Dominion Transmission, Inc. 701 East Cary Street, Richmond, VA 23219 July 17, 2015 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Atlantic Coast Pipeline, LLC & Dominion Transmission, Inc. Atlantic Coast Pipeline & Supply Header Projects Docket Nos. PF15-6-000 & PF15-5-000 Monthly Status Report: June 2015 Dear Secretary Bose: On November 13, 2014, the Federal Energy Regulatory Commission (Commission) approved Atlantic Coast Pipeline, LLC and Dominion Transmission, Inc. (DTI)’s request to utilize the pre-filing process for the Atlantic Coast Pipeline and Supply Header Projects (Projects). As required under 18 CFR 157.21(f)(6), DTI, on behalf of Atlantic Coast Pipeline, LLC, and itself, hereby submits the June 2015 monthly status report for the Projects. If you have any questions, please contact me at 866-319-3382. Respectfully submitted, Angela M. Woolard Angela M. Woolard Regulatory and Certificates Analyst III cc: Mr. Kevin Bowman, FERC Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 1 The following monthly status report summarizes the activities for the Atlantic Coast Pipeline (ACP) and the Supply Header Project (SHP) for the month of June 2015. I. Surveys A. Engineering / Right-of-Ways / Facility Sites Atlantic Coast Pipeline • • Pipeline Corridor o Routing surveys have been completed for approximately 76 miles in WV, 205 miles in VA, and 191 miles in NC (a combined total of approximately 472 miles or 84% of the route). o Civil surveys have been completed for approximately 74 miles in WV, 204 miles in VA, and 191 miles in NC (a combined total of approximately 469 miles or 83% of the route). Compressor Stations o ACP Compressor Station No. 1 – Sound study completed. Wetlands field work completed. o ACP Compressor Station No. 2 – Sound study completed. Purchase option agreement executed. Wetlands field work completed. o ACP Compressor Station No. 3 – Sound study completed. Purchase option agreement executed. Wetlands field work completed. Supply Header Project • Pipeline Corridor o Routing and civil surveys were completed for approximately 30 miles in WV (approximately 92% of the route in WV) previously. o Routing and civil surveys were completed for approximately 4 miles in PA (100% of the route in PA) previously. • Compressor Stations o Sound study reports have been completed for Mockingbird Hill, Crayne, and JB Tonkin Compressor Stations. Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 2 B. Environmental Atlantic Coast Pipeline • • Pipeline Corridor o Wetland and waterbody surveys have been completed for approximately 69 miles in WV, 199 miles in VA, and 188 miles in NC (a combined total of approximately 456 miles or 81% of the route). o Cultural resources surveys have been completed for approximately 68 miles in WV, 196 miles in VA, and 186 miles in NC (a combined total of approximately 450 miles or 80% of the route). o Field surveys for several species are ongoing (cow knob salamander and statelisted salamanders in VA, state-listed plants in VA and NC, and bats in VA and NC). Compressor Stations o Wetland/waterbody and cultural resources surveys have been completed at the proposed locations for Compressor Stations 1, 2, and 3. Supply Header Project • • Pipeline Corridor o Wetland and waterbody surveys have been completed for approximately 4 miles in PA (100% of the route) and approximately 28 miles in WV (approximately 86% of the route). o Cultural resources surveys have been completed for approximately 4 miles in PA (100% of the route) and approximately 29 miles in WV (approximately 90% of the route). o Field surveys for bats are ongoing in PA and WV. Compressor Stations o Wetland/waterbody and cultural resources surveys have been completed on land adjacent to the existing J.B. Tonkin, Crayne, and Mockingbird Hill Compressor Stations. II. Stakeholder Communications A. Governmental Officials (Federal, State, and Local) Atlantic Coast Pipeline The following ACP Stakeholder Contact Table update identifies stakeholder communications with federal, state, and local officials that occurred in June 2015. Additionally, it Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 3 contains a few instances of additional previous governmental official communications that occurred prior to June 2015 but were not captured in previous reporting. Stakeholder & Address Contact Telephone Email Contact History/Comments Federal Elected Officials U.S. Senator Mark Warner 475 Russell Senate Office Building Washington, D.C. 20510 Ken Johnson, Legislative Assistant U.S. Senator Mark Warner 475 Russell Senate Office Building Washington, D.C. 20510 Ann