Buildings and Grounds Dale Crans, Head of Maintenance Overview of Buildings and Grounds Buildings and Grounds Overview • 1 Head Maintenance Man • 2 Additional Maintenance Men – Down from 5 total in 2005 • Maintain five geographically separated buildings. CVHS, WAES, ADMIN, CLARK WOOD COMPLEX, WILLIAMSON COMPLEX • Communications- E-Mail, Phone, Daily Records, Face to Face. (Every Day) we touch base with one another. Personnel Overview Personnel Overview Head of Maintenance • Dale Crans Basic Function • To oversee all of the maintenance operations of the buildings and grounds. • To be there for the administration and staff. • To be a mentor to the department and be the team leader. Personnel Overview Maintenance Men • Bill Bloom and Jon McElwain Basic Function • To keep the building systems running to the best of their abilities. • To do all aspects of maintaining the buildings and grounds. No matter how big or how small. Systems Used Apogee • Provided by Siemens Building Technology (SBT) • Controls HVAC systems district-wide with some exceptions – Controls scheduling – Controls and monitors room temperatures, Monitors Cooler and Freezer Temps – Controls Boilers – Controls circulator pumps – Controls Hot water reset schedules • Centrally located in Administration Building and accessed by all members of the department • Capable of event notification with purchase of RENO software Maintenance Direct and PM Direct • Used by staff to submit work orders • Used to track the following: – Equipment usage – Trending information – Repair costs • Automatically schedule preventive maintenance events and submit a work order for that event Cowanesque Valley High School Building Status CVHS Building Status • Building condition: GOOD to FAIR • Roof condition: GOOD – New 2005 • Last Renovation: 1995 • Acreage: 30 • Square Footage: 85,400 • Equipment Maintained: 2 Mowers, 2 Tractors, 2 Boilers, 3 Domestic Hot Water Heaters, Exhaust Fans, all aspects of the HVAC system, and much more. • Security System: 2 DVR’S and 20 Cameras CVHS Building Status • Projects in the past couple years. – Field Goal Post Installed. – Security camera’s and DVRs installed. – Added a room in the library. – Added additional parking by the football field and also out back of the school. – Repaving of the bus circle and a few bad spots in the parking lot. – Installation of Security cameras and DVRs also promethium boards and projectors. – Weight room addition. CVHS Building Status Continued • Possible Future Projects. – Upgrade the schools sound system. – Upgrade the gym sound system. – Switch controls for the football field lights. – Boiler upgrade these are 54 years old. – Update and upgrade the HVAC systems to DDC (Better Control) – Update the dishwashing room and also the kitchen. – Upgrade and update the Tech areas. – See the five year plan for more items. Westfield Area Elementary School Building Status WAES Building Status • Building condition: GOOD to EXCELLENT • Roof condition: GOOD – New 2002 in 2011 - 11,185 sq ft Replaced • Last Renovation: 1997 • Acreage: 15 • Square Footage: 62,400 • Equipment Maintained: 1 Mower, 1 small lawn tractor, 1 skid steer, District Truck , 3 Boilers, 2 Domestic Hot Water Heaters, Exhaust Fans, all aspects of the HVAC system, and much more. • Security System: 3 DVR’S and 22 Cameras WAES Building Status • Projects in the past couple years. – Installation of the nature trail. – Roof issues 11,185 sq ft replaced under warranty. – Installation of Security cameras and DVRs also promethium boards and projectors. – Installed new domestic hot water heaters. – Installed 4 heat valves in the four newer class rooms. ( Better Control) – Installed new combination oven in the kitchen. – Installation of a new water softener system for the kitchen. WAES Building Status Continued • Possible Future Projects. – Replace some broken skylights. – Replace old and dis-colored egg crate in the hallways. – Apply blacktop sealer. – See the five year plan for more items. Clark Wood Elementary School Building Status CWES Building Status • Building condition: GOOD to EXCELLENT • Roof condition: 1995 Flat areas need replaced. Sloped areas Good • Last Renovation: 2001 (The high school side) • Acreage: 37.5 • Square Footage: 158,000 sq ft for the complex. • Equipment Maintained: 2 Mowers, 1 Tractor, 3 Boilers, 2 Domestic Hot Water Heaters, Exhaust Fans, all aspects of the HVAC system, and much more. • Security System: 4 DVR’S and 43 Cameras CWES Building Status • Projects