272346
Layout Number
TD 03
Interactive Board
Electronic Orientaion Signage Board
65 in Monitor.
Networked with update for daily events.
Laser sensor interactive projection board.
Effiectivly a 90 inch multi touch screen.
Provides full translation.
Provides more in depth information.
Interactive map.
Teachers aid.
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Concept Sketches -3
fax: +64 3 3272346
Layout Number
TD 04
The following section is a selection of Spatial -layout drawings
only selectected drawings have been included
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Layout section
fax: +64 3 3272346
Layout Number
TD 05
LIFE TECH
ELECTROMAGNETISM
REVISION D 2/11/2015
Job Title
For
TECH DOME LAYOUT
Tech Dome
© Tim Stephenson
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
Galleries Mezzanine
February 28, 2016
ph +64 3 3272246 -
fax: +64 3 3272346
Layout Number
C 02
Revision F 28/02/2016
Revision F 15/12/2015
Revision E 19/11/2015
Revision C 23/ 09/ 2015
HM06 THE BRAIN
Digital Autopsy
HM10 The Heart
HM15The Eye
HM14 The Ear
HM12 The Nose
HM13 The Lungs
HM02 JOINTS AND ARTIFICAL JOINTS
HM04 strengthometer
HM03 MUSCLES
HM05 Sketeton moves
HM20 COCHLER IMPLANT
HM09 Cell model
HM17 GIANT HEART
HM16 CYCLING SKELETON
HM19 EYE MODEL
HM08 DNA puzzle
HM11 HEALTH ROBOT
HM21 DNA puzzle
HM18 FIRST AID
HM01 Body Scanner
PZ01 TOWER OF HANOI
ME04 GENERATOR MOTOR
ME16 magnetic field
ME02 Mighty Magnet
ME13 SOLAR POWER
ME06 Magnetic eddie currents
ME12 magnets in magnetic field
HM22 DESIGN A HUMAN
HM24 ENERGY FROM DEATH
HM25MAKE A MEAL
ME10 Magnetic sculpture
ME19 van de graaff
ME14 Wind Power
ME11 LEVITATING MAGNETS
ME07 electricity table
ME08Plasma Tube
ME17 electric motor
STAGE / LECTURE AREA.
LECTURES/ PERFORMANCE
DIFFERENT COLOURED CARPET
UTILISE EXISTING SEATING
S01 Whisper dish
S01 Whisper dish
ME09 chaotic pendulum
ME05 Electromagnet
ME03 GENERATOR
ME18 TRANSSITORS
Revision F 28/02/2016
Revision F 15/12/2015
Revision E 19/11/2015
Revision C 23/ 09/ 2015
Job Title
For
TECH DOME LAYOUT
Tech Dome
© Tim Stephenson
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 https://www.youtube.com/watch?v=xm1iwzOjwI4 )
For approx measurements use acrobat reader measuring tool- (instructions:
MEZZANINE FLOOR EXHIBITS
February 28, 2016
ph +64 3 3272246 -
fax: +64 3 3272346
Layout Number
C 04
scale 1:200
banner wall BW05
(deleted)
Screen Ass HS08
I- Interactive Board
move to observatory
deleted
HS09 new
Orientation Sign J4
Hex Tower H -09
Hex tower H -08
HS10 new
Hex Tower H -10
3.97 m
1
1
3
3
2
2
3
1
3
2
1
5.50 m
Screen Ass HS07
4.87 m
Hex Tower H -12
3.06 m
2
1
2
Hex Tower H- 11
3
3
2
1
2.98 m
2.69 m
1
2
3
3.98 m
1
2
3
2
1
3
3
4.82 m
8.04 m
5.37 m
2
1
I- Interactive Board
I- Interactive Board
Orientation sign J5
I- Interactive Board
Revision F 28/02/2016
Revision F 15/12/2015
Revision E 19/11/2015
Revision C 23/ 09/ 2015
Job Title
For
TECH DOME LAYOUT
Tech Dome
© Tim Stephenson
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
Exhibition design plan Mezzanine
February 28, 2016
ph +64 3 3272246 -
fax: +64 3 3272346
Layout Number
C 07
Scale 1:200
Description
2
d jack.
32
Power point double
40
Power point switched - single.
30
Electrical Components Legend MEZZANINE
D-2
9,100
30
HB
D
2
9,400
Quantity
data and power for projectors
5,770
4,350
5,608
D 2.4
22.4 0.0
2
D 0.0
0.0
0.0
2
D 2.4
2
2 2.4
0.0
2
0.0
2
1:1
0.0
0.0 0.0
2
2
0.0
0.0
D 2
0.0
2
0.0
2
0.0
2
2
0.0
0.0
0.0
D2
0.0
20.0 D
2
2,667
D 0.0
11,000
2
D 0.0
0.0
0.
