REQUEST FOR PROPOSALS STRUCTURAL FIREFIGHTER TURNOUT GEAR SEPTEMBER 2016 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 TABLE OF CONTENTS 1.0 INTRODUCTION AND PURPOSE Page 3-4 2.0 REQUEST FOR PROPOSAL TERMS 2.1 DEFINITIONS 2.2 NO OBLIGATION TO PROCEED 2.3 CITY’S DECISION-MAKING 2.4 ENQUIRIES 2.5 ELIGIBILITY 2.6 EVALUATION COMMITTEE 2.7 EVALUATION AND SELECTION 2.8 DEBRIEFING 2.9 SIGNED PROPOSALS 2.10 ALTERNATIVE SOLUTIONS 2.11 CHANGES TO PROPOSAL WORDING 2.12 IRREVOCABILITY OF PROPOSALS 2.13 COMPLETENESS OF PROPOSAL 2.14 SUB-CONTRACTING 2.15 ASSIGNMENT 2.16 CONFLICT OF INTEREST 2.17 LAWS OF PRINCE EDWARD ISLAND 2.18 FINAL AGREEMENT 2.19 GRATUITIES 2.20 PERFORMANCE Pages 5-7 3.0 ITEM SPECIFICATIONS 3.1 REQUIREMENTS AND ITEM SPECIFICATIONS 3.2 ANTICIPATED TIMEFRAMES Pages 8-24 4.0 EVALUATION CRITERIA Pages 25-26 5.0 QUOTATION FORM Pages 27-29 City of Charlottetown Page 2 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 1. INTRODUCTION AND PURPOSE Proposals shall be submitted by completing this document and placing it in a sealed envelope, clearly marked on the outside, "STRUCTURAL FIREFIGHTING TURNOUT GEAR; Controller; 3rd Floor City Hall", and must be received by the Controller before 2:00:00 pm local time on Wednesday, October 5th, 2016. It is the responsibility of the bidder to deliver the sealed tender to the 3rd floor of City Hall before the time indicated. Late proposals will not be accepted and will be returned to the Proponent. Any addenda will be posted on the City of Charlottetown website at www.charlottetown.ca/tenders.php. Proponents are responsible for checking the website for proposal/quote/tender notices, documents, and addenda. The City is not responsible for ensuring bidders have obtained addenda. No fax, email or electronic submissions will be received. It is the proponent’s responsibility to ensure that their submission is received prior to the closing date and time noted above. There will be no public opening of proposals received. The successful proponent(s) and the respective details will be posted on the City of Charlottetown awards webpage. This RFP creates no obligation on the part of the City of Charlottetown to award the contract or to reimburse proponents for proposal preparation expenses. The City of Charlottetown reserves the right to accept or reject any and all proposals, in whole or in part, received as a result of this request, and to negotiate in any manner necessary best serve the interest of the City. . The decision on which tender best satisfies the needs of the City rests solely with the City and any decision is not open to appeal. Submissions will not be evaluated if the Proponent’s current or past corporate or other interests may, in the City’s opinion, give rise to a conflict in connection with this project. At the election of the City, whether or not a bid or bidder otherwise satisfies the requirements of the RFP, the City may reject summarily any bid received from a corporation or other person which has been anywise involved in litigation, arbitration or alternative dispute resolution with the City within the five (5) year period immediately preceding the date on which the request for Proposals was published. The City’s evaluation may include information provided by the proponent’s references and may also consider the proponent’s past performance on previous contracts with the City or other institutions. The City may prohibit a proponent from participating in a procurement process based on past performance or based on inappropriate conduct in a prior procurement process, and such inappropriate conduct shall include but not be limited to the following: (a) the submission of quotations containing misrepresentations or any other inaccurate, misleading or incomplete information; (b) the refusal of the proponent to honour its pricing or other commitments made in its proposal; or (c) any other conduct, situation or circumstance, as solely determined by the City. Any potential conflict of interest must be disclosed to the City in writing. Any conflict of interest identified will be considered and evaluated by the City. The City has the sole discretion to take the steps deemed necessary to resolve the conflict. If, during the term of the contract, a conflict or risk of conflict of interest should arise, the Contractor will notify the City immediately in writing of that conflict or risk and take any steps that the City reasonably requires to resolve the conflict or deal with the risk. City of Charlottetown Page 3 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 The City will pay the successful proponent via Electronic Funds Transfer. The successful proponent will be required to provide the necessary information for registration on the City’s payment system. Any questions in respect of this Request for Proposals, please contact [email protected], questions must be received no less than three (3) business days before the closing date. PURPOSE The purpose of this Request for Proposal process is to select an equipment provider for the sizing, purchase and delivery of thirty six (36) complete sets of bunker gear and an additional thirteen (13) pants of NFPA 1971: Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting, 2013 Edition, compliant, turnout gear as per the specifications, terms and conditions as set out in Section 3 of this document. City of Charlottetown Page 4 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 2.0 REQUEST FOR PROPOSAL TERMS The City has formulated the terms and procedures set out in this RFP to ensure that it receives proposals through an open, competitive process, and the Proponents receive fair and equitable treatment in the solicitation, receipt and evaluation of their proposals. The following terms will apply to this Request for Proposal and to any subsequent Contract. Submission of a proposal in response to this Request for Proposal indicates acceptance of all the following terms. 