"W " "W " 37.5" "A" Cos 0 "A" Cos 0 "A" Cos 0 3" 3" 3" Cos

"C" = distance to C
L Brg
"B" = distance to beam end
8
0
1
2"
e
gl
n
w A
e
k
S
Sole Plate, see SGEB standard
1
2
1
2"
1
See SGEB standard
1
or Girder
C
L Steel Beam
1
4"
W F = Flange
Inverted-T Bent
W idth
Bkwl, or Face of
WS = Sole Plate W idth
~
C
L Bent, Face of Abut
C
L of End Bearing
Min
f
do
n
e
= E
c
"
an
A
"
ear
l
C
m
Bea
Top and bottom flanges are clipped parallel to face of abutment backwall,
faces of Inverted-T bents, or where beam conflicts exist. Top flange is
clipped parallel to centerline of joint at conventional bents.
2
Bottom flange at conventional bents is not clipped unless conflict exists
with beams in adjacent span.
"A" = 2" Min at conventional bents; may be increased to 3" at Abutments
and Inverted-T bents.
"A"
1
"B" = Cos 0+ 1.25" Tan 0, rounded up to nearest 4".
"C"(for un-clipped bottom flange) = "B" + 9", rounded up to nearest
"A"
0
"C"(for clipped bottom flange)Cos
=
"A"
or =
+ 0
Cos
1
2"
"W
F "
+ 2
Tan 0 + 9"
S "
"W
Tan
2 0 + 8.5", whichever is
greater,
rounded up to
Example:
nearest
1
2".
Abutment, ES5 Brg, 24" flange width,
Skew Angle = 45°
"W
S " = 37.5"
"A" = 3"
3"
"B" = Cos 45°
+ 1.25" Tan 45° = 5.49", use 5.5"
3"
24"
2 Tan 45° + 9" = 25.24"
"C" =Cos 45°
+
3"
37.5"
"C" = Cos 45°
+
2Tan 45° + 8.5" = 31.49", 31.49" controls, use 31.5"