LINCOLNSHIRE COUNTY COUNCIL DEVELOPMENT SERVICES HIGHWAYS AND TRAFFIC GUIDANCE NOTE |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| NO. HAT 41/4/10 SUBJECT SECTION 278 AGREEMENTS EFFECTIVE FROM 1 May 2010 AUTHOR Jason Grace DISTRIBUTION Distribution List |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| Contents 1. Introduction 2. Pre-Planning Application Stage 3. Planning Application Stage 4. Preparation of the Section 278 Agreement 5. Fees, Charges and Financial Procedures 6. Changes to the Design, Additional and Abortive Work 7. Design Standards 8. Health and Safety and the Construction Design and Management Regulations 9. Design and Tender Stage 10. Bond 11. Commuted Sums 12. N etwork Management 13. Dedication of Land for Highway Purposes 14. Preparation and Issue of Licence 15. Works Construction and Start of Warranty Period 16. End of Warranty Period 17. Land Compensation Act 1973 and Noise Insulation Regulations 1975 18. Bond Call-in Procedure Appendices A Standard First Letter to Developer A1 Carriageway Width Alteration Schemes/Passing Places A2 Ghost Island Right Turn Lane A3 Roundabouts B Information and Items Required From Developers to Progress a Section 278 Agreement C Schemes involving Traffic Signals D Design Services, Supervision and Contract Administration E Design Checking, Inspection and Testing F Works valued at £25,000 or under G Financial Procedure H TSP Section 278 Project Initiation/Requisition Form I Approval of Consultants J Approval of CDM Coordinator K Design Guidance Notes L Section 278 Procedure M Procedure for Calculation of Bond Sum (Surety) N Instruction to prepare a S.278 Agreement O Approval of Contractors not on the Standing List P Information Required from Contractors Q Procedure for Completion of the Works R Land Compensation Act - Part 1 Claims S T U V Construction Design and Management Regulations 2007 Letter – Certificate of Start of Warranty Period Letter – Certificate of End of Warranty Period Check List for Issue of Licence – Second Stage 1.0 Introduction 1.1 As part of the planning process, developers are often required to carry out improvements to the highway infrastructure to overcome objections to a Planning Application. In order to ensure such works are carried out in a satisfactory manner, and that any additional land for these works is dedicated to Lincolnshire County Council developers are required to enter into an Agreement under Section 278 (S.278) of the Highways Act 1980. Such an Agreement incorporates a surety (Bond) to cover the works and all associated costs (Outline procedure as Appendix L and Q). 1.2 This policy document provides guidance to developers, sets out Lincolnshire County Council’s methods of dealing with such Agreements and has appendices which detail the procedures to be used by applicant/developers (D) and the County Council - as Local Highway Authority (LHA), Highways Divisions (HD), the Technical Services Partnership (TSP), the Accessibility and Policy Group (APG), Lincolnshire Road Safety Partnership (LRSP), Mouchel Business Services - Accountancy Services (MBSAS) and Lincolnshire County Council Legal Services (LS). It details what is required from developers in terms of; • conditions that developers need to meet • technical details, drawings and road safety audits to enable technical acceptance to be issued in order to progress the Agreement • signing and sealing of a legal Section 278 Agreement, to allow construction of the highway works • construction and maintenance of the highway works before adoption • fees and payments payable to Lincolnshire County Council for progressing the Agreement 1.3 At an early stage when development proposals are being prepared the D should consult the LHA and the Planning Authority. This will give an opportunity to mitigate, and hopefully, resolve any potential problems associated with the works before submission of the planning application. 1.4 Extract from the Highways Act 1980; Section 278(1), of the Highways Act 1980, (as amended by the New Roads and Street Works Act 1991) says “A highway authority may, if they are satisfied it will be of benefit to the public, enter into an agreement with any person(a) for the execution by the authority of any works which the authority are or may be authorised to execute, or (b) for the execution by the authority of such works incorporating particular modifications, additions or features, or at a particular time or in a particular manner, on terms that that person pays the whole or such part of the cost of the works as may be specified or determined in accordance with the agreement.” 1.5 Where the cost of the proposed S.278 works is estimated to be £25,000 or less, the procedure set out in Appendix F shall be followed. 2.0 P re-Planning Application Stage 2.1 The LHA, through TSP, is able to offer a range of highway, transport and traffic investigation, feasibility and design services to allow D’s to seek planning consent for their developments, offering the obvious benefits associated with design work produced by the LHA. 2.2 In situations where the LHA recommends, or has recommended refusal of a planning application, TSP will not be able to offer a design service, LRSP will not carry out any safety audits and the D will be permitted to employ their own professional consultant to carry out the design, safety audits and supervision of the S.278 highway works (Appendices E, J & K), subject to LHA approval (Appendix I) and Highways and Traffic Guidance Note (HAT) 62 – SAFETY AUDIT POLICY AND PROCEDURE which can be viewed on the LCC website. 3.0 Planning Application Stage 3.1 Definitions: TSP Senior Project Leader (SPL) and HD Principal Highways Officer – Development Control (PHO). 3.2 Where the PHO identifies from a planning application that highway works are needed in order to mitigate the impacts of a development on the highway network, they will send a letter (Appendix A) to the D advising the D of this work and that this will need to be done under a S.278 Agreement, after first seeking the necessary specialist advice from TSP, LRSP or others and taking into consideration any of the implications or recommendations from any associated Transport Assessment. 3.3 This first letter will be accompanied by the appropriate form (Appendix A1, A2, A3 or a combination) indicating to the D the general construction requirements. By including these additional forms this should provide greater clarification to the D of the scope of the required works and reduce any potential future problems. At this time the PHO will also advise the D that they will need to contact TSP to progress the Agreement and that the policy of the County Council as LHA is to carry out all the scheme design, preparation of tender documents and supervision of the highway works (subject to workload and resource constraints). 3.4 Commuted sums for maintenance – as it may be not possible at the planning application stage to accurately assess if a commuted sum, or sums, will be required the paragraph concerning this is to be retained in the letter to the D (Appendix A), in all cases. If the need for a commuted sum, or sums, is identified all commuted sums will be calculated in accordance with the latest version of HAT 40, using the accompanying spreadsheet by either the PHO or SPL, which can be viewed on the LCC website, and this will be collected by APG before issue of the Licence, discussed in section 14. 3.5 In respect of highway advice/comments the planning application can then be cleared, subject to a negative (Grampian) condition restricting development until a programme for the S.278 works has been agreed, the works themselves have been agreed, they have completed, or a combination. 3.6 At this time the PHO will notify TSP of the site, the type of works required and the D’s contact details (name, address, telephone number, email address etc) and provide a copy of the planning conditions including any conditioned drawings and other supporting information (e.g. Transport Assessment/S.106 Agreement). If the S.278 Agreement is being progressed outside of TSP then the PHO will obtain a TSP requisition form (Appendix H) from TSP Senior Support Officer, complete this and return it to TSP Senior Support Officer, who will allocate a budget code (SAP code) to record all costs against for progressing the Agreement. 3.7 W here the Agreement requires new and/or upgraded Traffic Signals the procedure in Appendix C is to be followed. 3.8 In Agreements where a Traffic Regulation Order(s) may be required the SPL or PHO will advise the D of this and that the D is required to write to APG to request this be progressed to suit the timing of the Agreement and also agreeing to pay all costs associated with this, whether implementation of the Order is successful or not. 3.9 Before any work is started by the LHA to progress the design, or design checking (in cases where the D is permitted to employ his own consultant to do this – discussed later in this document), of the S.278 highways work the D will be required to sign the Agreement and pay an up-front fee (refer to Appendix A) which will be determined by either the SPL (if the Agreement is progressed by TSP), or the PHO (if this is to be done by HD). 3.10 In all cases a suitable highway layout will be required prior to the grant of planning permission to ensure that the scheme can be implemented. It will also permit the planning permission to be conditioned with a suitable Grampian condition by the PHO. When commissioned by the D, TSP will design a highway layout suitable for planning purposes that has satisfied the requirements of a Stage 1 Safety Audit, and provide a drawing to the PHO and the D. Where a design has not been subjected to a Stage 1 Safety Audit the D and PHO will be advised of this and that the subsequent Audit may require design changes. 3.11 Where TSP, decide not carry out the design and supervision work the D and PHO will be notified by the SPL. The D will then be allowed to employ his own professional consultant, subject to the requirements of Appendix I, and TSP will carry out a design checking, testing and inspection role as Appendix E. 4.0 Preparation of the Section 278 Agreement 4.1 Upon the D notifying TSP of their intention to enter into a S.278 Agreement the SPL will request the D provide all the information needed to progress the Agreement (Appendix B). 4.2 When this information is received the SPL will forward this to APG, together with a completed instruction to progress an Agreement form (Appendix N) and details of the required up-front fee. 4.3 APG will then prepare the Agreement and send this to the D’s solicitor/legal representative for signing and provide details of the required up-front payment and fixed fees required from the D. At this time APG will also request that the D’s solicitor provide proof of evidence of Title to any land needed for the highway works that is to be dedicated to LHA to become public highway. 4.4 When the Agreement is returned to APG (together with the required up-front fees and charges detailed in the Agreement and confirmation has been received that these sums have cleared the LHA bank account) APG will arrange for the Agreement to be signed and engrossed. A copy of this will be sent to the D’s solicitor, SPL, PHO, LS and a copy retained in APG until the Agreement is completed. 4.5 Upon receipt of a copy of the Agreement and confirmation that the up-front fee has been received SPL will initiate the project in TSP so that the detail design/design checking work can commence. 5.0 Fees, Charges and Financial Procedures 5.1 Up-front Fees - The up-front fee payable upon signing the Agreement is £2,000 for highway works expected to cost below £50,000, or £5,000 where the works are expected to cost above this sum, plus other fixed fees as detailed later in this document and this will be determined by the SPL or PHO and notified to APG and the D. 5.2 When the costs incurred by the LHA reach the level of the up-front fee the D will then be invoiced in arrears on a quarterly basis, arranged by TSP Senior Support Officer (SSO). If the costs incurred by the LHA do not reach the level of the up-front payment then a refund of the difference will be made to the D at the end of the Warranty Period allowed for in the Agreement. In cases where the Agreement is terminated by the LHA or it lapses then a refund will be made to the D at an appropriate stage. 5.3 Activities charged at cost - D’s will be liable for paying the LHA’s actual costs associated with; • • • • • Post-application checks by TSP and APG of details supplied by the D Traffic Regulation Orders Road Safety Audits Design of planning layouts by TSP TSP’s activities in design, approval, tendering, checking, inspection, testing, supervising, granting consents and certificates, geotechnical investigations consultancy design and testing, and project management of the works and the S.278 Agreement. • Provision of CDMC services and production of CDM health and safety information (where agreed by TSP). 5.4 When the SPL has received a signed Agreement and confirmation from APG that all up-front fees and fixed charges have been paid the SPL will then arrange for an estimate of fees to be prepared for progressing the Agreement, in accordance with TSP current Quality Management System procedures and an indication of anticipated dates for completion of the work. The SPL will then notify the D of this and initiate the project using TSP Quality Management procedures (indicative form in Appendix H). 5.5 The actual costs incurred by the LHA for progressing an Agreement will be recharged, whether this is above or below any cost estimates previously given and also whether or not the D is allowed to employ their own consultant. 5.6 D’s will also be liable for all third party costs incurred by the LHA in progressing the Agreement, such as the Environment Agency, Network Rail, statutory undertakers etc. 5.7 If the design requirements change for any reason and abortive design works are carried out these will be dealt with through TSP Quality Management System (QMS) change control procedure (detailed later in this document) and invoiced on an actual cost basis to the D, as mentioned above. This also includes changes to the design requirements caused by changes in standards that may occur after the design is complete, but before the works are implemented. 5.8 If the Agreement, construction or completion of the highway works is delayed by the D, or for any other reasons outside of the control of the LHA, then the LHA will recover from the D all additional or abortive costs incurred and these will be processed by SPL using the change control system discussed above. 5.9 In situations where the D is permitted to employ their own consultant actual costs incurred for the checking of the design, contract documents, inspection and testing of the works and progressing the Agreement (Appendix E) will be recharged to the D. 5.10 Fixed Fees - In addition to the up-front fee and costs outlined above, the D will also be required to pay the following fixed fees, which will be collected by APG upon signing of the Agreement; • Administration Fee - An administration charge of £500 for the preparation, issue, completion of the standard Section 278 Agreement. • Legal Fee - A fee for work carried out by LS of £950. Where the work carried out by LS exceeds 10 hours the D shall pay for all further hours, or any subsequent part of an hour at a rate of £100 per hour. 5.11 Fixed fees for the following services will be collected from the D, together with any other costs incurred by the LHA, prior to issue of the Licence. APG will obtain details of these from LHA Business Support Services Tendering and Contract Officer and advise the D. APG will also notify the D at this time that all unpaid invoices, charges and costs will have to paid by the D before the Licence will be issued by the LHA. • Approval of a contractor not on the standing list - A fee of £250 will be charged for approval of any contractor not on the LHA’s Standing List • Tender process - Where the LHA’s Business Support Services tenders the highway works on behalf of the Developer a fee of £250 will be levied for this service. 