Brent Spence Bridge Replacement Project Cincinnati, Ohio

Brent Spence Bridge Replacement Project
Type: Cable Supported Bridge
Services: Conceptual Design, Type Study
Selection, Preliminary Design,
Community Participation and
Architectural Visualizations
Cost: $650 Million
Completion Date: N/A
Client: K
entucky Transportation Cabinet
District 6
Mr. Robert Hans
Project Manager
Phone: 859.341.2700 ext. 256
email: [email protected]
10 Derne Street, MA 02114
Cincinnati, Ohio
R+P
The new Brent Spence Bridge will cross the Ohio River next to downtown
Cincinnati, Ohio. The new interstate will accommodate multiple lanes for both
I-71 and I-75 and will be vital to long-distance state and national commerce.
The bridge will be a double deck cable supported structure that will clearly
announce the entrance to the city from a distance. The main clear span of the
bridge is approximately 1000’ (305m) with an exceptional width of approximately
155’ (47m). The single tower of the cable stayed bridge will have a height of
500’ (152.5m) making it visible from afar and a counterpoint to the high rise
buildings in downtown. The new bridge will clearly mark the river crossing from
a distance making it an important landmark and a major thoroughfare for local
and regional mobility.
t 617 247 7499 f 617 723 6892
[email protected]
www.rosalespartners.com