Rust, State Director 202-224-2023 [email protected] Email on 6/30/15 (Project update) U.S. Senator Tim Kaine 388 Russell Senate Office Building Washington, D.C. 20510 Senator Tim Kaine 202-224-4024 In-person meeting on 5/18/15 (Project update) U.S. Senator Tim Kaine 388 Russell Senate Office Building Washington, D.C. 20510 Nick Barbash, Legislative Assistant 202-224-4024 [email protected] In-person meeting on 6/18/15 (Project update) Email on 6/30/15 (Project update) U.S. Senator Richard Burr 217 Russell Senate Office Building Washington, D.C. 20510 John McDonald, Legislative Assistant 202-224-3154 In-person meeting on 6/25/15 (Project update) U.S. Representative Randy Forbes 2135 Rayburn House Office Building Washington, D.C. 20515 Christopher Mandeval 202-225-6365 In-person meeting on 6/25/15 (Project update) Email on 6/30/15 (Project update) U.S. Representative Randy Forbes 505 Independence Parkway, Suite 104 Chesapeake, VA 23320 Curtis Byrd, District Director 757-382-0080 Email on 6/30/15 (Project update) U.S. Senator Rob Portman (Ohio) 448 Russell Senate Office Building Washington, D.C. 20510 Steve Kittredge , Legislative Assistant U.S. Senator Tim Kaine Diane Kaufman, Regional 222 Central Park Avenue, Suite Director 120 Virginia Beach, VA 23462 U.S. Senator Tim Kaine 388 Russell Senate Office Building Washington, D.C. 20510 John Knapp, State Director [email protected] In-person meeting on 6/4/15 e.gov (Project update) In-person meeting on 6/18/15 (Project update) Email on 6/25/15 (Project update) Email on 6/30/15 (Project update) 202-224-3353 [email protected] In-person meeting on 5/12/15 te.gov (Project update) 757-5181674 Email on 6/30/15 (Project update) Email on 6/30/15 (Project update) Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 4 Stakeholder & Address Contact Telephone Email Contact History/Comments U.S. Representative Robert Kelly Simpson, Chief of Staff 434-791-2596 [email protected] Hurt 308 Craghead St., Suite 102-D Danville, VA 24541 Email on 6/30/15 (Project update) John Lange, Legislative U.S. Representative Robert Assistant Hurt 308 Craghead St., Suite 102-D Danville, VA 24541 Email on 6/30/15 (Project update) 434-791-2596 Scott Leake, District U.S. Representative Robert Representative Hurt 308 Craghead St., Suite 102-D Danville, VA 24541 [email protected] Email on 6/30/15 (Project update) Other Federal Contacts House of Representatives Bill Cooper, Staff Director 202-225-2761 [email protected] In-person meeting on 6/17/15 Committee on Natural Kate MacGregor, Legislative [email protected] (Project overview) Resources and Sub-Committee Staff on Energy and Mineral Resources 1324 Longworth House Office Building Washington, DC 20515 State Elected Officials Delegate Terry Kilgore VA House of Delegates P.O. Box 669 Gate City, VA 24251 Delegate Terry Kilgore 276-386-7011 [email protected] Delegate Todd Pillion PO Box 406 Richmond, VA 23218 Delegate Todd Pillion 804-698-1004 [email protected] In-person meeting on 5/31/15 (Project overview) Representative Dean Arp Representative Dean Arp 300 N. Salisbury Street, Room Deputy Majority Whip 531 Raleigh, NC 27603 919-715-3007 [email protected] In-person meeting on 5/31/15 (Project overview) In-person meeting on 6/15/15 (Project overview and status update) Other State Contacts Virginia Cave Board 572 Spruce St. Monterey, VA 24465 Dan Doctor David Ek Virginia Department of Conservation and Recreation Tom Smith, Natural Heritage Division Director Clyde Cristman, Agency Director Larry Smith, NA Protection Manager Will Orndorff, Karst Protection Specialist Virginia Department of Mines, Phil Skorupa, Mining Minerals, and Energy supervisor David Spears, Geologist Matthew Heller, Geologist In-person meeting 5/26/15 (Project Overview) 804-786-4554 [email protected] In-person meeting 5/26/15 804-786-6124 [email protected] 804-371-6205 [email protected] 540-394-2552 [email protected] 804-692-3200 In-person meeting 5/28/15 (Project overview) Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 5 Stakeholder & Address Contact Virginia Department of Environmental Quality PO Box 1105 Richmond, VA 23218 James Golden Telephone Email Contact History/Comments In-person meeting 6/24/15 (Project overview) Local Officials Northampton County PO Box 808 Jackson, NC 27845 Gary Brown, Director County Economic Development 252-534-2501 Phone call and follow up email on 6/25/15 (Project overview) Nash County 120 W. Washington St., Suite 3072 Suite 3072 Nashville, NC 27856 Zee Lamb, County Manager Rosemary Dorsey, Asst. County Manager 252-459-9800 [email protected] Email on 6/2/15 emailed requested information