2.1 DEFINITIONS Throughout this Request for Proposal, terminology is used as follows: a) “City” means The City of Charlottetown. b) “Contract” means the written agreement or Purchase Order resulting from this Request for Proposal, in accordance with this Request for Proposal. c) “Contractor” means a successful Proponent to this Request for Proposal who enters into a written Contract with the City. d) “Must”, “mandatory” or “required” means a requirement that must be met in order for a proposal to receive consideration. e) “Proponent” means an individual or a company that submits, or intends to submit, a Proposal in response to this “Request for Proposal”. f) “Proposal” means the Proponent’s response to this “Request for Proposal”. g) “Should” or “desirable” means a requirement having a significant degree of importance to the objectives of the Request for Proposal. 2.2 NO OBLIGATION TO PROCEED Though the City fully intends at this time to proceed through the RFP, the City is under no obligation to proceed to the purchase, or any other stage. The receipt by the City of any information (including any submissions, ideas, plans, drawings, models or other materials communicated or exhibited by any intended Proponent, or on its behalf) shall not impose any obligations on the City. There is no guarantee by the City, its officers, employees or agents, that the process initiated by the issuance of this RFP will continue, or that this RFP process or any RFP process will result in a contract with the City. 2.3 CITY’S DECISION-MAKING The City has the power to make any decision, or to exercise any contractual right or remedy, contemplated in this RFP at its own absolute and unfettered discretion. 2.4 ENQUIRIES All enquiries related to this Request for Proposal are to be directed, in writing, to the contact person Stephen Wedlock ([email protected]). Information obtained from any other source is not official and should not be relied upon. Enquiries and responses will be recorded and may be distributed to all Proponents at the City’s option. Any questions regarding this RFP must be submitted by at least three (3) working days prior to the closing date. Any questions submitted after this date may not be answered. City of Charlottetown Page 5 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 2.5 ELIGIBILITY Proposals will not be evaluated if the Proponent’s current or past corporate or other interests may, in the City’s opinion, give rise to a conflict of interest in connection with this project. 2.6 EVALUATION COMMITTEE Evaluation of proposals will be by a committee formed by the City. 2.7 EVALUATION AND SELECTION Proposals will be checked against mandatory criteria. Proposals not meeting all mandatory criteria will be rejected without further consideration. Proposals that do meet all the mandatory criteria will then be assessed and scored against the desirable criteria. The City’s intent is to enter into a Contract with the Proponent who has the highest overall ranking. By responding to this RFP, Proponents will be deemed to have agreed that the decision of the Evaluation Team will be final and binding. 2.8 DEBRIEFING Unsuccessful Proponents may request a debriefing meeting with the City. 2.9 SIGNED PROPOSALS The proposal must be signed by the person(s) authorized to sign on behalf of the Proponent and to bind the Proponent to statements made in response to this Request for Proposal. 2.10 ALTERNATIVE SOLUTIONS If alternative solutions are offered, please submit the information in the same format, as a separate proposal. 2.11 CHANGES TO PROPOSAL WORDING The Proponent will not change the wording of its proposal after closing and no words or comments will be added to the proposal unless requested by the City for purposes of clarification. 2.12 IRREVOCABILITY OF PROPOSALS By submission of a clear and detailed written notice, the Proponent may amend or withdraw its proposal prior to the closing date and time. Upon closing time, all proposals become irrevocable. By submission of a proposal, the Proponent agrees that should its proposal be successful the Proponent will enter into a contract with the City of Charlottetown. 2.13 COMPLETENESS OF PROPOSAL By submission of a proposal the Proponent warrants that, if this Request for Proposal is to design, create or provide a system or manage a program, all components required to run the system or manage the program have been identified in the proposal or will be provided by the Contractor at no charge. 2.14 SUB-CONTRACTING a) Using a sub-contractor (who must be clearly identified in the proposal) is acceptable. This includes a joint submission by two Proponents having no formal corporate links. However, in this case, one of these Proponents must be prepared to take overall responsibility for successful interconnection of the two product or service lines and this must be defined in the proposal. b) Sub-contracting to any firm or individual who’s current or past corporate or other interests may, in the City’s opinion, give rise to a conflict of interest in connection with this project will not be City of Charlottetown Page 6 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 permitted. This includes, but is not limited to, any firm or individual involved in the preparation of this Request for Proposal. c) Any Sub-contracting of the service to any firm or individual after the award of a Contract must have prior approval by the City. 2.15 ASSIGNMENT This RFP and any resulting contract may not be assigned by either party without the prior written consent and approval of the other party, which consent may not be unreasonably withheld; provided however, either party, without such consent, may assign or sell the same in connection with the transfer or sale of substantially its entire business to which this contract pertains or in the event of its merger or consolidation with another company. Any permitted assignee shall assume all obligations of its assignor under this contract. No assignment shall relieve any party of responsibility for the performance of any accrued obligation that such party then has hereunder. 2.16 CONFLICT OF INTEREST Any potential conflict of interest must be disclosed to the City in writing. Any conflict of interest identified will be considered and evaluated by the City. The City has the sole discretion to take the steps they deem necessary to resolve the conflict. If, during the term of the Contract, a conflict or risk of conflict of interest arises, the Contractor will notify the City immediately in writing of that conflict or risk and take any steps that the City reasonably requires to resolve the conflict or deal with the risk. 2.17 LAWS OF PRINCE EDWARD ISLAND This Request for Proposal will be governed by and will be construed and interpreted in accordance with the laws of the Province of Prince Edward Island. 