Sample Reserve Study - Museum , Account Museum -- Version Sample January 01, 2020 Reserve Data Analyst www.rdanorthwest.com 866-574-5115 Prepared By Quality Check By TABLE OF CONTENTS Sample Reserve Study - Museum Introduc on 3 Summary Page 4 What Components Are Included? 5 The Component List 6 Current Cost by Category Chart 11 How Much To Reserve? 12 About Percent Funded 13 Percent Funded Chart 14 Reserve Acct. Balance Chart 15 Recommended Funding - Summary 16 Recommended Funding - Projec ons 17 Baseline Funding - Summary 18 Baseline Funding - Projec ons 19 Current Funding - Summary 20 Current Funding - Projec ons 21 Reserve Account Expenditures Chart 22 Annual Expenditure Report 23 Distribu on of Accumulated Reserves 33 Component Detail Reports 38 Calcula ons Appendix 90 Defini ons Appendix 91 Disclosures Appendix 97 Component Index 101 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 2 Sample Reserve Study - Museum Introduc on Thank you for utilizing the services of Reserve Data Analyst for your reserve study. We strive to create a comprehensive report that can be utilized for your budgeting needs and for future replacement schedules but above all else we place an emphasis on a high level of customer service. If there are any questions, concerns, corrections or revisions needed please do not hesitate to call or email us. While this study does have some explanations of the methodology used we have kept it to a minimum for brevity. More detailed explanations of methodology & concepts are explained in our Reserve Study Guidebook which can be found on our website at www.rdanorthwest.com There are a couple of tips to consider that will help you both navigate this study and understand the different sections within the study: 1. To most easily navigate this study we recommend printing out the Table of Contents page at the beginning of the study and the Component Index pages at the rear of the study. This way you don’t need to print out the whole study, you can have the PDF of this study open on the computer and can refer to the printed out Table of Contents and Component Index pages to scroll to or jump to pages within your PDF reader program on the computer. 2. We have created a video summary of a sample study to explain the different pages & reports within this study. You can view this video in a smaller browser window while navigating your study for an explanation of each page in the study. This is extremely helpful and answers the majority of questions that we receive from readers of our reserve studies. Link here: www.rdanorthwest.com/video-reserve-study The below section summaries touch on the some of the more sought after sections of this study; these can be found on the following Table of Contents page. Summary Page - The Summary Page is a brief outline of the findings and recommendations found after the due diligence was conducted by the Reserve Analyst. A percent funded and summary of the finding models can be found on this page. Component List - Perhaps the most important section of the study is the Component List which is the basis for the recommendations found within the study. It is important that this list is comprehensive and accurate so that the funding models are helpful and accurate in their projections. Funding Plans & Percent Funded - Following the Component List are the Funding Models, Percent Funded Calculations and Projections. These are based on the component list developed earlier and each have a different goal in mind. Annual Expenditures Report - Following the Funding Plans is the Annual Expenditure Report which shows the projected replacement schedule of the components annually for the next 30 years. Component Detail Reports - The Component Detail Report section of this study gives recommendations for each component as well as shows the specifics of the component (e.g. – quantity, location, special considerations, etc.). ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 3 Sample Reserve Study - Museum Summary Page Profile Name Location # of Units Base Year / Age Fiscal Year Ends Sample Reserve Study - Museum , 1 June, 1 2012 December, 31 2017 Parameters Level of Service Level III Update Reserve Study (No Site-Visit) Prepared for Fiscal Year 2017 Last On Site Inspection Date February, 10 2015 Allocation Increase Rate ref. Funding Model Summary Contingency Rate Inflation Rate Interest Rate Tax Rate Funding Plan - Method ref. Component Detail Report 3% 1% ref. Funding Model Summary Cash Flow – achieve 100% funded in 30 years Summary *Current Reserve Allocation $0 per year *Estimated FY Start Balance $100,000 Fully Funded Balance $549,114 (ideal amount in reserve account) Percent Funded -------------> 18% (Deficit) or Surplus Per Unit (-$449,114) per unit *Supplied by Client per year per month $153,250 $12,771 $95,030 $7,919 $0 $0 Recommended Funding - Achieve 100% funded in 30 years Baseline Funding - Keeps account above $0 in the 30 year timeline of this study Current Funding - Current data supplied by Client ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 4 Sample Reserve Study - Museum What Components Are Included? Included Components Reserve expenses for components are major expenses which must be budgeted for in advance in order to provide the necessary funds in time for their occurrence. Reserve expenses are reasonably predictable both in terms of frequency and cost. They are expenses that when incurred would have a significant impact on the smooth operation of the budgetary process from one year to the next if they were not reserved for in advance. A common concern when beginning this process is what components are to be included and funded for in the Reserve Study. Nationally recognized Reserve Study Standards indicates reserve components need to meet the following criteria: Excluded Common Area Components Some common area components may have been left out of the study or included in the component list but “Unfunded” and not considered in the mathematical models. These components will typically fall into one or more of the categories listed below. ⦁ Below Threshold Costs - Component repair and/or replacement costs that are deemed too small to be considered reserve expenses are typically included in the operational or maintenance budget have not been funded for in this study. ⦁ Operational Expenses - These occur at least annually and can be effectively budgeted for each year. They are characterized as being reasonably predictable both in terms of frequency and cost. ⦁ Very Long or Unpredictable Useful Life Expectancy - Components which, when properly maintained, have a very long useful life with no predictable replacement cycle. ⦁ Unit Improvements - Improvements made to the property that fall within the Governing Documents’ unit description summary (unit owner’s responsibility). ⦁ Other Non-Association/Organization Owned - Improvements installed on the property but which are owned by other parties such as governmental agencies, utility companies, the US Postal Service, etc. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 5 2032 2032 2037 2021 2021 2032 2032 2032 2032 2030 2022 2030 2047 2027 2027 2047 2032 2047 2032 2047 2047 2027 2042 2047 2022 2022 2022 2022 2032 2032 2027 2027 2027 2027 2037 2032 2020 2020 2037 2037 2037 20 20 25 9 9 20 20 20 20 18 10 18 35 15 15 35 20 35 20 35 35 15 30 35 10 10 10 10 20 20 15 15 15 15 25 20 8 8 25 25 25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 15 20 4 4 15 15 15 15 13 5 13 30 10 10 30 15 30 15 30 30 10 25 30 5 5 5 5 15 15 10 10 10 10 20 15 3 3 20 20 20 3 1 1 310 6,205 6,205 1 1 1 3 3 3 3 1 1 34 4 7 1 4 7 1 1 3 77 140 44 150 50 90 1 1 1 1 1 2 2 2 440 3,950 1,945 Each Each Each Square Feet Square Feet Square Feet Each Each Each Each Each Each Each Each Each Linear Feet Each Each Each Each Each Each Total Each Square Yard(s) Square Yard(s) Square Yard(s) Square Yard(s) Each Each Total Total Total Each Each Each Each Each Square Feet Square Feet Square Feet 4,635.00 3,090.00 20,600.00 6.18 2.57 6.69 51,500.00 30,900.00 13,905.00 1,184.50 360.50 1,854.00 772.50 2,575.00 2,575.00 154.50 1,545.00 772.50 824.00 1,081.50 978.50 24,205.00 6,695.00 7,725.00 66.95 66.95 92.70 66.95 87.55 154.50 2,266.00 36,050.00 15,450.00 772.50 1,030.00 772.50 1,545.00 1,545.00 5.82 5.82 5.82 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 6 Cu r Co rent st 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 Un i Co t st Re p Ye lace ar me nt Us efu l Ad jus tm e Re ma nt ini ng A/C Units, Ceiling Mounted (Mitsubishi) - R.. A/C Units, Floor Mounted (Mitsubishi) - Re.. Accessibility Li Acous c Tile Suspended Ceiling - 5% Repair.. Acous c Tile Suspended Ceiling - Refinish Acous c Tile Suspended Ceiling - Replace Air Handling Unit (11,230 CFM) - AHU #3 Air Handling Unit (5,175 CFM) - AHU #2 Air Handling Unit (800 CFM) - AHU #1 Appliances - Dishwashers Appliances - Microwaves Appliances - Refrigerators Appliances - Sinks Backflow Device for Mechanical Backflow for Fire System Bathroom Countertops Bathroom Par ons Bathroom Sinks Bathroom Urinal Par on Bathroom Urinals Bathroom Water Closets Boiler, Electric (563 MBH) - EB #1 Cabinets Cabinets & Countertops - Refurbish Carpet Flooring - Auditorium Carpet Flooring - Lower Level Carpet Flooring - Sherry Grover Gallery Carpet Flooring - Upper Level Chairs - Stackable Classroom Chairs - Stackable Fabric Covered Chemical Feeder Cinema Projec on System Cinema Sound System - Retrofit Classroom Projector Classroom Projector Screen Compressors 2hp, 29 Gallon Computer Equipment Computer Equipment Concrete Flooring Refinish - Auditorium Concrete Flooring Refinish - Lower Level Concrete Flooring Refinish - Main Level Un its Descrip on Da t Se e i n rvi ce Sample Reserve Study - Museum The Component List 13,905 3,090 20,600 1,916 15,978 41,542 51,500 30,900 13,905 3,553 1,081 5,562 2,317 2,575 2,575 5,253 6,180 5,407 824 4,326 6,849 24,205 6,695 23,175 5,155 9,373 4,079 10,042 4,377 13,905 2,266 36,050 15,450 772 1,030 1,545 3,090 3,090 2,561 22,987 11,319 Cu r Co rent st 2012 2037 2012 2037 2012 2042 2012 2042 2012 2022 2012 2042 2012 2042 2012 2042 2012 2042 2012 2022 2012 2024 2012 2036 2012 2030 Unfunded 2012 2042 2012 2042 2012 2042 2012 2032 2012 2042 2012 2017 2012 2027 2012 2027 2012 2027 2012 2032 2012 2032 Unfunded 2012 2037 2012 2037 2012 2032 2012 2032 2012 2032 2012 2037 2012 2032 2012 2032 2012 2052 2012 2032 2012 2032 2012 2052 2012 2017 2012 2022 Un i Co t st INVALID_CATGROUP con nued... Curtains Curtains Power Control and Track System Dampers, Fire /Smoke Dampers, Motorized Control Day Lounger Desk Display Pedestal Cabinets Display Tables Downspouts Drinking Fountain Duel Sump Pump Duel Sump Pump Controls Elevator Cab Refurbish & Door Package Elevator System - Maintenance/Repairs Elevator System - Modernize/Upgrade Exhibit Display Cabinet Exhibit Display Pedestal Expansion Tanks Exterior Metal Doors Exterior Surfaces - Pressure Wash Fans, Exhaust (300 CFM) - EF #1-2 Fans, Exhaust (340 CFM) - EF #2-1 Fans, Exhaust (380 CFM) - EF #L-1 Fans, Exhaust (850 CFM) - EF #1-1 Fans, Scavenger (2,000 CFM) - #SF-L-1 Fire System - Tes ng & Minor Repairs Fire System Panel - Upgrade/Modernize Fire System Sprinkler Heads - Replace Fluid Cooler, Closed Loop Furnishings - Business Office Furnishings - Marke ng Office Generator - 14 KW Glass Storefront Entry Door Auto Openers Glass Storefront Entry Doors Greenscreen Metal Vine Wall Gypsum Board Suspended Ceiling - 5% Rep.. Gypsum Board Suspended Ceiling - Refinish Gypsum Board Suspended Ceiling - Replace Hardwood Flooring Refinish - Grand Stairca.. Hardwood Flooring Refinish - Main & Uppe.. Un its Descrip on Da t Se e i n rvi ce Re p Ye lace ar me nt Us efu l Ad jus tm e Re ma nt ini ng Sample Reserve Study - Museum The Component List 25 25 30 30 10 30 30 30 30 10 12 24 18 0 0 0 0 0 0 0 0 0 0 0 0 0 20 20 25 25 5 25 25 25 25 5 7 19 13 928 1 9 9 1 1 11 3 120 3 2 1 1 Square Feet Total Each Each Each Total Each Each Linear Feet Each Each Each Each 8.24 7,828.00 515.00 875.50 1,545.00 10,300.00 2,575.00 515.00 15.45 1,442.00 1,545.00 2,060.00 20,600.00 7,647 7,828 4,635 7,879 1,545 10,300 28,325 1,545 1,854 4,326 3,090 2,060 20,600 30 30 30 20 30 3 15 15 15 20 20 0 0 0 0 0 0 0 0 0 0 0 25 25 25 15 25 0 10 10 10 15 15 1 11 21 3 4 11,200 1 1 1 1 1 Each Each Each Each Each Square Feet Each Each Each Each Each 77,250.00 2,575.00 566.50 3,090.00 1,236.00 0.51 772.50 772.50 772.50 1,236.00 4,944.00 77,250 28,325 11,896 9,270 4,944 5,768 772 772 772 1,236 4,944 25 25 20 20 20 25 20 20 40 20 20 40 5 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 20 15 15 15 20 15 15 35 15 15 35 0 5 1 173 1 1 1 1 2 5 390 350 7,005 7,005 180 6,495 Each Each Each Total Total Each Each Each Square Feet Square Feet Square Feet Square Feet Square Feet Square Feet 6,180.00 103.00 30,900.00 3,090.00 5,665.00 15,450.00 2,575.00 3,605.00 20.60 5.66 2.06 6.18 6.69 6.69 6,180 17,819 30,900 3,090 5,665 15,450 5,150 18,025 8,034 1,983 14,430 43,291 1,205 43,484 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 7 Cu r Co rent st 2012 2022 2012 2052 2012 2052 2012 2052 2012 2032 2012 2032 2012 2027 2012 2027 2012 2052 Unfunded 2012 2020 2012 2024 2012 2037 2012 2037 2012 2037 2012 2037 2012 2037 2012 2037 2012 2052 2012 2032 2012 2032 2012 2052 2012 2020 2012 2032 Unfunded 2012 2022 2012 2037 2012 2024 2012 2036 2012 2024 2012 2024 2012 2032 2012 2042 2012 2042 2012 2042 2012 2042 2012 2027 2012 2037 2012 2024 2012 2024 Un i Co t st INVALID_CATGROUP con nued... Hardwood Flooring Refinish - Stage Hardwood Flooring Replace - Grand Stairca.. Hardwood Flooring Replace - Main & Uppe.. Hardwood Flooring Replace - Stage Heat Pumps - 3.5 Ton Geothermal Water t.. Heat Pumps - Main and Upper Level HVAC Humidifier - HUM #1 Humidifier - HUM #2 Interior Doors Interior Surfaces Kaleidescape Server Keri Systems - Key Fob System Upgrades Ligh ng - Cove Light Fixtures Ligh ng - Exhibit Track Fixtures Ligh ng - Pendant Linear Fluorescent Fixtu.. Ligh ng - Recessed 2' x 2' Fixtures (Lower L.. Ligh ng - Recessed Mul lamp Fixtures Ligh ng - Recessed/Pendant Single Fixtures Louver Sun Shade System - Replace Louver Sun Shades - Paint (both sides) Metal Siding - Refinish Metal Siding - Replace Office - Computer Equipment Par on Walls Piping - Geothermal Pocket Doors Projec on Screen with Power Li Pump, Circula on - Geothermal Pump, Circula on Controls - Geothermal Pump, In-Line Water Pump Pump, In-Line Water Pump Recessed Fixtures Roof Deck - Guard Rail Roof Deck - Paver System Roof Hatch Roo op Garden - Membrane Roo op Garden - Renovate Sea ng - Theatre Style Security - Cameras Replace Security - DVR Unit Moderniza on/Upgrade Un its Descrip on Da t Se e i n rvi ce Re p Ye lace ar me nt Us efu l Ad jus tm e Re ma nt ini ng Sample Reserve Study - Museum The Component List 10 40 40 40 20 20 15 15 40 0 0 0 0 0 0 0 0 0 5 35 35 35 15 15 10 10 35 263 180 6,495 263 3 4 1 2 31 Square Feet Square Feet Square Feet Square Feet Each Each Each Each Each 6.69 128.75 20.60 20.60 12,360.00 10,300.00 3,605.00 3,605.00 824.00 1,761 23,175 133,797 5,418 37,080 41,200 3,605 7,210 25,544 8 12 25 25 25 25 25 25 40 20 20 40 8 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 7 20 20 20 20 20 20 35 15 15 35 3 15 1 1 10 171 82 8 36 90 1,870 3,740 1,024 1,024 5 7 Each Total Each Each Each Each Each Each Square Feet Square Feet Square Feet Square Feet Each Each 6,180.00 6,180.00 257.50 