4
0.
4
0.4
D-1
0.4
0.0
2
0.0
0.0
D 0.0
F2
2 0.0 D
D 0.0
2
0.0
0.4
0.4
0.4
D
D
0
0
0.4
0.4
0.0
0.4
2,880
2
D 0.0
0.0
2
0.0
0.0
D 0.0
F2
0.4
compressed air outlet to mezzanine
2,376
0.4
D 0.0
F2
0.0
D 0.0
0
2
0.0
2
0.0
1
D 0.0
2
0.0
D 0.0
D 0.0
0.4
0.4
0.4
D 0.0
2
0.0
2
0.
4
2
0.0
D
2,750 1,900
0.4
D 0.0
0.4
7,701
D
2,667
2
0.4
0.4
D
D
0.4
0.4
2,667
D 0.0
D 0.0
2
0.0
0.0
A
0
0
0.0
0.
4
2
0.0
2
0.0
D 0.0
D 2
0.
4
0.4
0.4
0.4
7,350
0.0
2
0.4
0.0
0.4
D 0.0
0.4
0.0
0.0
0.0
2
14,000
Symbol
2
D 0.0
4,350
9,100
12,750
1
MEZZANINE ELECTRICAL
1:200
Issue
ID
For
TECH DOME
Penang Tech Centre
Tim Stephenson Design
GSPublisherEngine 625.54.60.100
At
Job Title
51 Featherstone Ave Kairaki Beach
Kaiapoi 7630 New Zealand
Cell: 0275 532 784
Drawing Title
#Site Address1
#Site Address2
Phone: +64 3 327 2246
Drawing Number
MEZZANINE ELECTRICAL LAYOUT
Plot Date
Fax: +64 3 3272346
email: tim@ timstephenson.co.nz
7/03/2016
Drawn
A02
Tim Stephenson ALL DIMENSIONS TO BE VERIFIED ON SITE
C
D
D
ChID
D-1
D-2
Change Name
power data added
projectors deleted
Date
7/03/2016
05/10/2015
7/03/2016
18,936
4.01.05 Spots mounted on
HEX column
GU10lamp spots
(24deg) Mounted to
fitout column. Feed
from Mezzanine. see
schedule PARATHOM
PRO PAR16 50 24°
ADV 6.8 W/927
GU10,
4.01.10 Work Lights Below
Mezzanine
OSRAM Osram
Ledavance 840 19w
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
9
4
6
81
1
1
1
C
5
4.01.04 Bill Board Floods
OSRAM PURSOS or
similar on bars
C
5
C
5
C
C
4
4
4
4
4
4
4
4
C
C
5
C
5
1
C
C
5
5
1
C
7 7
5
5
C
C
5
5
9
10
7
1
5
C
C
5
C
5
5
7
C
5
5
5
C
C
C
1
1
C
1
C
C
C
C
C
C
C
1
1
C
6
6
1
1
C
C
5
1
C
5
C
5
1
5
5
1
5
5
C
C
C
C
C
1
2
2
7
7
7 7
7
lamps on track on truss
1
C
1
1
9
2
1
2
1
2
9
2
2
2
1
3
2
2
9
7
7
1
C
9
5
7
7
7
10
4.01.04 Bill Board Floods
OSRAM PURSOS or
7 similar on bars
C
5
5
this area to be
confirmed
7
1
5
7
7
1
1
1
1
11
1
C
1
5
5
C
7
4.01.04 Bill Board Floods
7 OSRAM PURSOS or
similar on bars
1
5
5
5
8
1
C
1
1
11
11
4.01.02 Lighting Track
for OSRAM SPOTS
(LEDVANCE TRACK
L ) Fix to Mezzanine
ceiling . Equal
spacing between
columns and at
Mezzanine edge.
7
1
C
1
5
9
1
C
11
existing store
future workshop?
9
1
7
C
1
5
5
1
5
C
1
9
4
7
5
5
1
5
1 5
4.01.04 Bill Board Floods
OSRAM PURSOS or
similar on bars
4
1
9
9
4.01.06 Spots mounted on
HEX column Free
GU10lamp spots
T.B.A (24deg?)
