Construction Worker Registration System (CWRS) Briefing March 2016 About the CWRS Briefing 1. Terminology 2. System Overview 3. Benefits 4. Roles & Duties 5. System Components 6. CIC Android device 7. Other tested devices 8. Setup Procedure 9. Daily Operation after setup 10. Construction Worker Registration Gateway (CWRG) 11. CIC Daily Attendance Records (DAR) App 12. Scenarios 13. Migration from SATM (old) to CWRS (new) 2 1. Terminology CWRS - Construction Workers Registration System •New system to be launch in Dec-2015 SATM - Site Attendance Module •Current system using excel files to submit DAR Good List •The list of workers assigned to work on a specific contract or site •Controlled by the site admin or master admin of an individual contractor. Bad List •The list of workers not allowed to work on a specific site •Controlled by CIC for all contracts or sites DAR – Daily Attendance Record NFC – Near Field Communication CWRG – Construction Workers Registration Gateway (Front-end portal) CWR Card – Construction Workers Registration Card 3 2. System Overview CIC mobile app CWR Gateway Cloud Service Any Personal Computer with browser 4 3. Benefits 1. Enhanced flow of collection & submission of DAR 2. More options on card readers to record the workers registration card information 3. Web-based managing platform for daily site administrator work 4. Increased accuracy of DAR collection 5. Simplified registration process for workers 6. Workers can access their DAR on CWR card 7. Multipurpose on one card 5 4. Roles & Duties Roles Site Admin Master Admin Workers Duties •Manage and edit Good List and DAR •Submit DAR via CWRG •Login CIC DAR App for admin functions In addition to the access rights of the Site Admin: •Create / manage / delete site admin accounts •Manage Contracts •Tap CWR Card on CIC DAR App to create attendance record 6 5. System Components Applications Hardware Construction Workers Registration Gateway [CWRG] Android device with NFC (NXP chipset) & GPS (ver.4.4.2 or up) * Final result depends on actual testing CIC Daily Attendance Record Application [CIC DAR App] Computer with browser* *IE: v.10 or above Chrome: v.44 or above Screen resolution: 1280 x 1024 (recommended) CWR Card Valid & Updated Workers Registration Card 7 6. CIC Android Device Basic Durability Options Android (OS ver. 4.4.2 or up) Water Resistant (IP54) Wiegand & RS232 & USB connectivity WiFi + 3G Shock Resistant (810G) Fixation NFC (NXP chip set) GPS Micro USB Micro SD 8 7. Other Android Devices with NFC During the system testing, the CIC and the Working Group has tried to use the following devices available in the market: HTC One E9+ HTC One E8 Samsung Galaxy Grand Prime Samsung Galaxy A8 Samsung Galaxy Note 5 Meizu Pro5 Huawei Honor 6 Plus The CIC does not hold any bias towards any brands or models of mobile device for DAR operations. Sony Xperia C3 Sony Xperia SP Sony Xperia Z5 Premium LG G3 LG G3 Beat LG GPro2 1. 2. The list above is only a record of testing devices. Contractor user s are free to choose any mobile device as long as they fulfill the basic requirements for the CIC Attendance apps operations 9 8. Setup Procedure New Contractor with new contracts Existing Contractors with Contracts need to migrate Send Application form to CIC Notify CIC and apply for site data migration Approved Manage Site Admin accounts and Contracts Master Login Ready Approved Add Workers to Good List by DAR App Manage Good List at CWRG Device ready for collecting DAR Action by contractor Action by CIC Action on DAR App Action on CWRG No Device first use? Yes 1. 2. 3. 