5.12 If TSP decide not to progress the Agreement HD may elect to do this for the LHA and they should complete and send the TSP Section 278 Agreements – Requisition form (Appendix H) to the Senior Support Officer. The Senior Support Officer will then arrange for the project to be set-up on the LHA financial accounting system (SAP), as Appendix G, and notify the PHO and SPL of the details. The PHO will be required to devise and use a suitable system to record all HD staff time in progressing the Agreement and this must be accurately recorded and journalled onto the SAP code. By following this process this should enable the accurate financial management (monitoring and control) of the costs incurred in progressing the Agreement and for the subsequent recharging of these to the D. Note - as actual costs incurred by the LHA will be recharged to the D, whether above or below any estimates previously given, and it is in the D’s interest to work with the LHA and use due diligence and care to ensure that the Agreement, design and supervision are completed as expeditiously as practicable. 5.13 The cost of the works themselves will be paid directly by the D to their appointed contractor (the highway works must be procured and the contractor appointed through the appropriate version of the New Engineering Contract) – In situations where the D is permitted to employ his own consultant to design and supervise the works the D is to confirm the version through TSP before the contract documents are prepared and the order for the works subsequently placed with a contractor. 6.0 Changes to the Design, Additional and Abortive Work 6.1.1 The TSP operates and uses a QMS to ensure the quality of its services, projects and products. As part of this system, identified changes to the requirements for these are recorded, monitored and controlled using a formal change control procedure. D’s will be required to instruct, or agree, all changes that affect the S.278 project using the QMS change control procedure discussed below. 6.1.2 When TSP identifies a change that will affect the S.278 project a change control form will be prepared, using the procedure in the QMS, and the SPL will either; • accept this change on behalf of the D and send a copy of the completed form to the D and TSP SSO for information (Note: If the D does not respond to the form within 5 days of it being sent to them then the notified changes will be taken as agreed by the D). The SPL will then notify APG, the PHO and update TSP project documentation with the changes. • If the SPL does not accept the identified changes by TSP the form will be returned to the originator with reasons why and this will be resolved using TSP internal mechanisms. • If the D does not accept the identified changes they will be required to write to the SPL with supporting reasons and this will be investigated by the SPL with the aim of resolving the problem. If this cannot be achieved the matter will be escalated to the TSP Consultancy Manager who will make a decision, which will be binding on the D. Otherwise disputes will be resolved as detailed in the S.278 Agreement. If the D identifies a change and needs to instruct it they are to advise TSP of this who will follow the above process. 6.2 A change is anything that will affect the S.278 project time, cost, quality or safety and below is a list (not exhaustive) that illustrates changes that may trigger this procedure: • • • • • • 6.3 Brief / scope of works changes, additions or abortive work New or revised information from the D or other sources Risk register alterations resulting in new risks or control Health and safety issues Agreed timescale/programme, budget/cost estimates identified as insufficient Other Sources The D will be notified of changes in the following circumstances (list not exhaustive): • • • • • • • Where previously notified fee estimates will be exceeded Where previously indicated timescales/programme will be exceeded Where the change exposes the D to greater risk Where the works cost will require increasing Where the scheme feasibility or justification is affected Where third party partners may be affected Other circumstances Note – The D will be charged actual costs incurred irrespective of whether any changes are identified, instructed or agreed. 7.0 D esign Standards 7.1 All S.278 highway works are to be designed in accordance with HAT 34 and the guidance provided in Appendix K. If designers are unsure as to which design standard to use in designing S.278 highway works they should seek guidance from TSP before any design work is started. 8.0 Health and Safety and the Construction Design and Management Regulations 8.1 For the purposes of the Agreement the D is the Client, as detailed in the CDM Regulations (discussed in the letter in Appendix A). As Client, the D has legal responsibilities, one of which is a duty to appoint a competent CDM Coordinator (CDMC) on notifiable projects, (those where the works are anticipated to last longer than 30 working days or 500 person days). Any CDMC the D may wish to appoint must also comply with the requirements in Appendix J. TSP may be able to provide this service at a cost on request. 8.2 Should it become evident that there is to be, or has been a change, in the appointed CDMC, it is the D’s responsibility to notify TSP of any changes. 8.3 Where the highway works are notifiable it is the CDMC’s responsibility to ensure that the HSE have been notified of the works using the appropriate communication. The LHA will only do this if it has agrees to be the CDMC. 8.4 The requirements of the S.278 detail that the D has the responsibility to ensure that a suitable and sufficient health and safety file (as Appendix S - containing as-built drawings and information) is prepared and delivered to the LHA before the issue of the Certificate of End of Warranty Period, at the D’s expense. During the Warranty Period the D should endeavour to submit a draft of the health and safety file to the LHA for consideration, as this should minimise the potential for delay to completion of the Agreement at the end of the Warranty Period. 9.0 Design and Tender Stage 9.1 Following the issue of planning permission for the development by the Planning Authority and receipt of the signed S.278 by the LHA the detailed design, or design checking of the highway works shall commence and be done in accordance with HAT’s Notes 34, 62, the requirements of Appendices D, E and K and also in consultation with the D and PHO. 9.2 Should any relaxation or departure from standard be required in the design of the highway works the process in HAT 34 is to be followed (this requires that the D sign the application, in advance of its submission to TSP by the designer). 9.3 Upon completion of the detailed design by TSP (following resolution of all issues raised in the Stage 2 safety audit and after completion of all stage reviews required under the QMS), the SPL will send a copy of the drawings to the D for his acceptance, or in cases where the D is permitted to employ his own designer - at the stage acceptance of the detailed design is granted. Before this stage is reached, or at this time, the SPL will also seek confirmation from the D of how the works are to be procured - whether through a tender process managed by TSP, or the D may wish to appoint his own contractor, subject to them either being on the LHA Standing list of Contractors or them obtaining the necessary approval from the LHA to work on the public highway in Lincolnshire (Appendix O). 9.4 At this stage of the process the SPL will arrange for 12 copies of all detailed design drawings along with the Bond calculation (as discussed later in this document and Appendix M) to be sent to APG for drafting of the Licence. Also at this time the SPL will ensure that a copy of the detail design drawings are sent to the PHO for information. In addition to any detailed design drawings the following is also required for inclusion in the Agreement; • • a coloured drawing, at a suitable scale (1:500/1:200), showing the full extent and limits of the Section 278 Agreement Works - inclusive of suitable working space, also showing any land to be dedicated for highway purposes coloured blue and bounded with thick red line – number of copies required is as discussed above Land transfer drawing(s), at a suitable scale (1:1250/1:500/1:200), showing land to be dedicated, bounded with thick red line, coloured pink and also indicating the quantity of land to be transferred in square metres and current owner details. Schedules may also be needed. Note - S.278 highway works will NOT to be carried out using the LHA’s General Highways Term Maintenance Contract, as the LHA will not assume the Employer’s role for construction of S.278 works. 9.5 Should the D require that TSP seek competitive tenders for the highway works, on their behalf, then TSP will prepare a list of suitable contractors and will provide this to the D for their approval prior to tenders being sought. Upon approval of the list by the D TSP will then arrange for tenders to be sent out using LHA usual procedures (in accordance with the Council’s Financial Regulations and Standing Orders). The D will be informed of the results by TSP design team, or the SPL, and asked to confirm which tender they wish to accept. 9.6 Any geotechnical/site investigation work needed during the design is to be commissioned through Lincolnshire Laboratory. 10.0 B ond 10.1 The bond sum will be calculated by the SPL, or PHO, in accordance with the procedure in Appendix M and notified to APG and the D at the time of completion of the detailed design. 10.2 For the purposes of the Agreement the LHA has taken the decision that all District, Borough, Town and Parish Councils, in the geographic area of Lincolnshire County Council will NOT be required to provide a Bond. However Housing Associations, charities and other organisations and will be treated as a private D and required to provide a Bond. 10.3 In situations where a District, Borough, Town or Parish Council is to be a signatory with a private D in a S.278 Agreement a partial bond is to be applied to the Agreement and apportioned on the D’s private interests. In these situations the SPL, or PHO is to seek relevant guidance from an appropriate senior manager/member of the LHA (Highway Management Group and LS) on how this should be levied and written into the Agreement. 10.4 The SPL or PHO will advise the D that they have the option to provide the Bond for the Agreement either through a bondsman, e.g. recognised UK financial institution/bank etc, or as a deposit cash sum with the LHA (Appendix G). 11.0 C ommuted Sums 11.1 All commuted sums required under the Agreement are to be identified and calculated in accordance with the requirements of HAT 40 - Commuted Sums for Maintenance, which can be viewed on the LCC website. Note – Departure from the requirements of HAT 40 requires Executive Councillor approval. 12.0 Network Management In order to allow the LHA to fulfil its obligations under the New Roads and Street Works Act 1991 (NRSWA) and the Traffic Management Act 2004 (TMA), under the Agreement the D is to be treated as a statutory undertaker and the S.278 works are deemed to be street works. The D is therefore responsible for ensuring that all notices required under the NRSWA and TMA are issued at the appropriate time to ensure compliance with both Acts (forms available from HAT 29 on the LCC website). If the D has allowed sufficient time, and requests TSP issue the TMA notices, TSP may agree to do this. Otherwise the D will have to issue all the relevant notices. 12.1 Under the Agreement the LHA still retains all powers, duties and functions conveyed to it under the Highways Act 1980 and should the D breach any of the requirements of the TMA, e.g. overrun of highway works, then the LHA has the power to have the D’s works stopped, removed from the highway network and charge the D fixed penalties for any contraventions as detailed in both of the aforementioned Acts. 13.0 Dedication of Land for Highway Purposes 13.1 For the Licence to be issued, discussed later in this document, the D must be able to dedicate any land required for the highway works (which is not already public highway), to the LHA and they will be expected to provide proof of title to all the land required. This land needs to be dedicated free of charge, freehold, free from any encumbrances and in addition the D must not dispose of any part of the land or grant any right or interest in or across the land, which could impede the LHA highway function in order for this to be acceptable to the LHA. 13.2 Should the D be unable to prove title to all land required for the highway works the D will be expected to acquire all the land needed at their expense in the required timeframe. Should this not be possible the LHA will require suitable proof from the D all reasonable methods of acquiring the land required have been exhausted and being satisfied of this, may at its discretion offer to acquire the land needed for the works through compulsory purchase powers (CPO). This will however be as a last resort and the D will be expected to underwrite all costs associated with this, whether or not the land is successfully acquired. D’s should also note that; • processing a Compulsory Purchase Order is seldom a swift or easy process and that objections are commonplace and usually lead to a Public Inquiry. As a result of the Inquiry the LHA may decide not to use the powers • if the powers are used and the Order is made the Order may be challenged in the High Court • compulsory purchase achieves entry onto the land only, with its valuation being subject to market forces including possible ransom valuation 13.3 Title to the Land will then be checked by LS prior to issue of the Licence, discussed later in this document and again upon transfer before the issue of the Certificate of End of Warranty Period and if this is acceptable to the LHA the land will become public highway and maintainable from the public purse. APG will then notify the relevant section of the LHA so that land records can be updated. 14.0 Preparation and Issue of Licence 14.1 At completion of the detailed design (or upon issue of technical acceptance of the detailed design - in situations where the D is permitted to employ their own consultant to do the design), and following completion of the Stage 2 Safety Audit and resolution of any issues raised in this, the SPL will calculate the Bond sum (Appendix M) and forward this together with 12 copies of all detail design and other drawings to APG for them to prepare the Licence, discussed earlier in this document. (Note - In addition to any detailed design drawings 12 copies of the following is also required for inclusion in the Agreement; a coloured drawing, at a suitable scale (1:500/1:200), showing the full extent and limits of the Section 278 Agreement Works, inclusive of suitable working space, showing any land to be dedicated for highway purposes coloured blue and bounded with a thick red line. If land is to be dedicated then a land transfer drawing(s), at a suitable scale (1:1250/1:500/1:200) are also required showing all land to be conveyed bounded in a thick red line, coloured pink and indicating the quantity of land to be transferred in square metres. In addition to the above the SPL will also forward to APG confirmation of the following information needed for issue of the Licence as detailed in Appendix V, items; • A – CDMC details • C – Suitable confirmation the D has accepted the detailed design • F – Suitable confirmation the D has requested, obtained, or a combination of both, any temporary/permanent traffic regulation order needed for the works • G – Suitable confirmation that the D has obtained any permission/permits/approvals, or other licences necessary for the works • K – Suitable confirmation that the D has complied with all conditions of the planning consent for the development site • M – Suitable proof of the D’s agreement to the timescale for implementation of the S.278 works APG will obtain and verify all the other items required in Appendix V before requesting LS issue the Licence. 