Mounted to fitout
column. Feed from
lighting grid
PARATHOM PRO
PAR16 50 24° ADV
6.8 W/927 GU10,
2
2
2
3
2
2
2
3
3
3
3
3
2
2
2
2
2
2
2
3
2
3
3
3
2
2
2
2
2
2
2
2
3
Luminaire parts list
Index
1
Manufacturer
OSRAM
Luminaire type
LEDVANCE® TRACK L
2
OSRAM
LEDVANCE Downlight
XL_840_19W
3
OSRAM
LEDVANCE® TRACK L
4
OSRAM
OSRAM
7
OSRAM
8
OSRAM
9
10
OSRAM
OSRAM
Luminous
flux
Fitting
1xLED 3000K /
load
Quantity
0.8
22 W
54
1970 lm
0.8
19 W
32
1200 lm
0.8
22 W
12
540 lm
0.8
7.5 W
27
700 lm
0.8
13.6 W
42
1xLED 3000K /
1200 lm
0.8
22 W
3
G8.5
5400 lm
0.8
80 W
23
2500 lm
0.8
44 W
2
1xLED
4700 lm
0.8
60 W
11
1xLED
9400 lm
0.8
120 W
2
1xLED 3000K /
CRI >= 90
1xLED 4000K / CRI >= 80
PUNCTOLEDCOB
loss
1200 lm
CRI >= 90
1xLED
2xPARATHOM PRO
Two Spot Bar
2x GU10
5
6
Item number
PAR16 50 24° ADV
6.8 W/927 GU10,
CRI >= 90
LEDVANCE® TRACK L
70W 24° GR
WDL PB Shoplight
LDV PWRSPOT XXL 840 L24 WT
1xLED
PURSOS 60W
PURSOS 120W
1
Main Floor lighting
1:200
Issue
ID
For
TECH DOME
Penang Tech Centre
Tim Stephenson Design
GSPublisherEngine 625.54.60.100
At
Job Title
51 Featherstone Ave Kairaki Beach
Kaiapoi 7630 New Zealand
Cell: 0275 532 784
Drawing
TitleFloor
Main
#Site Address1
#Site Address2
Phone: +64 3 327 2246
Plot Date
Fax: +64 3 3272346
email: tim@ timstephenson.co.nz
7/03/2016
Drawn
Lighting - reflected ceiling
(Mezz)
Drawing Number
A03
Tim Stephenson ALL DIMENSIONS TO BE VERIFIED ON SITE
C
D
D
Revision C 05/10/20105
ChID
Change Name
Date
05/10/2015
7/03/2016
7/03/2016
Working Drawings
The full set of construction drawings numbers over one hundred pages, plus dxf file and more.
Full Documentation includes:
Working drawings of all parts and assemblies.
DXF files for CNC manufacture of all parts.
A detailed Bill Of Materials for all parts including fasteners.
A detailed Schedule of all Assemblies and Printing.
A written specification covering all materials, parts, assemblies, installation and handling.
The following section is a sample of working drawings
only selected drawings have been included.
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Working Drawing
fax: +64 3 3272346
Layout Number
TD 06
07
08
03
02
01
04
06
05
09
10
Elevation
Scale 1:20
PANEL NOTATION FOR PRINT REFERENCE
HW#
#
- F#
- R#
ASSEMBLY NO. - SCREEN No. - FRONT FACE FOR POSTION NO. - REAR FACE
FOR POSTION NO
i.e. HW01-2 - F2 is the front face of position 02 on screen no. 2 on assembly HW01
Revision G 27/02/2016
Job Title
For
Hex Screen Assemblies
Tech Dome
© Tim Stephenson
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 17, 2016
ph +64 3 3272246 -
Panel Notation
fax: +64 3 3272346
Layout Number
HS
Long Strut E12
Long Strut E12
Brace assembly E03
Bolt fix here
Note goes in washer space
Brace assembly E03
Projector Bracket
Projector Bracket
Projector arm 1 ass
Projector arm 1 ass
5
4
1218 mm
6
Long Strut E14
Projection arm centre mounting
Plain Brace E03.1
Plain Brace E03.1
Refer seperate drawing
Long Strut E14
1
3
2
Brace assembly E03
goes in washer space
bolt through here
Brace assembly E03
refer seperate drawing
Long Strut E12
Long Strut E12
Plan
Projector arm 1 ass
Projector Bracket
Scale 1:20
Projection arm ends mounting
cut back inside skirting
Plan detail end
HS07
Job Title
For
Hex Screen Assemblies
Tech Dome
© Tim Stephenson
Hex screen assembly
Long Strut E14
Long Strut E12
Brace assembly E03
Projector arm 1 ass
Projector arm 2 ass Left and right
Projector Bracket
Plain Brace E03.1
6
2
4
4
1
2
3
2
M12 x 120 sleeve anchor
Bolt cover
M6 x 75 JCB and barrel nut 304 s/s
longer M6 jcb and nut
Revision G 27/02/2016
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
12
12
42
18
March 17, 2016
ph +64 3 3272246 -
HW07
fax: +64 3 3272346
Layout Number
HS 07
HEXSCREENS
SHEET AND PART INDEX
Sheet
E01-E02
E03
Parts Info
Part Name
n/a
Brace E03
Quantity (per screen) Part Notes
n/a
Assembly Drawing Only
Various depends on
assembly
Parts Material
Core
Finish
Welded hollow steel sections(50x
50 x 2 +
50 x 25 x 2mm)
Epoxy Powdercoat Satin Black
HDPE
Black