2.18 FINAL AGREEMENT This solicitation does not contain all terms and conditions necessary for conducting business with the City of Charlottetown. 2.19 GRATUITIES The City of Charlottetown may, by written notice to a proponent, cancel any contract if it is found by the City that gratuities, in the form of entertainment, gifts, or otherwise, were offered or given by the proponent, or the agent or representative of the proponent, to any employee or agent of the project with a view toward securing favorable treatment with respect to the awarding or amending, or making any determinations with respect to performing of such contract. 2.20 PERFORMANCE The City has the right to cancel agreements based on performance with the City as the sole judge of that performance. City of Charlottetown Page 7 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 3.0 ITEM SPECIFICATIONS 3.1 REQUIREMENTS AND ITEM SPECIFICATIONS The City of Charlottetown invites proposals to provide custom sizing, purchase and delivery of thirtysix (36) complete sets of bunker gear and an additional twelve (12) pants of NFPA 1971: Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting, 2013 Edition, compliant, turnout gear. To avoid liability and interface problems, coats and pants shall be procured from the same manufacturer. The following criteria will be scored prior to the possible proponent being considered: As part of the submission, each Proponent must complete the following criteria and include in their submission. 1) NFPA 1971 COMPLIANCE The turnout gear must be new and fully NFPA 1971: Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting, 2013 Edition, compliant. Yes ____ No ____ 2) CERTIFICATION The manufacturer must certify that the garments proposed in its bid meet or exceed all requirements of NFPA 1971. The manufacturer must also list and label this product with Underwriters Laboratories Inc. (UL) or Safety Equipment Institute (SEI), as the third party certification organization prescribed in NFPA 1971. All certification testing and test preconditioning must have been performed by an ISO 17025-certified laboratory. UL, SEI or a UL Authorized Client Test Data Program laboratory will fulfill this requirement. The manufacturer must be registered to ISO 9001, Quality Management Systems – Requirements, 2000. Yes ____ No ____ 3) WARRANTY The manufacturer must provide a minimum five (5) year warranty against all defects, wear and/or tear that is not associated with that expected of normal firefighting operations and a lifetime warranty against defects in materials and workmanship with the bid package. All warranty repairs are to be corrected by the supplier at no cost to the City of Charlottetown. Yes ____ No ____ City of Charlottetown Page 8 City of Charlottetown 4) RFP - Structural Firefighter Turnout Gear October 2016 LABELLING REQUIREMENTS Labels should be permanently and integrally printed onto materials that meet all the requirements for labels of NFPA 1971. The garment must be clearly labeled to fully identify the material content of all three layers: outer shell, moisture barrier and thermal liner. In addition, each separable outer shell component should be labeled in an obvious location including the size, date of manufacturer and an individualized serial number and bar code that matches the corresponding garment liner. Yes ____ No ____ 5) CARE INSTRUCTIONS The manufacturer should provide a user information guide for the garments, which complies with user information requirements of NFPA 1971. Topics should include, but not necessarily be limited to: preuse information, preparation for use, inspection frequency and details, don/doff, use consistent with NFPA 1500, maintenance and cleaning, and retirement and disposal criteria and considerations. This document should be packaged with each garment along with a specification summary sheet describing garment custom options, sizing and production details. This written information must be in complete compliance with NFPA 1971 requirements, and must reference same. Yes ____ No ____ 6) TRACEABILITY PROGRAM The manufacturer should have in place a computer maintained traceability program that provides for the assignment of a production control number to each garment. The traceability program must be capable of tracing the garment through production, from the bolts of cloth used in all three layers of the garment composite construction, to the assignment of the garment to the individual firefighter. This production control number should be visibly located on the garment label and on other protected areas of garment. Yes ____ No ____ 7) SIZING To ensure a perfect fit, sizing should be determined by actual measurements taken of the firefighter by a trained measurement specialist, or sizing try-ons, or both. Sizing measurements must be taken according to a schedule and location(s) mutually agreed between the manufacturer and the department. Garments should be available in custom sizing as follows: coat chest in 2-inch (5.1 cm) increments, coat sleeve in 0.5-inch (1.3 cm) increments, coat back length in 1-inch (2.5 cm) increments, pant waist City of Charlottetown Page 9 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 in 2-inch (5.1 cm) increments and pant inseam in 1-inch (2.5 cm) increments. A full range of women’s sizing, on women’s patterns, must also be available. Each sleeve and inseam length should provide 100% gradation from shoulder to wrist, and from hip to ankle, to provide proper fit for individual arm and leg lengths. Pattern tailoring to custom-fit neck, bicep, hip/seat and thigh circumferences should also be provided, when needed, at no additional charge. Neither Small-Medium-Large-Extra Large sizing nor women’s garments cut to men’s patterning are considered acceptable, since proper fit facilitates mobility and minimizes stress. Yes ____ No ____ 8) SELF-BINDING Liner and moisture barrier should be stitched together, turned, then topstitched, to create a self-binding