Biogas Plants for Waste Products for the Production of Biomethane As at the location Halle-Lochau Dr.-Ing. Uwe Jung, C.A.R.E. GmbH Copyright by C.A.R.E.® 2006 Project - Characteristics Requirements: Broad acceptance spectrum for substrates Operational reliability Optimal output of energy Inclusion of the structure of the compost plant Process: Simultaneous Dry-Wet Fermentation (TNS-Process) Loock Biogassysteme GmbH, Hamburg Capacity: 50.000 Mg/a 20.000 Mg/a dry fermentation 30.000 Mg/a wet fermentation Output: at present 1.052 kW of the electrical power installed correspond to about 1,500 households of four people Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Flow Chart [ TNS-Process ] Solid Waste Acceptance hopper Selection of disturbing components (manually) Dry fermenter Drying impurities/ tunnel 2 Additional decomposition/ drying tunnel 1 Compost Percolate storage tank Refeed Fluid paste-like waste Acceptance tank Crushing (automatiically) Wet fermenter Tank for additional fermentation Hygienisation Final storage Liquid fertiliser Desulfurization Legend Material flow Biogas Gas processing Heat flow Fermentation Plant Halle-Lochau Combined Heat and Power Plant Copyright by C.A.R.E.® Plant Layout [ TNS-Process at the location Halle-Lochau] Wet fermenter Dry fermenter Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Examples of Input Substrates [ for dry fermentation ] [ for wet fermentation] Organic waste from separate collection Residues from grease separator Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Dry Fermentation with solid organic Waste Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Wet Fermentation with flowable Substrates Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Crushing of packed Comestibles Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Biogas Utilization for Electricity and Heat 2 x Gasoline engine Parallel generation PEL= 1.052 kW (total) EL= 40 % Heat extraction: Exhaust gas Motor Cooling Oil Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Preparatory Measures for Biomethanation Production of a constant gas composition with the application of a broad input spectrum by - successive loading of the dry fermenters - Substrate supply in wet fermentation via storage tanks - Production of mixed gas in differing gas storages Elimination of trace elements from biogas by - Desulfurization - physical-chemical gas scrubbing Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Measures for Gas Scrubbing Air lance Desulfurization in the gas storage External gas scrubbing Fermentation Plant Halle-Lochau Copyright by C.A.R.E.® Conclusion The biogas plant in Halle-Lochau is well prepared for the production of biomethane from biogas. Fermentation Plant Halle-Lochau Copyright by C.A.R.E.®
© Copyright 2026 Paperzz