Tie into existing Westhaven Promenade shared path (not shown on aerial photograph) Mark zebra crossing on existing raised table Widen footpath by 1.7m to provide shared path past transformer. All existing car parks retained. Trim Trees Bollards to define shared path and car park access sections WESTHAVEN DRIVE Localised narrowing. Replace part of fence with bollards on same alignment as current fence Painted buffer markings of 0.5m to be installed on the footpath to protect cyclist from car door opening. All parking and traffic lanes retained (including clearway) Widen path and cut back vegetation on motorway side Mark red crossing surface Retain existing turn geometry and width to retain use by oversize vehicles, narrowing by road markings only Widen pedestrian crossing / change signals to allow cycle crossing Widen footpath by 1.0m. All traffic lanes remain to Arterial Road Standards Remove approximately one carpark to allow raised table Reseal footpath and move street furniture to edge of footpath. Reinstate all driveways in existing locations GAUNT STREET A B C D --------- Provide raised table over Gaunt Street approach to improve road safety Reprofile footpath to tie into existing driveway for carpark FANSHAWE REV BEAUMONT STREET REVISION DESCRIPTION BASED ON 13505-N-1B AMEND NOTES UPDATE BASE PLAN AND ASSOCIATED TEXT UPDATE BASE PLAN AND ASSOCIATED TEXT ---- ---- ------- ---- ------- ---- ------- ---- ---- DRAWN CM CM GE CM CHECKED MR MR MR MR X:\Live\npe\TDG PROJECTS\13,000-13,999\13505 Beaumont St, Wynyard Quarter Cycleway Design\CAD\13505 N2D.dwg APPROVED DATE 11/03/2016 15/03/2016 16/05/2016 16/11/2016 BEAUMONT STREET INTERIM SHARED WALKING AND CYCLING PATH ENGAGEMENT PLAN - STATUS: DETAILED DESIGN DATE: REV SCALE: 11/16/16 TDG DRAWING NO. 13505 N2D 1:600 @ A3 (H) 1:300 @ A1 (H) SHEET NO. -- -- -- D
© Copyright 2026 Paperzz