edge. The extra bulk of separate binding material is specifically prohibited. Yes ____ No ____ Exception ____ Score ____ 9) THREAD All thread used in structural seams should be Nomex®. Light colored trim areas should feature yellow thread. Black garments should feature black thread. Yes ____ No ____ Exception ____ Score ____ 10) STITCH METHODS Major A & B seams Except for the collar Major A seam, which is single-needle lock stitched three times, all Major A & B seams (as defined by NFPA 1971) should be double stitched, double feld throughout all three layers (outer shell, moisture barrier and thermal liner), and should be made with Nomex® thread. Also, all moisture barrier seams should be tape-sealed to meet all requirements of the NFPA 1971 Liquid Penetration Resistance Test. Most Minor seams, such as storm shields and mated hems, should also be stitched with the specified Nomex® thread. Flat garment pockets should be stitched with the specified Nomex® thread. 3-Dimensional pocketing should feature these same construction details, but the reinforced single stitch Seam Type LSd-1 may be substituted for LSd-2. Trim and DANGER labels will be stitched with the specified Nomex® thread. City of Charlottetown Page 10 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 Single layer hemming and finishing will be stitched with the specified Nomex® thread. Yes ____ No ____ Exception ____ Score ____ 11) POCKETS When exterior pockets are specified, the following requirements should apply to all such custom option specified exterior pockets: All pockets and flaps should be reinforced at the top corners with bar tack stitching. All pockets will be reinforced with an extra layer of NFPA-certified outer shell, moisture barrier, or other NFPA-certified reinforcement material for extra durability. The exact location of the reinforcements should be identified in the custom options section(s). All pockets will have a means to drain water and should have a means of closure. All pocket closures should be made either with hook and loop fastener tape, with a flap, or with snaps. The specific placement of the closure system should be outlined in the custom options sections. Yes ____ No ____ Exception ____ Score ____ 12) POINTS OF STRESS All points of stress should be reinforced with sturdy bar tacks. Rivets are not acceptable because of their potential for rust and electrical or heat conduction. Yes ____ No ____ Exception ____ Score ____ 13) ASSET TRACKING SERVICES The manufacturer will be capable of providing a Windows-compatible software program for the tracking of care, cleaning and maintenance of the department’s PPE. This tracking program should meet or exceed all record-keeping requirements of standard NFPA 1851, Standard on Selection, Care, and Maintenance of Structural Fire Fighting Protective Ensembles, Latest Edition Labels on each separable part of the garment should include a standard style interleaved 2 of 5 barcode containing (at a minimum) an individualized serial number for asset tracking purposes. The manufacturer should be capable of providing onsite training to department personnel who are City of Charlottetown Page 11 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 involved with the daily use of this tracking program. Yes ____ No ____ Exception ____ Score ____ 14) HIGH TEMPERATURE THERMAL INSULATING MATERIALS Because thermally stable materials are essential to maximizing protective performance in firefighters’ PPE, and because NFPA only states “minimum” performance requirements, all thermal liner or thermal enhancing materials used in the garments should also meet the following criteria after the 500 degree F oven test: 1) Material should remain intact and flexible 2) No portion of the material should crack, crumble or flake Yes ____ No ____ Exception ____ Score ____ 15) BREATHABILITY REQUIREMENT Excluding where required by NFPA standard, necessary for functionality, or specifically called out in the custom option sections, all materials fabrics and reinforcements used in the construction of the garments shall be breathable and all moisture barrier material should be as specified in the Materials Section. The breathability requirement includes but is not limited to: collar, chinstrap, storm shield, fly, water wells, front coat facings, and reinforcement cushioning where applicable. Areas where non-breathability is allowed (absent Custom Option specifications): trim or other items placed externally on the arms that might need extra material to pass NFPA required Stored Energy Testing, hook and loop fastening, hardware or hardware backing, and pocket linings where used exterior to the outer shell. Yes ____ No ____ Exception ____ Score ____ 16) CONDUCTIVE AND COMPRESHIVE HEAT RESISTANCE (CCHR) Using breathable materials as outlined in the section titled Breathable Materials, there should be: A minimum area of 4” x 4” (10.2 cm x 10.2 cm) at the shoulders and elbows that provide a minimum of 25 CCHR at 2 psi. with a minimum 6” x 6” (15.2 cm x 15.2 cm) area at the knees that provide 25 CCHR at 8 psi. In all three of these compression areas at least a portion of the protective area should be made from high temperature fiber based materials sewn to the thermal liner on the inside of the liner toward the moisture barrier. City of Charlottetown Page 12 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 Yes ____ No ____ Exception ____ Score ____ 17) SEAM PROTECTION AT CUFFS At the coat and pant cuff Major A seams, the reflective trim should stop just before the folding of the full feld seam and for additional abrasion protection be covered by a sewn on strip of polymer coated Kevlar material laid on top of the Major A seam and covering each end of the trim. Yes ____ No ____ Exception ____ Score ____ 18) APPLICABLE DOCUMENTS The following standards in their active versions on the date of invitation for bid should form a part of this specification to the extent specified herein. STANDARD TITLE ASTM D 6193-97 Standard Practice for Stitches and Seams NFPA 1500, Latest Edition Standard on Fire Department Occupational Safety and Health Program NFPA 1851, Latest Edition Standard on Selection, Care, and Maintenance of Structural Fire Fighting Protective Ensembles NFPA 1971, Latest Edition