Assembly instruction for Conen height adjustable column system. Packing unit PY-… left column Handle columns with care! Unpack the columns slowly! right column Packing unit PY-… 1. 2x floor panel left floor panel right floor panel 4x 8mm dowel 4x sheet metal screw 5x55 2. 2x z-holder 3. 2x slide 4. 2x 8mm washer 2x selflocking nut M8 5. 4x 8mm washer 4x selflocking nut M8 Packing unit PY-… center of system 61,75 cm 7 cm 61,75 cm 123,5 cm 3,5 cm 1. left floor panel 2x floor panel 4x 8mm dowel 4x sheet metal screw 5x55 3 cm center of floor panel right floor panel Mark the center of the System at the floor or the wall. Mark the center of the floor panel. Attention! Left and right floor panel are different. Center of system to center of floor panel 61,75 cm. Mark at floor and wall. The distance from the center of one floor panel to the other must be exactly 123,5 cm. Distance from wall to floor panel 7 cm. Mark the four holes. Use a 8mm drill. Use a drill suitable for the floor. Use 2x 8mm dowel and 2x sheet metal screw 5x55 per floor panel. Use four z-holders in case of floor heating (not included). Packing unit PY-… Center of z-holder 2. 2x z-holder No fittings for wallmounting included. 210 cm – 240 cm Mark center of z-holder. Center of z-holder must be situated exactly above middle of floor panel. Use a water level. Attach the z-holder 210 cm – 240 cm above the ground. Mark position of z-holder. Fix z-holder with suitable wallmounting material according to the consistence of the wall. Ask wallmounting specialist. No fittings for wallmounting included. The wallmounting specialist has to decide wether 4 z-holder or a load distribution panel has to be used (not included). Packing unit PY-… 3. 2x slide After fixing the floor panels put the two pylons in front of the panels carefully. Use the nut M8 and 8mm washer. Tighten the nut a little. Attach the slides to the pylons. Packing unit PY-… Packing unit PY-… 4. 2x washers M8 2x selflocking nutM8 Put the column to the wall. Fix the slide with the z-holder. Washer has to be situated between z-holder and nut M8. Packing unit AF-PY… 6. 4x Allen head screw M8x20 4x 8mm washer 4x Allen head lense screw with flange M6x20 4x 6mm washer 7. 4x Allen head screw M8x45 4x 8mm washer 4x Allen head screw M6x45 4x 6mm washer 8. 1x hexagon head screw M8x100 2x 8mm washer 1x nut M8 Packing unit AF-PY… 5. 4x 8mm washer 4x selflocking nut M8 Attach the adapter frame to the slides at the columns. Use 4x selflocking nut M8 and 4x 8mm washer. Packing unit AF-PY… 800mm 710mm 600mm 400mm Fix rail at the back of the television According to model use 2-4x Allen head screw M8x20 and washer or 2-4x Allen head lense screw with flange 6. M6x20 and washer. 2-4x Allen head screw M8x20 and 2-4x 8mm washer or 2-4x Allen head lense screw with flange M6x20 and 2-4x 6mm washer Packing unit AF-PY… Hang in the television with rail at the spare outs of the frame. Make sure, that the television is placed exactly in the centre of the system. The rail has to hang 1. hang rail in in the front of the spare out at the frame. 2. bring it to the front Packing unit AF-PY… Picture without television Packing unit AF-PY… Packing unit AF-PY… 7. 2-4x Allen head screw M8x45 and 2-4x 8mm washer or 2-4x Allen head screw M6x45 and 2-4x 6mm washer Picture without television Fix television to the traverse at the frame to secure it. According to model use 2-4x Allen head screw M8x45 and washer or 2-4x Allen head screw M6x45 and washer. Packing unit AF-PY… Packing unit AF-PY… Picture without television Attach upper bar (only for use for systems with wings) and lower bar to the frame. Packing unit WBW… 9. 12x sheet metal screw 4,2x25 10. 4x rubber buffer Packing unit WBW… 9. 12x sheet metal screw 4,2x25 Fix wings with 3 sheet metal screws to each hinge. (Only for use for systems with wings.) Packing unit WBW… 10. 4x rubber buffer 8. 1x hexagon head screw M8x100 2x 8mm washer 1x nut M8 Adjust wings via the long slots in the upper and lower bar. Use 4x black buffer to protect the frame of the television. (Only for use for systems with wings.) Fix weight panels to the lower bar of the frame. Use 1x hexagon head screw M8x100, 2x 8mm washer and 1x nut M8.
© Copyright 2026 Paperzz