Standard Operating Procedures The Standard Operation Documents Where Key Point Reason No. Work Element Take kettle to tap, fill 1 for 1 mug with water and return 2 Plug in kettle and switch on Key Point Use kettle filler gauge. See Fig. 1. Take care not to get water on electric connectors Safety Quality Photo/Sketch Ease Save water and electricity What and how Danger of electric shock How long Documenting the Standard Operations Standardised Work Chart Organisation ACME Area Part Name/Number From: Job Content To: Taste tea 2 3 Collect mug from top cupboard, bottom shelf Get sugar and spoon 7 Wait for kettle to boil Chart headingmugs information tea Pour hot water in mug Standard In 9 Wait for tea to fully brew Process Stock 10 Remove tea bag and add sugar 11 Walk to fridge with mug, add milk 12 Stir and taste tea Employee Movement: Symbol 08/02/2007 2 180 s Diagram of the area tap or milk a flow chart kettle bags sugar 4 6 5 3 7-10 12 2 1 spoons Movement of employee and materials 8 Issue Date Takt Time Working4 Sequence Select tea bag from tea caddy on work top Steps 5 Place tea bag in mug 6 C Brown Issue Number Take kettle to tap Working Sequence Steps Take kettle to tap, fill for 1 mug with water and return Plug in kettle and switch on 1 Standardised Work Chart Mug of Tea Created By 11 2.4m No. Kitchen 4.2m Safety and quality key points Material Movement: Standard In-Process Stock Total Number In Cell n/a Safety Quality Check Cycle Time 76 seconds The completed chart Organisation ACME Area Kitchen Part Name/Number Mug of Tea From: Job Content To: Take kettle to tap C Brown Issue Date 08/02/2007 Issue Number Taste tea Takt Time 2 180 s Working Sequence Steps 1 Take kettle to tap, fill for 1 mug with water and return 2 Plug in kettle and switch on 3 Collect mug from top cupboard, bottom shelf 4 Select tea bag from tea caddy on work top mugs kettle tea bags sugar 4 6 5 3 7-10 Place tea bag in mug 6 Get sugar and spoon 7 Wait for kettle to boil 8 Pour hot water in mug 9 Wait for tea to fully brew 10 Remove tea bag and add sugar 11 Walk to fridge with mug, add milk 12 Stir and taste tea milk 12 2 1 spoons 5 tap 11 2.4m No. Standardised Work Chart Created By 4.2m Employee Movement: Material Movement: Standard In-Process Stock Symbol Total Number In Cell n/a Safety Quality Check Cycle Time 76 seconds Job Detail Sheet Organisation Area Part Name/ Number Working Sequence Step ACME Chart Kitchen heading Mug of Tea information Steps 1 to 12 Operation / Process No. Initial Creation Date No. Work Element 1 Take kettle to tap, fill for 1 mug with water and return 2 Plug in kettle and switch on Job Detail Sheet 30 Collect mug from top cupboard, bottom shelf 4 Select tea bag from tea caddy on work top 5 Place tea bag in mug 6 Get sugar and spoon C Brown Issue Date 08/02/2007 Issue Number 05/10/2006 2 Takt time Key Point Key Point Reason Use kettle filler gauge. See Fig. 1. Safety Quality 180 s Photo/Sketch Ease Save water and electricity Take care not to get water on electric connectors Detailed work 3 elements Created By Key points highlighting essential detail Danger of electric shock Easy to reach Key point reason: Safety, quality or ease Filler gauge Fig. 1 7 Wait for kettle to boil 8 Pour hot water in mug Take care not to spill Risk of scalding Prevent weak tea 9 Wait for tea to fully brew Description of any 10 PPE required Do not use wet spoon in sugar Remove tea bag and add sugar 11 Key preparation activities Photo or sketch to explain detail Makes sugar lumpy Walk to fridge with mug, add milk 2 Confirm tea is to taste 12 08/02/2007 Fig. 1 new picture Assure customer satisfaction Stir and taste tea Rev. Date Eye Protection PPE Required: (Write specification) Ear Protection Foot Protection Hand Protection Other PE Content of revision Key Preparation Activities 1. Switch on electricity at mains board. The completed sheet Organisation ACME Area Kitchen Part Name/ Number Working Sequence Step Mug of Tea Steps 1 to 12 Operation / Process No. Initial Creation Date No. 30 Take kettle to tap, fill for 1 mug with water and return 2 Plug in kettle and switch on 3 Collect mug from top cupboard, bottom shelf 4 Select tea bag from tea caddy on work top 5 Place tea bag in mug 6 Get sugar and spoon 7 Wait for kettle to boil 8 Pour hot water in mug 9 Wait for tea to fully brew C Brown Issue Date 08/02/2007 Issue Number 05/10/2006 Work Element 1 Job Detail Sheet Created By Key Point Use kettle filler gauge. See Fig. 1. Take care not to get water on electric connectors 2 Takt time Key Point Reason Safety Quality 180 s Photo/Sketch Ease Save water and electricity Danger of electric shock Easy to reach Filler gauge Fig. 1 Take care not to spill Risk of scalding Prevent weak tea 10 Remove tea bag and add sugar 11 Walk to fridge with mug, add milk Do not use wet spoon in sugar Makes sugar lumpy Confirm tea is to taste Assure customer satisfaction 2 12 08/02/2007 Fig. 1 new picture Stir and taste tea Rev. Date Eye Protection PPE Required: (Write specification) Ear Protection Foot Protection Hand Protection Other PE Content of revision Key Preparation Activities 1. Switch on electricity at mains board. Standardised Work Combination Table Chart heading information Detailed work elements The time for each work element A chart illustrating the times The completed table
© Copyright 2026 Paperzz