from 5/29 phone call Supply Header Project • There are no SHP stakeholder communications with federal, state, or local officials to report for June 2015. B. Other Stakeholders Atlantic Coast Pipeline A summary of e-mails, phone calls, and in-person meetings with non-governmental, environmental, and other organizations is provided in the table below. Additionally, it contains a few instances of additional previous communications that occurred prior to June 2015 but were not captured in previous reporting. Stakeholder & Address Contact Telephone Email Contact History/Comments Non-governmental, environmental, and other organizations Appalachian Power 800-956-4237 Email on 4/21/15 (Project overview) Appalachian Trail Conservancy Andrew Downs, Regional 5162 Valleypointe Pkwy Director Roanoke, VA 24019 540-904-4354 [email protected] In-person meeting on 6/18/15 (Project overview) Appalachian Trail Conservancy Laura Belleville, Director of 5162 Valleypointe Pkwy Conservation Programs Roanoke, VA 24019 540-904-4393 [email protected] In-person meeting on 6/18/15 (Project overview) Babcock and Wilcox 13024 Ballantyne Corporate Place, Suite 700 Charlotte, NC 28277 Mark Dempsey Marshall Cohen, Vice 434-522-5165 President of Government Affairs and Communications Email on 3/31/15 (Project overview) Email on 5/1/2015 (Project introduction) Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 6 Stakeholder & Address Contact Telephone Babcock and Wilcox 13024 Ballantyne Corporate Place, Suite 700 Charlotte, NC Andrew Lemar 434-522-5165 Email on 3/31/15 (Project overview) Eastern Mennonite School 801 Parkwood Drive Harrisonburg, VA 22802 Gretchen Cessna, Earth Science Teacher 540-236-6000 In-person meeting on 6/9/15 (Project overview—tour of Lightburn Station and explanation/discussion of ACP) Enspire Energy 134 N. Battlefield Blvd Chesapeake, VA 23320 Mary Hensley, Director of Marketing 757-963-9123 [email protected] In-person meeting on 3/12/15 (Project overview) Friends of Augusta Nancy Sorrells Greater Dulles Chamber of Commerce 3901 Centerview Dr, Suite S Chantilly, VA 20151 Email Contact History/Comments In-person meeting 6/22/2015 703-787-8859 [email protected] In-person meeting 6/16/15 (Project overview) John Y. Wright 830 W. 39th St. Norfolk, VA 23508 Vince O’Brien, Owner 757-789-8012 [email protected] In-person meeting on 3/12/15 (Project overview) Lake Gaston Association P.O. Box 656 Littleton, NC 27850 Moira Underwood, Director 252-586-6577 In-person meeting on 6/3/15 (Project overview—provided info for upcoming meeting with their membership) In-person meeting on 6/13/15 (Project overview) MeadWestvaco 501 S. 5th St. Richmond, VA 23219 Ned Massee, Vice President Corporate Affairs 804-444-1000 Phone call on 3/13/15 (Project overview) National Federation of Independent Businesses, Virginia 919 E. Main St, Suite 1160 Richmond, VA 23219 Nicole Riley, NFIB/Virginia State Director 804-377-3661 In-person meeting on 5/20/15 (Project overview) Newport News Shipbuilding 4101 Washington Ave. Newport, VA 23607 Thomas Cosgrove 757-380-2000 Email on 4/16/15 (Project overview) North Carolina Chamber of Lew Ebert, President Commerce 701 Corporate Center Dr #400 Raleigh, NC 27607 919-836-1407 [email protected] In-person meeting 6/17/15 (Project update) North Carolina Petroleum Council 150 Fayetteville St. Raleigh, NC 27601 919-256-3646 In-person meeting 6/29/15 (Project update) David McGowan, Executive Director Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 7 Stakeholder & Address Contact Telephone North Carolina Technology Association 4020 Westchase Blvd Suite 350 Raleigh, NC 27607 Books Raiford, Executive Director 919-633-7972 In-person meeting 6/19/15 (Project update) North River Ruritan Club 3395 Scenic Hwy Rd. Mt. Solon, VA 22843 Mack Wilson Jim Grove, President 540-828-0626 In-person meeting on 5/19/15 (Project overview) Rudy Hawkins Electrical 600 West Hundred Road Chester, VA 23836 Travis Hawkins 804-796-9100 Phone call on 5/22/15 (Project overview) Smithfield Foods Adam Zubowsky 757-365-3000 Email on 3/23/15 (Project introduction) Email on 5/2/2015 (Project overview) STIHL 536 Viking Drive Virginia Beach, VA 23452 Scott Tilley, General Council 757-486-9100 and Executive Board Member Email on 3/23/15 (Project overview) Timmons Group 208 Golden Oak Ct. #230 Virginia Beach, VA 23452 Joe Hines, Economic Development 804-200-6380 [email protected] Phone call on 3/13/15 (Project overview) Trout Unlimited (National, WV Katy Dunlap and VA representatives) 9281 Cayutaville Road Alpine, NY 14805 607 742-3331 [email protected] In person meeting/presentation on 