154.50 257.50 257.50 463.50 154.50 36.05 3.60 3.60 12.36 1,545.00 1,545.00 6,180 6,180 2,575 26,419 21,115 2,060 16,686 13,905 67,413 13,483 3,692 12,657 7,725 10,815 10 25 12 24 12 12 20 30 30 30 30 15 25 12 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 20 7 19 7 7 15 25 25 25 25 10 20 7 7 2 180 1 1 1 1 22 43 170 1 650 650 58 19 1 Each Square Feet Each Each Each Each Each Linear Feet Square Feet Each Square Feet Square Feet Each Each Total 1,545.00 20.60 10,815.00 2,060.00 4,120.00 4,120.00 206.00 128.75 15.45 1,854.00 12.36 30.90 412.00 1,287.50 4,120.00 3,090 3,708 10,815 2,060 4,120 4,120 4,532 5,536 2,626 1,854 8,034 20,085 23,896 24,462 4,120 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 8 30 30 10 30 30 30 30 15 15 20 20 30 20 40 20 40 20 40 40 40 22 22 22 22 22 22 22 22 22 22 22 20 20 20 25 25 15 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 25 5 25 25 25 25 10 10 15 15 25 15 35 15 35 15 35 35 35 17 17 17 17 17 17 17 17 17 17 17 15 15 15 20 20 10 15 67 15 1 7,560 144 2 30 60 1 6 700 3 926 926 3,003 3,003 30 2,965 260 260 1 1 1 1 1 1 1 1 1 1 1 1 2 1 60 105 1 1 Linear Feet Linear Feet Each Square Feet Square Feet Each Each Each Total Each Square Feet Each Square Feet Square Feet Square Feet Square Feet Each Square Feet Square Feet Square Feet Each Each Each Each Each Each Each Each Each Each Each Each Each Each Square Feet Square Yard(s) Each Each 463.50 463.50 1,030.00 10.30 123.60 515.00 566.50 978.50 3,090.00 103.00 9.27 875.50 30.90 51.50 41.20 113.30 206.00 18.54 25.75 25.75 3,090.00 3,090.00 3,090.00 3,605.00 1,545.00 4,120.00 4,635.00 2,060.00 2,060.00 2,060.00 2,060.00 3,605.00 2,575.00 5,665.00 14.42 123.60 6,180.00 2,060.00 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 9 Cu r Co rent st Unfunded 2012 2042 2012 2042 2012 2022 2012 2042 2012 2042 2012 2042 2012 2042 2012 2027 2012 2027 2012 2032 2012 2032 2012 2042 2012 2032 2012 2052 2012 2032 2012 2052 2012 2032 2012 2052 2012 2052 2012 2052 2012 2034 2012 2034 2012 2034 2012 2034 2012 2034 2012 2034 2012 2034 2012 2034 2012 2034 2012 2034 2012 2034 2012 2032 2012 2032 2012 2032 2012 2037 2012 2037 2012 2027 2012 2032 Unfunded Un i Co t st INVALID_CATGROUP con nued... Sewer Mains Sherry Grover - Display Cabinets Sherry Grover - Display Table Case Sherry Grover - TV Single Ply Membrane (PVC) - Replace Skylights Small Tables Solar Panel Moun ng Brackets Solar Panels - Replace Solar Panels Controller - Replace Stanchions Stone Veneer - 50% Repair Con ngency Storage Cabinets Storefront Type (Exterior) - Repair Storefront Type (Exterior) - Replace Structural Glazing Systems - Repair Structural Glazing Systems - Replace Tables - Folding Tigerwood Rainscreen Siding - Replace Tile Flooring - Main Level Bathrooms Tile Flooring - Upper Level Bathrooms Variable Air Volume Terminal (1,240 CFM) .. Variable Air Volume Terminal (1,425 CFM) .. Variable Air Volume Terminal (1,475 CFM) .. Variable Air Volume Terminal (1,610 CFM) .. Variable Air Volume Terminal (195 CFM) - .. Variable Air Volume Terminal (2,100 CFM) .. Variable Air Volume Terminal (2,180 CFM) .. Variable Air Volume Terminal (425 CFM) - .. Variable Air Volume Terminal (485 CFM) - .. Variable Air Volume Terminal (550 CFM) - .. Variable Air Volume Terminal (660 CFM) - .. Variable Frequency Drive (10 HP) - VFD #2 Variable Frequency Drive (2 HP) - VFD #1 Variable Frequency Drive (20 HP) - VFD #3 Vinyl Flooring - Upper Level Bathroom Vinyl/Lino Flooring - Classroom Upper Level Water Heater Water Heater Circula on Pump 1/6 hp Water Mains Un its Descrip on Da t Se e i n rvi ce Re p Ye lace ar me nt Us efu l Ad jus tm e Re ma nt ini ng Sample Reserve Study - Museum The Component List 31,054 6,952 1,030 77,868 17,798 1,030 16,995 58,710 3,090 618 6,489 2,626 28,613 47,689 123,724 340,240 6,180 54,971 6,695 6,695 3,090 3,090 3,090 3,605 1,545 4,120 4,635 2,060 2,060 2,060 2,060 3,605 5,150 5,665 865 12,978 6,180 2,060 INVALID_CATGROUP con nued... Water Storage Tank Window Interior Sun Shades - Replace Wood Benches Wood Siding & Overhang - Refinish Wood Table Sets INVALID_CATGROUP - Total 30 18 30 3 30 0 0 0 0 0 25 13 25 0 25 1 8 2 2,965 2 Each Each Each Square Feet Each Cu r Co rent st 2042 2030 2042 2017 2042 Un i Co t st 2012 2012 2012 2012 2012 Un its Re p Ye lace ar me nt Us efu l Ad jus tm e Re ma nt ini ng Descrip on Da t Se e i n rvi ce Sample Reserve Study - Museum The Component List 9,785.00 4,120.00 824.00 3.60 2,575.00 Total Asset Summary 9,785 32,960 1,648 10,689 5,150 $81,209,763 $2,483,272 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 10 Sample Reserve Study - Museum Current Cost by Category Chart The above chart illustrates the current cost breakdown percentage of the Component Categories in this reserve study. Special attention should be given to those component categories which take up a bulk of the % of the current cost as these may require significant planning to adequately budget for their replacement. These large expenses may be well into the future during "Peak Year" cycles. Refer to the Cash Flow Projections and the Annual Expenditure Report for the projected timeline of expected expenditures. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 11 Sample Reserve Study - Museum How Much To Reserve? There is no right or wrong answer to “How Much Should We Reserve? as the reserve contributions in all the funding models in this study are based on different funding goals. Each Client has different risk tolerances and challenges in enacting whatever funding plan is most appropriate to them. This being said any funding model that projects the reserve account balance to dip into a deficit would not, in our opinion, be appropriate or fiscally responsible as future special assessments, loans or deferred maintains are typically the outcome of any funding model that projects a deficit in the reserve account. Below are some of the more common funding models utilized: ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 12 Sample Reserve Study - Museum About Percent Funded Percent funded is a calculation of how much is in the reserve account versus an ideal amount known as the Fully Funded Balance. The different ranges in levels of funding are explained below. 71 - 100 % Funded - Good At this level, the the reserve balance is considered to be at a good level of funding. The risk for reliance on special assessments, loans and deferred maintenance is minimized. While the goal is to reach and remain at the 100% funded mark the actual funding level will likely fluctuate above and below 100% due to changing component expenses in any given period of time covered in this reserve study. 31 – 70 % Funded - Fair A fairly funded reserve account is typically one on the right path to becoming fully funded but one that can also run into trouble if large expenses arise such as unexpected component failures or rapidly rising costs, specifically in years when large expenditures come to fruition. Additionally it is important that the Client is vigilant with their goal to reach a higher percent funded level as there is often pressure to reduce the reserve allocation rate or utilize money elsewhere as the reserve account balance grows to a level which is perceived to be large. Boards often have difficulties in continuing with the longer term goals in years of economic downturn when when there is greater difficulty in continuing to allocation to the reserve account with regular annual increases to offset inflationary factors. 0 – 30 % Funded – Low A low funding level often forces an Association/Organization to rely on special assessments and/or loans. With insufficient funds the Client may not be able to meet predictable component project expenditures. At this level of funding many Clients choose to defer component projects which results in condition deficiencies and over time will cause significant deferred maintenance issues which in turn hurt property values and aestetic appeal of the property. Note that Associations/Organizations can often stay within a poor funding range for many years before any apparent negative impact. The reality of the financial position of the Association/Organization will often become apparent in "peak" expense years when one or several large expense component projects occur (e.g. roofing, asphalt, siding, windows) which will require special assessments to be implemented or loans secured. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 13 Sample Reserve Study - Museum Percent Funded Chart The chart above compares three funding models (Recommended Funding Model, Baseline Funding Model and the Current Funding Model) by the percentage funded, annually over the 30 year timeframe of this reserve study. Note that the Recommended Funding Plan increases the Client's reserve account Percent Funded Level to 100% funding within the timeframe of this study. Once this 100% funded level is reached it is a good indicator that the Client is on track to meet its future obligations with minimal risk of reliance on loans/special assessments. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 14 Sample Reserve Study - Museum Reserve Acct. Balance Chart The chart above compares the annual year end balance of the funding models (Recommended, Baseline & Current Funding Models) over the 30 years covered in this reserve study. Note than even though balances cannot realistically be in the negative territory these have been shown as a visual for the level of deficiency. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 15 Sample Reserve Study - Museum Recommended Funding - Summary Report Parameters Report Date Account Number Version Budget Year Beginning Budget Year Ending January 01, 2020 Museum Sample January 01, 2017 December 31, 2017 Total Units Infla on Annual Assessment Increase Interest Rate on Reserve Deposit Tax Rate Included in Interest Rate 1 2017 Beginning Balance 3.00% 3.00% 0.70% $100,000 We have developed a funding plan which will help steer the reserve account into a high funded range over a period of 30 years. This funding model is very realistic and helps to guide the reserve account out of the current poor/fair funding range in a relatively short period of time. This Recommended Funding Model requires the Client to allocate the recommended allocation amount into the reserve account with annual increases over the 30 years covered in this study. In the following pages you will find the recommended allocation rates to the reserve account, annual projected expenditures and the percent funded of the reserve account if following this Recommended Funding Model. This Recommended Funding Plan Takes into Account 4 Basic Principles: 1. There are adequate reserves when needed. 2. The budget should remain stable but increasing to offset inflationary factors. 3. The costs are fairly distributed over time. 4. The funding plan must allow the Client to be fiscally responsible. 30 Year Full Funding Model Summary of Calcula ons Required Month Contribu on Average Net Month Interest Earned Total Month Alloca on to Reserves $12,770.83 $96.71 $12,867.54 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 16 Sample Reserve Study - Museum Recommended Funding - Projec ons Beginning Balance: $100,000 Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 Current Cost 2,483,272 2,557,770 2,634,503 2,713,538 2,794,944 2,878,792 2,965,156 3,054,111 3,145,734 3,240,106 3,337,309 3,437,429 3,540,551 3,646,768 3,756,171 3,868,856 3,984,922 4,104,469 4,227,603 4,354,432 4,485,064 4,619,616 4,758,205 4,900,951 5,047,980 5,199,419 5,355,401 5,516,063 5,681,545 5,851,992 Annual Contribu on 153,250 157,847 162,583 167,460 172,484 177,659 182,989 188,478 194,133 199,956 205,955 212,134 218,498 225,053 231,804 238,759 245,921 253,299 260,898 268,725 276,787 285,090 293,643 302,452 311,526 320,871 330,498 340,413 350,625 361,144 Annual Annual Interest Expenditures 1,161 2,262 3,405 4,308 5,392 5,960 7,131 7,996 9,397 10,698 10,442 11,790 13,221 14,043 15,747 10,161 11,936 13,411 15,116 16,085 15,086 16,953 18,865 21,093 23,165 16,084 18,487 20,405 22,978 25,641 17,662 39,930 20,139 99,897 19,650 69,989 21,472 250,366 27,802 23,463 118,319 1,046,800 51,924 28,017 142,231 431,359 30,615 34,286 33,453 1,348,122 81,170 Projected Ending Reserves 236,749 396,858 562,846 694,685 852,422 936,144 1,106,613 1,233,098 1,436,628 1,625,810 1,591,840 1,787,961 1,996,217 2,116,994 2,364,546 1,566,665 1,824,523 2,039,308 2,287,305 2,429,884 2,290,398 2,561,826 2,840,048 3,163,593 3,464,831 2,453,665 2,802,649 3,082,297 3,455,899 3,842,684 Fully Funded Percent Reserves Funded 662,774 801,496 947,945 1,061,331 1,202,286 1,269,215 1,424,819 1,537,374 1,729,652 1,909,967 1,864,446 2,051,453 2,253,330 2,368,498 2,614,072 1,794,045 2,033,013 2,231,223 2,465,726 2,595,514 2,437,465 2,693,692 2,960,264 3,276,779 3,575,165 2,535,429 2,860,314 3,118,806 3,476,346 3,852,531 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 17 36% 50% 59% 65% 71% 74% 78% 80% 83% 85% 85% 87% 89% 89% 90% 87% 90% 91% 93% 94% 94% 95% 96% 97% 97% 97% 98% 99% 99% 100% Sample Reserve Study - Museum Baseline Funding - Summary Report Parameters Report Date Account Number Version Budget Year Beginning Budget Year Ending January 01, 2020 Museum Sample January 01, 2017 December 31, 2017 Total Units Infla on Annual Assessment Increase Interest Rate on Reserve Deposit Tax Rate Included in Interest Rate 1 2017 Beginning Balance 3.00% 3.00% 0.70% $100,000 The Baseline Funding Model is considered a bare minimum approach which has a goal of only keeping the reserve account balance above $0 and long term does not result in a good funding range (above 70%) for much of the time period over the 30 years covered in this reserve study. We do not suggest following this funding method due to the higher risk of the reserve account reaching a $0 balance specifically in years when there are large expenses or due to components failing earlier than projected. Baseline Threshold Funding Model Summary of Calcula ons Required Month Contribu on Average Net Month Interest Earned Total Month Alloca on to Reserves $7,919.13 $78.28 $7,997.41 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 18 Sample Reserve Study - Museum Baseline Funding - Projec ons Beginning Balance: $100,000 Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 Current Cost 2,483,272 2,557,770 2,634,503 2,713,538 2,794,944 2,878,792 2,965,156 3,054,111 3,145,734 3,240,106 3,337,309 3,437,429 3,540,551 3,646,768 3,756,171 3,868,856 3,984,922 4,104,469 4,227,603 4,354,432 4,485,064 4,619,616 4,758,205 4,900,951 5,047,980 5,199,419 5,355,401 5,516,063 5,681,545 5,851,992 Annual Contribu on 95,030 97,880 100,817 103,841 106,957 110,165 113,470 116,874 120,381 123,992 127,712 131,543 135,489 139,554 143,741 148,053 152,495 157,069 161,782 166,635 171,634 176,783 182,087 187,549 193,176 198,971 204,940 211,088 217,421 223,943 Annual Annual Interest Expenditures 939 1,624 2,334 2,789 3,409 3,494 4,167 4,515 5,380 6,127 5,296 6,050 6,866 7,050 8,096 1,827 2,897 3,641 4,590 4,778 2,972 4,003 5,052 6,387 7,535 17,662 39,930 20,139 99,897 19,650 69,989 21,472 250,366 27,802 23,463 118,319 1,046,800 51,924 28,017 142,231 431,359 30,615 34,286 33,453 1,348,122 919 1,818 3,337 4,912 81,170 Projected Ending Reserves 178,307 277,812 380,962 447,663 537,889 551,652 649,639 701,039 826,800 935,446 818,088 927,879 1,046,771 1,075,057 1,226,893 329,974 485,365 594,151 