14.2 LS will then sign and engross the Licence, retaining a copy for their files and return the remaining copies to APG. APG will then place a copy on their files and send a copy of the Licence to the D’s solicitor, the SPL, PHO and any other organisations requiring a copy. 15.0 Works Construction and Start of Warranty Period 15.1 Following issue of the Licence and at the time the D appoints a contractor to build the highway works the D is to make contact with TSP design team to arrange a works pre-start meeting. Note - the D must provide 20 working days notice of the works pre-start meeting and this must be held at least 15 working days before the planned works construction start date. This lead-in period is needed for TSP to allocate staff resources to carry to out the site supervision, or inspection and testing of the works and for TSP to arrange for the public to receive suitable notification of the planned highway works. Should the D not comply with this lead-in period requirement the LHA will not permit construction of the works to start on site. 15.2 Upon the date being agreed for the works pre-start meeting TSP design team will ensure all necessary attendees are invited, including the D, and also prepare and issue a meeting agenda to the invitees (Appendix P). The D will also need to ensure that their chosen contractor is able to provide all the information required in Appendix P to TSP at works pre-start meeting and also at this time, provide proof that the D has signed the contract for the highway works. Note - should the D not comply with the above requirements 15 days before the planned works start date the works will not be permitted to start on site. 15.3 After the works pre-start meeting has taken place TSP design team will prepare and issue minutes of the meeting to all attendees and also confirm acceptance of the contractor’s works construction programme, CDM Construction Phase Plan, temporary traffic management measures and acceptance of the D’s Project Manager and Site Supervisor - where TSP are administering the contract. At this time TSP design team will also arrange for the public to be notified of the works using the LHA’s usual methods, the costs of which will be charged to the relevant SAP budget code for the Agreement and subsequently recharged to the D using the financial procedure discussed earlier in this guidance document. 15.4 When construction of the works is complete and agreed by TSP and HD as acceptable to be opened to traffic TSP design team will arrange the Stage 3 Safety Audit to be carried out by LRSP, in accordance with the requirements of HAT 62, and any issues raised in this audit will need to be satisfactorily resolved by the D, at the D’s expense, in a timeframe as agreed by TSP. Having verified this has been done the SPL will then notify APG that works are acceptable for the Warranty Period to commence and for the bond to be reduced to 10% of its original value, as allowed for in the Agreement, subject to no other issues arising which may affect this. APG will then notify the D’s solicitor of this and arrange for Certificate of Start of Warranty Period to be issued to the D (Appendix T), sending copies of this to the SPL, PHO and LS. Also at this time APG will arrange for the bond to be reduced. 15.5 A ny geotechnical/materials testing work needed during the works construction and Warranty Periods is to be commissioned through Lincolnshire Laboratory. 15.6 Note – As per the terms of the Agreement from the issue of the Certificate of Start of Warranty Period the D is responsible for maintenance of the highway works for a period of 16 months, following the stage 4 safety audit as per the requirements of HAT 62 (Warranty Period increased to 24 months where thin surface courses are installed and 36 months in situations where high friction surface courses are provided) the LHA will not carry out any cyclic highway maintenance activities on this part of the highway network, unless this would affect any of its statutory duties or functions. Therefore if any defects arise in the works these will be notified to the D who will be required to resolve these to the LHA satisfaction in the timescales below; • Emergency Repairs - To be rectified within 4 hours from notification by the LHA • Urgent Repairs – To be rectified within 72 hours from notification by the LHA • Normal Repairs – To be rectified within 1 calendar month from notification by the LHA Should the D fail to carry out any notified repairs to the S.278 works in the required timescales mentioned above the LHA will carry out this work on behalf of the D and recharge the D all costs incurred associated with this. 16.0 End of Warranty Period 16.1 A minimum of one calendar month before the end of the Warranty Period the D is to notify TSP design team or the SPL of this and request a final site inspection of the works. This will then be arranged with a representative from HD. Following this inspection a list of any issues needing to be resolved will be sent to the D who will need to complete all these issues to the satisfaction of the LHA in the timescales detailed in the Agreement, before the works will be considered to be suitable for adoption by the LHA. As a minimum requirement the D will be required to do the following for all S.278 works (where included in the works); • Clean and re-lamp all street lights, other illuminated signs and bollards within the limits of the works and at their tie-in to the existing highway network • Test and obtain approval of all highway drainage within the limits of the works and at their tie-in to the existing highway network • Renew/refresh all road markings within the limits of the works and at their tie-in to the existing highway network • Cleaning of all highway surface water gullies and drainage within the limits of the works and at their tie-in to the existing highway network, including any outfalls outside the limits of the works • Sweeping of the site within the limits of the works and at their tie-in to the existing highway network • Application of weed killer within the limits of the works and at their tie-in to the existing highway network • Clean all traffic signs and road markings within the limits of the works and at their tie-in to the existing highway network • Make good any corrosion protection to street lights installed as part of the works or moved as part of the works Note – the onus on securing adoption of highway works constructed under a Section 278 Agreement rests with the D and NOT the LHA. It is therefore in the D’s interest to ensure that the works are fit for purpose and are suitable for adoption before the end of the Warranty Period. 16.2 At the end of the Warranty Period TSP will arrange the Stage 4 Safety Audit to be carried out by LRSP, in accordance with the requirements of HAT 62, and any issues raised in this audit will need to be satisfactorily resolved by the D, at the D’s expense, in a timeframe in accordance the requirements of the Agreement and as agreed by TSP. 16.3 Upon TSP SPL being satisfied, that any issues raised in the Stage 4 safety audit have been satisfactorily addressed by the D the SPL will check that the D has provided a suitable CDM health and safety file for the works, in accordance with the requirements of section 8 of this document and Appendix S. After having verified this the SPL will notify APG that the works are acceptable to be adopted, and the remaining Bond can be released. 16.4 Having received this notification APG will verify the following; • A suitable land dedication drawing and any necessary supporting schedules have been provided by the D • The D has provided suitable evidence that all requirements of the Traffic Management Act have been complied with • The D has provided any easement or wayleave required for the works, or suitable evidence that this has been updated • The D has provided suitable evidence to the LHA that any structures installed as part of the works are suitable for adoption by the LHA • The D has paid all costs and fees to the LHA • The D has paid to the LHA any commuted sum(s) Upon all the above requirements being met APG will then issue the Certificate of End of Warranty Period (Appendix U) and Bond cancellation notice/arrange for the remaining deposit sum to be returned to the D and send a copy of these communications to the SPL, PHO and LS. At this time APG will also send the land dedication drawing and notification to the LHA land section (County Terrier) for land records to be updated. 16.5 At this stage the LHA now considers the S.278 Agreement to be FULFILLED, subject to the LHA not receiving any claims for compensation under the Land Compensation Act 1973, or Noise Insulation Regulations 1975 as a result of the works, discussed in the section 17, below and the SPL, or PHO will close down the project and archive the files in accordance with current LHA procedures. 17.0 Land Compensation Act 1973 and Noise Insulation Regulations 1975 17.1 Under Part 1 of the Land Compensation Act 1973 residents living close to the new works can claim compensation if they perceive the works have had a detrimental effect on their environment, e.g. the value of their property is depreciated by noise and other specified physical factors arising from the use of a new or altered highway. The Noise Insulation Regulations 1975 require the LHA to offer noise insulation or grants to occupiers of dwellings, such claims cannot be made until the “first claim date”, which is 12 months after the highway is open to the public. As the limitation period for claims under statute is 6 years from the time when the cause of the action arose, it follows that claims can be brought up to 7 years after completion of the works. 17.2 Under the Section 278 Agreement the D is required to indemnify the LHA against any claims, or costs incurred in investigating such claims. 17.3 Where a claim is received the procedure in Appendix R is to be followed. 18.0 Bond Call-In Procedure 18.1 A judgement is to be made by the SPL, or PHO, as to when this process should be initiated, but this will generally be as a result of the D not complying with requirements of the Agreement in the required timescale, or them refusing to do so. Should this occur the SPL or PHO will arrange a meeting between LHA officers involved with the S.278 together with all relevant facts, documents and approved drawings and this should lead to a joint decision to commence this process. 18.2 Following the meeting the SPL or PHO will arrange, through APG, for a letter to be sent to the D (APG will also send a copy of this letter and any supporting information to the Bondsman) advising them that Bond will be called-in 28 days from the date of the letter, unless the D resolves all issues raised (to be itemised in the letter) to the satisfaction of the LHA, or the D provides all the following documentary evidence to the LHA, in a suitable format; proving that an order has been placed for all uncompleted items, a programme/timescale clearly showing all uncompleted tasks and a clear unambiguous date for their completion and a specification for all uncompleted items. At this time the SPL, or PHO, will advise the D if this is acceptable to the LHA, or if not - the reasons why. 18.3 If the D fails to comply with the above requirements the SPL or PHO will notify APG who will then send a letter to the Bondsman advising them of this and also send a copy to the SPL and PHO. Upon receipt of this letter the SPL, or PHO, will pass all relevant correspondence to LS and request that the Bond be called-in. 18.4 Upon notification of receipt of the Bond money, from APG or LS, the SPL will arrange for a TSP Senior Support Officer to set-up a separate sub-code under the project SAP code, so all costs can be accurately recorded and subsequently recharged to the Bond money. At this time the SPL will also arrange for TSP design team to prepare the necessary procurement documents for any unfinished items. Note – At this stage of the Agreement any unfinished part of the highway works may be completed using the LHA Highways Maintenance Term Contract – where financial rules allow, but the SPL and TSP design team should choose the most expeditious and efficient way for these to be completed, e.g. use the Term Contract or use of competitive quote/tender to procure any unfinished items. 18.5 When the work is completed the SPL will notify APG, who will then arrange for the cost of this work to be deducted from the Bond money and any balance remaining refunded back to the Bondsman. 18.6 TSP SPL, or the PHO, will then ensure the project closed and all files archived in accordance with current LHA procedures. APPENDIX A Your ref: My ref: CRM no: Date: Please reply to: Divisional Highways Office Address Tel: 01522 782070 Fax: 01522 553171 Email: [email protected] Dear WORKS REQUIRED UNDER SECTION 278 OF THE HIGHWAYS ACT 1980 I have given consideration to the proposal you have submitted to the District Planning Authority for Planning Permission. In order to mitigate the impact of the effects of your development on the highway network highway works will be required. The works required are as follows:[Enter Manually] Such works are required to be carried out under a Section 278 Agreement (Highways Act 1980) and are to be funded by you. The policy of the County Council as Highway Authority is to carry out all the scheme design, preparation of tender documents and supervision of such works (subject to workload and any resource constraints, in which case Lincolnshire County Council may allow you to employ your own consultant to do this). The works themselves will be carried out by a contractor appointed by you, but requiring the approval of the County Council. Attached is a sheet showing the minimum requirements for these works (Note for PHO’s – Append Appendix A1, A2, A3, or a combination of these to this letter and delete this note before sending out this letter). To progress towards the construction of the Section 278 highway works you will be required to enter into an Agreement and pay an up front fee, according to the estimated cost of the works – to be determined by the County Council. The fee will be either: £2,000 for highway works expected to cost below £50,000, or £5,000 for works expected to cost above this sum. Please note; 1. Lincolnshire County Council will not carry out any work to progress the detailed design/design checking until receipt of the signed Agreement and up-front payment. 