Date: September 27, 2016 REQUEST FOR PROPOSAL Addendum 2016 SIDEWALK AND ADA RAMP ENHANCEMENT DATE DUE: TIME DUE: October 6, 2016 2:00 P.M. Addendum #1 This addendum is hereby made a part of the Contract Document to the same extent as though it was originally included therein. Bidders must acknowledge receipt of all addenda as part of the RFP Submission Packet, Attachment A – Proposal Form. Bids that fail to acknowledge all addenda may be considered non-responsive and may be rejected. Addendum to the RFP consist of the following item: 1. Revision of unit of Bid Item #14 from LF to LS on Bid Schedule. 2. Add Parallel Sidewalk Ramp (Monolithic Pour) - Bid Item #16to the Bid Schedule. 3. Add the following at the end of Bid Item Descriptions in the Contract Documents: 16. Parallel Sidewalk Ramp (Monolithic Pour) – Measurement of this bid item will made per linear foot of concrete install per Parallel Sidewalk Ramp (Monolithic Pour) Detail provided. Payment will be for placing and furnishing all materials, equipment, labor, and incidentals necessary to complete the work as specified in the detail provided. Bid Schedule 2016 Sidewalk and ADA Ramp Enhancement CIP2016-S15 Bid 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Bid Items Mobilization Temporary Traffic Control Clearing & Grubbing Erosion Control Landscape Restoration Sawcutting Concrete Curb and Gutter Standard Type C Curb Concrete Sidewalk – 4” Depth Truncated Dome Asphalt Concrete – 8” Thick Replace Street Sign 30” Max Height Decorative Retaining Wall White Stripes (Thermoplastic) Surveying Parallel Sidewalk Ramp (Monolithic Pour) Unit Quantity LS LS LS LS LS LF LF LF SF SF SY EA SF LS LS LF 1 1 1 1 1 390 60 425 2885 120 67 2 210 1 1 130 Unit Cost Total Cost Total Amount Bid (Figures) Total Amount Bid (Writing) Company Name Phone No. Bidder's Name (Printed) Bidder's Name (Signature) 500 501 Parallel Sidewalk Ramp (Monolithic Pour)
© Copyright 2026 Paperzz