732,506 761,688 504,935 655,106 807,958 1,001,894 1,169,151 20,000 225,859 357,596 578,354 807,210 Fully Funded Percent Reserves Funded 662,774 801,496 947,945 1,061,331 1,202,286 1,269,215 1,424,819 1,537,374 1,729,652 1,909,967 1,864,446 2,051,453 2,253,330 2,368,498 2,614,072 1,794,045 2,033,013 2,231,223 2,465,726 2,595,514 2,437,465 2,693,692 2,960,264 3,276,779 3,575,165 2,535,429 2,860,314 3,118,806 3,476,346 3,852,531 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 19 27% 35% 40% 42% 45% 43% 46% 46% 48% 49% 44% 45% 46% 45% 47% 18% 24% 27% 30% 29% 21% 24% 27% 31% 33% 1% 8% 11% 17% 21% Sample Reserve Study - Museum Current Funding - Summary Report Parameters Report Date Account Number Version Budget Year Beginning Budget Year Ending January 01, 2020 Museum Sample January 01, 2017 December 31, 2017 Total Units Infla on Annual Assessment Increase Interest Rate on Reserve Deposit Tax Rate Included in Interest Rate 1 2017 Beginning Balance 3.00% 3.00% 0.70% $100,000 The Current Funding Model does not adequately fund the reserve account within the timeframe of this reserve study. This funding model assumes a 3% increase to the Current reserve allocation rate annually which still does not meet the projected obligations over the 30 years of this study. Continuing with this funding model will likely lead to a high risk for reliance on special assessments, loans and/or deferred maintenance. Note that while reserve account balance and percent funded could not realistically be in a negative territory it has been reported this way as a visual representation of the amount that the reserve account is projected to be in shortfall. Current Assessment Funding Model Summary of Calcula ons No Required Month Contribu on Average Net Month Interest Earned Total Month Alloca on to Reserves $48.18 $48.18 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 20 Sample Reserve Study - Museum Current Funding - Projec ons Beginning Balance: $100,000 Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 Current Cost 2,483,272 2,557,770 2,634,503 2,713,538 2,794,944 2,878,792 2,965,156 3,054,111 3,145,734 3,240,106 3,337,309 3,437,429 3,540,551 3,646,768 3,756,171 3,868,856 3,984,922 4,104,469 4,227,603 4,354,432 4,485,064 4,619,616 4,758,205 4,900,951 5,047,980 5,199,419 5,355,401 5,516,063 5,681,545 5,851,992 Annual Contribu on Annual Annual Interest Expenditures 578 582 586 310 171 17,662 39,930 20,139 99,897 19,650 69,989 21,472 250,366 27,802 23,463 118,319 1,046,800 51,924 28,017 142,231 431,359 30,615 34,286 33,453 1,348,122 81,170 Projected Ending Reserves 82,916 83,499 84,085 44,465 24,496 -75,401 -95,051 -165,040 -165,040 -186,512 -436,879 -464,681 -488,145 -606,463 -606,463 -1,653,263 -1,653,263 -1,705,187 -1,733,204 -1,875,435 -2,306,794 -2,337,409 -2,371,695 -2,371,695 -2,405,148 -3,753,270 -3,753,270 -3,834,440 -3,834,440 -3,834,440 Fully Funded Percent Reserves Funded 662,774 801,496 947,945 1,061,331 1,202,286 1,269,215 1,424,819 1,537,374 1,729,652 1,909,967 1,864,446 2,051,453 2,253,330 2,368,498 2,614,072 1,794,045 2,033,013 2,231,223 2,465,726 2,595,514 2,437,465 2,693,692 2,960,264 3,276,779 3,575,165 2,535,429 2,860,314 3,118,806 3,476,346 3,852,531 13% 10% 9% 4% 2% -6% -7% -11% -10% -10% -23% -23% -22% -26% -23% -92% -81% -76% -70% -72% -95% -87% -80% -72% -67% -148% -131% -123% -110% -100% ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 21 Sample Reserve Study - Museum Reserve Account Expenditures Chart The above chart provides a visual of the reserve account projected expenditures over the 30 years covered in this study. We suggest making a note of large expenditure years (peak years) when there will be significant projected expenditures related to one or more costly component that will require repair/replacement. These large but infrequent component expenses during “peak” years are typically the most difficult to budget for as they are often overlooked or ignored due to the perception that the expenses are far in the future and there will be time to budget for them at a later date. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 22 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2017 Exterior Surfaces - Pressure Wash Hardwood Flooring Refinish - Grand Staircase Wood Siding & Overhang - Refinish Total for 2017 5,768 1,205 10,689 $17,662 No Replacement in 2018 No Replacement in 2019 Replacement Year 2020 Computer Equipment Computer Equipment Exterior Surfaces - Pressure Wash Kaleidescape Server Office - Computer Equipment Wood Siding & Overhang - Refinish 3,377 3,377 6,303 6,753 8,441 11,680 Total for 2020 $39,930 Replacement Year 2021 Acous c Tile Suspended Ceiling - 5% Repair Con ngency Acous c Tile Suspended Ceiling - Refinish Total for 2021 2,156 17,983 $20,139 Replacement Year 2022 Appliances - Microwaves Carpet Flooring - Auditorium Carpet Flooring - Lower Level Carpet Flooring - Sherry Grover Gallery Carpet Flooring - Upper Level Day Lounger Drinking Fountain Hardwood Flooring Refinish - Grand Staircase 1,254 5,976 10,866 4,728 11,642 1,791 5,015 1,397 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 23 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2022 con nued... Hardwood Flooring Refinish - Main & Upper Level Hardwood Flooring Refinish - Stage Pocket Doors Sherry Grover - TV Total for 2022 50,410 2,041 3,582 1,194 $99,897 Replacement Year 2023 Exterior Surfaces - Pressure Wash Wood Siding & Overhang - Refinish 6,887 12,763 Total for 2023 $19,650 Replacement Year 2024 Duel Sump Pump Keri Systems - Key Fob System Upgrades Pump, Circula on - Geothermal Pump, In-Line Water Pump Pump, In-Line Water Pump Security - Cameras Replace Security - DVR Unit Moderniza on/Upgrade Total for 2024 3,800 7,601 13,301 5,067 5,067 30,086 5,067 $69,989 No Replacement in 2025 Replacement Year 2026 Exterior Surfaces - Pressure Wash Wood Siding & Overhang - Refinish 7,526 13,946 Total for 2026 $21,472 Replacement Year 2027 Backflow Device for Mechanical Backflow for Fire System 3,461 3,461 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 24 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2027 con nued... Boiler, Electric (563 MBH) - EB #1 Chemical Feeder Cinema Projec on System Cinema Sound System - Retrofit Classroom Projector Fans, Exhaust (300 CFM) - EF #1-2 Fans, Exhaust (340 CFM) - EF #2-1 Fans, Exhaust (380 CFM) - EF #L-1 Hardwood Flooring Refinish - Grand Staircase Humidifier - HUM #1 Humidifier - HUM #2 Roo op Garden - Renovate Solar Panels - Replace Solar Panels Controller - Replace Water Heater Total for 2027 32,529 3,045 48,448 20,764 1,038 1,038 1,038 1,038 1,620 4,845 9,690 26,993 78,901 4,153 8,305 $250,366 Replacement Year 2028 Computer Equipment Computer Equipment Kaleidescape Server Office - Computer Equipment 4,277 4,277 8,555 10,693 Total for 2028 $27,802 Replacement Year 2029 Exterior Surfaces - Pressure Wash Wood Siding & Overhang - Refinish 8,224 15,240 Total for 2029 $23,463 Replacement Year 2030 Acous c Tile Suspended Ceiling - 5% Repair Con ngency 2,813 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 25 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2030 con nued... Acous c Tile Suspended Ceiling - Refinish Appliances - Dishwashers Appliances - Refrigerators Elevator Cab Refurbish & Door Package Window Interior Sun Shades - Replace 23,464 5,218 8,168 30,252 48,403 Total for 2030 $118,319 No Replacement in 2031 Replacement Year 2032 A/C Units, Ceiling Mounted (Mitsubishi) - Replace A/C Units, Floor Mounted (Mitsubishi) - Replace Acous c Tile Suspended Ceiling - Replace Air Handling Unit (11,230 CFM) - AHU #3 Air Handling Unit (5,175 CFM) - AHU #2 Air Handling Unit (800 CFM) - AHU #1 Appliances - Microwaves Bathroom Par ons Bathroom Urinal Par on Carpet Flooring - Auditorium Carpet Flooring - Lower Level Carpet Flooring - Sherry Grover Gallery Carpet Flooring - Upper Level Chairs - Stackable Classroom Chairs - Stackable Fabric Covered Compressors 2hp, 29 Gallon Day Lounger Drinking Fountain Expansion Tanks Exterior Surfaces - Pressure Wash Fans, Exhaust (850 CFM) - EF #1-1 Fans, Scavenger (2,000 CFM) - #SF-L-1 21,664 4,814 64,722 80,235 48,141 21,664 1,685 9,628 1,284 8,032 14,603 6,355 15,646 6,820 21,664 2,407 2,407 6,740 14,442 8,986 1,926 7,703 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 26 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2032 con nued... Fluid Cooler, Closed Loop Furnishings - Business Office Furnishings - Marke ng Office Glass Storefront Entry Door Auto Openers Glass Storefront Entry Doors Gypsum Board Suspended Ceiling - 5% Repair Con ngency Gypsum Board Suspended Ceiling - Refinish Hardwood Flooring Refinish - Grand Staircase Hardwood Flooring Refinish - Main & Upper Level Hardwood Flooring Refinish - Stage Heat Pumps - 3.5 Ton Geothermal Water to Air Heat Pumps - Main and Upper Level HVAC Louver Sun Shades - Paint (both sides) Metal Siding - Refinish Par on Walls Pocket Doors Recessed Fixtures Sherry Grover - TV Stanchions Stone Veneer - 50% Repair Con ngency Storefront Type (Exterior) - Repair Structural Glazing Systems - Repair Tables - Folding Variable Frequency Drive (10 HP) - VFD #2 Variable Frequency Drive (2 HP) - VFD #1 Variable Frequency Drive (20 HP) - VFD #3 Water Heater Circula on Pump 1/6 hp Wood Siding & Overhang - Refinish Total for 2032 48,141 4,814 8,826 8,024 28,082 3,089 22,482 1,878 67,747 2,743 57,769 64,188 21,006 5,751 16,849 4,814 7,061 1,605 963 10,110 44,579 192,757 9,628 5,616 8,024 8,826 3,209 16,653 $1,046,800 No Replacement in 2033 Replacement Year 2034 Variable Air Volume Terminal (1,240 CFM) - VAV #2-1 5,107 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 27 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2034 con nued... Variable Air Volume Terminal (1,425 CFM) - VAV #2-3 Variable Air Volume Terminal (1,475 CFM) - VAV #1-1 Variable Air Volume Terminal (1,610 CFM) - VAV #1-6 Variable Air Volume Terminal (195 CFM) - VAV #L-1 Variable Air Volume Terminal (2,100 CFM) - VAV #1-2 Variable Air Volume Terminal (2,180 CFM) - VAV #1-5 Variable Air Volume Terminal (425 CFM) - VAV #L-2 Variable Air Volume Terminal (485 CFM) - VAV #2-2 Variable Air Volume Terminal (550 CFM) - VAV #1-4 Variable Air Volume Terminal (660 CFM) - VAV #1-7 Total for 2034 5,107 5,107 5,959 2,554 6,810 7,661 3,405 3,405 3,405 3,405 $51,924 Replacement Year 2035 Exterior Surfaces - Pressure Wash Wood Siding & Overhang - Refinish 9,820 18,197 Total for 2035 $28,017 Replacement Year 2036 Computer Equipment Computer Equipment Duel Sump Pump Duel Sump Pump Controls Kaleidescape Server Keri Systems - Key Fob System Upgrades Office - Computer Equipment Pump, Circula on - Geothermal Pump, Circula on Controls - Geothermal Pump, In-Line Water Pump Pump, In-Line Water Pump Security - Cameras Replace Security - DVR Unit Moderniza on/Upgrade Total for 2036 5,418 5,418 5,418 3,612 10,837 10,837 13,546 18,964 3,612 7,224 7,224 42,895 7,224 $142,231 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 28 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2037 Accessibility Li Classroom Projector Screen Concrete Flooring Refinish - Auditorium Concrete Flooring Refinish - Lower Level Concrete Flooring Refinish - Main Level Curtains Curtains Power Control and Track System Fire System Panel - Upgrade/Modernize Fire System Sprinkler Heads - Replace Generator - 14 KW Hardwood Flooring Refinish - Grand Staircase Ligh ng - Cove Light Fixtures Ligh ng - Exhibit Track Fixtures Ligh ng - Pendant Linear Fluorescent Fixtures Ligh ng - Recessed 2' x 2' Fixtures (Lower Level) Ligh ng - Recessed Mul lamp Fixtures Ligh ng - Recessed/Pendant Single Fixtures Projec on Screen with Power Li Sea ng - Theatre Style Vinyl Flooring - Upper Level Bathroom Vinyl/Lino Flooring - Classroom Upper Level Total for 2037 37,206 1,860 4,625 41,517 20,443 13,811 14,138 11,162 32,183 27,904 2,177 4,651 47,717 38,136 3,721 30,137 25,114 6,697 43,159 1,563 23,440 $431,359 Replacement Year 2038 Exterior Surfaces - Pressure Wash Wood Siding & Overhang - Refinish 10,730 19,884 Total for 2038 $30,615 Replacement Year 2039 Acous c Tile Suspended Ceiling - 5% Repair Con ngency Acous c Tile Suspended Ceiling - Refinish Total for 2039 3,671 30,615 $34,286 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 29 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures No Replacement in 2040 Replacement Year 2041 Exterior Surfaces - Pressure Wash Wood Siding & Overhang - Refinish 11,725 21,728 Total for 2041 $33,453 Replacement Year 2042 Appliances - Microwaves Backflow Device for Mechanical Backflow for Fire System Boiler, Electric (563 MBH) - EB #1 Cabinets Carpet Flooring - Auditorium Carpet Flooring - Lower Level Carpet Flooring - Sherry Grover Gallery Carpet Flooring - Upper Level Chemical Feeder Cinema Projec on System Cinema Sound System - Retrofit Classroom Projector Dampers, Fire /Smoke Dampers, Motorized Control Day Lounger Desk Display Pedestal Cabinets Display Tables Downspouts Drinking Fountain Elevator System - Modernize/Upgrade Exhibit Display Cabinet Exhibit Display Pedestal Exterior Metal Doors 2,264 5,391 5,391 50,680 14,018 10,794 19,625 8,540 21,027 4,744 75,481 32,349 1,617 9,705 16,498 3,235 21,566 59,306 3,235 3,882 9,058 161,744 59,306 24,909 10,352 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 30 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2042 con nued... Fans, Exhaust (300 CFM) - EF #1-2 Fans, Exhaust (340 CFM) - EF #2-1 Fans, Exhaust (380 CFM) - EF #L-1 Hardwood Flooring Refinish - Grand Staircase Hardwood Flooring Refinish - Main & Upper Level Hardwood Flooring Refinish - Stage Humidifier - HUM #1 Humidifier - HUM #2 Pocket Doors Roof Deck - Guard Rail Roof Deck - Paver System Roof Hatch Roo op Garden - Membrane Roo op Garden - Renovate Sherry Grover - Display Cabinets Sherry Grover - Display Table Case Sherry Grover - TV Single Ply Membrane (PVC) - Replace Skylights Small Tables Solar Panel Moun ng Brackets Solar Panels - Replace Solar Panels Controller - Replace Storage Cabinets Water Heater Water Storage Tank Wood Benches Wood Table Sets Total for 2042 1,617 1,617 1,617 2,523 91,046 3,687 7,548 15,096 6,470 11,592 5,499 3,882 16,821 42,054 65,021 14,557 2,157 163,038 37,266 2,157 35,584 122,926 6,470 5,499 12,940 20,488 3,451 10,783 $1,348,122 No Replacement in 2043 Replacement Year 2044 Computer Equipment 6,864 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 31 Sample Reserve Study - Museum Annual Expenditure Report Descrip on Expenditures Replacement Year 2044 con nued... Computer Equipment Exterior Surfaces - Pressure Wash Kaleidescape Server Office - Computer Equipment Wood Siding & Overhang - Refinish 6,864 12,812 13,728 17,159 23,743 Total for 2044 $81,170 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 32 Sample Reserve Study - Museum Distribu on of Accumulated Reserves Descrip on Exterior Surfaces - Pressure Wash Hardwood Flooring Refinish - Grand Staircase Wood Siding & Overhang - Refinish Computer Equipment Computer Equipment Kaleidescape Server Office - Computer Equipment Acous c Tile Suspended Ceiling - 5% Repair .. Acous c Tile Suspended Ceiling - Refinish Appliances - Microwaves Carpet Flooring - Auditorium Carpet Flooring - Lower Level Carpet Flooring - Sherry Grover Gallery Carpet Flooring - Upper Level Day Lounger Drinking Fountain Hardwood Flooring Refinish - Main & Upper .. Hardwood Flooring Refinish - Stage Pocket Doors Sherry Grover - TV Duel Sump Pump Keri Systems - Key Fob System Upgrades Pump, Circula on - Geothermal Pump, In-Line Water Pump Pump, In-Line Water Pump Security - Cameras Replace Security - DVR Unit Moderniza on/Upgrade Backflow Device for Mechanical Backflow for Fire System Boiler, Electric (563 MBH) - EB #1 Chemical Feeder Cinema Projec on System Cinema Sound System - Retrofit Classroom Projector Fans, Exhaust (300 CFM) - EF #1-2 Fans, Exhaust (340 CFM) - EF #2-1 Remaining Life Replacement Year Assigned Reserves Fully Funded Reserves 0 0 0 3 3 3 3 4 4 5 5 5 5 5 5 5 5 5 5 5 7 7 7 7 7 7 7 10 10 10 10 10 10 10 10 10 2017 2017 2017 2020 2020 2020 2020 2021 2021 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2024 2024 2024 2024 2024 2024 2024 2027 2027 2027 2027 2027 2027 2027 2027 2027 5,768 1,205 10,689 1,931 1,931 3,862 4,828 1,064 8,877 541 2,578 4,686 2,039 5,021 772 2,163 21,742 880 1,545 515 1,287 2,575 4,506 1,717 1,717 * 5,559 5,768 1,205 10,689 1,931 1,931 3,862 4,828 1,064 8,877 541 2,578 4,686 2,039 5,021 772 2,163 21,742 880 1,545 515 1,287 2,575 4,506 1,717 1,717 10,193 1,717 858 858 8,068 755 12,017 5,150 257 257 257 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 33 Sample Reserve Study - Museum Distribu on of Accumulated Reserves Descrip on Fans, Exhaust (380 CFM) - EF #L-1 Humidifier - HUM #1 Humidifier - HUM #2 Roo op Garden - Renovate Solar Panels - Replace Solar Panels Controller - Replace Water Heater Appliances - Dishwashers Appliances - Refrigerators Elevator Cab Refurbish & Door Package Window Interior Sun Shades - Replace A/C Units, Ceiling Mounted (Mitsubishi) - Re.. A/C Units, Floor Mounted (Mitsubishi) - Repl.. Acous c Tile Suspended Ceiling - Replace Air Handling Unit (11,230 CFM) - AHU #3 Air Handling Unit (5,175 CFM) - AHU #2 Air Handling Unit (800 CFM) - AHU #1 Bathroom Par ons Bathroom Urinal Par on Chairs - Stackable Classroom Chairs - Stackable Fabric Covered Compressors 2hp, 29 Gallon Expansion Tanks Fans, Exhaust (850 CFM) - EF #1-1 Fans, Scavenger (2,000 CFM) - #SF-L-1 Fluid Cooler, Closed Loop Furnishings - Business Office Furnishings - Marke ng Office Glass Storefront Entry Door Auto Openers Glass Storefront Entry Doors Gypsum Board Suspended Ceiling - 5% Repai.. Gypsum Board Suspended Ceiling - Refinish Heat Pumps - 3.5 Ton Geothermal Water to .. Heat Pumps - Main and Upper Level HVAC Louver Sun Shades - Paint (both sides) Metal Siding - Refinish Remaining Life Replacement Year 10 10 10 10 10 10 10 13 13 13 13 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 2027 2027 2027 2027 2027 2027 2027 2030 2030 2030 2030 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 Assigned Reserves Fully Funded Reserves 257 1,202 2,403 6,695 19,570 1,030 2,060 987 1,545 5,722 9,156 3,476 772 10,386 12,875 7,725 3,476 1,545 206 1,094 3,476 386 2,317 309 1,236 7,725 772 1,416 1,287 4,506 496 3,608 9,270 10,300 3,371 923 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 34 Sample Reserve Study - Museum Distribu on of Accumulated Reserves Descrip on Par on Walls Recessed Fixtures Stanchions Stone Veneer - 50% Repair Con ngency Storefront Type (Exterior) - Repair Structural Glazing Systems - Repair Tables - Folding Variable Frequency Drive (10 HP) - VFD #2 Variable Frequency Drive (2 HP) - VFD #1 Variable Frequency Drive (20 HP) - VFD #3 Water Heater Circula on Pump 1/6 hp Variable Air Volume Terminal (1,240 CFM) - .. Variable Air Volume Terminal (1,425 CFM) - .. Variable Air Volume Terminal (1,475 CFM) - .. Variable Air Volume Terminal (1,610 CFM) - .. Variable Air Volume Terminal (195 CFM) - VA.. Variable Air Volume Terminal (2,100 CFM) - .. Variable Air Volume Terminal (2,180 CFM) - .. Variable Air Volume Terminal (425 CFM) - VA.. Variable Air Volume Terminal (485 CFM) - VA.. Variable Air Volume Terminal (550 CFM) - VA.. Variable Air Volume Terminal (660 CFM) - VA.. Duel Sump Pump Controls Pump, Circula on Controls - Geothermal Accessibility Li Classroom Projector Screen Concrete Flooring Refinish - Auditorium Concrete Flooring Refinish - Lower Level Concrete Flooring Refinish - Main Level Curtains Curtains Power Control and Track System Fire System Panel - Upgrade/Modernize Fire System Sprinkler Heads - Replace Generator - 14 KW Ligh ng - Cove Light Fixtures Ligh ng - Exhibit Track Fixtures Remaining Life Replacement Year 15 15 15 15 15 15 15 15 15 15 15 17 17 17 17 17 17 17 17 17 17 17 19 19 20 20 20 20 20 20 20 20 20 20 20 20 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2032 2034 2034 2034 2034 2034 2034 2034 2034 2034 2034 2034 2036 2036 2037 2037 2037 2037 2037 2037 2037 2037 2037 2037 2037 2037 Assigned Reserves Fully Funded Reserves 2,704 1,133 154 1,622 7,153 30,931 1,545 901 1,287 1,416 515 702 702 702 819 351 936 1,053 468 468 468 468 429 429 4,120 206 512 4,597 2,264 1,529 1,566 1,236 3,564 3,090 515 5,284 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 35 Sample Reserve Study - Museum Distribu on of Accumulated Reserves Descrip on Ligh ng - Pendant Linear Fluorescent Fixtures Ligh ng - Recessed 2' x 2' Fixtures (Lower Le.. Ligh ng - Recessed Mul lamp Fixtures Ligh ng - Recessed/Pendant Single Fixtures Projec on Screen with Power Li Sea ng - Theatre Style Vinyl Flooring - Upper Level Bathroom Vinyl/Lino Flooring - Classroom Upper Level Cabinets Dampers, Fire /Smoke Dampers, Motorized Control Desk Display Pedestal Cabinets Display Tables Downspouts Elevator System - Modernize/Upgrade Exhibit Display Cabinet Exhibit Display Pedestal Exterior Metal Doors Roof Deck - Guard Rail Roof Deck - Paver System Roof Hatch Roo op Garden - Membrane Sherry Grover - Display Cabinets Sherry Grover - Display Table Case Single Ply Membrane (PVC) - Replace Skylights Small Tables Solar Panel Moun ng Brackets Storage Cabinets Water Storage Tank Wood Benches Wood Table Sets Appliances - Sinks Bathroom Countertops Bathroom Sinks Remaining Life Replacement Year 20 20 20 20 20 20 20 20 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 30 30 30 2037 2037 2037 2037 2037 2037 2037 2037 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2042 2047 2047 2047 Assigned Reserves Fully Funded Reserves 4,223 412 3,337 2,781 742 4,779 173 2,596 1,116 772 1,313 1,717 4,721 257 309 12,875 4,721 1,983 824 923 438 309 1,339 5,176 1,159 12,978 2,966 172 2,832 438 1,631 275 858 331 750 772 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 36 Sample Reserve Study - Museum Distribu on of Accumulated Reserves Remaining Life Descrip on Bathroom Urinals Bathroom Water Closets Cabinets & Countertops - Refurbish Greenscreen Metal Vine Wall Gypsum Board Suspended Ceiling - Replace Hardwood Flooring Replace - Grand Staircase Hardwood Flooring Replace - Main & Upper .. Hardwood Flooring Replace - Stage Interior Doors Louver Sun Shade System - Replace Metal Siding - Replace Storefront Type (Exterior) - Replace Structural Glazing Systems - Replace Tigerwood Rainscreen Siding - Replace Tile Flooring - Main Level Bathrooms Tile Flooring - Upper Level Bathrooms Elevator System - Maintenance/Repairs Fire System - Tes ng & Minor Repairs Interior Surfaces Piping - Geothermal Sewer Mains Water Mains 30 30 30 35 35 35 35 35 35 35 35 35 35 35 35 35 Replacement Year Assigned Reserves 2047 2047 2047 2052 2052 2052 2052 2052 2052 2052 2052 2052 2052 2052 2052 2052 Unfunded Unfunded Unfunded Unfunded Unfunded Unfunded Total Asset Summary Percent Fully Funded Current Average Liability per Unit (Total Units: 1) '*' Indicates Par ally Funded Fully Funded Reserves 618 978 3,311 1,004 5,411 2,897 16,725 677 3,193 8,427 1,582 5,961 42,530 6,871 837 837 $100,000 $549,114 18% -$449,114 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 37 Sample Reserve Study - Museum Component Detail Reports A/C Units, Ceiling Mounted (Mitsubishi) - Replace - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 3 Each Asset Cost Percent Replacement Future Cost @ $4,635.00 $13,905.00 100% $21,663.54 A/C Units, Floor Mounted (Mitsubishi) - Replace - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 Accessibility Li - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 25 2037 20 1 Each Asset Cost Percent Replacement Future Cost @ $3,090.00 $3,090.00 100% $4,814.12 1 Each Asset Cost Percent Replacement Future Cost @ $20,600.00 $20,600.00 100% $37,205.89 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 38 Sample Reserve Study - Museum Component Detail Reports Acous c Tile Suspended Ceiling - 5% Repair Con ngency - 2021 Category Placed in Service Useful Life Replacement Year Remaining Life Ceiling Finishes June 2012 9 2021 4 310 Square Feet Asset Cost Percent Replacement Future Cost @ $6.18 $1,915.80 100% $2,156.25 6,205 Square Feet Asset Cost Percent Replacement Future Cost @ $2.57 $15,977.87 100% $17,983.24 6,205 Square Feet Asset Cost Percent Replacement Future Cost @ $6.69 $41,542.47 100% $64,721.82 Acous c Tile Suspended Ceiling - Refinish - 2021 Category Placed in Service Useful Life Replacement Year Remaining Life Ceiling Finishes June 2012 9 2021 4 Acous c Tile Suspended Ceiling - Replace - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Ceiling Finishes June 2012 20 2032 15 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 39 Sample Reserve Study - Museum Component Detail Reports Air Handling Unit (11,230 CFM) - AHU #3 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 1 Each Asset Cost Percent Replacement Future Cost @ $51,500.00 $51,500.00 100% $80,235.32 1 Each Asset Cost Percent Replacement Future Cost @ $30,900.00 $30,900.00 100% $48,141.19 1 Each Asset Cost Percent Replacement Future Cost @ $13,905.00 $13,905.00 100% $21,663.54 Air Handling Unit (5,175 CFM) - AHU #2 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 Air Handling Unit (800 CFM) - AHU #1 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 40 Sample Reserve Study - Museum Component Detail Reports Appliances - Dishwashers - 2030 Category Placed in Service Useful Life Replacement Year Remaining Life Kitchene es June 2012 18 2030 13 Appliances - Microwaves - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Kitchene es June 2012 10 2022 5 Appliances - Refrigerators - 2030 Category Placed in Service Useful Life Replacement Year Remaining Life Kitchene es June 2012 18 2030 13 Appliances - Sinks - 2047 Category Placed in Service Useful Life Replacement Year Remaining Life Kitchene es June 2012 35 2047 30 3 Each Asset Cost Percent Replacement Future Cost @ $1,184.50 $3,553.50 100% $5,218.43 3 Each Asset Cost Percent Replacement Future Cost @ $360.50 $1,081.50 100% $1,253.75 3 Each Asset Cost Percent Replacement Future Cost @ $1,854.00 $5,562.00 100% $8,167.98 3 Each Asset Cost Percent Replacement Future Cost @ $772.50 $2,317.50 100% $5,625.18 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 41 Sample Reserve Study - Museum Component Detail Reports Backflow Device for Mechanical - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 Backflow for Fire System - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Fire Systems June 2012 15 2027 10 Bathroom Countertops - 2047 Category Placed in Service Useful Life Replacement Year Remaining Life Bathroom Par Bathroom Fixtures June 2012 35 2047 30 ons - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Bathroom Fixtures June 2012 20 2032 15 1 Each Asset Cost Percent Replacement Future Cost @ $2,575.00 $2,575.00 100% $3,460.58 1 Each Asset Cost Percent Replacement Future Cost @ $2,575.00 $2,575.00 100% $3,460.58 34 Linear Feet Asset Cost Percent Replacement Future Cost @ $154.50 $5,253.00 100% $12,750.41 4 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $6,180.00 100% $9,628.24 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 42 Sample Reserve Study - Museum Component Detail Reports Bathroom Sinks - 2047 Category Placed in Service Useful Life Replacement Year Remaining Life Bathroom Urinal Par Category Placed in Service Useful Life Replacement Year Remaining Life Bathroom Fixtures June 2012 35 2047 30 on - 2032 Bathroom Fixtures June 2012 20 2032 15 Bathroom Urinals - 2047 Category Placed in Service Useful Life Replacement Year Remaining Life Bathroom Fixtures June 2012 35 2047 30 Bathroom Water Closets - 2047 Category Placed in Service Useful Life Replacement Year Remaining Life Bathroom Fixtures June 2012 35 2047 30 7 Each Asset Cost Percent Replacement Future Cost @ $772.50 $5,407.50 100% $13,125.42 1 Each Asset Cost Percent Replacement Future Cost @ $824.00 $824.00 100% $1,283.76 4 Each Asset Cost Percent Replacement Future Cost @ $1,081.50 $4,326.00 100% $10,500.34 7 Each Asset Cost Percent Replacement Future Cost @ $978.50 $6,849.50 100% $16,625.53 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 43 Sample Reserve Study - Museum Component Detail Reports Boiler, Electric (563 MBH) - EB #1 - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 Cabinets - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Retail Store June 2012 30 2042 25 1 Each Asset Cost Percent Replacement Future Cost @ $24,205.00 $24,205.00 100% $32,529.50 1 Total Asset Cost Percent Replacement Future Cost @ $6,695.00 $6,695.00 100% $14,017.84 3 Each Asset Cost Percent Replacement Future Cost @ $7,725.00 $23,175.00 100% $56,251.81 Cabinets & Countertops - Refurbish - 2047 Category Placed in Service Useful Life Replacement Year Remaining Life Kitchene es June 2012 35 2047 30 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 44 Sample Reserve Study - Museum Component Detail Reports Carpet Flooring - Auditorium - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 10 2022 5 77 Square Yard(s) Asset Cost Percent Replacement Future Cost @ $66.95 $5,155.15 100% $5,976.23 140 Square Yard(s) Asset Cost Percent Replacement Future Cost @ $66.95 $9,373.00 100% $10,865.88 44 Square Yard(s) Asset Cost Percent Replacement Future Cost @ $92.70 $4,078.80 100% $4,728.45 Carpet Flooring - Lower Level - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 10 2022 5 Carpet Flooring - Sherry Grover Gallery - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 10 2022 5 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 45 Sample Reserve Study - Museum Component Detail Reports Carpet Flooring - Upper Level - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 10 2022 5 Chairs - Stackable Classroom - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Classroom June 2012 20 2032 15 Chairs - Stackable Fabric Covered - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Event Equipment June 2012 20 2032 15 150 Square Yard(s) Asset Cost Percent Replacement Future Cost @ $66.95 $10,042.50 100% $11,642.01 50 Each Asset Cost Percent Replacement Future Cost @ $87.55 $4,377.50 100% $6,820.00 90 Each Asset Cost Percent Replacement Future Cost @ $154.50 $13,905.00 100% $21,663.54 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 46 Sample Reserve Study - Museum Component Detail Reports Chemical Feeder - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 Cinema Projec on System - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 15 2027 10 Cinema Sound System - Retrofit - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 15 2027 10 Classroom Projector - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Classroom June 2012 15 2027 10 1 Total Asset Cost Percent Replacement Future Cost @ $2,266.00 $2,266.00 100% $3,045.31 1 Total Asset Cost Percent Replacement Future Cost @ $36,050.00 $36,050.00 100% $48,448.18 1 Total Asset Cost Percent Replacement Future Cost @ $15,450.00 $15,450.00 100% $20,763.51 1 Each Asset Cost Percent Replacement Future Cost @ $772.50 $772.50 100% $1,038.17 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 47 Sample Reserve Study - Museum Component Detail Reports Classroom Projector Screen - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Classroom June 2012 25 2037 20 Compressors 2hp, 29 Gallon - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 Computer Equipment - 2020 Category Placed in Service Useful Life Replacement Year Remaining Life Retail Store June 2012 8 2020 3 Computer Equipment - 2020 Category Placed in Service Useful Life Replacement Year Remaining Life Recep on June 2012 8 2020 3 1 Each Asset Cost Percent Replacement Future Cost @ $1,030.00 $1,030.00 100% $1,860.29 2 Each Asset Cost Percent Replacement Future Cost @ $772.50 $1,545.00 100% $2,407.06 2 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $3,090.00 100% $3,376.53 2 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $3,090.00 100% $3,376.53 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 48 Sample Reserve Study - Museum Component Detail Reports Concrete Flooring Refinish - Auditorium - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 25 2037 20 440 Square Feet Asset Cost Percent Replacement Future Cost @ $5.82 $2,560.58 100% $4,624.69 3,950 Square Feet Asset Cost Percent Replacement Future Cost @ $5.82 $22,987.02 100% $41,517.12 1,945 Square Feet Asset Cost Percent Replacement Future Cost @ $5.82 $11,318.93 100% $20,443.24 Concrete Flooring Refinish - Lower Level - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 25 2037 20 Includes local repair and a 1"" topping as needed. Concrete Flooring Refinish - Main Level - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 25 2037 20 Includes local repair and a 1"" topping as needed. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 49 Sample Reserve Study - Museum Component Detail Reports Curtains - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 25 2037 20 928 Square Feet Asset Cost Percent Replacement Future Cost @ $8.24 $7,646.72 100% $13,810.83 1 Total Asset Cost Percent Replacement Future Cost @ $7,828.00 $7,828.00 100% $14,138.24 9 Each Asset Cost Percent Replacement Future Cost @ $515.00 $4,635.00 100% $9,704.66 Curtains Power Control and Track System - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 25 2037 20 Dampers, Fire /Smoke - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 30 2042 25 9 total fire/smoke dampers. Variable in size. An average per unit cost has been used for budgeting purposes. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 50 Sample Reserve Study - Museum Component Detail Reports Dampers, Motorized Control - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 30 2042 25 Day Lounger - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 10 2022 5 Desk - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Recep on June 2012 30 2042 25 Display Pedestal Cabinets - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Retail Store June 2012 30 2042 25 9 Each Asset Cost Percent Replacement Future Cost @ $875.50 $7,879.50 100% $16,497.92 1 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $1,545.00 100% $1,791.08 1 Total Asset Cost Percent Replacement Future Cost @ $10,300.00 $10,300.00 100% $21,565.91 11 Each Asset Cost Percent Replacement Future Cost @ $2,575.00 $28,325.00 100% $59,306.26 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 51 Sample Reserve Study - Museum Component Detail Reports Display Tables - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Retail Store June 2012 30 2042 25 Downspouts - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Roofing June 2012 30 2042 25 Drinking Fountain - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Plumbing June 2012 10 2022 5 Duel Sump Pump - 2024 Category Placed in Service Useful Life Replacement Year Remaining Life Plumbing June 2012 12 2024 7 3 Each Asset Cost Percent Replacement Future Cost @ $515.00 $1,545.00 100% $3,234.89 120 Linear Feet Asset Cost Percent Replacement Future Cost @ $15.45 $1,854.00 100% $3,881.86 3 Each Asset Cost Percent Replacement Future Cost @ $1,442.00 $4,326.00 100% $5,015.02 2 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $3,090.00 100% $3,800.31 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 52 Sample Reserve Study - Museum Component Detail Reports Duel Sump Pump Controls - 2036 Category Placed in Service Useful Life Replacement Year Remaining Life Plumbing June 2012 24 2036 19 1 Each Asset Cost Percent Replacement Future Cost @ $2,060.00 $2,060.00 100% $3,612.22 1 Each Asset Cost Percent Replacement Future Cost @ $20,600.00 $20,600.00 100% $30,251.79 Asset Cost Percent Replacement Future Cost 100% Elevator Cab Refurbish & Door Package - 2030 Category Placed in Service Useful Life Replacement Year Remaining Life Elevator June 2012 18 2030 13 Elevator System - Maintenance/Repairs Category Placed in Service No Useful Life Elevator June 2012 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 53 Sample Reserve Study - Museum Component Detail Reports Elevator System - Modernize/Upgrade - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Elevator June 2012 30 2042 25 1 Each Asset Cost Percent Replacement Future Cost @ $77,250.00 $77,250.00 100% $161,744.34 Includes upgrades to the hydraulic unit, jack, and controller. Exhibit Display Cabinet - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 30 2042 25 Exhibit Display Pedestal - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 30 2042 25 11 Each Asset Cost Percent Replacement Future Cost @ $2,575.00 $28,325.00 100% $59,306.26 21 Each Asset Cost Percent Replacement Future Cost @ $566.50 $11,896.50 100% $24,908.63 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 54 Sample Reserve Study - Museum Component Detail Reports Expansion Tanks - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 Exterior Metal Doors - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Doors June 2012 30 2042 25 3 Each Asset Cost Percent Replacement Future Cost @ $3,090.00 $9,270.00 100% $14,442.36 4 Each Asset Cost Percent Replacement Future Cost @ $1,236.00 $4,944.00 100% $10,351.64 11,200 Square Feet Asset Cost Percent Replacement Future Cost @ $0.51 $5,768.00 100% $5,768.00 Exterior Surfaces - Pressure Wash - 2017 Category Placed in Service Useful Life Replacement Year Remaining Life Pain ng & Staining June 2012 3 2017 0 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 55 Sample Reserve Study - Museum Component Detail Reports Fans, Exhaust (300 CFM) - EF #1-2 - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 Fans, Exhaust (340 CFM) - EF #2-1 - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 Fans, Exhaust (380 CFM) - EF #L-1 - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 Fans, Exhaust (850 CFM) - EF #1-1 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 1 Each Asset Cost Percent Replacement Future Cost @ $772.50 $772.50 100% $1,038.17 1 Each Asset Cost Percent Replacement Future Cost @ $772.50 $772.50 100% $1,038.17 1 Each Asset Cost Percent Replacement Future Cost @ $772.50 $772.50 100% $1,038.17 1 Each Asset Cost Percent Replacement Future Cost @ $1,236.00 $1,236.00 100% $1,925.65 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 56 Sample Reserve Study - Museum Component Detail Reports Fans, Scavenger (2,000 CFM) - #SF-L-1 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 1 Each Asset Cost Percent Replacement Future Cost @ $4,944.00 $4,944.00 100% $7,702.59 Asset Cost Percent Replacement Future Cost 100% 1 Each Asset Cost Percent Replacement Future Cost @ $6,180.00 $6,180.00 100% $11,161.77 Fire System - Tes ng & Minor Repairs Category Placed in Service No Useful Life Fire Systems June 2012 Fire System Panel - Upgrade/Modernize - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Fire Systems June 2012 25 2037 20 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 57 Sample Reserve Study - Museum Component Detail Reports Fire System Sprinkler Heads - Replace - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Fire Systems June 2012 25 2037 20 Fluid Cooler, Closed Loop - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 Furnishings - Business Office - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Office June 2012 20 2032 15 173 Each Asset Cost Percent Replacement Future Cost @ $103.00 $17,819.00 100% $32,183.09 1 Each Asset Cost Percent Replacement Future Cost @ $30,900.00 $30,900.00 100% $48,141.19 1 Total Asset Cost Percent Replacement Future Cost @ $3,090.00 $3,090.00 100% $4,814.12 Includes 2 desks, 1 file cabinet, and 1 bookcase. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 58 Sample Reserve Study - Museum Component Detail Reports Furnishings - Marke ng Office - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Office June 2012 20 2032 15 1 Total Asset Cost Percent Replacement Future Cost @ $5,665.00 $5,665.00 100% $8,825.88 1 Each Asset Cost Percent Replacement Future Cost @ $15,450.00 $15,450.00 100% $27,904.42 Includes 3 desks, 2 file cabinets, and 3 bookshelves. Generator - 14 KW - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 25 2037 20 Glass Storefront Entry Door Auto Openers - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Doors June 2012 20 2032 15 2 Each Asset Cost Percent Replacement Future Cost @ $2,575.00 $5,150.00 100% $8,023.53 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 59 Sample Reserve Study - Museum Component Detail Reports Glass Storefront Entry Doors - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Doors June 2012 20 2032 15 5 Each Asset Cost Percent Replacement Future Cost @ $3,605.00 $18,025.00 100% $28,082.36 390 Square Feet Asset Cost Percent Replacement Future Cost @ $20.60 $8,034.00 100% $22,606.57 Greenscreen Metal Vine Wall - 2052 CategoryLandscaping & Irriga on Placed in Service June 2012 Useful Life 40 Replacement Year 2052 Remaining Life 35 Gypsum Board Suspended Ceiling - 5% Repair Con ngency - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Ceiling Finishes June 2012 20 2032 15 350 Square Feet Asset Cost Percent Replacement Future Cost @ $5.66 $1,982.75 100% $3,089.06 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 60 Sample Reserve Study - Museum Component Detail Reports Gypsum Board Suspended Ceiling - Refinish - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Ceiling Finishes June 2012 20 2032 15 7,005 Square Feet Asset Cost Percent Replacement Future Cost @ $2.06 $14,430.30 100% $22,481.94 Gypsum Board Suspended Ceiling - Replace - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Ceiling Finishes June 2012 40 2052 35 7,005 Square Feet Asset Cost Percent Replacement Future Cost @ $6.18 $43,290.90 100% $121,814.63 Hardwood Flooring Refinish - Grand Staircase - 2017 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 5 2017 0 180 Square Feet Asset Cost Percent Replacement Future Cost @ $6.69 $1,205.10 100% $1,205.10 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 61 Sample Reserve Study - Museum Component Detail Reports Hardwood Flooring Refinish - Main & Upper Level - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 10 2022 5 6,495 Square Feet Asset Cost Percent Replacement Future Cost @ $6.69 $43,484.02 100% $50,409.90 263 Square Feet Asset Cost Percent Replacement Future Cost @ $6.69 $1,760.78 100% $2,041.23 Sand and refinish, 2 coats Hardwood Flooring Refinish - Stage - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 10 2022 5 Hardwood Flooring Replace - Grand Staircase - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 40 2052 35 180 Square Feet Asset Cost Percent Replacement Future Cost @ $128.75 $23,175.00 100% $65,211.26 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 62 Sample Reserve Study - Museum Component Detail Reports Hardwood Flooring Replace - Main & Upper Level - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 40 2052 35 6,495 Square Feet Asset Cost Percent Replacement Future Cost @ $20.60 $133,797.00 100% $376,486.35 263 Square Feet Asset Cost Percent Replacement Future Cost @ $20.60 $5,417.80 100% $15,244.94 Hardwood Flooring Replace - Stage - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 40 2052 35 Heat Pumps - 3.5 Ton Geothermal Water to Air - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 3 Each Asset Cost Percent Replacement Future Cost @ $12,360.00 $37,080.00 100% $57,769.43 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 63 Sample Reserve Study - Museum Component Detail Reports Heat Pumps - Main and Upper Level HVAC - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 Humidifier - HUM #1 - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 Humidifier - HUM #2 - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 15 2027 10 4 Each Asset Cost Percent Replacement Future Cost @ $10,300.00 $41,200.00 100% $64,188.26 1 Each Asset Cost Percent Replacement Future Cost @ $3,605.00 $3,605.00 100% $4,844.82 2 Each Asset Cost Percent Replacement Future Cost @ $3,605.00 $7,210.00 100% $9,689.64 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 64 Sample Reserve Study - Museum Component Detail Reports Interior Doors - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Doors June 2012 40 2052 35 31 Each Asset Cost Percent Replacement Future Cost @ $824.00 $25,544.00 100% $71,877.30 Varying sizes and finishes. An average per unit cost has been used for budgeting purposes. Interior Surfaces Category Placed in Service No Useful Life Pain ng & Staining June 2012 Asset Cost Percent Replacement Future Cost 100% Per Client request interior painting has been excluded from this study as it is paid from the maintenance/operating account. Kaleidescape Server - 2020 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 8 2020 3 1 Each Asset Cost Percent Replacement Future Cost @ $6,180.00 $6,180.00 100% $6,753.05 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 65 Sample Reserve Study - Museum Component Detail Reports Keri Systems - Key Fob System Upgrades - 2024 Category Placed in Service Useful Life Replacement Year Remaining Life Security System June 2012 12 2024 7 1 Total Asset Cost Percent Replacement Future Cost @ $6,180.00 $6,180.00 100% $7,600.62 10 Each Asset Cost Percent Replacement Future Cost @ $257.50 $2,575.00 100% $4,650.74 171 Each Asset Cost Percent Replacement Future Cost @ $154.50 $26,419.50 100% $47,716.55 Includes system software updates and fob replacement. Ligh ng - Cove Light Fixtures - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Ligh ng - Interior June 2012 25 2037 20 Ligh ng - Exhibit Track Fixtures - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Ligh ng - Interior June 2012 25 2037 20 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 66 Sample Reserve Study - Museum Component Detail Reports Ligh ng - Pendant Linear Fluorescent Fixtures - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Ligh ng - Interior June 2012 25 2037 20 82 Each Asset Cost Percent Replacement Future Cost @ $257.50 $21,115.00 100% $38,136.04 Ligh ng - Recessed 2' x 2' Fixtures (Lower Level) - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Ligh ng - Interior June 2012 25 2037 20 8 Each Asset Cost Percent Replacement Future Cost @ $257.50 $2,060.00 100% $3,720.59 36 Each Asset Cost Percent Replacement Future Cost @ $463.50 $16,686.00 100% $30,136.77 Ligh ng - Recessed Mul lamp Fixtures - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Ligh