4. Select contract Register device Synchronisation Set to connect biometric device (optional) 10 9. Daily Operation after Setup Raw data will synchronize with CWRS automatically at •Around 04:00, 10:00, 16:00, 22:00 (4 times daily) • Duties during the 7-day cycle: 1. Check raw DAR 2. Edit DAR if necessary 3. Submit DAR in time 11 10. CWRG – login page https://cwrg.cic.hk/ 12 10. CWRG • Master Admin ➢Manage Contract(s) [chapter 2.2.2] ➢Manage Site Admin [chapter 2.2.3] • Master and Site Admin ➢Manage (DAR) [chapter 2.3] ➢Manage Good List of each Site [chapter 2.4.1] • Export [chapter 2.4.2] 13 10. CWRG - Manage Contract(s) • Manage Contract(s) [chapter 2.2.2] ➢How to search contract ➢How to assign contract admin 14 10. CWRG - Manage Site Admin • Manage Site Admin [chapter 2.2.3] ➢How to create new Site Admin account ➢How to modify Site Admin account 15 10. CWRG - Manage Good List • Manage Good List [chapter 2.4.1] ➢Create / Modify Good List at CWRG ➢Option to add workers on the Good List by CIC DAR App 16 10. CWRG - Manage DAR • Manage DAR [chapter 2.3] ➢Raw DAR collected at the Android device will upload to the CIC Cloud manually or automatically according to pre-set schedule ➢How to check status of DAR ➢How to add, delete or modify DAR ➢Download DAR (Raw / Submitted) ➢Submit DAR 17 11. CIC DAR App - Admin functions • Master Admin / Site Admin ➢Login is needed [chapter 1.1.1] ➢Select Contract for device (once) [chapter 1.1.3] ➢Register device (once) [chapter 1.1.4] ➢Create Good List [chapter 1.2] ➢Change Mode of Transaction (In, Out, Tab) [chapter 1.3.1] ➢Manual Synchronize Data [chapter 1.4] 18 11. CIC DAR App - get DAR • Workers ➢No need to login ➢Tap his/her CWR card for record (mandatory for each entry/exit of site) [chapter 1.3.1] ➢Yellow cards store the transaction history • Will store latest 62 records 19 12.Scenarios • Two Login IDs sharing same device under same contract • Two Login IDs sharing same device under different contract • Two Login IDs using different devices under same contract 20 12.Scenarios • Two Login IDs sharing same device under same contract ➢ Step 1. Master Admin create 2 Site Admin Account , A & B ➢ Step 2. Master Admin assign both admin account to a same contract ➢ Step 3. Site admin Register Device for the first use ➢ Step 4. On Day 1, Admin A login device > select contract > Capture DAR > Synchronization ➢ Step 5. On Day 2, Admin B login device > select contract > Capture DAR > Synchronization 21 12.Scenarios • Two Login IDs sharing same device under different contract ➢ Step 1. Master Admin create 2 Site Admin Account , A & B ➢ Step 2. Master Admin assign Admin A to contract 1 and assign Admin B to contract 2 ➢ Step 3. Site admin Register Device for the first use ➢ Step 4. Admin A login device > select contract 1 > Capture DAR > Synchronization ➢ Step 5. After Admin A finished using the device , Admin B bring along the device to other construction site ➢ Step 6. Admin B login device > select contract 2 > Capture DAR > Synchronization 22 12.Scenarios • Two Login IDs using different devices under same contract ➢ Step 1. Master Admin create 2 Site Admin Account , A & B ➢ Step 2. Master Admin assign both admin account to a same contract ➢ Step 3. Admin A register Device X, and Admin B register Device Y to the same contract in a construction site ➢ Step 4. Admin A login Device X > select contract > Capture DAR > Synchronization ➢ Step 5. Admin B login Device Y > select contract > Capture DAR > Synchronization 23 13. The transition week – migration from SATM to CWRS Day 1 2 3 4 5 6 7 Submitted DAR via Excel Week n Week n+1 Week n+2 Background Cutover Arrangement Suggested approach System switch over * Export CWRG DAR data to excel for submission Submitted DAR via Excel Submitted DAR via CWRG •Contract start dates vary •May not cutoff sharply on the last date of the DAR week pattern •Contractors to submit excel for the transition week after consolidating both the offline & online data 24 Thank you
© Copyright 2026 Paperzz