ASSEMBLY INSTRUCTIONS FOR #17208 AND 17209 METRO® SUPER ADJUSTABLE SUPER ERECTA® SHELF WIRE SHELVING Units include four wire shelves, four posts, and sixteen sleeve and wedge sets. 1. Grab a post and choose your desired shelf heights. Shelves are adjustable in 1” increments. Attach a sleeve and wedge onto each post groove at your desired heights. Sleeves and wedges interlock around the post grooves. There will be four sleeve and wedge sets per post. 2. Be sure that the number on the post is showing through the triangular window. 3. Repeat steps 1-3 for the remaining posts. Your posts are now ready for shelves. Sheet#17209 Rev.052505 Call Free: 1 800 848 1633 or 1 888 HCL INTL® (425 4685) Fax Free: 1 800 447 2923 Web Site: www.HealthCareLogistics.com • E-mail: [email protected] ASSEMBLY INSTRUCTIONS FOR #17208 AND 17209 METRO® SUPER ADJUSTABLE SUPER ERECTA® SHELF WIRE SHELVING top shelf 4. Remove top shelf from box and move to the side. Remove the remaining shelves keeping them stacked in the exact order they were in the box. You can also leave the three shelves in the box to keep correct order. We’ve removed shelves so that the box doesn’t interfere with future assembly steps. 5. Insert a post into each of the four shelf corners. The three shelves should still be stacked. inside The triangular window on wedge should face the inside of the shelf. 6. Posts will stand alone when in shelf corners. Call Free: 1 800 848 1633 or 1 888 HCL INTL® (425 4685) Fax Free: 1 800 447 2923 Web Site: www.HealthCareLogistics.com • E-mail: [email protected] ASSEMBLY INSTRUCTIONS FOR #17208 AND 17209 METRO® SUPER ADJUSTABLE SUPER ERECTA® SHELF WIRE SHELVING 7. Prepare top shelf by flipping the corner release handles down. 9. Prepare the next shelf by flipping the corner release handles up. 8. It may be helpful to use a step ladder for the top shelf. Install top shelf by lowering each corner onto a post. Press firmly to seat shelf to wedge and sleeve sets. 10. Lift and slide the shelf until you are above the sleeve and wedge sets at your next desired height. This shelf will be the first shelf below the top shelf. Once above the wedge and sleeve sets, flip all four corner release handles down and press the shelf down firmly to seat to wedge and sleeve sets. Once above the wedge and sleeve sets flip all four corner release handles down Call Free: 1 800 848 1633 or 1 888 HCL INTL® (425 4685) Fax Free: 1 800 447 2923 Web Site: www.HealthCareLogistics.com • E-mail: [email protected] ASSEMBLY INSTRUCTIONS FOR #17208 AND 17209 METRO® SUPER ADJUSTABLE SUPER ERECTA® SHELF WIRE SHELVING first shelf from bottom bottom shelf 11. Repeat steps 9-10 for the two remaining shelves. Your assembled shelving unit is ready for use. Posts include leveling bolts to stabilize your shelving unit. Turn bolts in or out to level unit. Call Free: 1 800 848 1633 or 1 888 HCL INTL® (425 4685) Fax Free: 1 800 447 2923 Web Site: www.HealthCareLogistics.com • E-mail: [email protected]
© Copyright 2026 Paperzz