ng - Interior June 2012 25 2037 20 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 67 Sample Reserve Study - Museum Component Detail Reports Ligh ng - Recessed/Pendant Single Fixtures - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Ligh ng - Interior June 2012 25 2037 20 90 Each Asset Cost Percent Replacement Future Cost @ $154.50 $13,905.00 100% $25,113.98 1,870 Square Feet Asset Cost Percent Replacement Future Cost @ $36.05 $67,413.50 100% $189,692.31 3,740 Square Feet Asset Cost Percent Replacement Future Cost @ $3.60 $13,482.70 100% $21,005.61 Louver Sun Shade System - Replace - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Glazing Systems June 2012 40 2052 35 Louver Sun Shades - Paint (both sides) - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Pain ng & Staining June 2012 20 2032 15 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 68 Sample Reserve Study - Museum Component Detail Reports Metal Siding - Refinish - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Pain ng & Staining June 2012 20 2032 15 Metal Siding - Replace - 2052 Category Building Exterior Surfaces Placed in Service June 2012 Useful Life 40 Replacement Year 2052 Remaining Life 35 Office - Computer Equipment - 2020 Category Placed in Service Useful Life Replacement Year Remaining Life Par Office June 2012 8 2020 3 on Walls - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 20 2032 15 1,024 Square Feet Asset Cost Percent Replacement Future Cost @ $3.60 $3,691.52 100% $5,751.27 1,024 Square Feet Asset Cost Percent Replacement Future Cost @ $12.36 $12,656.64 100% $35,614.04 5 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $7,725.00 100% $8,441.32 7 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $10,815.00 100% $16,849.42 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 69 Sample Reserve Study - Museum Component Detail Reports Piping - Geothermal Category Placed in Service No Useful Life Plumbing June 2012 Asset Cost Percent Replacement Future Cost 100% These systems are typically designed for a 50-years service life. Assuming the systems were installed as designed, and without defect; there is no expectation of total piping replacement within the 30-year scope of this report. The major reserve expenses should be limited to the Heat Pumps and associated mechanical equipment. Regular maintenance and inspections should be completed to ensure proper operation of system is maintained. Pocket Doors - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Doors June 2012 10 2022 5 2 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $3,090.00 100% $3,582.16 180 Square Feet Asset Cost Percent Replacement Future Cost @ $20.60 $3,708.00 100% $6,697.06 Projec on Screen with Power Li - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 25 2037 20 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 70 Sample Reserve Study - Museum Component Detail Reports Pump, Circula on - Geothermal - 2024 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 12 2024 7 1 Each Asset Cost Percent Replacement Future Cost @ $10,815.00 $10,815.00 100% $13,301.09 1 Each Asset Cost Percent Replacement Future Cost @ $2,060.00 $2,060.00 100% $3,612.22 1 Each Asset Cost Percent Replacement Future Cost @ $4,120.00 $4,120.00 100% $5,067.08 Pump, Circula on Controls - Geothermal - 2036 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 24 2036 19 Pump, In-Line Water Pump - 2024 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 12 2024 7 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 71 Sample Reserve Study - Museum Component Detail Reports Pump, In-Line Water Pump - 2024 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 12 2024 7 Recessed Fixtures - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Ligh ng - Exterior June 2012 20 2032 15 Roof Deck - Guard Rail - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Roofing June 2012 30 2042 25 Roof Deck - Paver System - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Roofing June 2012 30 2042 25 1 Each Asset Cost Percent Replacement Future Cost @ $4,120.00 $4,120.00 100% $5,067.08 22 Each Asset Cost Percent Replacement Future Cost @ $206.00 $4,532.00 100% $7,060.71 43 Linear Feet Asset Cost Percent Replacement Future Cost @ $128.75 $5,536.25 100% $11,591.68 170 Square Feet Asset Cost Percent Replacement Future Cost @ $15.45 $2,626.50 100% $5,499.31 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 72 Sample Reserve Study - Museum Component Detail Reports Roof Hatch - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Roofing June 2012 30 2042 25 1 Each Asset Cost Percent Replacement Future Cost @ $1,854.00 $1,854.00 100% $3,881.86 650 Square Feet Asset Cost Percent Replacement Future Cost @ $12.36 $8,034.00 100% $16,821.41 650 Square Feet Asset Cost Percent Replacement Future Cost @ $30.90 $20,085.00 100% $26,992.56 Roo op Garden - Membrane - 2042 CategoryLandscaping & Irriga on Placed in Service June 2012 Useful Life 30 Replacement Year 2042 Remaining Life 25 Roo op Garden - Renovate - 2027 CategoryLandscaping & Irriga on Placed in Service June 2012 Useful Life 15 Replacement Year 2027 Remaining Life 10 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 73 Sample Reserve Study - Museum Component Detail Reports Sea ng - Theatre Style - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Auditorium June 2012 25 2037 20 Security - Cameras Replace - 2024 Category Placed in Service Useful Life Replacement Year Remaining Life Security System June 2012 12 2024 7 58 Each Asset Cost Percent Replacement Future Cost @ $412.00 $23,896.00 100% $43,158.83 19 Each Asset Cost Percent Replacement Future Cost @ $1,287.50 $24,462.50 100% $30,085.79 Security - DVR Unit Moderniza on/Upgrade - 2024 Category Placed in Service Useful Life Replacement Year Remaining Life Security System June 2012 12 2024 7 1 Total Asset Cost Percent Replacement Future Cost @ $4,120.00 $4,120.00 100% $5,067.08 Asset Cost Percent Replacement Future Cost 100% Sewer Mains Category Placed in Service No Useful Life Plumbing June 2012 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 74 Sample Reserve Study - Museum Component Detail Reports Sherry Grover - Display Cabinets - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 30 2042 25 67 Linear Feet Asset Cost Percent Replacement Future Cost @ $463.50 $31,054.50 100% $65,021.22 15 Linear Feet Asset Cost Percent Replacement Future Cost @ $463.50 $6,952.50 100% $14,556.99 1 Each Asset Cost Percent Replacement Future Cost @ $1,030.00 $1,030.00 100% $1,194.05 Sherry Grover - Display Table Case - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 30 2042 25 Sherry Grover - TV - 2022 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 10 2022 5 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 75 Sample Reserve Study - Museum Component Detail Reports Single Ply Membrane (PVC) - Replace - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Roofing June 2012 30 2042 25 Skylights - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Roofing June 2012 30 2042 25 Small Tables - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 30 2042 25 7,560 Square Feet Asset Cost Percent Replacement Future Cost @ $10.30 $77,868.00 100% $163,038.30 144 Square Feet Asset Cost Percent Replacement Future Cost @ $123.60 $17,798.40 100% $37,265.90 2 Each Asset Cost Percent Replacement Future Cost @ $515.00 $1,030.00 100% $2,156.59 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 76 Sample Reserve Study - Museum Component Detail Reports Solar Panel Moun ng Brackets - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Solar System June 2012 30 2042 25 Solar Panels - Replace - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Solar System June 2012 15 2027 10 Solar Panels Controller - Replace - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Solar System June 2012 15 2027 10 Stanchions - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 20 2032 15 30 Each Asset Cost Percent Replacement Future Cost @ $566.50 $16,995.00 100% $35,583.75 60 Each Asset Cost Percent Replacement Future Cost @ $978.50 $58,710.00 100% $78,901.33 1 Total Asset Cost Percent Replacement Future Cost @ $3,090.00 $3,090.00 100% $4,152.70 6 Each Asset Cost Percent Replacement Future Cost @ $103.00 $618.00 100% $962.82 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 77 Sample Reserve Study - Museum Component Detail Reports Stone Veneer - 50% Repair Con ngency - 2032 Category Building Exterior Surfaces Placed in Service June 2012 Useful Life 20 Replacement Year 2032 Remaining Life 15 Storage Cabinets - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Classroom June 2012 30 2042 25 1,400 Square Feet Asset Cost Percent Replacement Future Cost @ $9.27 $6,489.00 50% $10,109.65 3 Each Asset Cost Percent Replacement Future Cost @ $875.50 $2,626.50 100% $5,499.31 926 Square Feet Asset Cost Percent Replacement Future Cost @ $30.90 $28,613.40 100% $44,578.74 Storefront Type (Exterior) - Repair - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Glazing Systems June 2012 20 2032 15 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 78 Sample Reserve Study - Museum Component Detail Reports Storefront Type (Exterior) - Replace - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Glazing Systems June 2012 40 2052 35 926 Square Feet Asset Cost Percent Replacement Future Cost @ $51.50 $47,689.00 100% $134,190.28 3,003 Square Feet Asset Cost Percent Replacement Future Cost @ $41.20 $123,723.60 100% $192,757.34 3,003 Square Feet Asset Cost Percent Replacement Future Cost @ $113.30 $340,239.90 100% $957,388.28 Structural Glazing Systems - Repair - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Glazing Systems June 2012 20 2032 15 Reseal and repair locally as-needed. Structural Glazing Systems - Replace - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Glazing Systems June 2012 40 2052 35 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 79 Sample Reserve Study - Museum Component Detail Reports Tables - Folding - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Event Equipment June 2012 20 2032 15 30 Each Asset Cost Percent Replacement Future Cost @ $206.00 $6,180.00 100% $9,628.24 2,965 Square Feet Asset Cost Percent Replacement Future Cost @ $18.54 $54,971.10 100% $154,681.11 260 Square Feet Asset Cost Percent Replacement Future Cost @ $25.75 $6,695.00 100% $18,838.81 Tigerwood Rainscreen Siding - Replace - 2052 Category Building Exterior Surfaces Placed in Service June 2012 Useful Life 40 Replacement Year 2052 Remaining Life 35 Tile Flooring - Main Level Bathrooms - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 40 2052 35 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 80 Sample Reserve Study - Museum Component Detail Reports Tile Flooring - Upper Level Bathrooms - 2052 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 40 2052 35 260 Square Feet Asset Cost Percent Replacement Future Cost @ $25.75 $6,695.00 100% $18,838.81 Variable Air Volume Terminal (1,240 CFM) - VAV #2-1 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $3,090.00 $3,090.00 100% $5,107.30 Variable Air Volume Terminal (1,425 CFM) - VAV #2-3 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $3,090.00 $3,090.00 100% $5,107.30 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 81 Sample Reserve Study - Museum Component Detail Reports Variable Air Volume Terminal (1,475 CFM) - VAV #1-1 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $3,090.00 $3,090.00 100% $5,107.30 Variable Air Volume Terminal (1,610 CFM) - VAV #1-6 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $3,605.00 $3,605.00 100% $5,958.51 Variable Air Volume Terminal (195 CFM) - VAV #L-1 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $1,545.00 $1,545.00 100% $2,553.65 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 82 Sample Reserve Study - Museum Component Detail Reports Variable Air Volume Terminal (2,100 CFM) - VAV #1-2 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $4,120.00 $4,120.00 100% $6,809.73 Variable Air Volume Terminal (2,180 CFM) - VAV #1-5 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $4,635.00 $4,635.00 100% $7,660.95 Variable Air Volume Terminal (425 CFM) - VAV #L-2 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $2,060.00 $2,060.00 100% $3,404.87 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 83 Sample Reserve Study - Museum Component Detail Reports Variable Air Volume Terminal (485 CFM) - VAV #2-2 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $2,060.00 $2,060.00 100% $3,404.87 Variable Air Volume Terminal (550 CFM) - VAV #1-4 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $2,060.00 $2,060.00 100% $3,404.87 Variable Air Volume Terminal (660 CFM) - VAV #1-7 - 2034 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 22 2034 17 1 Each Asset Cost Percent Replacement Future Cost @ $2,060.00 $2,060.00 100% $3,404.87 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 84 Sample Reserve Study - Museum Component Detail Reports Variable Frequency Drive (10 HP) - VFD #2 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 1 Each Asset Cost Percent Replacement Future Cost @ $3,605.00 $3,605.00 100% $5,616.47 2 Each Asset Cost Percent Replacement Future Cost @ $2,575.00 $5,150.00 100% $8,023.53 1 Each Asset Cost Percent Replacement Future Cost @ $5,665.00 $5,665.00 100% $8,825.88 Variable Frequency Drive (2 HP) - VFD #1 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 Variable Frequency Drive (20 HP) - VFD #3 - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 20 2032 15 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 85 Sample Reserve Study - Museum Component Detail Reports Vinyl Flooring - Upper Level Bathroom - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 25 2037 20 60 Square Feet Asset Cost Percent Replacement Future Cost @ $14.42 $865.20 100% $1,562.65 Flooring is bubbling up due to poor installation. Vinyl/Lino Flooring - Classroom Upper Level - 2037 Category Placed in Service Useful Life Replacement Year Remaining Life Floor Finishes June 2012 25 2037 20 Water Heater - 2027 Category Placed in Service Useful Life Replacement Year Remaining Life Plumbing June 2012 15 2027 10 105 Square Yard(s) Asset Cost Percent Replacement Future Cost @ $123.60 $12,978.00 100% $23,439.71 1 Each Asset Cost Percent Replacement Future Cost @ $6,180.00 $6,180.00 100% $8,305.40 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 86 Sample Reserve Study - Museum Component Detail Reports Water Heater Circula on Pump 1/6 hp - 2032 Category Placed in Service Useful Life Replacement Year Remaining Life Plumbing June 2012 20 2032 15 1 Each Asset Cost Percent Replacement Future Cost @ $2,060.00 $2,060.00 100% $3,209.41 Asset Cost Percent Replacement Future Cost 100% 1 Each Asset Cost Percent Replacement Future Cost @ $9,785.00 $9,785.00 100% $20,487.62 Water Mains Category Placed in Service No Useful Life Plumbing June 2012 Water Storage Tank - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Mechanical June 2012 30 2042 25 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 87 Sample Reserve Study - Museum Component Detail Reports Window Interior Sun Shades - Replace - 2030 Category Placed in Service Useful Life Replacement Year Remaining Life Glazing Systems June 2012 18 2030 13 Wood Benches - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 30 2042 25 8 Each Asset Cost Percent