Standard on Protective Ensemble for Structural Fire Fighting Yes ____ No ____ Exception ____ Score ____ COAT 19) DESIGN CONCEPT STYLING The standard coat design should be 6-inches (15.2 cm) longer at the rear hem than at the front hem and provide continuous and unbroken moisture barrier and thermal liner protection from the collar seam to the hem at the bottom of the coat tail. Each coat length should be determined by each individual’s torso length to provide the coat-to-pant interface as defined by NFPA 1500. Coat design must interface properly with standard waist high bunker pants. To facilitate various body types the front to rear length differential should be made available in 3-inch (7.5cm), 4-inch (10.0cm), 5-inch (12.5cm and 6-inch (15.0cm) tail drops. Yes ____ No ____ Exception ____ Score ____ City of Charlottetown Page 13 City of Charlottetown 20) RFP - Structural Firefighter Turnout Gear October 2016 PATTERNING CONCEPT Garments should feature a tailored three-piece body (with one-piece back) and one-piece, set-in sleeve construction throughout the outer shell, moisture barrier and thermal liner layers. One-piece garment body (either all layers or some layers) will not be considered acceptable since they cannot be tailored to hard-to-fit personnel. Similarly, garments with seams in mid-back are not considered acceptable because of backbone irritation that can occur with SCBA use. To facilitate individual tailoring needs, the major A & B seams joining the one-piece back to the right and the left front body panels (outer shell and all interior layers) should be located at the most lateral position when the coat is laid flat for inspection. Yes ____ No ____ Exception ____ Score ____ 21) PATTERNING REQUIREMENTS To assure maximum freedom of movement and reduce kinetic resistance with minimum garment weight and bulk, coat patterning should include the following features: • • • • • • • • • Degree of slope on shoulders should be no more than 20%. Hydraulic Butterfly sleeve patterning having built-in underarm bellow with 85-degree Lift Up Release Action should be provided to minimize coat hem rise. Sleeve attachment should minimize shoulder lift and allow a minimum of full 360 degrees freedom of movement. Coat hem rise with overhead reach of both arms not to exceed 4-inch (10.2-cm) maximal extension on properly fitted garments. Shell-and-liner retraction at the cuff should not exceed 1 inch (2.5 cm) when both arms are raised overhead. This helps eliminate wrist exposure. 10-inch (25.4-cm) chest over-sizing should be provided. Coat sweep measurements should be consistent with the chest over-size at the hem. Reach when measured from cuff to cuff, with coat lying flat, and standard length sleeves extended to each side, should be provided as detailed below. An alteration point at the hem that during manufacture allows the sweep dimension to be adjustable in two-inch (5.0cm) increments Chest Size 40 in 42 in 44 in 46 in (101.6 cm) (106.7 cm) (111.8 cm) (116.8 cm) Standard Reach 66 in 67 in 68 in 68 in (167.6 cm) (170.2 cm) (172.7 cm) (172.7 cm) Yes ____ No ____ Exception ____ Score ____ City of Charlottetown Page 14 City of Charlottetown 22) RFP - Structural Firefighter Turnout Gear October 2016 DRAG RESCUE DEVICE (DRD) Manufacturer should supply an NFPA required and certified Drag Rescue Device with each coat. Each strap will be properly labeled with the chest size(s) the Rescue Strap is designed to fit. Rescue Strap should be designed in a fashion that it functionally provides a dynamic and articulated action and to eliminate excess strapping material hanging down the back when installed between the garment’s liner and outer shell. The device should be constructed to go around each of the wearer’s arms/shoulder. The grab loop should extend upward and pass through a tunnel of outer shell and pass out through a reinforced slot in the coat outer shell just below the center rear of the collar seam. . The protruding grab loop should then fold back down and be stored by hook and loop fastener. The end of the garb loop should be covered with an outer shell flap sewn below the held in place with hook & loop fastener to reduce the chances of snagging the grab loop by accident. The Grab Handle should be constructed of soft and pliable Kevlar webbing. Rescue Strap should be sewn with Kevlar thread Yes ____ No ____ Exception ____ Score ____ 23) LINER ATTACHMENT The completed liner-moisture barrier assembly should attach by means of four (4) evenly spaced glove snaps to each outer shell front facing to reduce weight, bulk and stiffness. To provide continuous moisture and pathogen protection at the front, the liner should be positioned so it is sandwiched between the coat front facing and a breathable pathogen shield. The use of zippers or hook and loop fasteners in this area is not allowed due to their added weight, bulk and stiffness. Liner sleeves should be attached at the cuff by means of snaps on two (2) sets of Nomex tabbing per liner cuff. The male and female snap parts should both be located on Nomex tabbing that is sewn to the liner at the cuff. A separate piece of Nomex tabbing should be sewn to the shell cuff and fashioned as a loop without any snap hardware. To provide continuous moisture protection and pathogen protection at the neck, the liner should be positioned so that it is sandwiched between an outer-facing pathogen shield and an inside facing of the specified outer shell material. Attachment at the neck should be by means of four (4) glove straps that penetrate only the layer of the attachment strip facing towards the liner, so that metal contact at a wearer’s neckline is completely eliminated. City of Charlottetown Page 15 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 Yes ____ No ____ Exception ____ Score ____ 24) COAT CERTIFICATION LABEL ON LINER The coat certification label on the liner should be affixed to provide an inside liner pocket. Yes ____ No ____ Exception ____ Score ____ 25) COAT CERTIFICATION LABEL ON SHELL The coat label on the shell should be affixed in a conspicuous location once the liner is removed. Yes ____ No ____ Exception ____ Score ____ 26) COLLAR The collar should be of layered construction, consisting of a layer of waterproof moisture