A 1" DRAIN C L LIGHTING POLE PEDESTAL 1'-0" B 1'-0" C LIGHTING POLE L 2" PROJECTION FOR ANCHOR BOLT THREADED ROD EXTENSIONS ABOVE TOP OF BASE PLATE. GOOVE IN B 4-COUPLINGS 3" LONG MIN. HANDHOLE FOR HEAVY BOLTS (8 THREADS PER INCH) NC FREE FIT CLASS 2. THREAD FULL LENGTH OF COUPLING 1•" MEETING THE REQUIREMENTS OF 1101.04. " C L CONDUIT B 9• " 1• LEVELING NUT (TYP.) NOTES: 1'-7" 1'-9" A 4" THREAD EACH END, HEX. NUTS, 2"| x ‰" AS REQ'D., TOP ONLY. 2"| CONDUIT ANCHOR ANGLES " GUTTER LINE 3. LOCATE JUNCTION BOX ON SIDEWALK SIDE OF BARRIER WHEN APPLICABLE AND PROVIDE TAMPER RESISTANT SCREWS. CONSTR. JOINT PLAN 2. SET ANCHOR BOLTS ACCURATELY BY THE TEMPLATE FURNISHED BY THE MANUFACTURER, TO THE CORRECT ELEVATION AND ALIGNMENT AND SECURELY BRACE AGAINST DISPLACEMENT BEFORE THE SURROUNDING CONCRETE IS PLACED. ANCHOR BOLT DIAMETER AS REQUIRED BY LIGHTING POLE MANUFACTURER. (FOR FUTURE LIGHTING PROVISIONS, SEE CHART ON THIS SHEET.) 4x4x•x1'-8" 4‡ A 1. PROVIDE MATERIALS AND WORKMANSHIP IN ACCORDANCE WITH PUBLICATION 408. SPRING LOCK WASHER C 1'-8‚ " C L CONDUIT 4-1"| ANCHOR BOLTS, 4. ORIENT HAND HOLES FOR BARRIER MOUNTED POLES TOWARD THE ROADWAY; EXCEPT WHEN THERE IS SIDEWALK ACCESS, ORIENT TOWARD SIDEWALK. BLISTER DIMENSIONS F-BARRIER TYPE "A" "B" "C" TYP. 1'-0" 11" 3…" ALT. 1'-1" 10" 2…" 5. SEAL CONDUIT AND PROTECT THREADS FOR FUTURE LIGHTING INSTALLATIONS. 6. CONFORM ANCHOR MATERIALS TO SECTION 1104.04 OF PUB. 408. ANCHOR ANGLES ARE PERMITTED TO BE GALVANIZED. 7. SET LIGHTING POLES TRULY VERTICAL WITH BASES LEVEL USING LEVELING NUTS. 8. PROVIDE 2" CLEAR ON ALL REINFORCEMENT UNLESS NOTED. FILL SPACE BETWEEN POLE BASE PLATE AND 9. PROVIDE A MINIMUM OF 2•" CONCRETE COVER SECTION A-A C LIGHTING POLE L * CONCRETE WITH GROUT AFTER SETTING POLE FOR CONDUIT. TRULY VERTICAL USING LEVELING NUTS. TOOL EDGES OF PAD. MINIMUM HEIGHT BASE PLATE * OF LEVELING PAD IS 1". 2" DIA. LEVELING NUT (TYP.) B CONDUIT (TYP.) GROUT 4" CHANGE 1 CHANGE 2 R= 9" MIN. (TYP.) 2"| CONDUIT CHANGE 3 PROVISIONS FOR FUTURE LIGHTING CONSTR. JT. GUTTER LINE MOUNTING HEIGHT ANCHOR BOLT CIRCLE DIA. 50'-0" MAX. 15" ANCHOR BOLT DIAMETER 1" CONCRETE DECK SECTION B-B B CONDUIT EXPANSION AND DEFLECTION JOINT FITTING, SEE BC-721M. ELEVATION 3…" FOR TYPICAL BARRIER, 4" 2…" FOR ALTERNATE BARRIER. 1'-0" FOR TYPICAL BARRIER, C 3'-0" MIN. 8" AT DECK C JUNCTION BOX L EXPANSION JOINTS JUNCTION BOX 3" 1'-1" FOR ALTERNATE BARRIER. 2"| CONDUIT COMMONWEALTH OF PENNSYLVANIA CONSTR. JT. DEPARTMENT OF TRANSPORTATION 4‡ " BUREAU OF PROJECT DELIVERY ƒ" | DRAIN PIPE AT LOW END OF BOX STANDARD 4" JUNCTION BOX (JB 25) C NUMBER AND SIZE CONDUITS AS REQUIRED LIGHTING POLE ANCHORAGE SECTION C-C ALTERNATE - PLAN (SLOPED BARRIER WITH JUNCTION BOX) BC-721M ELECTRICAL DETAILS REFERENCE DRAWINGS RECOMMENDED NOV. 21, 2014 CHIEF BRIDGE ENGINEER RECOMMENDED NOV. 21, 2014 ACTING DIR, BUR. OF PROJECT DELIVERY SHEET 1 OF 2 BC-722M INSTRUCTIONS FOR FUTURE LIGHTING 1. IF LIGHTING POLES ARE TO BE INSTALLED AT A FUTURE TIME. C L LIGHTING POLE A. PLACE RAILING POSTS AS SHOWN AND CLOSE GAPS WITH A SEPARATE PIECE OF FABRIC. C LIGHTING POLE L 1'-0" 1'-0" 1'-5" 1'-5" OR B. PLACE RAILING POSTS AS SHOWN BUT DO NOT INTERRUPT RAILING. SEE INSTRUCTION 1A. 1'-6" SEE INSTRUCTION 1B. NOTE: 1'-0" SEE SHEET 1 FOR NOTES. HAND RAILING 1" DRAIN GROOVE ORIENTED BARRIER PROTECTIVE FENCE TOP OF BARRIER TO OUTSIDE OF BARRIER. PEDESTRIAN RAILING / FENCE / HAND RAILING AT LIGHTING POLE COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY STANDARD LIGHTING POLE ANCHORAGE RECOMMENDED NOV. 21, 2014 CHIEF BRIDGE ENGINEER RECOMMENDED NOV. 21, 2014 ACTING DIR, BUR. OF PROJECT DELIVERY SHEET 2 OF 2 BC-722M
© Copyright 2026 Paperzz