Tech Dome Penang. Project Notes Project Description: Completion date: This project is nearing completion, opening the beginning of June 2016. It is a project in which I contracted to Science Alive Exhibits ltd who in turn have contracted to Tech Dome Penang to build 101 exhibits here and provide exhibition design. mid 2016 Tim Stephenson Design’s Involvement. My role is as Exhibition Designer. In that role I have: • Worked out the layout for a predetermined set of exhibits. • Designed the visual look of the exhibition galleries and divided the space. • Designed and documented the interior fitout for the exhibition space. That includes full working drawings, specifications and production ready CNC files for that to be built by contractors in Malaysia. • Designed and documented the modular exhibit table to be used on most of the exhibits. This includes full working drawings,specifications and production ready CNC files for that to be built by contractors in Malaysia. • Produced and delivered various presentations. • Designed and produced print ready files for all the explanatory exhibit graphic panels from content supplied by Science Alive. • Design for electronic orientation signage. • Design storyboard / template for interactive boards. • Designed a detailed lighting plan for implementation by contractors in Penang. • Detailed a mechanical and electrical layout for implementation by contractors in Penang. • Because I have traveled to site a several times I have become the main point of contact with the client and have therefore handled many other tasks outside of my original brief. Video File As space is limited I will attach a dropbox link to an overview presentation. Note this was done at very short notice so is a little rough around the edges in some places. But it does give a good feel for the project in a short time. https://www.dropbox.com/s/96vxlcg8btcmukz/TD-CM-Presenation.mp4?dl=0 Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Project Notes fax: +64 3 3272346 Layout Number TD 01 Mezzanine Floor Concept - gallery dividers and towers Tech Dome is built in a 44m diameter Dome with a mezzanine. There is also a large annex for cafe, two temporary exhibit spaces, kids discover area, observatory classrooms and labs. For the purposes of this I have confined it to the dome area. Main Floor Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Concept Sketches -1 fax: +64 3 3272346 Layout Number TD 02 Project on these panels lighting Hexagonal Screens Hexagonal Towers Space efficient layout of exhibits. Provides lighting ( a challenge in this space) Provide theming graphics, Can be relatively easily repositioned. Distribute power and data. Easy to re-theme. Mounting of some exhibits and graphic panels Divide gallery space Provide Theming Graphics, Can be relativly easily repositioned. Projection for moving images. Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Concept Sketches - 2 fax: +64 3 3272346 Layout Number TD 03 Interactive Board Electronic Orientaion Signage Board 65 in Monitor. Networked with update for daily events. Laser sensor interactive projection board. Effiectivly a 90 inch multi touch screen. Provides full translation. Provides more in depth information. Interactive map. Teachers aid. Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Concept Sketches -3 fax: +64 3 3272346 Layout Number TD 04 The following section is a selection of Spatial -layout drawings only selectected drawings have been included Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Layout section fax: +64 3 3272346 Layout Number TD 05 LIFE TECH ELECTROMAGNETISM REVISION D 2/11/2015 Job Title For TECH DOME LAYOUT Tech Dome © Tim Stephenson At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - Galleries Mezzanine February 28, 2016 ph +64 3 3272246 - fax: +64 3 3272346 Layout Number C 02 Revision F 28/02/2016 Revision F 15/12/2015 Revision E 19/11/2015 Revision C 23/ 09/ 2015 HM06 THE BRAIN Digital Autopsy HM10 The Heart HM15The Eye HM14 The Ear HM12 The Nose HM13 The Lungs HM02 JOINTS AND ARTIFICAL JOINTS HM04 strengthometer HM03 MUSCLES HM05 Sketeton moves HM20 COCHLER IMPLANT HM09 Cell model HM17 GIANT HEART HM16 CYCLING SKELETON HM19 EYE MODEL HM08 DNA puzzle HM11 HEALTH ROBOT HM21 DNA puzzle HM18 FIRST AID HM01 Body Scanner PZ01 TOWER OF HANOI ME04 GENERATOR MOTOR ME16 magnetic field ME02 Mighty Magnet ME13 SOLAR POWER ME06 Magnetic eddie currents ME12 magnets in magnetic field HM22 DESIGN A HUMAN HM24 ENERGY FROM DEATH HM25MAKE A MEAL ME10 Magnetic sculpture ME19 van de graaff ME14 Wind Power ME11 LEVITATING MAGNETS ME07 electricity table ME08Plasma Tube ME17 electric motor STAGE / LECTURE AREA. LECTURES/ PERFORMANCE DIFFERENT COLOURED CARPET UTILISE EXISTING SEATING S01 Whisper dish S01 Whisper dish ME09 chaotic pendulum ME05 Electromagnet ME03 GENERATOR ME18 TRANSSITORS Revision F 28/02/2016 Revision F 15/12/2015 Revision E 19/11/2015 Revision C 23/ 09/ 2015 Job Title For TECH DOME LAYOUT Tech Dome © Tim Stephenson At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 https://www.youtube.com/watch?v=xm1iwzOjwI4 ) For approx measurements use acrobat reader measuring tool- (instructions: MEZZANINE FLOOR EXHIBITS February 28, 2016 ph +64 3 3272246 - fax: +64 3 3272346 Layout Number C 04 scale 1:200 banner wall BW05 (deleted) Screen Ass HS08 I- Interactive Board move to observatory deleted HS09 new Orientation Sign J4 Hex Tower H -09 Hex tower H -08 HS10 new Hex Tower H -10 3.97 m 1 1 3 3 2 2 3 1 3 2 1 5.50 m Screen Ass HS07 4.87 m Hex Tower H -12 3.06 m 2 1 2 Hex Tower H- 11 3 3 2 1 2.98 m 2.69 m 1 2 3 3.98 m 1 2 3 2 1 3 3 4.82 m 8.04 m 5.37 m 2 1 I- Interactive Board I- Interactive Board Orientation sign J5 I- Interactive Board Revision F 28/02/2016 Revision F 15/12/2015 Revision E 19/11/2015 Revision C 23/ 09/ 2015 Job Title For TECH DOME LAYOUT Tech Dome © Tim Stephenson At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - Exhibition design plan Mezzanine February 28, 2016 ph +64 3 3272246 - fax: +64 3 3272346 Layout Number C 07 Scale 1:200 Description 2 d jack. 32 Power point double 40 Power point switched - single. 30 Electrical Components Legend MEZZANINE D-2 9,100 30 HB D 2 9,400 Quantity data and power for projectors 5,770 4,350 5,608 D 2.4 22.4 0.0 2 D 0.0 0.0 0.0 2 D 2.4 2 2 2.4 0.0 2 0.0 2 1:1 0.0 0.0 0.0 2 2 0.0 0.0 D 2 0.0 2 0.0 2 0.0 2 2 0.0 0.0 0.0 D2 0.0 20.0 D 2 2,667 D 0.0 11,000 2 D 0.0 0.0 0. 4 0. 4 0.4 D-1 0.4 0.0 2 0.0 0.0 D 0.0 F2 2 0.0 D D 0.0 2 0.0 0.4 0.4 0.4 D D 0 0 0.4 0.4 0.0 0.4 2,880 2 D 0.0 0.0 2 0.0 0.0 D 0.0 F2 0.4 compressed air outlet to mezzanine 2,376 0.4 D 0.0 F2 0.0 D 0.0 0 2 0.0 2 0.0 1 D 0.0 2 0.0 D 0.0 D 0.0 0.4 0.4 0.4 D 0.0 2 0.0 2 0. 