2016 Transmission Task Opt-Out - Annual Review Company Neptune RTS Neptune RTS Neptune RTS Neptune RTS Neptune RTS Common Task or Company-Specific? Common Common Common Company-Specific Company-Specific Task Number Task Statement Reason for requesting Opt-Out TO1 Given the daily load and weather forecast, evaluate your operating strategy in accordance with the appropriate PJM manuals Weather events do not require Neptune RTS to take into account changes in load, since we do not directly serve any "Native" load. Operating strategies are determined by the PJM (The Operating Authority) for Neptune RTS. TO6 Given a request for PJM operational information, respond in accordance with the appropriate PJM manuals Reactive Reserve Checks or Supplementary Status Reports to PJM are not applicable to Neptune RTS. TO8 Given a Voltage Emergency, respond to Emergency Procedures and take the appropriate actions in accordance with PJM manuals Neptune RTS Operators take no actions during a given voltage emergency. The Reactive Power Control for the HVDC conversion process will respond automatically for voltage imbalances on the BES within the abilities of the equipment, operating parameters and protections. Neptune RTS Operators take directives from the PJM System Operator in event of an emergency. TO 5.3 Given a monitored facility, explain how to utilize your company’s security analysis, evaluate the results, and coordinate the results with PJM in accordance with company guidelines Neptune RTS does not run security contingency analysis, Pre and or Post event on the BES. PJM does that for Neptune and dispatches them accordingly. TO 12.5 Given an equipment outage request, model the outage in a network study program and analyze the results in accordance with company guidelines Neptune does not perform outage studies PJM does that for Neptune and dispatches them accordingly. Initial PJM Recommendation PJM Comments PJM recommends this request be APPROVED Given that there is no load directly served by Neptune, and any changes in the operation of the Neptune tie would be directed by PJM/LIPA, exemption from this task seems reasonable. PJM recommends this request be APPROVED Since Neptune is not required to submit data for either RRC or SSR reports, then exemption from this task seems reasonable. PJM recommends this request be APPROVED Any activities that Neptune would perform during voltage emergencies would be at the direction of their connecting TO's, and are covered under Task TO3. There are no Member Company tasks identified in the PJM Manuals for these procedures that Neptune can perform. PJM recommends this request be APPROVED Since Neptune RTS does not perform their own contingency analysis,(with PJM performing those studies on their behalf) exemption from this task seems reasonable. PJM recommends this request be APPROVED Since Neptune RTS does not perform their own outage studies, (with PJM performing those studies on their behalf) exemption from this task seems reasonable. UGI UGI CPP CPP Company-Specific Company-Specific Company-Specific Company-Specific TO 5.3 Given a monitored facility, explain how to utilize your company’s security analysis, evaluate the results, and coordinate the results with PJM in accordance with company guidelines TO 12.5 Given an equipment outage request, model the outage in a network study program and analyze the results in accordance with company guidelines UGI does not perform outage studies PJM and PL do that for UGI and PJM dispatches them accordingly. TO 5.3 Given a monitored facility, explain how to utilize your company’s security analysis, evaluate the results, and coordinate the results with PJM in accordance with company guidelines CPP does not run security contingency analysis, Pre and or Post event on the BES. PJM does that for CPP and dispatches them accordingly. PJM recommends this request be APPROVED TO 12.5 Given an equipment outage request, model the outage in a network study program and analyze the results in accordance with company guidelines CPP does not perform outage studies PJM does that for CPP. PJM recommends this request be APPROVED UGI does not run security contingency analysis, Pre and or Post event on the BES. PJM and PL do that for UGI and PJM dispatches them accordingly. PJM recommends this request be APPROVED Since UGI does not perform their own contingency analysis, (with PJM and PL performing those studies on their behalf) exemption from this task seems reasonable. PJM recommends this request be APPROVED Since UGI does not perform their own contingency analysis, (with PJM and PL performing those studies on their behalf) exemption from this task seems reasonable. Since CPP does not perform their own contingency analysis, (with PJM performing those studies on their behalf) exemption from this task seems reasonable. Since CPP does not perform their own outage studies, (with PJM performing those studies on their behalf) exemption from this task seems reasonable.
© Copyright 2026 Paperzz