2. The works themselves will not be permitted to start on site until the Licence allowed for in the Agreement has been issued by the County Council. When the costs incurred by the Council reach the level of the up front fee you will then be invoiced in arrears on a quarterly basis. Should the costs incurred by the Council not reach the level of the up front fee then a refund of the difference will be made at the end of the Warranty Period allowed for in the Agreement. You will be liable for paying the County Council’s actual costs associated with: • Post-application checks by the County Council’s Technical Services Partnership (TSP) and Accessibility and Policy Group of details supplied by you • Traffic Regulation Orders • Road Safety Audits • Design of planning layouts by TSP • TSP’s activities in design, approval, tendering, checking, inspection, testing, supervising, granting consents and certificates, geotechnical investigations consultancy design and testing, and project management of the works and the S278 Agreement • Provision of CDMC services and the production of the health and safety file (where agreed and advised by TSP) Please be advised that you will be charged the actual costs incurred by the County Council, whether this is above or below any estimates given to you and also whether or not you are allowed to employ your own consultant. The cost of the works themselves will be paid directly by you to your contractor, who must be appointed through the appropriate version of the New Engineering Contract. You will also be liable for third party costs, such as the Environment Agency, Network Rail and statutory undertakers If the design requirements change for any reason and abortive design works are carried out, these will be invoiced on an actual cost basis, as mentioned above. This also includes changes to the design requirements caused by changes in standards that occur after the design is complete, but before the works are implemented. Should the Agreement, construction or completion of the highway works be delayed by you, or for other reasons outside of the control of Lincolnshire County Council, the Council will recover from the developer all additional or abortive costs incurred. In situations where you are permitted to employ your own consultant the Council will charge you actual costs incurred for the checking of your design and contract documents, inspection and testing of the works and for progressing the Agreement. Additional to the up front fee and costs outlined above, you will be required to pay the following fixed fees: Administration Fee - An administration charge of £500 for the preparation, issue, completion of the standard Section 278 Agreement Legal Fee - A fee for work carried out by our Legal Services of £950. Where the work carried out by Legal Services exceeds 10 hours the Developer shall pay for all further hours at a rate of £100 per hour. Approval of a contractor not on the standing list - A fee of £250 for approval of any contractor not on the Council’s Standing List. Tender process - Where the Council’s Support Services tenders the highway works on behalf of the Developer a fee of £250 will be levied for this service. All unpaid invoices at the time of the completion of the Licence will have to be paid for the Licence to be issued. Please note in accordance with this authority’s policy, the Lincolnshire Road Safety Partnership (LRSP) must undertake all safety audits even when your own consultants have been permitted to design the works. This will be charged on a fee basis, details of which can be obtained by contacting the LRSP on 01522 805800. Where your proposal includes land to be dedicated to this Council to facilitate your scheme, you must forward certified copies of your land title documents at your earliest convenience to avoid any future delays regarding the issue of the Licence. Any land to be dedicated must also be free from any encumbrances, for the title to be acceptable. The nature of the required works may cause the County Council to incur additional future maintenance costs in respect of additions to its existing infrastructure. There could, therefore, be a charge for commuted maintenance within the Section 278 Agreement, which will be notified to you before the issue of the Licence allowed for in the Agreement. Commuted sums are payable at the latest on the issue of the Certificate of the End of Warranty Period as defined in the Agreement. The charge will be calculated following the published CSS guidance on commuted sums as implemented by the County Council in its Highways and Traffic Guidance Note 40, available for download on the Council’s website. In order to avoid delays in commencing works and prior to issue of the Licence, Road Space Booking must be made by you. This can be done by contacting this office. You should note that under the Traffic Management Act 2004, works of a duration of longer than ten days or requiring a Traffic Regulation Order (e.g. for a temporary road closure) must have at least a three month notification period. For the purposes of the Agreement and the works, you will be considered an ‘undertaker’ and the works ‘street works’ under the 2004 Act. May I also remind you that under The Construction (Design and Management) Regulations 2007, (CDM) as you are commissioning the works, you are legally the Client (Regulation 2, Paragraph 37 of the Approved Code of Practice). As the Client you do have the duty to appoint a CDM Co-ordinator on notifiable projects, which are defined as those lasting longer than 30 working days or 500 person days. The Council’s TSP may be able to provide this service at cost on request. In accordance with Regulation 17/4 of the CDM Regulations 2007, once this site is completed you are required to provide to the Director for Development, a Health & Safety File for any structures, i.e. culverts, highway drains, traffic signals and the road itself. Your CDM Coordinator should ensure the Director for Development is made aware of this file and any difficulties which occur in future maintenance i.e. land contamination areas, maintenance of drains and culverts etc. To progress this matter you are advised to contact [Enter Manually] of the Council’s Technical Services Partnership (tel. no. 01522 782070) to arrange for the works to be assessed and the Agreement to be progressed. Should you wish to discuss any of the above further, please contact [Enter Manually] at the above number. Yours faithfully DIVISIONAL HIGHWAYS SUPPORT MANAGER 23/4/2010 Rev.4 APPENDIX A1 SECTION AGREEMENT 278 CARRIAGEWAY WIDTH ALTERATION/PASSING PLACES File No: SAP Code: Road Name/No: Parish: D/C Highway Officer: Division: Tel No: Area Manager • • • • • • • • • • • • Refresh all Road Markings and Studs within scheme area. Lining and studs should be reviewed and refreshed/amended as appropriate for a distance of up to 100 metres beyond the limits of the works Minimum 300mm cut back into existing full depth construction. Materials and their testing shall be from Lincolnshire County Council’s Code of Practice “HT/14/1/94” ‘The Code of Practice Highway Works/Standards, Materials, Testing’ Unless otherwise agreed where widening is required, the existing carriageway shall be resurfaced to its centreline. Care is required to ensure differential skid resistance is not inadvertently introduced by the use of new surfacing with different characteristics to the existing surfacing. Signing – Consideration should be given to the provision/removal of direction signs, regulatory and warning signs for a distance of up to 250 metres beyond the limits of the works, as required. Street lighting – Consideration should be given to improving the existing or providing a new system of street lighting where appropriate in accordance with LCC lighting policy Drainage –Where the existing drainage system is being utilised, the adequacy of the system shall be checked to ensure that it can cope with the additional surface area of the carriageway Kerbing The subgrade’s bearing capacity, existing carriageway construction strength and surfacing shall be investigated. Pavement design shall be in accordance with Highways and Traffic Guidance Note (HAT) 34. Subgrade’s bearing capacity, existing carriageway construction strength and surfacing shall be investigated. Safety Audit Guidelines are to be followed (HAT 62). Signed: Dated: Note: The above is required unless agreed in writing by Lincolnshire County Council APPENDIX A2 SECTION 278 GHOST ISLAND RIGHT TURN File No: SAP Code: Road Name/No: Parish: D/C Highway Officer: Division: Tel No: Area Manager • • • • • • • • • • • • • • • Scheme shall be in accordance with TD 42 (geometric Design of Major/Minor Priority Junctions) Lining and Studs should be reviewed and refreshed/amended as appropriate for a distance of up to 100 metres beyond the limits of the Works. Lighting shall be provided/renewed in accordance with LCC lighting policy (note scheme’s to tie in together – please contact the Council’s Street Lighting Section for guidance) Pedestrian Refuges are required on all roads where pedestrian flows are anticipated (including bollards and refuge beacons as appropriate). Need to liaise with Abnormal Loads team to ensure they do not impact on wide load roads. Consider coloured surfacing on all A roads – (to be agreed with LRSP) Footways/cycleways to tie into existing facilities. Full carriageway overlay/inlay required. Material to incorporate a coarse aggregate with an appropriate PSV (polished stone value) Longitudinal joints shall not be located within a future wheelpath zones Overlay/inlay shall commence at beginning of taper areas. Materials and their testing shall be from Lincolnshire County Council’s Code of Practice “HT/14/1/94” ‘The Code of Practice Highway Works/Standards, Materials, Testing and taking particular note of table 2 note 12. Lane widths shall be a min 3.0m/3.5m/3.0m where practicable. Where 1.0m of hardstrips exist, these should be maintained through the junction area. Signing – Consideration should be given to the provision/removal of direction signs, regulatory and warning signs for a distance of up to 250 metres beyond the limits of the works, as required. Drainage – where the existing drainage system is being utilised the adequacy of the system shall be checked to ensure that it can cope with the additional surface area of the carriageway. Pavement design shall be in accordance with Highways and Traffic Guidance Note 34. Subgrade’s bearing capacity, existing carriageway construction strength and surfacing shall be investigated. Safety Audit Guidelines to be followed (HAT 62). Signed: Dated: Note: The above is required unless agreed in writing by Lincolnshire County Council APPENDIX A3 SECTION 278 ROUNDABOUTS File No: SAP Code: Road Name/No: Parish: D/C Highway Officer: Division: Tel No: Area Manager • Scheme shall be in accordance with TD 16 – Geometric Design of Roundabouts, or TD 54 – Design of Mini Roundabouts • Road Markings and Studs should be reviewed and refreshed /amended as appropriate for a distance of up to 100 metres beyond the limits of the works. • Lighting shall be provided/renewed in accordance with LCC lighting policy (note scheme’s to tie in together – please contact the Council’s Street Lighting Section for guidance). All roundabouts shall be illuminated. • Pedestrian refuges required on all roads. Pedestrian refuges would normally only be required if there is a pedestrian demand. • Consider coloured surfacing on all A roads (to be agreed with LRSP) • Footways, if provided, to tie into existing facilities. • Full carriageway overlay/inlay required • Overlay/inlay should extend to the limits of any realignment to the existing carriageway. • Materials and testing shall be in accordance with Lincolnshire County Council’s Code of Practice “HT/14/1/94” ‘The Code of Practice Highway Works/Standards, Materials, Testing’. • Signing – Consideration should be given to the provision /removal of direction signs, regulatory and warning signs for a distance of up to 250 metres beyond the limits of the works, as required. • Drainage – Consideration should be given to the vertical design to achieving carriageway drainage using a conventional ‘gully’ drainage system. • The subgrades bearing capacity, existing carriageway construction, strength and surfacing shall be investigated. • Pavement design shall be in accordance with Highways and Traffic Guidance Note 34. Subgrade’s bearing capacity, existing carriageway construction strength and surfacing shall be investigated. • Safety Audit Guidelines to be followed (HAT 62). Signed: Dated: Note: The above is required unless agreed in writing by Lincolnshire County Council APPENDIX B INFORMATION AND ITEMS REQUIRED FROM DEVELOPERS TO PROGRESS A SECTION 278 AGREEMENT Please note Lincolnshire County Council will not carry out any work to progress the detailed design/design checking until receipt of the signed Agreement and up-front payment. 1. Details of Developer’s (or details of the beneficiary of the planning consent) who is to sign the Agreement; full name and postal address and contact details (contact name, email address, telephone number, fax number etc). 2. Names and addresses of all other parties to the Agreement, e.g. landowners etc. 3. Details of the solicitor, who will be representing the developer (or beneficiary of the planning consent) who is to sign the Agreement; name of company, full postal address, contact name, email address, telephone number, fax number etc. 4. Copy of full planning consent for the development, including details of reserved matters relating to the highway works and a copy of all supporting documents (approved layout drawings, Traffic Assessment, Travel Plan etc). 5. Proof of land title – evidence of title of any land required for the works to be dedicated to the Highway Authority (note this will need to free from any encumbrances to be acceptable). 6. Up front payment of either £2,000 or £5,000, as advised by the LHA. 7. Details of how the Bond (Surety) is to be provided; full contact details of the bondsman will be needed; name of company, full postal address, contact name, email address, telephone number, fax number etc. Otherwise a cash deposit will be required and this will be placed in an interest bearing account, which will be returned to the developer together with any interest earned upon satisfactory completion of the Agreement. 8. Indication of developer’s project timescale, with programme, if available. 9. If the LHA does not agree to carry out the design and supervision of the works and allows the developer to use his own consultant (the developer must seek prior Highway Authority approval of any consultant to be employed – Appendix I) to do this work, then full contact details will be needed; name of company, full postal address, contact name, email address, telephone number, fax number etc. 10. For the purposes of the Licence 10 copies (12 are required if any land is to be dedicated/transferred to the LHA) of the following drawings are generally required, together with a schedule showing drawing number, name and revision; a) a location plan showing site location at a suitable scale (1:1250/1:2500). A site plan showing the site of the 278 works outlined in red, 1:500 (as defined in the Agreement). b) a Layout Plan showing the general layout of the 278 works (1:500/1:200). c) a detailed technical drawing(s) of the actual works, see later guidance on what is required for technical acceptance. d) a plan showing any land to be conveyed to the highway, which should be shaded blue (as defined in the Agreement). With prior agreement of the LHA items b), c) and d) My be combined, but this will depend upon the scope, complexity, location and value of the highway works. Please note that as these drawings will need to be folded and inserted into the Licence, drawings above A1 size will not generally be accepted. APPENDIX C SCHEMES INVOLVING TRAFFIC SIGNALS 1 The D is to be informed be informed at the Planning Application stage that all traffic signal equipment is to be provided and installed by the LHA Traffic Signal Term Contractor, this is necessary to ensure that the new equipment is compatible with the LHA maintenance and Urban Traffic Management Control systems control and monitoring equipment and associated systems database programming and validation works (UTMC). 2 The D shall be informed that they are responsible for the payment of all equipment and installation costs (see 5 below). 3 A commuted sum for future maintenance will be calculated and charged in accordance with Highways and Traffic Guidance Note 40 ‘Commuted Sums for Maintenance’. This shall be initially coded to the SAP S.278 project budget code (H7F…….) then transferred immediately to the appropriate account. 4 The Principal Engineer (LHA Traffic Signals Team) is to be consulted on whether to accept or decline the commission. Generally, all traffic signal design work is carried out by LHA Traffic Signals Team. 5 If the LHA Traffic Signals team accept the traffic signal commission, the new traffic signal installations and UTMC will be procured through the LHA Term Contract. An order is required from the D (who must be the signatory to the Agreement to ensure the work is covered by the Bond) to enable orders to be placed for the traffic signals installation, UTMC equipment, associated works, telecommunications and electric supply connections. Costs are allocated within the Traffic Signals range (H7P ….. code). The Traffic Signals team must invoice the D for all the equipment and installation costs, prior to the Bond being released. Income received will then be allocated to the H7P code, which should balance against the costs. 