4 2 0.0 D 2,750 1,900 0.4 D 0.0 0.4 7,701 D 2,667 2 0.4 0.4 D D 0.4 0.4 2,667 D 0.0 D 0.0 2 0.0 0.0 A 0 0 0.0 0. 4 2 0.0 2 0.0 D 0.0 D 2 0. 4 0.4 0.4 0.4 7,350 0.0 2 0.4 0.0 0.4 D 0.0 0.4 0.0 0.0 0.0 2 14,000 Symbol 2 D 0.0 4,350 9,100 12,750 1 MEZZANINE ELECTRICAL 1:200 Issue ID For TECH DOME Penang Tech Centre Tim Stephenson Design GSPublisherEngine 625.54.60.100 At Job Title 51 Featherstone Ave Kairaki Beach Kaiapoi 7630 New Zealand Cell: 0275 532 784 Drawing Title #Site Address1 #Site Address2 Phone: +64 3 327 2246 Drawing Number MEZZANINE ELECTRICAL LAYOUT Plot Date Fax: +64 3 3272346 email: tim@ timstephenson.co.nz 7/03/2016 Drawn A02 Tim Stephenson ALL DIMENSIONS TO BE VERIFIED ON SITE C D D ChID D-1 D-2 Change Name power data added projectors deleted Date 7/03/2016 05/10/2015 7/03/2016 18,936 4.01.05 Spots mounted on HEX column GU10lamp spots (24deg) Mounted to fitout column. Feed from Mezzanine. see schedule PARATHOM PRO PAR16 50 24° ADV 6.8 W/927 GU10, 4.01.10 Work Lights Below Mezzanine OSRAM Osram Ledavance 840 19w 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 9 4 6 81 1 1 1 C 5 4.01.04 Bill Board Floods OSRAM PURSOS or similar on bars C 5 C 5 C C 4 4 4 4 4 4 4 4 C C 5 C 5 1 C C 5 5 1 C 7 7 5 5 C C 5 5 9 10 7 1 5 C C 5 C 5 5 7 C 5 5 5 C C C 1 1 C 1 C C C C C C C 1 1 C 6 6 1 1 C C 5 1 C 5 C 5 1 5 5 1 5 5 C C C C C 1 2 2 7 7 7 7 7 lamps on track on truss 1 C 1 1 9 2 1 2 1 2 9 2 2 2 1 3 2 2 9 7 7 1 C 9 5 7 7 7 10 4.01.04 Bill Board Floods OSRAM PURSOS or 7 similar on bars C 5 5 this area to be confirmed 7 1 5 7 7 1 1 1 1 11 1 C 1 5 5 C 7 4.01.04 Bill Board Floods 7 OSRAM PURSOS or similar on bars 1 5 5 5 8 1 C 1 1 11 11 4.01.02 Lighting Track for OSRAM SPOTS (LEDVANCE TRACK L ) Fix to Mezzanine ceiling . Equal spacing between columns and at Mezzanine edge. 7 1 C 1 5 9 1 C 11 existing store future workshop? 9 1 7 C 1 5 5 1 5 C 1 9 4 7 5 5 1 5 1 5 4.01.04 Bill Board Floods OSRAM PURSOS or similar on bars 4 1 9 9 4.01.06 Spots mounted on HEX column Free GU10lamp spots T.B.A (24deg?) Mounted to fitout column. Feed from lighting grid PARATHOM PRO PAR16 50 24° ADV 6.8 W/927 GU10, 2 2 2 3 2 2 2 3 3 3 3 3 2 2 2 2 2 2 2 3 2 3 3 3 2 2 2 2 2 2 2 2 3 Luminaire parts list Index 1 Manufacturer OSRAM Luminaire type LEDVANCE® TRACK L 2 OSRAM LEDVANCE Downlight XL_840_19W 3 OSRAM LEDVANCE® TRACK L 4 OSRAM OSRAM 7 OSRAM 8 OSRAM 9 10 OSRAM OSRAM Luminous flux Fitting 1xLED 3000K / load Quantity 0.8 22 W 54 1970 lm 0.8 19 W 32 1200 lm 0.8 22 W 12 540 lm 0.8 7.5 W 27 700 lm 0.8 13.6 W 42 1xLED 3000K / 1200 lm 0.8 22 W 3 G8.5 5400 lm 0.8 80 W 23 2500 lm 0.8 44 W 2 1xLED 4700 lm 0.8 60 W 11 1xLED 9400 lm 0.8 120 W 2 1xLED 3000K / CRI >= 90 1xLED 4000K / CRI >= 80 PUNCTOLEDCOB loss 1200 lm CRI >= 90 1xLED 2xPARATHOM PRO Two Spot Bar 2x GU10 5 6 Item number PAR16 50 24° ADV 6.8 W/927 GU10, CRI >= 90 LEDVANCE® TRACK L 70W 24° GR WDL PB Shoplight LDV PWRSPOT XXL 840 L24 WT 1xLED PURSOS 60W PURSOS 120W 1 Main Floor lighting 1:200 Issue ID For TECH DOME Penang Tech Centre Tim Stephenson Design GSPublisherEngine 625.54.60.100 At Job Title 51 Featherstone Ave Kairaki Beach Kaiapoi 7630 New Zealand Cell: 0275 532 784 Drawing TitleFloor Main #Site Address1 #Site Address2 Phone: +64 3 327 2246 Plot Date Fax: +64 3 3272346 email: tim@ timstephenson.co.nz 7/03/2016 Drawn Lighting - reflected