Amendment

Date: September 27, 2016
REQUEST FOR PROPOSAL
Addendum
2016 SIDEWALK AND ADA RAMP ENHANCEMENT
DATE DUE:
TIME DUE:
October 6, 2016
2:00 P.M.
Addendum #1
This addendum is hereby made a part of the Contract Document to the same extent as
though it was originally included therein.
Bidders must acknowledge receipt of all addenda as part of the RFP Submission Packet,
Attachment A – Proposal Form. Bids that fail to acknowledge all addenda may be considered
non-responsive and may be rejected.
Addendum to the RFP consist of the following item:
1. Revision of unit of Bid Item #14 from LF to LS on Bid Schedule.
2. Add Parallel Sidewalk Ramp (Monolithic Pour) - Bid Item #16to the Bid Schedule.
3. Add the following at the end of Bid Item Descriptions in the Contract
Documents:
16. Parallel Sidewalk Ramp (Monolithic Pour) – Measurement of this bid item
will made per linear foot of concrete install per Parallel Sidewalk Ramp (Monolithic
Pour) Detail provided. Payment will be for placing and furnishing all materials,
equipment, labor, and incidentals necessary to complete the work as specified in the
detail provided.
Bid Schedule
2016 Sidewalk and ADA Ramp Enhancement
CIP2016-S15
Bid
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Bid Items
Mobilization
Temporary Traffic Control
Clearing & Grubbing
Erosion Control
Landscape Restoration
Sawcutting
Concrete Curb and Gutter
Standard Type C Curb
Concrete Sidewalk – 4” Depth
Truncated Dome
Asphalt Concrete – 8” Thick
Replace Street Sign
30” Max Height Decorative Retaining Wall
White Stripes (Thermoplastic)
Surveying
Parallel Sidewalk Ramp (Monolithic Pour)
Unit
Quantity
LS
LS
LS
LS
LS
LF
LF
LF
SF
SF
SY
EA
SF
LS
LS
LF
1
1
1
1
1
390
60
425
2885
120
67
2
210
1
1
130
Unit Cost
Total Cost
Total Amount Bid (Figures)
Total Amount Bid (Writing)
Company Name
Phone No.
Bidder's Name (Printed)
Bidder's Name (Signature)
500
501
Parallel Sidewalk Ramp
(Monolithic Pour)