barrier and a layer of NFPA 1971-certified insulating material, sandwiched between two (2) layers of specified outer shell material. NFPA compliant collars should be at least 3 inches (7.6 cm) high. The design should incorporate in its patterning a natural contour that will allow proper fit and performance in the standing (upright) or stowed position. There should be no vertical or horizontal seams or stitching in the body of the collar. The outside of the collar should have a hook fastener tape for chinstrap-to-collar closure. The fastener tape should be located rear ward far enough to allow for the location of a forward mounted microphone tab if so desired. Each collar should be graded to individual coat sizes. Yes ____ No ____ Exception ____ Score ____ 27) CHIN STRAP The chinstrap should be of layered construction identical to that of the collar configuration described in the previous paragraphs. Chinstrap should be of a crescent shaped design with minimum dimensions of: 9 inches (22.5 cm) long across the top corners, 10.5 inches (26 cm) long across the bottom corners, and 3.5 inches (8.75 cm) in vertical height, measured at the center. The leading underside edge of the chinstrap should have a 4.0-inch-wide (3.8 cm-wide) horizontal strip of loop fastener tape to ensure an adequately adjustable closure and to ensure passage of the Whole Garment Liquid Penetration Test. Yes ____ No ____ Exception ____ Score ____ City of Charlottetown Page 16 City of Charlottetown 28) RFP - Structural Firefighter Turnout Gear October 2016 HANG UP LOOP An 80-pound (36.3 kg) tear strength hang-up loop should be provided at the interior collar seam. The loop should be constructed of triple layers of the specified outer shell material, lock stitched to the coat. Webbing is not acceptable. Yes ____ No ____ Exception ____ Score ____ 29) SLEEVES To prevent stove-piping the sleeves should be individually graded by coat size and sleeve length. For maximum freedom, the sleeve design should feature extra full cut one-piece set-in sleeves with built-in bellows. To reduce the chances of possible top seam failure in that high thermal exposure area, the sleeve Major seams should follow the underside of the arm and should not cross over the outside of the elbow joint. Sleeve seam and sleeve attachment to coat body in all layers should be 100% double feld and double stitched for maximum. Yes ____ No ____ Exception ____ Score ____ 30) INNER WRISTLET AND WATERWELL Every coat should feature a minimum 4.5-inch (11.4-cm) long, double-layer knit inner wristlets protected by a flame-resistant and moisture-resistant inner waterwell. The inner wristlet should be sewn to the thermal liner sleeve end (not to the outer shell). The specified moisture barrier should form an inner waterwell with an elastic gather sewn to the moisture barrier sleeve end. Yes ____ No ____ Exception ____ Score ____ 31) EXTERNAL WRISTLET Every coat should feature a 2.5-inch (6.4 cm) long knit outer wristlet, which should be mounted to the end of each outer shell sleeve to prevent liquid and debris movement up the sleeve between the outer shell and the moisture barrier/ thermal liner assembly. Yes ____ No ____ Exception ____ Score ____ 32) FRONT CLOSURE PROTECTIVE OVERLAP At least two-inch-wide (5.1 cm-wide) panels of breathable moisture/ pathogen barrier and specified thermal liner materials should be provided at coat front closure facings to preclude any type of break in the protective envelope. The entire circumference of a closed coat should consist of specified shell, City of Charlottetown Page 17 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 moisture barrier and thermal liner materials. An additional layer of breathable moisture/ pathogen barrier material should be sewn between the 2inch-wide (5.1 cm-wide) panels and outer shell coat body for the entire length of coat front in a fashion to prevent liquid entry during the NFPA 1971 Whole Garment Liquid Penetration Test. Yes ____ No ____ Exception ____ Score ____ 33) COMPOSITE MATERIALS The specifier has determined these acceptable combination of materials. Any substitution of materials needs to be fully explained and meet the minimum requirements. OUTER SHELL 7.2 oz. Rip stop Weave; 60% Kevlar / 40% Nomex (Berry Compliant) – Black 1.1 THERMAL LINING 7.0 oz. - 1 Layer 1.6oz & 1 Layer 2.5oz Basophil Spun lace, Spun Aramid Facecloth 1.2 MOISTURE BARRIER 3.2 oz./yd2 woven Nomex containing 2% carbon fibers, laminated to a PTFE membrane (Berry Compliant 1.3 Yes ____ No ____ Exception ____ Score ____ 34) COAT CUSTOM OPTIONS REQUIRED Instructions in this custom options section that contradict earlier specifications or statements supersede those earlier specifications or statements as long as the required certifications are not compromised. Std -Coat Cuffs Std -Inspection Port Liner Std -Liner Detachable Std -SET Thermal Enhancement Std -Take Up Straps - 2 Postman (R01) Std-Articulating Rapid Rescue Strap Trim -(4) NEW YORK -lime 2-tone Scotch lite (3") (T04) Trim -Split cuff bands -lime 2-tone Scotch lite (3") Above Hem Trim Patch - Advance - Black # # - avg. 2 numbers TO BE SPECIFIED AT TIME OF ORDER2 -3" sewn letters -lime Scotch lite Back Patch - Advance - Black < C. F. D.>3-Sewn Periods 3 -3" sewn letters -lime Scotch lite City of Charlottetown Page 18 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 Hem Patch - Advance - Black FF LAST NAME (1st INITIAL when specified) - avg 7 letters7 -2" sewn letters -lime Scotch lite Integral Customization - Charlottetown FD Patch - right sleeve (E08) Chicago Closure -2" Velcro/Hooks & Dees (Q02) LTO Comfort Chinstrap Dead Air Panels Extended (O12) Label Pocket w/Pencil Slot Hand warmer Pockets - Advance - Black Mic Tab - Advance - Black - left chest - 1" x 3" place 3" above radio pocket Large Hook on Patch - Advance - Black - right chest Radio Pocket - Advance - Black - left chest - 7" x 3.5" x 2.5" Notch Flap - Double Notches (both left & right) - left chest Sub Wristlets -Long with tabs -Nomex Yes ____ No ____ Exception ____ Score ____ PANTS To avoid liability and interface problems, coats and pants should be procured from the same manufacturer. 