ceiling (Mezz) Drawing Number A03 Tim Stephenson ALL DIMENSIONS TO BE VERIFIED ON SITE C D D Revision C 05/10/20105 ChID Change Name Date 05/10/2015 7/03/2016 7/03/2016 Working Drawings The full set of construction drawings numbers over one hundred pages, plus dxf file and more. Full Documentation includes: Working drawings of all parts and assemblies. DXF files for CNC manufacture of all parts. A detailed Bill Of Materials for all parts including fasteners. A detailed Schedule of all Assemblies and Printing. A written specification covering all materials, parts, assemblies, installation and handling. The following section is a sample of working drawings only selected drawings have been included. Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Working Drawing fax: +64 3 3272346 Layout Number TD 06 07 08 03 02 01 04 06 05 09 10 Elevation Scale 1:20 PANEL NOTATION FOR PRINT REFERENCE HW# # - F# - R# ASSEMBLY NO. - SCREEN No. - FRONT FACE FOR POSTION NO. - REAR FACE FOR POSTION NO i.e. HW01-2 - F2 is the front face of position 02 on screen no. 2 on assembly HW01 Revision G 27/02/2016 Job Title For Hex Screen Assemblies Tech Dome © Tim Stephenson At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 17, 2016 ph +64 3 3272246 - Panel Notation fax: +64 3 3272346 Layout Number HS Long Strut E12 Long Strut E12 Brace assembly E03 Bolt fix here Note goes in washer space Brace assembly E03 Projector Bracket Projector Bracket Projector arm 1 ass Projector arm 1 ass 5 4 1218 mm 6 Long Strut E14 Projection arm centre mounting Plain Brace E03.1 Plain Brace E03.1 Refer seperate drawing Long Strut E14 1 3 2 Brace assembly E03 goes in washer space bolt through here Brace assembly E03 refer seperate drawing Long Strut E12 Long Strut E12 Plan Projector arm 1 ass Projector Bracket Scale 1:20 Projection arm ends mounting cut back inside skirting Plan detail end HS07 Job Title For Hex Screen Assemblies Tech Dome © Tim Stephenson Hex screen assembly Long Strut E14 Long Strut E12 Brace assembly E03 Projector arm 1 ass Projector arm 2 ass Left and right Projector Bracket Plain Brace E03.1 6 2 4 4 1 2 3 2 M12 x 120 sleeve anchor Bolt cover M6 x 75 JCB and barrel nut 304 s/s longer M6 jcb and nut Revision G 27/02/2016 At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - 12 12 42 18 March 17, 2016 ph +64 3 3272246 - HW07 fax: +64 3 3272346 Layout Number HS 07 HEXSCREENS SHEET AND PART INDEX Sheet E01-E02 E03 Parts Info Part Name n/a Brace E03 Quantity (per screen) Part Notes n/a Assembly Drawing Only Various depends on assembly Parts Material Core Finish Welded hollow steel sections(50x 50 x 2 + 50 x 25 x 2mm) Epoxy Powdercoat Satin Black HDPE Black Plain Brace E03.1 4 M12 plastic cap M6 x 75 JCB and barrel nut 304 s/s E04 Skirting E05 E06 E07 E08 E09 E10 Strut 1 Side Strut 1 Screen Panel Screen Panel Small Disk Disk Spacer washer Long Strut E10 6 4 6 4 3 1 20 Various depends on assembly 3 mm cold rolled steel 3 mm cold rolled steel 9 mm water resistant MDF 9 mm water resistant MDF HDPE HDPE 3 mm cold rolled steel 3 mm cold rolled steel Epoxy Powdercoat Satin Black Epoxy Powdercoat Satin Black Melamine: White Melamine: White Black Black Epoxy Powdercoat Satin Black Epoxy Powdercoat Satin Black E11 Long Strut E11 Various depends on assembly 3 mm cold rolled steel Epoxy Powdercoat Satin Black E12 Long Strut