6/16/15 (Trout Unlimited areas of concern) The Nature Conservancy (VA, Michael L. Lipford NC, and WV Chapters) Thomas Minney 530 East Main Street, Suite 800, Richmond, VA 23219 804-644-5800 [email protected] 304-637-0160 [email protected] In person meeting/presentation on 6/1/15 (Update on project status) Universal Pegasus 715-425-6000 Email on 4/8/15 (Project overview) 804-643-3555 Email on 5/2/2015 (Project introduction) Tim Brown, Senior Vice President—Business Development Virginia Agribusiness Council Katie Frazier, President PO Box 718 Richmond, VA 23218 Email Contact History/Comments Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 8 Stakeholder & Address Contact Telephone Email Contact History/Comments Virginia Chamber of Commerce 919 E Main St. Richmond, VA 23219 Ryan Dunn, Chamber Vice President 804-644-1607 In-person meeting on 4/13/15 (Project overview) In-person meeting on 5/21/15 (Project overview) In-person meeting on 6/16/15 (Project overview with Greater Dulles Chamber of Commerce— hosted by Virginia Chamber of Commerce) In-person meeting on 6/18/15 (Project overview) Virginia Chamber of Commerce 919 E. Main St. Richmond, VA 23219 Barry DuVal, President & CEO 804-237-1463 [email protected] In-person meeting 5/21/15 (Project overview) Virginia Coal and Energy Alliance 131 Highland Dr. Lebanon, VA 24266 Harry Childress 276-889-4001 Email on 5/29/15 (Project overview) In-person meeting on 6/23/15 (Project overview) Virginia Forest Products Association 220 East Williamsburg Road PO Box 160 Sandston, VA 23150 Susan Seward, Director of Government Affairs 804-737-5625 Email on 5/20/15 (Project introduction) Virginia Manufacturers Brett Vassey, President Association 2108 West Laburnum Avenue, Suite 100F Richmond, Virginia 23227 804-643-7489 In-person meeting on 3/26/15 (Project overview) Virginia Oil and Gas Association PO Box 2285 Abingdon, VA 24212 Traci Warner Brent Archer 276-608-8224 [email protected] [email protected] In-person meeting on 6/26/15 (Project overview) Virginia Petroleum Council 701 E Franklin St. #112 Richmond, VA 23219 Michael Ward, Director 804-225-8248 [email protected] Email on 4/21/15 (Project overview) Virginia Tech – Department of Dr. Harold Burkhart Forest Resources and Environmental Conservation (540) 2316952 In-person meeting on 6/22 (Project overview) Washington Gas 101 Constitution Ave NW Washington, DC 20080 703-750-3000 Paul Logan Scott McGeary [email protected] Email on 5/22/15 (Project introduction) Atlantic Coast Pipeline, LLC Atlantic Coast Pipeline (PF15-6-000) and Dominion Transmission, Inc. Supply Header Project (PF15-5-000) Monthly Status Report Page 9 Supply Header Project A summary of e-mails, phone calls, and in-person meetings with non-governmental, environmental, and other organizations is provided in the table below. Stakeholder & Address Contact Telephone Email Contact History/Comments Non-governmental, environmental and other organizations Virginia Oil and Gas Association P.O. Box 2285 Abingdon, VA 24212 Brent Archer [email protected] 6/24/15 Presentation to m Board at annual meeting 6/26/15 Presentation to Board at annual meeting III. Agency Meetings A. Federal, State, and Local Atlantic Coast Pipeline • • • • • • Meeting with the West Virginia Department of Environmental Protection (WV DEP) on June 4, 2015 regarding the air permit process for Compressor Station 1. Meeting with staff of the U.S. Forest Service - George Washington National Forest (USFS-GWNF) and the U.S. Forest Service - Monongahela National Forest (USFS-MNF) on June 5, 2015 to discuss purpose and need, alterative analysis, and survey activities. Meeting with the Chesapeake Wetland Mitigation Bank Independent Review Team (comprised of the Virginia Department of Environmental Quality (VA DEQ), the U.S. Army Corps of Engineers, the U.S. Fish and Wildlife Service, the Virginia Department of Historic Resources, and the Virginia Department of Forestry) on June 17, 2015 regarding the pipeline potentially crossing mitigation bank property. Phone call and WebEx with the National Park Service on June 18, 2015 to discuss land ownership and conservation easements in the vicinity of the Blue Ridge Parkway and the Appalachian Trail. Meeting with the VA DEQ on June 24, 2015 to discuss stormwater permitting. Meeting with USFS-GWNF and USFS-MNF staff on June 30, 2015 to discuss survey activities, off highway vehicles, additional alterative analysis, and fire suppression plans. Supply Header Project • Meeting with the WV DEP on June 4, 2015 regarding the air permit process for Mockingbird Hill Compressor Station.
© Copyright 2026 Paperzz