35) DESIGN CONCEPT (STYLING) The pant should be of a traditional waist-high-only design to facilitate full torso ventilation of front, rear and sides of trunk for maximum body cooling effect to help minimize firefighter heat stress. For this reason, other than waist-high pants will not be considered acceptable or “equal,” since additional trunk wrapping traps heat and moisture, increasing heat stress buildup while also creating mechanical resistance when covering the natural torso flexion point of the waist. Yes ____ No ____ Exception ____ Score ____ 36) PATTERNING CONCEPT Garments should feature a tailored four-piece body plus a one-piece, over-sized crotch diamond pattern in the outer shell, moisture barrier and thermal liner. Yes ____ No ____ Exception ____ Score ____ 37) PATTERNING REQUIREMENTS To assure maximum freedom of movement and reduced kinetic resistance with minimum garment weight and bulk, the pants patterning should: City of Charlottetown Page 19 City of Charlottetown • • • • • • RFP - Structural Firefighter Turnout Gear October 2016 Incorporate hydraulic, swivel action leg-to-torso interfaces. Incorporate an oversized diamond-shaped crotch insert, graded according to size, for maximum action stride, optimum stepping reach and no “in-crotch” seaming. In the outer seam hip area, in all three layers should, incorporate convex seam technology to provide for generous seat expansion when squatting and crawling without creating unsightly bagginess. That the diamond extend from just above the left knee to just above the right knee, and be centered equally from front to rear. Width of diamond at top of crotch should be approximately proportionally graded to waist size and inseam length. Ensure that pants rest in normal body line balance of 22 inches (55.9 cm) center distance at the cuff for 42 waist, 30 inseam pants. Provide for an alteration point at the hips so that during manufacture the hip dimension can be adjustable in two-inch (5.0cm) increments Yes ____ No ____ Exception ____ Score ____ 38) SUSPENDER BOTTOMS Heavy duty, rust-resistant suspender buttons should be positioned around the waist. Suspender buttons should be mounted through waistband of triple layer outer shell material that is internally reinforced with an additional band of coated needle punch aramid. Yes ____ No ____ Exception ____ Score ____ 39) LINER ATTACHMENT The moisture barrier and thermal liner assembly should be attached to the outer shell at the waistband. Liners should be attached at the cuff by means of snaps on two (2) sets of Nomex tabbing per liner cuff. The male and female snap parts should both be located on Nomex tabbing that is sewn to the liner at the cuff. A separate piece of Nomex tabbing should be sewn to the shell cuff and fashioned as a loop without any snap hardware. Yes ____ No ____ Exception ____ Score ___ City of Charlottetown Page 20 City of Charlottetown 40) RFP - Structural Firefighter Turnout Gear October 2016 PANT CERTIFICATON LABEL ON LINER The pant certification label on the liner should be affixed to the liner. Yes ____ No ____ Exception ____ Score ____ 41) PANT CERTIFICATION ON SHELL The pant label on the shell should be affixed to the facing. Yes ____ No ____ Exception ____ Score ____ 42) FLY FRONT The outer shell fly should be lock stitched to the front opening and should be in proportion to waist size and crotch rise in both length and width. Fly inner lining should extend at least 2 inches (5.1 cm) past outer shell fly attachment seam and should be constructed of certified breathable moisture barrier and thermal liner. The front pant opening should have an internal facing extending at least 2 inches (5.1 cm) and be constructed of specified fabric. In combination with the liner, the system should offer 360-degree protection without gaps during movement of the outer shell moisture barrier and thermal liner. Closure should be by means of a minimum 1.5-inch-wide (3.8-cm-wide) hook and loop fastener, and all construction techniques used should provide liquid penetration protection under the NFPA 1971 Whole Garment Liquid Penetration Test. The fly should be graded to the waist size of garments and crotch rise. Yes ____ No ____ Exception ____ Score ____ 43) COMPOSITE MATERIALS The specifier has determined these acceptable combination of materials. Any substitution of materials needs to be fully explained and meet the minimum requirements. 1.1 OUTER SHELL 7.2 oz. Rip stop Weave; 60% Kevlar / 40% Nomex (Berry Compliant) - Black 1.2 THERMAL LINING 7.0 oz. - 1 Layer 1.6oz & 1 Layer 2.5oz Basophil Spun lace, Spun Aramid Facecloth 1.3 MOISTURE BARRIER 3.2 oz./yd2 woven Nomex containing 2% carbon fibers, laminated to a PTFE membrane (Berry Compliant) Yes ____ No ____ Exception ____ Score ____ City of Charlottetown Page 21 City of Charlottetown 44) RFP - Structural Firefighter Turnout Gear October 2016 PANT CUSTOM OPTIONS REQUIRED Instructions in this custom options section that contradict earlier specifications or statements supersede those earlier specifications or statements as long as the required certifications are not compromised. Std-Narrow Fly -1.5" Velcro w/ Hook & Dee Std -Inspection Port Liner Std -Liner Detachable Trim -(7) NFPA -lime 2-tone Scotch lite (3") Number Patch - Advance - Black - left side seam # # - avg 2 numbers - TO BE SPECIFIED AT TIME OF ORDER - Place directly above cuff trim - OK to move back to accommodate knee2 -2" sewn letters -lime Scotch lite - left side seam Number Patch - Advance - Black - right side seam # # - avg 2 numbers - TO BE SPECIFIED AT TIME OF ORDER - Place directly above cuff trim - OK to move back to accommodate knee2 -2" sewn letters -lime Scotch lite - right side seam Angled Cuffs - Advance - Black BiFlex Heat Channel Knees - Advance - Black Horizontal Strips in BiFlex knees to be Arashield - Black Take Up Straps - 2 Postman - Advance - Black Contoured Pockets - Advance - Black - 9" x 9" x 2" Snap Style Suspender Attachment Dyna-Fit Suspenders w/ Snap Attach & Quick Adjust Installed Suspender Padding Yes ____ No ____ Exception ____ Score ____ 45) EXCEPTIONS TO SPECIFICATIONS and TRIAL GEAR It is not the intent of these specifications to limit or restrict the use of alternate methods. Where exceptions or clarifications are noted a detailed explanation needs to be provided describing how it meets or exceeds the item specified. Sample