See a

Tie into existing Westhaven Promenade shared path
(not shown on aerial photograph)
Mark zebra crossing on
existing raised table
Widen footpath by 1.7m to provide
shared path past transformer.
All existing car parks retained.
Trim Trees
Bollards to define
shared path and car
park access sections
WESTHAVEN DRIVE
Localised narrowing.
Replace part of fence
with bollards on
same alignment as
current fence
Painted buffer markings of
0.5m to be installed on the
footpath to protect cyclist from
car door opening. All parking
and traffic lanes retained
(including clearway)
Widen path and cut
back vegetation on
motorway side
Mark red
crossing
surface
Retain existing turn geometry and width to retain use by
oversize vehicles, narrowing by road markings only
Widen pedestrian
crossing / change
signals to allow
cycle crossing
Widen footpath by 1.0m.
All traffic lanes remain to
Arterial Road Standards
Remove approximately one
carpark to allow raised table
Reseal footpath and
move street furniture to
edge of footpath.
Reinstate all driveways
in existing locations
GAUNT STREET
A
B
C
D
---------
Provide raised table over Gaunt Street
approach to improve road safety
Reprofile footpath to
tie into existing
driveway for carpark
FANSHAWE
REV
BEAUMONT STREET
REVISION DESCRIPTION
BASED ON 13505-N-1B
AMEND NOTES
UPDATE BASE PLAN AND ASSOCIATED TEXT
UPDATE BASE PLAN AND ASSOCIATED TEXT
---- ---- ------- ---- ------- ---- ------- ---- ----
DRAWN
CM
CM
GE
CM
CHECKED
MR
MR
MR
MR
X:\Live\npe\TDG PROJECTS\13,000-13,999\13505 Beaumont St, Wynyard Quarter Cycleway Design\CAD\13505 N2D.dwg
APPROVED
DATE
11/03/2016
15/03/2016
16/05/2016
16/11/2016
BEAUMONT STREET INTERIM SHARED WALKING AND CYCLING PATH
ENGAGEMENT PLAN
-
STATUS:
DETAILED DESIGN
DATE:
REV
SCALE:
11/16/16
TDG DRAWING NO.
13505 N2D
1:600 @ A3 (H)
1:300 @ A1 (H)
SHEET NO.
--
--
--
D