Replacement Future Cost @ $4,120.00 $32,960.00 100% $48,402.87 2 Each Asset Cost Percent Replacement Future Cost @ $824.00 $1,648.00 100% $3,450.54 2,965 Square Feet Asset Cost Percent Replacement Future Cost @ $3.60 $10,688.82 100% $10,688.82 Wood Siding & Overhang - Refinish - 2017 Category Placed in Service Useful Life Replacement Year Remaining Life Pain ng & Staining June 2012 3 2017 0 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 88 Sample Reserve Study - Museum Component Detail Reports Wood Table Sets - 2042 Category Placed in Service Useful Life Replacement Year Remaining Life Gallery - Furnishings June 2012 30 2042 25 2 Each Asset Cost Percent Replacement Future Cost @ $2,575.00 $5,150.00 100% $10,782.95 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 89 Sample Reserve Study - Museum Calcula ons Appendix 1) Allocation % = Reserve Allocation (Component Method) / Total Reserve Allocation (Component Method) x 100 2) Current Cost = Extended Cost (for a component without subcomponents) -orSum of subcomponent Extended Costs (for a component with subcomponents) 3) Extended Cost = Quantity x Unit Cost x Replacement % x (1+Contingency Rate) 4) Fully Funded Balance = Current Cost / Useful Life x (Useful Life - Remaining Life) 5) FY End Balance (same as Next FY Start Balance) = Initial or current fiscal yearCurrent Reserve Balance + Interest Earned + Reserve Allocation to Fund + Special Assessment to Fund + Funds Due from Operating - Approved Funds to Disburse - Disbursements Subsequent fiscal yearsFY Start Balance + Interest Earned + (Reserve Allocation (from previous year) x (1 + Reserve Allocation Rate) - Disbursements 6) Interest Earned= Initial fiscal yearCurrent Reserve Balance x (Interest Rate (net effective)/12 x Number of funding months remaining in current fiscal year) Subsequent fiscal yearsFY Start Balance x Interest Rate (net effective) 7) Percent Funded = (FY Start Balance / Fully Funded Balance) x 100 8) Reserve Allocation (Component Method) = Current Cost / Useful Life ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 90 Sample Reserve Study - Museum Defini ons Appendix Abbreviations bldgs = buildings ea = each FY = fiscal year lf or lin ft = lineal feet RL = remaining life sf or sq ft = square feet 100 sq ft = 1 square) sy or sq yd= square yard UL = useful life % = percent 1) Age The approximate age of the complex. This parameter is provided for information only. 2) Allocation % A percentage of the total Reserve Allocation. See - Calculations Appendix 3) Allocation Increase Rate Expressed as a percentage rate that reflects the increase of a given year’s Reserve Allocation over the previous year’s Reserve Allocation and utilized only in the Cash Flow Analysis. 4) Base Year The year in which the governing documents were recorded and/or the buildings constructed (average year may be used for phases built over a period of time), and utilized to determine the approximate complex age. This parameter is provided for information only. 5) Common Interest Development (CID) Defined by shared property and restrictions in the deed on use of the property. A CID is governed by a mandatory Association of homeowners which administers the property and enforces its restrictions. The Association Board is responsible for repairing, replacing, or maintaining the common areas, other than the exclusive use common areas, and the owner of each separate interest is responsible for maintaining that separate interest and any exclusive use common area appurtenant to the separate interest. The following are two typical CID subdivision types: A) Condominium- In general, the recorded owner has title to the unit (or airspace). They are typically responsible for the interior of their individual unit/garage, all utilities that service their unit and any exclusive use common area associated with their unit (e.g. balcony, doors/windows, patio yard, etc.). B) Planned Development- In general, the recorded owner has title to the lot. They are typically responsible for the maintenance and repair of any structure or improvement located on their respective lot. *Note- CIDs & subdivision types are general and may not apply or may vary, based on your local. 6) Component Inventory The task of selecting and quantifying reserve items. This task can be accomplished through on-site visual observations, review of association design and organizational documents, review of established ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 91 Sample Reserve Study - Museum Defini ons Appendix association precedents, and discussion with appropriate association representatives. 7) Condition Assessment The task of evaluating the current condition of the component based on observed or reported characteristics and normal documented in the field report for a Level 1 or Level 2 Reserve Study. 8) Contingency Rate Expressed as a percentage rate that reflects a factor added to the unit cost to prepare for an event that is liable to occur, but not with certainty. 9) Current Cost The current fiscal year’s estimated cost to maintain, replace, repair, or restore a reserve component to its original functional condition. Sources utilized to obtain estimates may include: the association, its contractors, other contractors, specialists and independent consultants, the State department of Real Estate (or other state department as applicable), construction pricing and estimating manuals, and the preparer’s own experience and/or database of costs formulated in the preparation of other reserve study reports. See - Calculations Appendix. 10) Disbursement / Expenditures The funds expected to be paid or expended from the Reserve Balance. 11) Extended Cost See - Calculations Appendix. 12) Fiscal Year (FY) A twelve-month period for which an organization plans the use of its funds. There are two distinct types: A) Calendar Fiscal Year (ends December 31) B) Non-Calendar Fiscal Year (does not end December 31) 13) Full Funded Balance (FFB) Total Accrued Depreciation. An indicator against which the FY Start Balance can be compared. The balance that is in direct proportion to the fraction of life “used up” of the cost. See - Calculations Appendix. 14) Funding Goal Independent of methodology utilized, the following represents the basic categories of funding plan goals: A) Baseline Funding- Maintaining a Net Reserve Balance above zero for length of the study. B) Full Funding- Maintaining a Reserve Balance at or near Percent Funded of 100%. C) Statutory Funding- Maintaining a specified Reserve Balance/Percent Funded per statutes. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 92 Sample Reserve Study - Museum Defini ons Appendix D) Threshold Funding- Establishing and maintaining a set predetermined Reserve Balance or Percent Funded. 15) Funding Method (or Funding Plan) An association’s plan to provide income to the reserve fund to offset expected disbursements from that fund. The following represents two (2) basic methodologies used to fund reserves: A. Cash Flow Method- A method of developing a reserve funding plan where allocations to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. B. Component Method- The component method develops a reserve-funding plan where the total contribution is based on the sum of contributions for individual components. The component method is the more conservative (typically higher reserve account balance) of the two funding options, and assures that the association will achieve and maintain an ideal level of reserves over time. This method also allows for computations on individual components in the analysis. However this method has also limitations with respects to variations in actual useful life of components and is much more time intensive to accurately follow this funding strategy. 16) Funding Plan The combined Funding Method & Funding Goal. 17) FY End Balance (same as next FY Start Balance) The balance in reserves at end of applicable fiscal year. See - Calculations Appendix. 18) FY Start Balance (same as prior year FY End Balance) The balance in reserves at start of applicable fiscal year. 19) Inflation Rate Expressed as a percentage rate that reflects the increase of this year’s costs over the previous year’s costs. Also known as a ‘cost increase factor’. 20) Interest Earned The annual earning of reserve funds that have been deposited into certificates of deposit (CDs), money market accounts or other investment vehicles. See - Calculations Appendix. 21) Interest Rate The ratio of the gain received from an investment and the investment over a period of time (usually one year), prior to any federal or state imposed taxes. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 93 Sample Reserve Study - Museum Defini ons Appendix 22) Interest Rate (net effective) The ratio of the gain received from an investment and the investment over a period of time (usually one year), after any federal or state imposed taxes. 23) Levels of Service A) Level 1 Reserve Study (Full or Comprehensive)- A Reserve Study in which the following five Reserve Study tasks are performed: a) Component Inventory b) Condition Assessment (based upon on-site visual observations) c) Life and Valuation Estimates d) Fund Status e) Funding Plan B) Level 2 Reserve Study (Update, With-Site-Visit/On-Site Review)- A Reserve Study update in which the following five tasks are performed: a) Component Inventory (from prior study) b) Condition Assessment (based upon on-site visual observations) c) Life and Valuation Estimates d) Fund Status e) Funding Plan *Note- Updates are reliant on the validity of prior Reserve Studies. C) Level 3 Reserve Study (Update, No-Site-Visit/Off-Site Review)- A Reserve Study update with no on-site visual observations in which the following three tasks are performed: a) Life and Valuation Estimates (from prior study - updated) b) Fund Status c) Funding Plan *Note- Updates are reliant on the validity of prior Reserve Studies. 24) Percent Funded A comparison of the Fully Funded Balance (ideal balance) to the Fiscal Year Actual Start Balance expressed as a percentage, and used to provide a ‘general indication’ of reserve strength. See Calculations Appendix. 25) Quantity The number or amount of a particular reserve component or subcomponent. 26) Remaining Life (RL) The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the current fiscal year (but have not ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 94 Sample Reserve Study - Museum Defini ons Appendix been approved) have a remaining life of “zero”. 27) Replacement % A percentage of the total replacement for a particular reserve component or subcomponent. This parameter is normally 100%. 28) Reserve Allocation The amount to be annually budgeted towards reserves based on a Funding Plan. 29) Reserve Component (or subcomponent) The individual line items in the reserve study, developed or updated in the physical analysis that form the building blocks of the reserve study. They typically are: A) association responsibility, B) with limited useful life expectancies, C) predictable remaining useful life expectancies, D) above a minimum threshold cost, E) and, as required by statutes. 30) Restoration Defined as to bring back to an unimpaired or improved condition. General types follow: A) Building- In general, funding utilized to defray the cost (in whole or part) of major building components that are not necessarily included as line items and may include termite treatment. B) Irrigation System- In general, funding utilized to defray the cost (in whole or part) of sectional irrigation system areas including modernization to improve water management. C) Landscape- In general, funding utilized to defray the cost (in whole or part) of sectional landscape areas including modernization to improve water conservation & drainage. 31) Risk Factor (Percent Funded) The associated risk of the availability of reserves to fund expenditures by interpreting the Percent Funded parameter as follows: A) 70% and above- LOW B) 31% to 69%MODERATE C) 30% and below- HIGH *High risk is associated with a higher risk for reliance on special assessments, loans and litigation. 32) Unit Cost The current fiscal year’s estimated cost to maintain, replace, repair, or restore an individual “unit of measure” of a reserve component or subcomponent to its original functional condition. 33) Unit of Measure A system of units used in measuring a reserve component or subcomponent (i.e. each, lineal feet, ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 95 Sample Reserve Study - Museum Defini ons Appendix square feet, etc.). 34) Useful Life (UL) Total Useful Life or Depreciable Life. The estimated time, in years, that a reserve item can be expected to serve its intended function if properly constructed and maintained in its present application or installation. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 96 Sample Reserve Study - Museum Disclosures Appendix Items Beyond the Scope of this Report This reserve study has been conducted to outline a financial plan for the proper and adequate budgeting of the Association component repair and/or replacement. This report should not be utilized for any other purpose and should not be considered or deemed appropriate or reliable for, but not limited to, any of the following: ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ ⦁ Building or land appraisals for any purpose State or local zoning ordinance violations Building code violations Soils conditions, soils contamination or geological stability of site Engineering analysis or structural stability of site Air quality, asbestos, electromagnetic radiation, formaldehyde, lead, mercury, or radon Water quality or other environmental hazards Invasions by termites and any or all other destroying organisms or insects Damage or destruction due to pests, birds, bats or animals to buildings or site Adequacy or efficiency of any system or component on site Specifically excluded reserve items Septic systems and septic tanks Buried or concealed portions of swing pools, pool liners, Jacuzzis/spas or similar items Items concealed by signs, carpets or other things Missing or omitted information supplied by the Association for the purposes of reserve study preparation Hidden improvements such as sewer lines, water lines, or other buried or concealed items Qualifications We are a professional business in the market to prepare Reserve Studies for Common Interest Development (CID) properties, seeking a budgeting tool to adequately fund for expected future expenditures related to community owned components. All of our Reserve Analysts’ are designated with either the RS or PRA designations which are given by the two leading industry organizations which require peer review, continuing education and provide resources to stay on top of industry trends. Disclosures The below disclosures are in accordance with reserve study standards developed by CAI, APRA and statutory requirements for reserve studies completed in Washington State. 1. Invasive Testing Estimated life expectancies and life cycles are based upon conditions that were readily accessible and visible at the time of the site visit. We did not destroy any landscape work, building walls, or perform any methods of intrusive/invasive testing during the site visit. In these cases, information may have been obtained by contacting the contractor or vendor that has worked on the property. The physical analysis ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 97 Sample Reserve Study - Museum Disclosures Appendix performed during this site visit is not intended to be exhaustive in nature and may include representative sampling. 