6 If the Traffic Signals Team decline the traffic signal commission, D’s must make their own arrangements with a suitable design consultant and the LHA Traffic Signal Term Contractor. The developer will need to be made aware that orders for BT and electricity connections will have to be made through the Traffic Signals section, which will incur a cost for doing this work. 7 Where TSP are carrying out the road works design the fees for signals will be part of the fees charged by TSP. Where signals are designed separately, then the design and supervision fees will be charged in accordance with the charging structure discussed in this document. APPENDIX D DESIGN SERVICES, SUPERVISION AND CONTRACT ADMINISTRATION Lincolnshire County Council’s role in carrying out Design Services at the detailed design stage, contract supervision and contract administration duties after award of tender is as follows; 1. Detailed design of highway works; geotechnical site investigation, trial holes to locate services plant and equipment, horizontal and vertical alignment, relaxations and departures, street lighting/structures/drainage/signs and road markings design, preparation of drawings, specification, bill of quantities, contract documents and works estimate. 2. Carrying out a Stage 2 Road Safety Audit and resolution of any issues raised. 3. Negotiations with all statutory consultees, utilities and services companies (electricity, gas, water, sewers, network rail etc), the general public and highway users. 4. Liaison with and provision of information to the CDM Coordinator, including provision of information for the health and safety file. 5. Attending project progress meetings. 6. Project management services for the S.278 highway works. 7. Carrying out tender procedure; preparation of tender list, sending out tender documents, tender analysis, preparation of report and recommendation of winning tenderer. 8. Contractual and financial administration; supervision and inspection of the works during construction, review and approval of contractual programmes, giving instructions, measurement and valuation of work, recommending payment, valuation of additional works/compensation events and resolution of claims. 9. Inspection of the whole of the works at key stages • Before issue of the Certificate of Start of Warranty Period • After completion of defects • At the end of the Warranty Period before the issue of the Certificate of End of Warranty Period • Before signing-off fulfilment of the Section 278 Agreement 10. Providing the services of a CDM Coordinator, producing a suitable CDM health and safety file (S.278 highway works) and issuing this to the relevant asset managers before completion of the Agreement (where agreed and notified by TSP). 11. Carrying out a Stage 3 Road Safety Audit and resolution of any issues raised. 12. Carrying out a Stage 4 Road Safety Audit and resolution of any issues raised. This list is not intended to be exhaustive, but is just a list of the main duties and functions carried out by Lincolnshire County Council in designing and supervising highway works to be provided under Section 278 Agreements. Note – actual costs incurred by Lincolnshire County Council for carrying out this work will be charged to D’s on a quarterly basis, as section 5.0. APPENDIX E DESIGN CHECKING, INSPECTION AND TESTING Lincolnshire County Council’s role in carrying out design checking of the detailed design, inspection and testing of highway works accepted to progress the Agreement is as follows; 1. Technical audit of detailed design documentation (drawings, specification, bill of quantities, contract documents etc. Ensuring that a competent CDM Coordinator is appointed and consulted at the appropriate stages throughout the Agreement. 2. Ensuring that a civil engineering construction contract is in place. The contract should be in accordance with Engineering and Construction Contract (NEC 2nd Edition) in order to comply with the tender documents. 3. Ensuring that a qualified contract administration and a supervision team are in place in order to undertake the Project Manager and Supervisor duties in accordance with the contract. 4. Inspecting the works during construction, in order to ensure compliance with the agreed project-specific specification, Lincolnshire County Council specification and the Specification for Highway Works. 5. Attending progress meetings. 6. Resolution of any queries by the Designer. 7. Issuing non-conformancy notices. 8. Ensuring that all required Safety Audits are carried out and any issues raised are addressed to the satisfaction of the LHA. 9. Monitoring testing carried out by Lincs Laboratory. 10. Inspection of the whole of the works at key stages • Before issue of the Certificate of Start of Warranty Period • After completion of defects • At the end of the Warranty Period before the issue of the Certificate of End of Warranty Period • Before signing-off of the Section 278 Agreement 11. Providing the services of a CDM Coordinator, producing a suitable CDM health and safety file (S.278 highway works) and issuing this to the relevant asset managers before completion of the Agreement (where agreed and notified in writing by TSP). As Lincolnshire County Council have no role in the administration of the contract, the following functions will not be carried out by the Highway Authority. • • • • • Review and approval of contractual programmes Measurement of the works Giving instructions (unless required as part of the LHA statutory duties and functions for the effective management of the highway network) Valuation of compensation events Resolution of claims BEFORE THE WORKS ARE PERMITTED TO START ON SITE: A minimum of 4 calender weeks before the intended start date on site the developer is required to provide the following information to the Technical Services Partnership for approval; 1. A Curriculum Vitae and list of qualifications for the proposed Project Manager and Site Supervisor in accordance with the Engineering and Construction Contract (NEC 2nd Edition). This list is not intended to be exhaustive, but is just a list of the main duties and functions carried out by Lincolnshire County Council in carrying out design checking, inspecting and testing of highway works to be provided under Section 278 Agreements. Note – actual costs incurred by Lincolnshire County Council for carrying out this work will be charged to developers on a quarterly basis, as section 5.0. APPENDIX F WORKS VALUED AT £25,000 AND UNDER Apart from the section below, the process is as for all other highway works constructed under a Section 278 Agreement, with the exception that the highway works will be procured using the NEC Short Conditions of Contract (version 2) and a minimum of three quotes will be obtained (one of which shall be from the Highways Term Maintenance Contractor, but not using the Highways Term Contract – this must be a separate quote). The Developer then chooses his preferred quote. Exceptions; 1. If TSP declines to carry out the design and supervision or design checking, testing and inspecting the HD PHO will be informed and they may choose to arrange for Division to carry out this work in which case the PHO sets up a SAP code using the process discussed in section 5. 2. If the PHO declines to carry out the design and supervision, or design checking, testing and inspecting then the PHO will notify the D of this and the D will then be permitted to employ his own consultant to design and supervise the works, subject to the requirements of Appendix E, I and K. The consultant must note the following; • • • • • The highway works are to be designed in accordance with HAT 34 DESIGN STANDARDS FOR USE ON HIGHWAY IMPROVEMENT MAINTENANCE AND SCHEMES IN LINCOLNSHIRE which can be viewed on the LCC website. The S.278 highway works will require road safety audits at the appropriate stages in accordance with requirements of HAT 62. A full specification in accordance with the requirements of HAT 34 and the Model Contract Documents for Highway works is required and this will form part of the technical acceptance and be included in the Licence. The works are to be procured using NEC Short Conditions of Contract (Version 2). Before the works will be permitted to start on site the D will be required to provide suitable documentary evidence to the PHO to confirm that a contract is in place and that the appropriate level of site supervision by professional site staff has been arranged. Upon acceptance of the detailed design the D will send 10 copies of the drawings, together with a schedule of the drawings, and all the other information required, to the PHO. 3. The D will be allowed to use his preferred contractor subject to receipt of approval from the Contracts and Tendering Officer, who will arrange for the following to be checked; • Adequate Public Liability Insurance cover. • Previous work in the County (with no problems, as evidenced by 2 references). • Health and Safety Policy – to be approved (by Mouchel safety advisor). On return, the Health and Safety documentation will be forwarded to the Mouchel Safety Advisor, whose comments will be passed to TSP Consultancy Manager for final approval. Rejections must be reasonable and will be supported by a full explanation. • Where no contractor is proposed, or they are unsuitable, the D will asked to contact the Contracts and Tendering Officer, to choose a contractor from the Authority’s Standing List of Contractors. 4. The D arranges the works pre-start meeting (Appendix P). 5. HD arranges for the works to be inspected and tested – fees to be reclaimed from the H7F… SAP code. 6. Before the Warranty Period will be allowed to start and a proportion of the Bond released the D is to organise and pay for a Stage 3 Road Safety Audit through LRSP, contact 01522 805800, provide a Design Team Response and address any issues raised to the satisfaction of LHA. 7. At the end of the Warranty Period the developer is to arrange and pay for a Stage 4 safety audit through LRSP, contact 01522 805800, provide a Design Team Response and address any issues raised to the satisfaction of LHA. Following this the D is to notify LHA and an inspection of the works will be arranged. Any defects or unfinished work will be notified to the developer and this will need to be completed at the D’s expense. 8. Before the works are adopted and the bond released the D will also be required to provide a suitable CDM health and safety file to LHA, as per the requirements of Appendix S. APPENDIX G FINANCIAL PROCEDURE 1. The SPL/PHO will complete a Section 278 Agreements – TSP Requisition Form (Appendix H) and forward to the Senior Support Officer in TSP who will arrange for all costs associated with progressing an Agreement to be allocated to the SAP code, (H7F….). (When the costs incurred by Lincolnshire Council reach the level of the upfront fee the D will be invoiced in arrears on a quarterly basis). 2. All fees received will be required to be allocated to this code apart from the following; Administration fee - which is to be allocated to the APG appropriate budget, Legal Services fee - which is to be allocated to LS budgets, approval of contractor not on the Standing List - and Tender process which are to be allocated to the Business Support Section appropriate budget(s). 3. Where there is a significant delay in reaching issue of the Licence, i.e. 6 calendar months from signing of the Agreement, or the issue of Licence is not completed the SPL will ensure that all costs incurred by the Council in progressing the S.278 are recovered from the Developer and then put the project on hold. 4. For work to restart work the D will be notified that they must provide a written request on their letter headed paper and reaffirm their commitment to pay all fees, charges, additional or abortive costs the LHA may incur in progressing the S.278. Upon receipt of this the SPL will then carry out a review of the project and make an assessment of any additional/abortive costs and initiate a change control in accordance with current TSP Quality Management System procedures. 5. Fees for design and supervision covers the activities as listed in the letter in Appendix A and in Appendix D. Design checking, testing and inspection are as those listed in Appendix A and E. 6. Where there is a commuted maintenance sum(s), Mouchel Business Services – Accountancy Services (MBSAS) are to be notified by APG, and the process in HAT 40 ‘Commuted Sums for Maintenance’ shall be followed. 7. On small schemes (value below £25,000), the HD may wish to carry out the design checking, testing and inspection. In these instances, they should contact TSP Senior Support Officer to obtain a SAP code to which their time should be allocated and they should implement suitable measures to record all time spent, as discussed in section 5.0 8. Regular monitoring of all S.278 accounts will be carried out by TSP. 9. Where a D wishes to deposit a cash Bond, APG will contact the Council’s Treasurer who will arrange for the money to be placed in an interest bearing account where the Bond money shall remain (subject to the usual reductions) until the completion of the scheme, including the Warranty Period. When it is finally released, the D shall be paid all the interest accrued, this is arranged between APG and the Council’s Treasurer. 10. Where a Part 1 claim has been made the procedure in Appendix R is followed. APPENDIX H TSP SECTION 278 AGREEMENTS PROJECT INITIATION/REQUISITION FORM To: From: Name: TSP/Division: Parish: Route: Site Location: Proposed Works: Developer: Contractor: Works Required (complete relevant boxes): TSP Expected Expenditure / Expected Fee Income 1. Allocation of SAP Internal Order Code: H7F 2. Prepare Initial Estimate of Bond Completion Date: £ CATS Reference: 3. Prepare Scheme Layout for Planning Permission £ Completion Date: 4. Detailed Design including Stage 2 Safety Audit and Detailed Estimate for Bond Completion Date: CATS Reference: £ CATS Reference: 5. Tender and Site Supervision Completion Date: £ CATS Reference: 6. Checking of Developer’s Design £ Completion Date: CATS Reference: 7. Inspection and Testing of Developer’s Site Completion Date: £ CATS Reference: 8. Project Management £ Completion Date: CATS Reference: Lead Design Engineer Comments: (e.g. associated S38 works, old scheme resurrected) Signed: Date: APPENDIX I APPROVAL OF CONSULTANTS The information requested below will need to be provided to the LHA in a suitable format before the D appoints a consultant to design and supervise the Section 278 Agreement highway works. The level of information needed will depend on whether or not the intended consultant has previously worked on a project of similar scope, complexity, financial value and location in Lincolnshire and the Highway Authority’s satisfaction with that performance. If the consultant has more than one office then details of each/all offices that will be carrying out the work will be needed. Company Information • • • • • • • • Company name Head office address, telephone and fax numbers Website address Contact details of personnel who will be working on the project (telephone number and email address) Brief description of company business Statement of company’s ability to carry out the design and supervision of the works (manpower and resources available) Details of quality management systems and any assurance certification Curriculum Vitae of staff who will be carrying out the design and supervision of the work Previous Design and Supervision Work Over the Preceding Five Years For each project please give the following information (a minimum of three projects will be needed): • Title and date when carried out • Brief description • Total cost of the project, including works construction cost and fees, excluding any contingency sums • Name and address of Client • Name, address and position of a