in the past couple years. – Installed some additional chain link fencing. – Cutting off of the curb around the bus circle. – Classroom door work. By VT Industries. (Warranty) – Installation of Security cameras and DVRs also promethium boards and projectors. CWES Building Status Continued • Possible Future Projects. – Replacement of the flat roof. – In a few years, replacement of the sloped roofs. – Replace two parking lot post and lights. – Repaving of some areas. – Replace some bathroom partitions. – See the five year plan for more items. Williamson High School Building Status WHS Building Status • Building condition: GOOD to FAIR • Roof condition: GOOD New in 2003, 2005, 2006 in 2011 49,313 sq ft replaced. • Last Renovation: 1996-97 • Acreage: 25 Shared • Square Footage: 117,100 • Equipment Maintained: 2 Mowers, 2 Tractor, 3 Boilers, 2 Domestic Hot Water Heaters, Exhaust Fans, all aspects of the HVAC system, The schools water system, and much more. • Security System: 2 DVR’S and 25 Cameras WHS Building Status • Projects in the past couple years. – Roof replacement of 49,313 sq ft. (Warranty) – Locker Installation. – Ceiling tile replacement. (In stages) – Installed new classroom door handles. – Installed COMBI oven in the kitchen. – Boiler and domestic hot water controls. Installation of Security cameras and DVRs also promethium boards and projectors. – Worked on many HVAC issues. Building is operating the best it has in a long time. WHS Building Status Continued • Possible Future Projects. – Upgrade the older HVAC units that are still in operation. – Upgrade the schools sound system. – Remove the damaged tennis courts. – Upgrade the freezer and cooler in the kitchen. (For the Complex) – Replace the expansion tank for the water system. – Upgrade the gym sound system. – Repair some broken sidewalk issues. – Upgrade and update the Tech areas including the Culinary arts area. – See the five year plan for more items. RB Walter Elementary School Building Status RBW Building Status • Building condition: GOOD to EXCELLENT • Roof condition: Fair – New 1996 There has been issues with it since it was applied and it needs to be replaced. • Last Renovation: 1996-97 • Acreage: 25 Shared • Square Footage: 72,600 • Equipment Maintained: Same as for Williamson • Security System: 2 DVR’S and 17 Cameras RBW Building Status • Projects in the past couple years. – Installed new classroom door handles. – Installation of Security cameras and DVRs also promethium boards and projectors. • Possible Future Projects. – Install a dishwasher in the kitchen. – Upgrade the schools sound system. – Carpet replacement. – Upgrade some older bathroom fixtures. – See the five year plan for more items. Administration Building Status Administration Building Status • Building condition: FAIR • Roof condition: GOOD – New is 2001 - 9,262 sq ft replaced in 2010 and 2011 • Last Renovation: NEVER • Acreage: 7.6 • Square Footage: 24,000 with out the shop • Equipment Maintained: 1 Mower, 1 Skid Steer, 2 Boilers, District Truck, Exhaust Fans, all aspects of the HVAC system. • Security System: Administration Building Status • Past Projects. – Repaired damaged roofs. 9,262 sq ft (Warranty) • Possible Future Projects. – Repair many sidewalk issues. – Replace some old and leaking faucets. – Install new entrance doors on the shop. – Upgrade the HVAC controls in the rooms. – Finish adding steel to the outside of the shop. – Upgrade the small sinks in the offices that have not been done yet. – See the five year plan for more items. Cost Savings Cost Savings • Boiler and domestic hot water controls at Williamson High School / RB Walter Elementary • Better tuned HVAC Systems at Williamson High School / RB Walter Elementary • Better control of the HVAC systems at Westfield Area Elementary (Better tuned building) • Roof issues fixed under warranty at Williamson High School, Westfield Area Elementary and Administration Building (69,760 sq. ft.) at cost of $450,000 for contractor. • Warranty work completed on classroom doors at Elkland Area High School Closing Thoughts Closing thoughts • Significant investment in Buildings and Grounds. • It is important to keep up with that investment. • This will save the district money in the long term. • The Maintenance department is in great shape, it is a successful team effort. • This shows in how the district looks and operates. • Any questions please feel free to contact me. I can be reached by e-mail or cell any time.
© Copyright 2026 Paperzz