2. Representative Sampling This study and report is based on observations of the visible and apparent conditions of a reasonable representative sampling of the property’s elements at the time of inspection. Although due diligence was performed during the inspection phase, we makes no representations regarding latent or concealed defects that may exist. The inspection did not constitute any invasive investigations and was not intended to determine whether applicable building components, systems, or equipment are adequate or in compliance with any specific or commonly accepted design requirement, building code, or specification. Such tasks as material testing, engineering analysis, destructive testing, or performance testing of building systems, components, or equipment are not considered as part of the scope of work, nor are they considered by the reserve study industry standard. 3. Conflicts of Interests As the preparer of this reserve study; the Reserve Analyst certifies that we do not have any vested interests, financial interests, or other interests that would cause a conflict of interest in the preparation of this reserve study. 4. Reliance on Client & Vendor Data Provided Information provided to the preparer of a reserve study by an official representative of the association regarding financial, historical, physical, quantitative or reserve project issues will be deemed reliable by the preparer. A reserve study will be a reflection of information provided to the preparer of the reserve study. The total of actual or projected reserves required as presented in the reserve study is based upon information provided that was not audited. A reserve study is not intended to be used to perform an audit, an analysis of quality, a forensic study or a background check of historical records. A site visit conducted in conjunction with a reserve study should not be deemed to be a project audit or quality inspection. The results of this study are based on the independent opinion of the preparer and their experience and research during the course of their career in preparing Reserve Studies. In addition the opinions of experts on certain components have been gathered through research within their industry and with client’s actual vendors. There is no implied warrantee or guarantee regarding our life and cost estimates/predictions. There is no implied warrantee or guarantee in any of our work product. Our results and findings will vary from another preparer’s results and findings. A Reserve Study is necessarily a work in progress and subsequent Reserve Studies will vary from prior studies. 5. Update to Prior Reserve Studies Level II Studies: Quantities of major components as reported in previous reserve studies are deemed to be accurate and reliable. The reserve study relies upon the validity of previous reserve studies. Level III Studies: In addition to the above we have not visited the property when completing a Level III “No Site Visit” study. Therefore we have not verified the current condition of the common area components. It is ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 98 Sample Reserve Study - Museum Disclosures Appendix assumed all prior study component information related to quantities, condition assessments, useful life and remaining useful life are accurate. 6. Assumption Regarding Ongoing Maintenance The projected life expectancy of the major components and the funding needs of the reserves of the association are based upon the association performing appropriate routine and preventative maintenance for each major component. Failure to perform such maintenance can negatively impact the remaining useful life of the major components and dramatically increase the funding needs of the reserves of the association. 7. Assumptions Regarding Defect in Design or Construction This Reserve Study assumes that all construction assemblies and components identified herein are built properly and are free from defects in materials and/or workmanship. Defects can lead to reduced useful life and premature failure. It was not the intent of this Reserve Study to inspect for or to identify defects. If defects exist, repairs should be made so that the construction components and assemblies at the community reach their full and expected useful lives. We have assumed any and all components have been properly built and will reach normal, typical life expectancies. In general a reserve study is not intended to identify or fund for construction defects. We did not and will not look for or identify construction defects during our site visit. 8. Basis of Cost Estimates Pricing used for the repair or replacement costs indicated in this report are derived from a variety of sources, e.g., recent contractor bids received by subject property HOA or prior clients, construction product vendor catalogs, internet, or national construction cost estimating publishers (RS Means / Marshall & Swift). The material and labor pricing provided are estimates and have been augmented, as necessary, to account for specific site conditions (i.e. material handling, scaffolding, etc.). The total expenses represent a useful guideline whereby reserve funds can be accumulated for future repairs and replacements. The estimated repair and replacement expenses, unless otherwise noted, do not include allowances for architectural, engineering, or permitting fees. 9. Limitations on Report Use A reserve study is not intended to be used to perform an audit, an analysis of quality, a forensic study or a background check of historical records. A site visit conducted in conjunction with a reserve study should not be deemed to be a project audit or quality inspection. This Reserve Study is provided as an aid for planning purposes and not as an accounting tool. Since it deals with events yet to take place, there is no assurance that the results enumerated within it will, in fact, occur as described. Additionally, other unanticipated expenses may arise that are not included within this reserve study. This reserve study should be reviewed carefully. It may not include all common and limited common element components that will require major maintenance, repair, or replacement in future years, and may not include regular contributions to a reserve account for the cost of such maintenance, repair, or ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 99 Sample Reserve Study - Museum Disclosures Appendix replacement. The failure to include a component in a reserve study, or to provide contributions to a reserve account for a component, may, under some circumstances, require you to pay on demand as a special assessment your share of common expenses for the cost of major maintenance, repair, or replacement of a reserve component. 10. Required Disclosure - RCW 64.34.382 This reserve study should be reviewed carefully. It may not include all common and limited common element components that will require major maintenance, repair, or replacement in future years, and may not include regular contributions to a reserve account for the cost of such maintenance, repair, or replacement. The failure to include a component in a reserve study, or to provide contributions to a reserve account for a component, may, under some circumstances, require you to pay on demand as a special assessment your share of common expenses for the cost of major maintenance, repair, or replacement of a reserve component. ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 100 Sample Reserve Study - Museum Component Index Descrip on Replacement Page A/C Units, Ceiling Mounted (Mitsubishi) - Replace A/C Units, Floor Mounted (Mitsubishi) - Replace Accessibility Li Acous c Tile Suspended Ceiling - 5% Repair Con ngency Acous c Tile Suspended Ceiling - Refinish Acous c Tile Suspended Ceiling - Replace Air Handling Unit (11,230 CFM) - AHU #3 Air Handling Unit (5,175 CFM) - AHU #2 Air Handling Unit (800 CFM) - AHU #1 Appliances - Dishwashers Appliances - Microwaves Appliances - Refrigerators Appliances - Sinks Backflow Device for Mechanical Backflow for Fire System Bathroom Countertops Bathroom Par ons Bathroom Sinks Bathroom Urinal Par on Bathroom Urinals Bathroom Water Closets Boiler, Electric (563 MBH) - EB #1 Cabinets Cabinets & Countertops - Refurbish Carpet Flooring - Auditorium Carpet Flooring - Lower Level Carpet Flooring - Sherry Grover Gallery Carpet Flooring - Upper Level Chairs - Stackable Classroom Chairs - Stackable Fabric Covered Chemical Feeder Cinema Projec on System Cinema Sound System - Retrofit INVALID_CATGROUP Con nued 2032 38 2032 38 2037 38 2021 39 2021 39 2032 39 2032 40 2032 40 2032 40 2030 41 2022 41 2030 41 2047 41 2027 42 2027 42 2047 42 2032 42 2047 43 2032 43 2047 43 2047 43 2027 44 2042 44 2047 44 2022 45 2022 45 2022 45 2022 46 2032 46 2032 46 2027 47 2027 47 2027 47 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 101 Sample Reserve Study - Museum Component Index Descrip on Replacement Page Classroom Projector Classroom Projector Screen Compressors 2hp, 29 Gallon Computer Equipment Computer Equipment Concrete Flooring Refinish - Auditorium Concrete Flooring Refinish - Lower Level Concrete Flooring Refinish - Main Level Curtains Curtains Power Control and Track System Dampers, Fire /Smoke Dampers, Motorized Control Day Lounger Desk Display Pedestal Cabinets Display Tables Downspouts Drinking Fountain Duel Sump Pump Duel Sump Pump Controls Elevator Cab Refurbish & Door Package Elevator System - Maintenance/Repairs Elevator System - Modernize/Upgrade Exhibit Display Cabinet Exhibit Display Pedestal Expansion Tanks Exterior Metal Doors Exterior Surfaces - Pressure Wash Fans, Exhaust (300 CFM) - EF #1-2 Fans, Exhaust (340 CFM) - EF #2-1 Fans, Exhaust (380 CFM) - EF #L-1 Fans, Exhaust (850 CFM) - EF #1-1 Fans, Scavenger (2,000 CFM) - #SF-L-1 INVALID_CATGROUP Con nued 2027 47 2037 48 2032 48 2020 48 2020 48 2037 49 2037 49 2037 49 2037 50 2037 50 2042 50 2042 51 2022 51 2042 51 2042 51 2042 52 2042 52 2022 52 2024 52 2036 53 2030 53 Unfunded 53 2042 54 2042 54 2042 54 2032 55 2042 55 2017 55 2027 56 2027 56 2027 56 2032 56 2032 57 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 102 Sample Reserve Study - Museum Component Index Descrip on Replacement Page Fire System - Tes ng & Minor Repairs Fire System Panel - Upgrade/Modernize Fire System Sprinkler Heads - Replace Fluid Cooler, Closed Loop Furnishings - Business Office Furnishings - Marke ng Office Generator - 14 KW Glass Storefront Entry Door Auto Openers Glass Storefront Entry Doors Greenscreen Metal Vine Wall Gypsum Board Suspended Ceiling - 5% Repair Con ngency Gypsum Board Suspended Ceiling - Refinish Gypsum Board Suspended Ceiling - Replace Hardwood Flooring Refinish - Grand Staircase Hardwood Flooring Refinish - Main & Upper Level Hardwood Flooring Refinish - Stage Hardwood Flooring Replace - Grand Staircase Hardwood Flooring Replace - Main & Upper Level Hardwood Flooring Replace - Stage Heat Pumps - 3.5 Ton Geothermal Water to Air Heat Pumps - Main and Upper Level HVAC Humidifier - HUM #1 Humidifier - HUM #2 Interior Doors Interior Surfaces Kaleidescape Server Keri Systems - Key Fob System Upgrades Ligh ng - Cove Light Fixtures Ligh ng - Exhibit Track Fixtures Ligh ng - Pendant Linear Fluorescent Fixtures Ligh ng - Recessed 2' x 2' Fixtures (Lower Level) Ligh ng - Recessed Mul lamp Fixtures Ligh ng - Recessed/Pendant Single Fixtures INVALID_CATGROUP Con nued Unfunded 57 2037 57 2037 58 2032 58 2032 58 2032 59 2037 59 2032 59 2032 60 2052 60 2032 60 2032 61 2052 61 2017 61 2022 62 2022 62 2052 62 2052 63 2052 63 2032 63 2032 64 2027 64 2027 64 2052 65 Unfunded 65 2020 65 2024 66 2037 66 2037 66 2037 67 2037 67 2037 67 2037 68 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 103 Sample Reserve Study - Museum Component Index Descrip on Replacement Page Louver Sun Shade System - Replace Louver Sun Shades - Paint (both sides) Metal Siding - Refinish Metal Siding - Replace Office - Computer Equipment Par on Walls Piping - Geothermal Pocket Doors Projec on Screen with Power Li Pump, Circula on - Geothermal Pump, Circula on Controls - Geothermal Pump, In-Line Water Pump Pump, In-Line Water Pump Recessed Fixtures Roof Deck - Guard Rail Roof Deck - Paver System Roof Hatch Roo op Garden - Membrane Roo op Garden - Renovate Sea ng - Theatre Style Security - Cameras Replace Security - DVR Unit Moderniza on/Upgrade Sewer Mains Sherry Grover - Display Cabinets Sherry Grover - Display Table Case Sherry Grover - TV Single Ply Membrane (PVC) - Replace Skylights Small Tables Solar Panel Moun ng Brackets Solar Panels - Replace Solar Panels Controller - Replace Stanchions INVALID_CATGROUP Con nued 2052 68 2032 68 2032 69 2052 69 2020 69 2032 69 Unfunded 70 2022 70 2037 70 2024 71 2036 71 2024 71 2024 72 2032 72 2042 72 2042 72 2042 73 2042 73 2027 73 2037 74 2024 74 2024 74 Unfunded 74 2042 75 2042 75 2022 75 2042 76 2042 76 2042 76 2042 77 2027 77 2027 77 2032 77 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 104 Sample Reserve Study - Museum Component Index Descrip on Replacement Page Stone Veneer - 50% Repair Con ngency Storage Cabinets Storefront Type (Exterior) - Repair Storefront Type (Exterior) - Replace Structural Glazing Systems - Repair Structural Glazing Systems - Replace Tables - Folding Tigerwood Rainscreen Siding - Replace Tile Flooring - Main Level Bathrooms Tile Flooring - Upper Level Bathrooms Variable Air Volume Terminal (1,240 CFM) - VAV #2-1 Variable Air Volume Terminal (1,425 CFM) - VAV #2-3 Variable Air Volume Terminal (1,475 CFM) - VAV #1-1 Variable Air Volume Terminal (1,610 CFM) - VAV #1-6 Variable Air Volume Terminal (195 CFM) - VAV #L-1 Variable Air Volume Terminal (2,100 CFM) - VAV #1-2 Variable Air Volume Terminal (2,180 CFM) - VAV #1-5 Variable Air Volume Terminal (425 CFM) - VAV #L-2 Variable Air Volume Terminal (485 CFM) - VAV #2-2 Variable Air Volume Terminal (550 CFM) - VAV #1-4 Variable Air Volume Terminal (660 CFM) - VAV #1-7 Variable Frequency Drive (10 HP) - VFD #2 Variable Frequency Drive (2 HP) - VFD #1 Variable Frequency Drive (20 HP) - VFD #3 Vinyl Flooring - Upper Level Bathroom Vinyl/Lino Flooring - Classroom Upper Level Water Heater Water Heater Circula on Pump 1/6 hp Water Mains Water Storage Tank Window Interior Sun Shades - Replace Wood Benches Wood Siding & Overhang - Refinish INVALID_CATGROUP Con nued 2032 78 2042 78 2032 78 2052 79 2032 79 2052 79 2032 80 2052 80 2052 80 2052 81 2034 81 2034 81 2034 82 2034 82 2034 82 2034 83 2034 83 2034 83 2034 84 2034 84 2034 84 2032 85 2032 85 2032 85 2037 86 2037 86 2027 86 2032 87 Unfunded 87 2042 87 2030 88 2042 88 2017 88 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 105 Sample Reserve Study - Museum Component Index Descrip on Replacement Wood Table Sets INVALID_CATGROUP Con nued 2042 89 Total Funded Assets Total Unfunded Assets Total Assets Page 160 6 166 ________________________________________________________________________________________________________________ Sample Reserve Study - Museum | Report # Museum Sample| Reserve Data Analyst | 866.574.5115 | www.rdanorthwest.com Page 106
© Copyright 2026 Paperzz