responsible person currently employed by the organisation/Highway Authority from whom a reference may be requested APPENDIX J APPROVAL OF CDM COORDINATOR The following information requested below will need to be provided to the LHA in a suitable format before the developer appoints a CDMC to manage health and safety during the S.278 Agreement. The level of information needed will depend on whether or not the intended CDMC has previously worked on a project of similar scope, complexity, financial value and location in Lincolnshire and the LHA’s satisfaction with that performance. If the CDMC has more than one office then details of each/all offices that will be carrying out this role will be needed. Company Information • • • • • • • • Company name Head office address, telephone and fax numbers Website address Contact details of personnel who will be carrying out the CDMC role (telephone number and email address) Brief description of company business Statement of company’s ability to carry out the CDMC role (manpower and resources available) Details of quality management systems and any assurance certification Curriculum Vitae of staff who will be carrying out the CDMC role Previous Experience of Carrying Out the Planning Supervisor/CDMC Role Over the Preceding Five Years For each project please give the following information (a minimum of three projects will be needed): • Title and date when carried out • Brief description • Total cost of the project, including works construction cost and fees, excluding any contingency sums • Name and address of Client • Name, address and position of a responsible person currently employed by the organisation/Highway Authority from whom a reference may be requested For guidance CDM co-ordinators need: • good interpersonal skills in order to encourage co-operation without being over-bureaucratic • a sound understanding of health and safety in construction work • a sound understanding of the design process • to understand the importance of co-ordination of the design process • an ability to identify information which others will need to know about the design in order to carry out their work safely • an understanding of relevant aspects of the client's business and the implications of the proposed work for it APPENDIX K DESIGN GUIDANCE NOTES Generally ¾ Design : To be in accordance with the Highways and Traffic Guidance Note 34 - Design Standards for use on Highway Improvement and Maintenance Schemes within Lincolnshire (HAT 34). ¾ Conditions of Contract : The Engineering and Construction Contract (NEC 2) as amended by Manual of Contract Documents for Highway Works ¾ Documents : As required in HAT 34, e.g. the Manual of Contract Documents for Highway Works, Specification for Highways Works, Volume 1, unless any changes are agreed with the LHA. Note: As a guide Developers should allow a minimum of 2 calendar months for the technical audit and acceptance of highway designs, by the LHA, associated with developments. This is however dependant upon the scope, complexity, value and location of the works on the highway network and the D providing suitable information in a timely manner. Feasibility/Preliminary Design Stage The level of detail required for consideration will depend on the scope, complexity, value and location of the proposed works. To avoid any future potential abortive design D’s are to provide what is requested by the LHA from the list below, together with any other supporting drawings, documents and calculations. This is so the proposed works and principles of the design can be assessed before the detail design is progressed. • • • • • • • • • • • • • • • • • • Brief description of development/intended works Suitable scale drawing (1:2500, 1:1250, 1:500) showing highway boundaries and expected land take Longitudinal Section of centre line, showing k values and vertical curves Any anticipated or known design constraints e.g. Traffic Regulation Orders, Tree Preservation Orders, Services/Statutory Undertakers, land issues Any anticipated or known relaxation or departure from standards needed Selection of design speed for each highway link Proposed highway width (justification of selected carriageway width with appropriate traffic flows) Proposed junction type (justification of selected junction with traffic flows, turning movements) Proposed type of drainage with outfall details Information on any structures required Solutions to any issues identified through any Transport Assessment and Travel Plan, e.g. public transport infrastructure, traffic calming, pedestrian requirements Cyclist and pedestrian facilities/strategy Intended method of dealing with existing Rights of Way Any special materials, e.g. required in conservation areas, street furniture Stage 1 safety audit, if available Environmental Assessments Accommodation works Traffic Flows and speeds (AADT – Annual Average Daily Traffic Flows and 85th percentile traffic speed) • • • Safety fence requirements Noise barrier requirements Any other site specific information Detail Design Stage The level of detail required for consideration will depend on the scope, complexity, value and location of the proposed works. To avoid any future potential abortive design D’s are to provide what is requested by the LHA from the list below, together with any other supporting drawings, documents and calculations. This is so the detail of the proposed works can be assessed efficiently. General Requirements: • 1:1250 plan showing extent of the scheme in relation to the existing road network and surrounding area. (A drawing with a different scale may be used to suit the scope, nature or size of the scheme). • If not provided at the preliminary design stage all information needed for a preliminary design check will be required. • Details of what guidance has been used to prepare the design, requirements of HAT 34. • A 3D topographical survey of the site will be required, containing existing level information. Detailed Design Drawings: • 1:500/1:200 scale layout plan/drawings showing; • General arrangement and site location plan, showing extent of site, temporary accesses, details at tie-ins to existing highway etc. • Site clearance details, including a key of items to be removed and any necessary schedules etc • Fencing and environmental barriers; plan, construction and foundation details etc • Safety fencing; plan, construction and foundation details etc • Drainage layout; showing existing and proposed, pipe runs, manhole and gully positions, pipe size, pipe gradients, pipe diameter, outfall details, backfill details, unique numbering of pipes/gullies and chambers and a full drainage schedule. Pipes intended to be adopted should be annotated • Earthworks details, embankment/cutting construction, verge treatments etc • Carriageway and footway construction details indicating areas of different types of construction, areas of planing/inlay/overlay and reconstruction. Evidence of adequacy of construction (cores of existing construction/pavement calculations), construction detail at interface of existing and new works, trench reinstatements etc • Kerbing, edging and channel details; different types to be shown, including areas of overbreak and reinstatement of surrounding carriageway and footway construction etc • Traffic signs positions and road markings; including schedules of new traffic signs and road markings to an end product specification • Landscaping proposals • Road lighting, illuminated signs and illuminated street furniture positions • Electrical works; ducts, service chambers, underground cables, position of feeder pillars and schematic cable diagrams etc • Structures position and orientation • Services/statutory undertakers (showing existing and any proposed alterations/protection measures/diversions etc with estimated costs) • Appropriate cross and longitudinal sections (showing existing and proposed) • Miscellaneous details • Plans showing swept turning paths/vehicular movements of appropriate vehicles around proposed highway scheme • Accommodation works; details of alterations to fencing, accesses, driveways etc including details of consultations and agreement with landowner • • • • Coloured plan showing full limits of Section 278 Agreement Works, inclusive of suitable working space and land to be dedicated for highway purposes (Limits bounded in a thick red line and land to be conveyed shaded blue) Layouts showing any easements or way-leaves required for future maintenance purposes Temporary traffic management measures, road closures and diversion routes Land transfer drawings and schedules Vertical Design: • Sections provided should have suitable exaggerated vertical scales • Cross sections indicating existing and proposed levels and profile • Longitudinal sections showing proposed centreline and channels in relation to existing levels, with proposed gradients, k values for sag and crest curves and a horizontal schematic indicating curve radii, transitions, gradient etc • Boundaries of sections • Contour drawings showing flow arrows Junction Design: Priority Junctions – • 1:500/1:200 scale layout plan/drawings, using a topographical survey of the site, showing proposed spot levels, channels, crown lines and contours • Design checklist to ensure geometric compliance with design standard agreed with LCC, e.g. DMRB (Vol.6) TD 42 – Geometric Design of Major/Minor Priority Junctions and TD 41 – Geometric Design of Vehicular access to All-Purpose Trunk Roads (where appropriate) • Traffic Turning flow data for existing, generated and forecast situations for morning and evening peak periods • Traffic reserve capacity calculations for the AM and PM peak periods using the latest version of PICADY • Justification of the chosen specific layout • Junction layouts will need to include suitable routes for pedestrians and cyclists as required Roundabouts – • 1:500/1:200 scale layout plan/drawings, using a topographical survey of the site, showing proposed spot levels, channels, crown lines and contours • Design checklist to ensure geometric compliance with design standard agreed with LCC, e.g. DMRB (Vol.6) TD 16 – Geometric Design of Roundabouts, or TD 54 – Design of Mini Roundabouts • Traffic Turning flow data for existing, generated and forecast situations for morning and evening peak periods • Traffic reserve capacity calculations for the AM and PM peak periods using the latest version of ARCADY • Drawings showing deflection and visibility • Roundabout layouts will need to include suitable routes and segregation for pedestrians and cyclists as required Traffic Signal Junctions – • 1:500/1:200 scale layout plan/drawings, using a topographical survey of the site, showing signal heads, pole position, feeder pillar, control box, ducting layouts etc • Design checklist to ensure geometric compliance with design standard agreed with the LHA, e.g. DMRB (Vol.6) TD 50 – The Geometric Layout of Signal Controlled Junctions and Signalised Roundabouts • Traffic Turning flow data for existing, generated and forecast situations for morning and evening peak periods • Traffic reserve capacity calculations for the AM and PM peak periods using the latest version of LINSIG or TRANSYT (where appropriate) Pedestrian Crossing Facility: • 1:500/1:200 scale layout plan/drawings, using a topographical survey of the site, showing signal heads, pole position, feeder pillar, control box, ducting layouts etc • Design checklist to ensure compliance with design standard agreed with LCC or the following standards/guidance; Traffic Advisory leaflet – 1/02 The Installation of Puffin Crossings Traffic Advisory leaflet – 04/98 Toucan Crossing Development Traffic Advisory leaflet – 10/93 “Toucan” An unsegregated Crossing for Pedestrians and Cyclists Statutory Instruments – 1997 No.2400 – Road Traffic – The Zebra, Pelican and Puffin Pedestrian Crossing Regulations & General Directions 1997 Local Transport Note 2/95 – The Design of Pedestrian Crossings Design Manual for Roads and Bridges (DMRB) Vol. 8 – TA 05/05 DMRB Vol. 6 – TA 86 Layout at Large Signal Controlled Crossings DMRB Vol. 8 – TD 35 –MOVA Traffic Control DMRB Vol. 8 – TA 12 Signals on High Speed Roads DMRB Vol. 8 – TA 16 General Principles of Control by Signals DMRB Vol. 8 – TA 68 – Assessment & Design of Pedestrian Crossings Drainage Design: • Drainage/hydraulic design calculations will be needed, calculations/data for gully spacings, discharge calculation at outfalls etc • Details of chamber sizing and invert – full drainage schedule showing chamber type, unique numbering, cover level, invert level etc • Details of any attenuation, retention storage with supporting calculations and information on any mechanical items, e.g. hydrobrakes or pumps • Details of pipe depth, cover, backfill details etc • Details of any petrol interceptors • Contour plans showing existing and proposed will also be required • In situations where any proposed highway drainage is expected to be located on/in land outside of the highway limits, which is not to be dedicated then an easement will be required for the its future maintenance • SUDS the level of detail required will be subject to discussion and agreement of Lincolnshire County Council • Proof of consent to discharge • S.104 Agreement Statutory Undertakers/Utilities and Services: • 1:1000/1:500/1:200 scale layout plan/drawings showing horizontal layout of existing services and, where necessary/requested, longitudinal sections together with alteration/protection/diversion proposals and costings Landscaping: • Information on planting strategy • Drawing showing planting areas, plant species, planting density and planting specifications • Information on preparation works and soil types to be used • Details of future maintenance regime and costings Traffic Management: • If a road closure is required during the construction phase details of suitable diversion routes for both local, freight transport and public service vehicles will be needed (where appropriate), with suitable drawings showing temporary signing layouts Structures: • Guidance on LHA’s requirements for the design and construction of highway structures (those over 600mm clear span or retained height) are provided in the LCC document Small Highway Structures Design Guide. • The promoter must be aware of the requirement to obtain the appropriate Technical Approval for the structure in advance of construction. The certification required is dependant upon the type of structure, and may include the need for a Design Certificate, Check Certificate and Approval In Principal document. The TAA in these matters will be TSP. • Independent of the formal Technical Approval process the approval of all calculations, drawings, details, and specifications relevant to the structure by TSP Structures Section will be necessary prior to work commencing on site. • On completion of the works (and prior to adoption), a Health And Safety file in accordance with the Construction (Design And Management) Regulations 2007 will be required for any adopted structures. This must include: o An ‘as-built’ General Arrangement drawing. o Detailed ‘as-built’ drawings showing dimensions, levels, earthworks, foundations, drainage and service ducts, materials, finishes, parapet, safety barriers etc. o Reinforcement ‘as-built’ drawings and schedules showing cover to steel. o Geotechnical information (including borehole logs) and both factual and interpretive ground investigation information. Representatives of TSP Structures Section will wish to test and inspect the works during the construction to satisfy themselves as to the quality and durability of any structure offered for adoption. The requirements for key stage inspections must be obtained from TSP Structures Section in advance of construction commencing. The failure to obtain these inspections may result in a refusal to adopt the structure or the payment of a significantly increased commuted sum. Buildability and Future Maintenance – The design will be subjected to a buildability and future maintenance test; • Does it allow for the contractor’s input? • Evidence will be requested