Plain Brace E03.1
4
M12 plastic cap
M6 x 75 JCB and barrel nut 304 s/s
E04
Skirting
E05
E06
E07
E08
E09
E10
Strut 1
Side Strut 1
Screen Panel
Screen Panel Small
Disk
Disk Spacer
washer
Long Strut E10
6
4
6
4
3
1
20
Various depends on
assembly
3 mm cold rolled steel
3 mm cold rolled steel
9 mm water resistant MDF
9 mm water resistant MDF
HDPE
HDPE
3 mm cold rolled steel
3 mm cold rolled steel
Epoxy Powdercoat Satin Black
Epoxy Powdercoat Satin Black
Melamine: White
Melamine: White
Black
Black
Epoxy Powdercoat Satin Black
Epoxy Powdercoat Satin Black
E11
Long Strut E11
Various depends on
assembly
3 mm cold rolled steel
Epoxy Powdercoat Satin Black
E12
Long Strut E12
Various depends on
assembly
3 mm cold rolled steel
Epoxy Powdercoat Satin Black
E13
Long Strut E13
Various depends on
assembly
3 mm cold rolled steel
Epoxy Powdercoat Satin Black
E14
Long Strut E14
Various depends on
assembly
3 mm cold rolled steel
Epoxy Powdercoat Satin Black
2
22
10g x ½ hex socket cap s/tap 304 s/s
M5 x 10 x 1 flat washer
204
204
13 mm tee edge
13 m
some panels are projected on
screw assembly
This is for one screen refer to assembly set for details of joiners
and print finishes. See hex screen printing schedule for panel
printing finshes
Panels can be replaced if damaged
SKIRTING
Two component manufacturing methods
laser cut and fold steel and CNC routered MDF
for simple accurate manufacture
exposed "techy" fixxings
Use dxf file for cutting
Job Title
For
HEX SCREEN
Tech Dome
© Tim Stephenson
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
September 7, 2015
ph +64 3 3272246 -
Cover Page
fax: +64 3 3272346
Layout Number
E 00
Brace E03
HDPE Skirting E04
Long Strut E10
Screen Panel Small E08
Note Braces vary depending on assembly refer
assembly drawings
Brace E03
Strut1 E05
Screen panel E07
On front side only, these holes to receive
3mm thick washer(spacer) between
Skirting
On front side only, these holes to
receive 3mm thick washer(spacer)
between Skirting
2 x HDPE Disk
Brace E03
Long Strut E10
Side E07
Long Strut E11
M6 JCB
Connection Detail
Small panel E09
Long Strut E12
Long Strut E13
Long Strut E14
Use dxf file for cutting
Job Title
For
HEX SCREEN
Tech Dome
© Tim Stephenson
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
September 7, 2015
ph +64 3 3272246 -
Screen Assembly
fax: +64 3 3272346
Layout Number
E01
3 mm cold rolled steel
Bend up 17 degrees
179.3 mm
1312.9 mm
22 x Dia 5 hole
Plan
Perspective
Scale 1:10
material: 3 mm cold rolled steel
finish epoxy powdercoat satin black
debur all edges
Use dxf file for cutting
Job Title
For
HEX SCREEN
Tech Dome
© Tim Stephenson
At
Drawing
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
September 7, 2015
ph +64 3 3272246 -
Strut1
fax: +64 3 3272346
Layout Number
E05
Direct UV print to melamine board
see drawing H03
Penang ID to provide board
H02
H03
Plot
2
3
1
2
3
Tim Stephenson
TECH DOME
51 Featherstone Ave Kairaki Beach
1
Kaiapoi 7630 New Zealand
Cell: 0275 532
Phone: +64 3 327
email: tim@ timstephenson.co.nz
7/11/2015
3
Penang Tech Centre
2
Job Title
1
Fax: +64 3
Draw
Tim Stephenson
Hex tower graphics
Drawing
M01
ALL DIMENSIONS TO BE VERIFIED ON SITE
2406 mm
allow for 3 mm bleed top and bottom only
note sides are covered
H01
2 off each file
894mm
Translation
for instructions only.
Full translations availble on Interactive Board
available in each gallery.
Themed colour for different galleries
Illustration
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Graphic Panels
fax: +64 3 3272346
Layout Number
TD 07
Construction of Prototypes in Malaysia
Construction is generally confined to CNC steel
cut and fold parts and CNC cut printed MDF
panels. That way parts are accurate, repeatable,
cost effiective, fast to manufacture and we know
what we are getting.
Drawing
WORK EXAMPLE
© Tim Stephenson
Tech Dome
Penang
Plot date
TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 -
March 28, 2016
ph +64 3 3272246 -
Prototype Construction
fax: +64 3 3272346
Layout Number
TD 08