gear needs to be provided for evaluation as required. Yes ____ No ____ Exception ____ Score ____ 46) DELIVERY Supplier must guarantee delivery of all equipment prior to December 23rd, 2016. Yes ____ No ____ Exception ____ Score ____ City of Charlottetown Page 22 City of Charlottetown 47) RFP - Structural Firefighter Turnout Gear October 2016 COMPANY HISTORY INCLUDING SAFETY RECORD, NUMBER OF YEARS IN BUSINESS, ETC. Include references and any additional information. This question is out of 10. Excellent ____ Very Good ____ Fair ____ Score ____ City of Charlottetown Page 23 3.2 ANTICIPATED TIMEFRAMES The following outlines the anticipated schedule for the Request for Proposal and contract process. The timing and sequence of events resulting from this Request for Proposal may vary and shall ultimately be determined by the City of Charlottetown. Event Anticipated Dates Request for Proposal issued Last Date for Submission of Questions Request for Proposal closes Review of Proposals Contract Award Delivery Date September 22st, 2016 September 30th, 2016 October 5th, 2016 October 6th, 2016 October 11th, 2016 December 23rd, 2016 4.0 EVALUATION CRITERIA The following criteria outlines the primary considerations to be used in the evaluation and consequent awarding of this RFP (not in any order). City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 Proponents who answer yes to all of the YES/NO questions and obtain a minimum scoring of 70% in Section 3 questions will be scored upon financial proposal evaluation. Score column shall be solely utilized by the City during evaluation process of the individual submitted bids. Each individual specification shall receive a numerical value (score) as per the following justification; Where a question has several parameters the score will be tabulated with each parameter out of 3 and the entire question’s score will be proportionately reduced to a value out of 3. Meets Specification (YES) – 3 Points Exception Taken, Meets Intent – 2 Points Exception Taken, Meets Intent Marginally – 1 Point Does Not Meet Specification (NO) – 0 Point Note - Question 47 is out of 10 with scores of 10 points, 7 points, 3 points and 0 points respectively. The score in Section 3 will be adjusted to a total out of 40 and added to the Financial Proposal Evaluation to get a score out of 100. Financial Proposal Evaluation 1. Quotation Price (60 points). Points shall be awarded on the following basis; 60 points for the Lowest Proposed Price 56 points for all Proposed Price or 110% of the Lowest Proposed Price 52 points for all Proposed Price or 115% of the Lowest Proposed Price 48 points for all Proposed Price or 120% of the Lowest Proposed Price 44 points for all Proposed Price or 125% of the Lowest Proposed Price 40 points for all Proposed Price or 130% of the Lowest Proposed Price 36 points for all Proposed Price or 135% of the Lowest Proposed Price 32 points for all Proposed Price or 140% of the Lowest Proposed Price 28 points for all Proposed Price or 145% of the Lowest Proposed Price 24 points for all Proposed Price or 150% of the Lowest Proposed Price 20 points for all Proposed Price or 160% of the Lowest Proposed Price 16 points for all Proposed Price or 170% of the Lowest Proposed Price 12 points for all Proposed Price or 180% of the Lowest Proposed Price 8 points for all Proposed Price or 190% of the Lowest Proposed Price 4 point for all Proposed Price or 200% of the Lowest Proposed Price City of Charlottetown Page 25 City of Charlottetown RFP - Structural Firefighter Turnout Gear October 2016 0 points for all Proposed Price more than twice the Lowest Proposed Price City of Charlottetown Page 26 5.0 QUOTATION FORM 5.1 SALUTATION To: City of Charlottetown For: Structural Firefighter Turnout Gear From: 5.2 PROPONENT DECLARATION The Proponent declares: 1. That this proposal was made without collusion or fraud. 2. That the proposed specifications were carefully examined. 3. That the contract documents and all addenda were carefully examined. 4. That all the above were taken into consideration in preparation of this Proposal 5. That the City is not bound to accept the lowest or any Proposal which it may receive. 5.3 PROPONENT AGREEMENT The proponent agrees: 1. To enter into a contract to supply all items specified herein for the stipulated price stated in Subsection 5.4 hereunder. 2. Declares that the stipulated price as set forth in the form of quotation (subsection 5.4) has been correctly computed for the purposes of this proposal and that it includes and covers all contingencies and provisional sums; all duties and handling charges; transportation; and all other charges. 3. That this proposal is valid for acceptance for a period of thirty (30) days from the date of RFP closing as stated in section 1 of this document. 4. That the RFP documents include: - Description of required items - Instructions to Proponents - Proposal Pricing form - Addenda (if any) 5.4 PROPOSAL SUMMARY The undersigned Proponent, having carefully read and examined the Request for Proposal documents prepared by the City for the provision of Structural Firefighter Turnout Gear in accordance with the following documents: City of Charlottetown - RFP - Structural Firefighter Turnout Gear October 2016 Description and Specification of required items Instructions to Proponents Proposal Pricing Form Addenda (if any) hereby accepts the same as part and parcel of the RFP herein referred to, and having carefully examined the specification of the items required, does hereby propose and offer to enter into a contract to provide all the necessary items and pay all applicable taxes as set forth and in strict accordance with the Specifications and other Proposal documents and to do all therein called for on the terms and conditions and under these provisions therein set forth for the following: Item Description COATS City of Charlottetown Quantity Price per Unit (before taxes) (continued on next page) Extended Price 36 Page 28 City of Charlottetown RFP - Structural Firefighter Turnout Gear PANTS October 2016 48 HST TOTAL EXTENDED PRICE (HST Included) $ SIGNED NAME (printed) COMPANY ADDRESS TELEPHONE E-MAIL DATE (Affix Corporate Seal if applicable) City of Charlottetown Page 29
© Copyright 2026 Paperzz