that construction issues have been resolved in the design, e.g. standard kerb radii used to reduce the need for manual cutting, manholes and pipes positioned out of the carriageway or close to channel lines Construction Design and Management Regulations: • All risk assessments and pre-construction information will be required • Where projects are notifiable provide a copy of the issued F10 form Other Required Supporting Information: • Traffic Flows • Carriageway construction design calculation • Drawings showing movements/tracks/vehicular manoeuvres of design vehicles at appropriate locations • Street lighting design calculations • Underground cable calculations and details of protective devices • Sign schedules • CCTV videos of any existing drainage used as connection/outfall • Stage 2 Safety audit report, design team response and recommendations where appropriate • LCC standard details drawings are to be used in all cases, except where the agreed design standard permits the use of other details drawings. These are available on the LCC website. Note - In all cases current standards are to be used at the time designs are prepared. APPENDIX L SECTION 278 PROCEDURE APPENDIX M CALCULATION OF BOND SUM (SURETY) Bond or Cash Deposit Sum (Surety): 1. The aim of the Bond is to safeguard the LHA’s interest should the D default, i.e. if the D should become insolvent or refuse to complete the S.278 works then the LHA needs to ensure that sufficient financial protection is in place to permit it to either; a. Reinstate the highway to its former condition before the S.278 works started on site, or b. Complete the S.278 works. (Dependant upon the stage of the development and the highway works) VAT – Whilst public works are subject to VAT at the current rate the LHA has decided NOT to include this in S.278 surety sums required from D’s. However persons using this procedure are required to verify this information with the Council’s Corporate Finance Section before the Licence (Second Stage) is issued. Procedure for Calculation of Bond or Cash Deposit Sum (Surety): 1. In all cases the cost of the works is to be calculated using the latest schedules provided by the LHA’s Highways Term Maintenance Contractor and this is to be compared against the quote/tender sum chosen by the D. The higher of these sums is then to be selected and the total cost of the works calculated ensuring all associated costs are included, e.g. costs for services alterations, land acquisition, accommodation works, Traffic Regulation Orders (permanent or temporary, e.g. for any required temporary road closures/speed reductions etc), third party fees etc. To this total the following is then added; 2. 5% for contract administration (site supervision / inspection / testing etc) 3. 1% for Health & Safety duties under the CDM Regulations (e.g. client/designer duties (HSE notification / production of as-built drawings / health and safety file etc) 4. 5% for general administration and legal 5. 5% for a contingency sum 6. Total 116% of the calculated cost of the whole of the works total as a minimum figure, and in accordance with the notes below. Notes: A. If a commuted sum(s) is required under the Agreement (for future maintenance purposes, or the running of a highways asset - in accordance with LHA policy – HAT 40); in cases where the D should not pay the commuted sum before issue of the Licence, the total value of the commuted sum(s) is to be included in the total of the Bond sum above. The 16% additional cost, should not however be applied to the commuted sum(s) part of the Bond value. B. Should the D advise of difficulty in obtaining a performance bond from a bondsman due to the requirement for the bond to be indexed linked, i.e. the need for the bond sum to be increased in accordance with the rate of inflation (the RPI value), the LHA may offer to relax this requirement subject to the following; where the cost of the whole of the works is expected to be below £50,000 then the original value of the bond sum will be increased at the current rate of inflation (RPI value to be obtained from http://www.statistics.gov.uk/cci/nugget.asp?id=19) to allow for increases in this value over a period of 2 consecutive years. In cases where the cost of the whole of the works is expected to exceed £50,000 then the bond sum will be subject to 5 years worth of RPI increases. The D is to be advised that these requirements are non-negotiable. APPENDIX N INSTRUCTION TO PREPARE A SECTION 278 AGREEMENT Location of highway works:……………….................................................................................................... File number 278/…………….............. Name & address of Developer: Name & address of Landowner: ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ Name & address of Bondsman (or is the Bond be a cash deposit?): ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ ________________________________________ Name & address of Solicitor: Details of Planning Application (attach copy of application form LCP1) Planning Authority:_____________________________________ County / District / Borough Council: Application number:_______________________ Date of Application:_____________________________ Parish:__________________________________ Has planning permission been granted? Yes / No Details of Section 278 Works Name of road: _____________________________________________Road number:_______________________ Scheme drawing number(s):____________________________________________________________________ (9 copies of scheme layout and 9 copies of Site Location Plan required) (12 copies required if there is land to be dedicated) Bond figure:_____________________________ Are the works to be designed by TSP? Date of Bond calculation:_________________________ Yes / No Design contact__________________________ Are TSP/Division to supervise the works or inspect and test? (If known)______________________________ Is the estimated value of the works above or below £50,000? Required up front fee (£2,000 or £5,000)_______________________________________ Is there any land dedication? Yes / No (Plan showing land to be dedicated coloured blue attached) Are there any commuted sums required by HAT 40? Yes / No If yes, what for and how much?:_____________________________ _______________________________________________________________________________________________ PTO FIRST SCHEDULE TO THE AGREEMENT Description of the works:_________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ General items of the works (amend / add to / delete as appropriate) Construction of new sections of carriageways including junctions, traffic signals and bridge works a) Widening of and tying into existing carriageways and footways b) Strengthening and overlay of existing carriageway and/or footway c) Provision and installation of new kerbs and footways d) Alterations to existing highway drainage systems e) Provision of new highway drainage systems f) Taking down and re-erecting existing street lighting columns, street furniture and traffic signs including electrical connections g) Provision and erection of new street lighting columns, street furniture and traffic signs including electrical connections h) Excavations top soiling and seeding and making good damage caused to existing footways carriageway verges and landscaping (including in relation to landscaping the replacement of any semi-mature trees affected except insofar as the same would be inconsistent with any new scheme of highway landscaping provided as part of the works) i) Alterations to carriageway markings and linings and the provision of new carriageway markings and linings j) Temporary traffic management measures including traffic controls and diversions k) Statutory Undertakers diversion works including any associated ancillary works and any works carried out in accordance with the provisions of paragraph 9 of the (Second) Schedule l) Provision where necessary of cycle lanes/cycle ways Is there a provisional start date for the works? when?____________________________________ Yes / No If Yes, Additional items/notes:__________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ TSP Contact Details:………………………………………….Division Contact Details:……………………………. Any other comments? Signed:_____________________________________________ Date:______________________________ APPENDIX O APPROVAL OF CONTRACTORS NOT ON THE STANDING LIST Procedure Where Developers Request to Use a Contractor NOT on the Standing List 1. Where a contractor is proposed who is not on the Standing List, then the SPL, or PHO shall request the D contact the Contract and Tendering Officer in the Business Support section of the LHA, or refer the matter direct to them, who will then send the contractor the following: • A checklist in respect of Health and Safety/CDM. • A schedule to be completed, with details of three comparable contracts completed within the last 2 years. • Three copies of the LHA Contractor Performance Report Form in order for the contractor to obtain references from other Highway Authorities. 2. On return, the Contract and Tendering Officer will forward the Health and Safety documentation to the LHA Safety Advisor whose comments will be passed to TSP Consultancy Manager for final approval. Any rejections will be reasonable and be supported by a full explanation. 3. The final decision, along with the documentation, will be returned to the Contract and Tendering Officer in the Business Support section who will notify the contractor. If approved, the contractor will be advised that the approval applies to the specific Section 278 works only and is for a limited time period. The D will be charged a fee of £250 for approval of any contractor not on the LHA’s Standing List. 4. Should the same contractor be nominated for further S.278 works, this procedure is repeated and a separate reference will be requested from TSP as to the recent past performance of this contractor. The above fee will also be chargeable to the D as any previous approval of a contractor not on the standing list is site specific. APPENDIX P INFORMATION REQUIRED FROM CONTRACTORS The information requested below will need to be provided to the LHA in a suitable format 15 working days before the intended start date of the proposed works on site. The level of detail of the information needed will depend on the scope, complexity, financial value and the location of the proposed works. • Start date (Note - this must be in accordance with NRSWA notices and TMA road space booking requirements). • Detailed Programme of works, listing; activities, durations, dates, milestones etc. • Method Statement (Note - limestone aggregate is not permitted on temporary running surfaces). • Drawing showing detailed traffic management proposals. • Signing layout for any diversion routes. Note - any temporary road closures will require application to the LHA HD (a minimum of 12 weeks notice is needed). • Names of supervisory personnel to whom instructions may be given. • 24 hour emergency phone no’s (at least 2 are required.) • Details of public liability insurance. • Details of Sub-Contractors / materials suppliers. • Details of routing of construction traffic. • Details of site compound and access. • Confirmation of consultations with police, passenger transport operators, and public relations work with affected residents and businesses. • Details of licensed tips operators for disposal of surplus materials • Details of supervisory personnel registration with the Construction Skills Certification Scheme • Details of the Contractors registration with the Considerate Contractors Scheme (where applicable). • CDM Construction Phase Safety Plan. • For projects with works value costing over £300,000 the Site Waste Management Plan Works Pre-Start Meeting: Representatives from: • LHA TSP (SPL and Design team representative) • LHA HD (PHO and the Area Manager) • Developer • Developer’s Consultant/Site Supervisory staff – where applicable • Contractor • Emergency Services - if appropriate Agenda Items/Matters to be considered: 1. 2. 3. 4. 5. 6. 7. 8. 9. Introductions, role of parties to the Agreement and site representatives Confirm if Agreement Licence and Bond are in place and fees paid Confirm if the contract for the works is in place Confirm if any necessary permanent/temporary Traffic Regulation Orders, consents, wayleaves or easements are in place (where appropriate) Contract Administration (where appropriate) Contract Supervision, daytime and out of hours contact telephone numbers Contractors insurances Approved documents and drawings Structures 10. Site investigation/geotechnical reports 11. Special requirements or constraints 12. Consultation/Liaison with local community, advance signing and noticing requirements 13. Works commencement date 14. Programme of works 15. Site working; days of the week/hours/times etc 16. Method of working 17. Temporary traffic management arrangements, including approvals for temporary traffic signals, road closures and traffic diversion routes 18. NRWSA/Services matters/special conditions (where appropriate) 19. Setting-out; agreement of control points, procedures, level control, highway boundaries and visibility splays 20. Sub-contractors; nominations and approvals (where appropriate) 21. Materials Suppliers and testing arrangements 22. Valuation (where appropriate) 23. Site accesses/egresses, specified construction traffic routes, site accommodation and materials storage areas 24. Health and Safety; CDM Regulations, HSE notification, CDM Co-ordinator, Construction Phase Health and Safety Plan, method statements, Health and Safety File, Client duties etc 25. LCC Inspection and notification of stages of construction (where appropriate) 26. Existing Rights of Way 27. Existing water courses 28. Approval of proposed direction signing 29. Permissions and Licences, off site tips, planning permission for borrow pits (where appropriate) 30. Interested Parties, landowners, accommodation works, adjacent landowners, councils, emergency services, transport operators etc 31. Noise and Vibration Levels 32. Mud, materials and equipment on the highway 33. Street Lighting, connections, test certificates 34. Protection of existing trees, hedgerows, wildlife and items to be retained 35. Future maintenance requirements, as-built drawings 36. Any other business APPENDIX Q PROCEDURE FOR COMPLETION OF THE AGREEMENT 1. Where TSP act as the Project Manager and Site Supervisor, they supervise the construction works on behalf of the D whilst ensuring that the works meet the requirements of the LHA. Compensation events exceeding the limit stated in the Agreement cannot be issued without reference to the D. 2. Although TSP can, on behalf of the D, obtain quotes from the Statutory Undertakers, only the D can place orders for any such works. 3. Where TSP decide to carry out an inspection and testing role, they will not issue any instructions to the contractor, except in cases involving safety matters. All requests/instructions will be made to the developer's Supervisory staff, except where requests made direct to Lincs Lab for samples and tests. (The costs of which are included in the inspection and testing fee). 4. For all schemes (regardless of who has designed them) a pre-start meeting will be held with the developer, (and his designer), the contractor, the PHO, the Area Highway Manager (or his delegate) and TSP. Minutes of the meeting will be prepared by using the standard agenda. 5. Upon completion of the works, and before the issue of the Certificate of End of Warranty Period, TSP shall arrange a meeting with the Area Highways Manager or his delegate to agree the works are complete and ensure that a Stage 3 and Stage 4 Safety Audit have been carried out. 6. TSP SPL or PHO authorise the issue of the relevant Certificate of End of Warranty Period, (subject to the Stage 3 and Stage 4 Safety Audits being done, all issues raised in this are to be completed by the D, and a suitable CDM health and safety file delivered to the LHA, at the D’s expense), and this is sent by APG who arrange for the Bonds to be reduced as necessary (copies of all such correspondence to both the SPL and PHO). This is usually to 10% (or a figure sufficient to cover any defects or unfinished works). APG will, where appropriate, check with the Traffic Signals Section that all signals works charges have been paid, before reducing the Bond. 7. Upon commencement of the Warranty Period, APG will arrange for the land to be dedicated to be recorded and the scheme will be plotted on the GIS system. 