E12 Various depends on assembly 3 mm cold rolled steel Epoxy Powdercoat Satin Black E13 Long Strut E13 Various depends on assembly 3 mm cold rolled steel Epoxy Powdercoat Satin Black E14 Long Strut E14 Various depends on assembly 3 mm cold rolled steel Epoxy Powdercoat Satin Black 2 22 10g x ½ hex socket cap s/tap 304 s/s M5 x 10 x 1 flat washer 204 204 13 mm tee edge 13 m some panels are projected on screw assembly This is for one screen refer to assembly set for details of joiners and print finishes. See hex screen printing schedule for panel printing finshes Panels can be replaced if damaged SKIRTING Two component manufacturing methods laser cut and fold steel and CNC routered MDF for simple accurate manufacture exposed "techy" fixxings Use dxf file for cutting Job Title For HEX SCREEN Tech Dome © Tim Stephenson At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - September 7, 2015 ph +64 3 3272246 - Cover Page fax: +64 3 3272346 Layout Number E 00 Brace E03 HDPE Skirting E04 Long Strut E10 Screen Panel Small E08 Note Braces vary depending on assembly refer assembly drawings Brace E03 Strut1 E05 Screen panel E07 On front side only, these holes to receive 3mm thick washer(spacer) between Skirting On front side only, these holes to receive 3mm thick washer(spacer) between Skirting 2 x HDPE Disk Brace E03 Long Strut E10 Side E07 Long Strut E11 M6 JCB Connection Detail Small panel E09 Long Strut E12 Long Strut E13 Long Strut E14 Use dxf file for cutting Job Title For HEX SCREEN Tech Dome © Tim Stephenson At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - September 7, 2015 ph +64 3 3272246 - Screen Assembly fax: +64 3 3272346 Layout Number E01 3 mm cold rolled steel Bend up 17 degrees 179.3 mm 1312.9 mm 22 x Dia 5 hole Plan Perspective Scale 1:10 material: 3 mm cold rolled steel finish epoxy powdercoat satin black debur all edges Use dxf file for cutting Job Title For HEX SCREEN Tech Dome © Tim Stephenson At Drawing Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - September 7, 2015 ph +64 3 3272246 - Strut1 fax: +64 3 3272346 Layout Number E05 Direct UV print to melamine board see drawing H03 Penang ID to provide board H02 H03 Plot 2 3 1 2 3 Tim Stephenson TECH DOME 51 Featherstone Ave Kairaki Beach 1 Kaiapoi 7630 New Zealand Cell: 0275 532 Phone: +64 3 327 email: tim@ timstephenson.co.nz 7/11/2015 3 Penang Tech Centre 2 Job Title 1 Fax: +64 3 Draw Tim Stephenson Hex tower graphics Drawing M01 ALL DIMENSIONS TO BE VERIFIED ON SITE 2406 mm allow for 3 mm bleed top and bottom only note sides are covered H01 2 off each file 894mm Translation for instructions only. Full translations availble on Interactive Board available in each gallery. Themed colour for different galleries Illustration Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Graphic Panels fax: +64 3 3272346 Layout Number TD 07 Construction of Prototypes in Malaysia Construction is generally confined to CNC steel cut and fold parts and CNC cut printed MDF panels. That way parts are accurate, repeatable, cost effiective, fast to manufacture and we know what we are getting. Drawing WORK EXAMPLE © Tim Stephenson Tech Dome Penang Plot date TIM STEPHENSON DESIGN - [email protected] - +64 275 532 784 - March 28, 2016 ph +64 3 3272246 - Prototype Construction fax: +64 3 3272346 Layout Number TD 08
© Copyright 2026 Paperzz