2016 Transmission Task Opt-Out - Annual Review

2016 Transmission Task Opt-Out - Annual Review
Company
Neptune RTS
Neptune RTS
Neptune RTS
Neptune RTS
Neptune RTS
Common Task or
Company-Specific?
Common
Common
Common
Company-Specific
Company-Specific
Task Number
Task Statement
Reason for requesting Opt-Out
TO1
Given the daily load and weather forecast,
evaluate your operating strategy in
accordance with the appropriate PJM
manuals
Weather events do not require Neptune
RTS to take into account changes in load,
since we do not directly serve any
"Native" load. Operating strategies are
determined by the PJM (The Operating
Authority) for Neptune RTS.
TO6
Given a request for PJM operational
information, respond in accordance with
the appropriate PJM manuals
Reactive Reserve Checks or
Supplementary Status Reports to PJM are
not applicable to Neptune RTS.
TO8
Given a Voltage Emergency, respond to
Emergency Procedures and take the
appropriate actions in accordance with PJM
manuals
Neptune RTS Operators take no actions
during a given voltage emergency. The
Reactive Power Control for the HVDC
conversion process will respond
automatically for voltage imbalances on
the BES within the abilities of the
equipment, operating parameters and
protections. Neptune RTS Operators take
directives from the PJM System Operator
in event of an emergency.
TO 5.3
Given a monitored facility, explain how to
utilize your company’s security analysis,
evaluate the results, and coordinate the
results with PJM in accordance with
company guidelines
Neptune RTS does not run security
contingency analysis, Pre and or Post
event on the BES. PJM does that for
Neptune and dispatches them
accordingly.
TO 12.5
Given an equipment outage request, model
the outage in a network study program and
analyze the results in accordance with
company guidelines
Neptune does not perform outage
studies PJM does that for Neptune and
dispatches them accordingly.
Initial PJM
Recommendation
PJM Comments
PJM recommends this
request be APPROVED
Given that there is no load directly
served by Neptune, and any changes in
the operation of the Neptune tie would
be directed by PJM/LIPA, exemption
from this task seems reasonable.
PJM recommends this
request be APPROVED
Since Neptune is not required to submit
data for either RRC or SSR reports, then
exemption from this task seems
reasonable.
PJM recommends this
request be APPROVED
Any activities that Neptune would
perform during voltage emergencies
would be at the direction of their
connecting TO's, and are covered under
Task TO3. There are no Member
Company tasks identified in the PJM
Manuals for these procedures that
Neptune can perform.
PJM recommends this
request be APPROVED
Since Neptune RTS does not perform
their own contingency analysis,(with
PJM performing those studies on their
behalf) exemption from this task seems
reasonable.
PJM recommends this
request be APPROVED
Since Neptune RTS does not perform
their own outage studies, (with PJM
performing those studies on their
behalf) exemption from this task seems
reasonable.
UGI
UGI
CPP
CPP
Company-Specific
Company-Specific
Company-Specific
Company-Specific
TO 5.3
Given a monitored facility, explain how to
utilize your company’s security analysis,
evaluate the results, and coordinate the
results with PJM in accordance with
company guidelines
TO 12.5
Given an equipment outage request, model
the outage in a network study program and
analyze the results in accordance with
company guidelines
UGI does not perform outage studies
PJM and PL do that for UGI and PJM
dispatches them accordingly.
TO 5.3
Given a monitored facility, explain how to
utilize your company’s security analysis,
evaluate the results, and coordinate the
results with PJM in accordance with
company guidelines
CPP does not run security contingency
analysis, Pre and or Post event on the
BES. PJM does that for CPP and
dispatches them accordingly.
PJM recommends this
request be APPROVED
TO 12.5
Given an equipment outage request, model
the outage in a network study program and
analyze the results in accordance with
company guidelines
CPP does not perform outage studies
PJM does that for CPP.
PJM recommends this
request be APPROVED
UGI does not run security contingency
analysis, Pre and or Post event on the
BES. PJM and PL do that for UGI and PJM
dispatches them accordingly.
PJM recommends this
request be APPROVED
Since UGI does not perform their own
contingency analysis, (with PJM and PL
performing those studies on their
behalf) exemption from this task seems
reasonable.
PJM recommends this
request be APPROVED
Since UGI does not perform their own
contingency analysis, (with PJM and PL
performing those studies on their
behalf) exemption from this task seems
reasonable.
Since CPP does not perform their own
contingency analysis, (with PJM
performing those studies on their
behalf) exemption from this task seems
reasonable.
Since CPP does not perform their own
outage studies, (with PJM performing
those studies on their behalf)
exemption from this task seems
reasonable.