8. APG will ensure that a reminder is sent to TSP for the final inspection 15 months after the commencement of the Warranty Period. 9. Before authorising the issue of the Certificate of End of Warranty Period, TSP should arrange a meeting with HD Area Highways Manager to agree that the works are acceptable, ensuring that any points raised in the Safety Audits have been addressed, including exception reports. 10. Upon confirmation from TSP that all defects, unfinished works are complete, APG will issue the Certificate of End of Warranty Period (Appendix U) and cancel the Bond, subject to all fees, costs, charges and commuted sums being paid by the D. 11. Should the D fail to complete any of his obligations under the Agreement, the SPL, or PHO will arrange for the Bond to be called in and used to pay for the costs associated with completing the Agreement. APPENDIX R LAND COMPENSATION ACT - PART 1 CLAIMS 1. If a claim is received, the SPL, or PHO, will forward it to the Head of APG, who will assess its reasonableness and inform the D of such claims. 2. If the D wishes to refute the claim the Head of APG will discuss with LS to agree the best way forward. 3. If a claim is to be investigated the Head of APG will forward it to MBSAS for them to investigate. 4. The D will be given a period of 14-28 days to agree payment. 5. If the D disputes the costs, the matter is to be referred to LS, by the Head of APG, for advice, as how to proceed. APPENDIX S CONSTRUCTION DESIGN AND MANAGEMENT REGULATIONS 2007 The Developer is the Client under the CDM Regulations and has the following duties and responsibilities; Client’s Duties For all projects, Clients must make sure that • Designers, contractors and other team members that they propose to engage are competent (or work under the supervision of a competent person), are adequately resourced and appointed early enough for the work they have to do; • They allow sufficient time for each stage of the project, from concept onwards; • They cooperate with others concerned in the project as is necessary to allow other duty holders to comply with their duties under the regulations; • They coordinate their own work with others involved with the project in order to ensure the safety of those carrying out the construction work, and others who may be affected by it; • There are reasonable management arrangements in place throughout the project to ensure that the construction work can be carried out, so far as is reasonably practicable, safely and without risk to health.; • Contractors have made arrangements for suitable welfare facilities to be provided from the start and throughout the construction phase; • Any fixed workplaces (e.g. offices, shops, factories, schools) which are to be constructed will comply, in respect of their design and the materials used, with any requirements of the Workplace (Health Safety and Welfare) regulations 1992; • Relevant information likely to be needed by designers, contractors or others to plan and manage their work is passed promptly to them. For notifiable projects (where the Construction Phase is longer than 30 working days or 500 person days), in addition to the duties set out above, clients must: • Appoint a competent CDM Co-ordinator, as Appendix J, in this document, to advise and assist with their duties and to co-ordinate the arrangements for health and safety during the planning phase; • Promptly provide the CDM Co-ordinator with stipulated information; • Sign the notification of project to the health and safety Executive which the CDM Coordinator is duty bound to issue. • Appoint a Principal Contractor to plan and manage the construction work – preferably early enough for them to work with the designer on issues relating to buildability, usability and maintainability; • Ensure that the construction phase does not start until the Principal Contractor has prepared a suitable health and safety plan and made arrangements for suitable welfare facilities to be present from the start of the work; • Ensure that the health and safety file prepared by the CDM Co-ordinator and issued to them at the end of the construction phase, this is kept up to date and kept available for inspection by persons involved in any future construction work; • Ensure that the health and safety file is passed on to any new owner of the structure concerned. In the case of notifiable projects the Regulations require that you appoint a CDM Coordinator prior to commencement of design. Construction Phase Plan The principal contractor is required to prepare a "sufficiently developed" Construction Phase Plan prior to construction commencement, with the client responsible for ensuring that it is "sufficiently developed". The CDM co-ordinator will assist the client in achieving this obligation, which will mean that the CDM co-ordinator will review the Construction Phase Plan. The principal contractor is then responsible for monitoring the performance of the Plan and revising the Plan as often as necessary to reflect the site, project, structures and work about to be performed. The Health and Safety File (LHA Requirements) The works Health and Safety (H&S) File is a record, in accessible form, that alerts those who will be responsible for a structure after handover to significant and unusual residual risks that have been created or controlled by the work. The inclusion is so that those who need to subsequently maintain, repair, renovate or demolish the structure can have access to and be aware of these risks at this location. All sections are mandatory but the content of each may vary and in some cases the section may be marked ‘Not applicable’. It is also acceptable to add extra information if necessary – particularly and historic information as may be discovered and deemed appropriate. Wherever practicable, the additional information should by included in, or appended to, the sections shown below. This will significantly aid integrating the Works H&S File information into the Location H&S File, held by the Client. In some situations where the work is like for like replacement, there may be no changes to the information held in the Location H&S File. In these cases, the CDM Coordinator may make a written declaration to this effect and has no need to complete a Works H&S File. Where the works covers more than one Location, a separate sub-section Works file must be produced for each Location, even though a lot of the information may be duplicated. The Works H&S File should contain: Note: As much information as practicable should be recorded on the as-built drawings for the works. For the majority of projects carried out by TSP, as-built drawings will be used to record the details required by a Health and safety file. Extract from ACOP The contents of the health and safety file 263 When putting together the health and safety file, you should consider including information about each of the following where they are relevant to the health and safety of any future construction work. The level of detail should allow the likely risks to be identified and addressed by those carrying out the work: a) b) a brief description of the work carried out; any residual hazards which remain and how they have been dealt with (for example surveys or other information concerning asbestos; contaminated land; water bearing strata; buried services etc); key structural principles (for example, bracing, sources of substantial stored energy including pre-or post tensioned members) and safe working loads for floors and roofs, particularly where these may preclude placing scaffolding or heavy machinery there; hazardous materials used (for example lead paint; pesticides; special coatings which should not be burnt off etc); information regarding the removal or dismantling of installed plant and equipment (for example any special arrangements for lifting, order or other special instructions for dismantling etc); c) d) e) f) g) h) health and safety information about equipment provided for cleaning or maintaining the structures; the nature, location and markings of significant services, including underground cables, gas supply equipment, fire-fighting services etc; information and as-built drawings of the structure, its plant and equipment (for example, the means of safe access to and from service voids, fire doors and compartmentalisation etc). 264 The file does not need to include things that will be of no help when planning future construction work, for example: a) b) c) d) e) the pre-construction information, or construction phase plan; construction phase risk assessments, written systems of work and COSHH assessments; details about the normal operation of the completed structure; construction phase accident statistics; details of all the contractors and designers involved in the project (though it may be useful to include details of the principal contractor and CDM co-ordinator); contractual documents; information about structures, or parts of structures, that have been demolished - unless there are any implications for remaining or future structures, for example voids; information contained in other documents, but relevant cross-references should be included f) g) h) Some of these items may be useful to the client, or may be needed for purposes other than complying with the CDM Regulations, but the Regulations themselves do not require them to be included in the file. Including too much material may hide crucial information about risks. For guidance purposes listed below are the contents of a typical S.278 works health and safety file (not exhaustive); Introduction Description of the Project Residual Hazards Key Design Principles, Relaxations and Departures from Standards Materials Plant and Equipment Significant Services and Statutory Undertakers Plant and Equipment Safety Audits, Design Team Response and Exception Reports As built Drawings Materials Testing Results Electrical Testing Results Format of presentation of the Works Health and Safety File One copy of the works health and safety file is required to be presented as a paper copy, in a suitable binder or folder and using appropriate stationary divided into sub-sections, and one electronic copy. The electronic copy of the file will be supplied in Adobe pdf format (or for as-built drawings – AutoCAD dwg format). Photographs shall be included to clarify any information given and these can be included in the main body of the file in pdf format. APPENDIX T LETTER – CERTIFICATE OF START OF WARRANTY PERIOD My ref: ???/278/ 20?? (Developer Address) Please reply to: Mr/Mrs ???? Development Services 4th Floor City Hall LINCOLN LN1 1DN Tel no: 01522 ????? Email: [email protected] Dear Sirs, WORKS REQUIRED UNDER SECTION 278 OF THE HIGHWAYS ACT 1980 HIGHWAY WORKS AT (insert location) BOND IN THE SUM OF (insert value) CERTIFICATE OF START OF WARRANTY PERIOD I have now received confirmation that the highway works for which this Agreement and deposit bond relate are considered acceptable for the Warranty Period to commence and this will take effect from ???/the date of this letter for a period of 16 calendar months. As the Section 278 Agreement provides for the Bond liability to be reduced for the duration of the Warranty Period please find attached a copy of a letter sent to ??????, who are acting as your Surety under this Agreement. The original bond sum of ??? has been reduced to £??? (??%) with effect from the date of this letter. This reduced sum of money is intended to secure your completion of any defects/unfinished work and all other liabilities under the Agreement before the end of this Warranty Period. If you have any queries, or require further information, please contact ???? on 01522 ???. Yours faithfully Executive Director (Development Services) APPENDIX U LETTER - CERTIFICATE OF END OF WARRANTY PERIOD My ref: ???/278/ 20?? (Developer Address) Please reply to: Mr/Mrs ???? Development Services 4th Floor City Hall LINCOLN LN1 1DN Tel no: 01522 ????? Email: [email protected] Dear Sirs, WORKS REQUIRED UNDER SECTION 278 OF THE HIGHWAYS ACT 1980 HIGHWAY WORKS AT (insert location) BOND IN THE SUM OF (insert value) CERTIFICATE OF END OF WARRANTY PERIOD The Warranty Period for the highway works provided under the above Agreement expired on ???? and I have received confirmation that these works are now acceptable to be adopted and become maintainable at public expense. Please therefore find attached a copy of a letter I have forwarded to ????, who are acting as your Surety in under this Agreement, authorising the release of the remaining bond monies. Accordingly you may take this letter as formal confirmation that all liabilities under this Agreement are now cancelled. If you have any queries, or require further information, please contact ??? on 01522 ????. Yours faithfully Executive Director (Development Services) APPENDIX V CHECK LIST FOR ISSUE OF LICENCE A. Has the Developer appointed a CDM Coordinator who is approved by the Highway Authority? B. Has the Developer provided the Bond; performance bond through a bondsman or cash deposit? C. Has the Developer accepted the design prepared by TSP or requested any changes to it within 10 days of it being issued to the Developer? If not it is deemed to be accepted by the Developer. D. Has the Developer paid all invoices and charges of Lincolnshire County Council for progressing the Agreement up to Issue of the Licence (Second Stage)? 1) £500 Administration fee for the preparation, issue and completion of the Agreement (First Stage). 2) £250 for approval of a contractor not on the Highway Authority Standing List? 3) £950 for work by Legal Services in progressing the Agreement? 4) Fees, charges and disbursements for designing the works, or checking the Developers design? 5) Additional Legal Fees, where applicable? E. Has the Developer provided suitable proof that all insurances required under the Agreement are in place; 1) Third party claims resulting from the work. 2) Public liability insurance - £10,000,000. 3) Employers liability insurance - £10,000,000. 4) Professional indemnity insurance - £10,000,000. 5) Insurance of the works for their full reinstatement value/Bond sum – whichever is the greater value (required up to the issue of Certificate of End Of Warranty Period). F. Has the Developer provided suitable proof of requesting, or obtaining, any permanent or temporary traffic regulation order required for the works? G. Has the Developer provided proof of obtaining any permission, permits, approvals or other licences necessary for carrying out the works? H. Has the Developer provided title or proof of purchase of all land to be dedicated as highway for the works? I. Has the Developer provided suitable proof that any necessary orders for services alterations/diversion/connection/disconnection of services have been placed with statutory undertakers, or that the services alteration works have been completed? J. Has the Developer paid to the Highway Authority the Commuted Sum(s)? If not the commuted sum must be added to the Bond or Deposit Sum? K. Has the Developer complied with all conditions attached to the Planning Permission(s) connected with the works? L. Has the Developer provided suitable proof that all required Network Management Notices have been issued and granted (copies of all notices are needed); 1) Road Space booking – Notice Number? M. Has the Developer provided suitable proof of agreement with the Highway Authority of a timescale or construction programme for construction and completion of the works? N. Has the Developer provided at their expense any easement or wayleave required for the works?
© Copyright 2026 Paperzz