Typical Process Connection Diagram

SUBJECT: TYPICAL PROCESS CONNECTION DIAGRAM
#6-A-10
1/20/1994
updated 4/12/2013
The design of the unit-to-process hook up is key to optimizing the capability of the heating/cooling
system. Selecting proper pipe IDʼs, minimum run lengths, minimum elbows, tees, etc. are all important to creating a
low pressure drop... thus a high flow rate... installation.
This diagram schematically contains piping and valving details which may not be needed in all cases. However, for
molding installations requiring maximum flexibility, a relatively minor increase in original piping costs can have great
efficiency paybacks in the future.
Select pipe sizes for 5-7 feet per second flow velocity and 5-10 psi pressure drop. Consult the engineering
department for assistance when needed.
TWS
TWR
CWS
CWR
TWS
TWR
CWS
CWR
Temperature and pressure gauges
check system performance
TWR
TWS
1
3
2
4
To/from
Auxiliary Unit
5
18
6
7
17
CWR
CWS
To/from
Auxiliary Unit
8
9
11
10
12
15
To/from
Auxiliary Unit
13
Note: for many processes, water
manifolds are desirable at this location
14
Mold - Roll
or other process
Water Regulator Valve
16
Hydraulic
Heat Exchanger
To/from Auxiliary Unit
KEY
TWS - Tower Water Supply
TWR - Tower Water Return
CWS - Chilled Water Supply*
CWR - Chilled Water Return*
*INSULATE ALL CHILLED WATER PIPING
19
20
VALVE POSITION
Tower supply for auxiliary
Open: 1 - 2
Chilled water for auxiliary
Open: 3 - 4
Tower on mold
Open: 5 - 6 - 9 - 10 - 11 - 12
Chilled water on mold
Open: 7 - 8 - 11 - 12
Auxiliary on mold
Open: 13 - 14
Tower on heat exchanger
Open: 5 - 6 - 17 - 18
Chilled water on heat exchanger
Open: 7 - 8 - 15 - 16
Auxiliary on heat exchanger
Open: 19 - 20
This drawing is supplied to demonstrate a possible piping configuration. The drawing is general in nature and is not intended to be all inclusive of every detail that
might be required for your specific location and installation. Advantage accepts no responsibility for piping and any other component supplied or installed by others.
ADVANTAGE Engineering, Inc. 525 East Stop 18 Road Greenwood, IN 46142 317-887-0729 fax: 317-881-1277
web site: www.advantageengineering.com email: [email protected]
original created 4/16/97 updated 4/12/2013 © 2013 ADVANTAGE ENGINEERING, INC.