NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED
REZONING AND DEVELOPMENT OF A RESIDENTIAL DEVELOPMENT AND ASSOCIATED
INFRASTRUCTURE ON ERF 1, TRANSHEX, WORCESTER, WESTERN CAPE
INVITATION TO PARTICIPATE
DEA&DP REFERENCE No: 16/3/1/2/B2/32/1005/14
Notice is given in terms of Regulation 54 of the Environmental Impact Regulations published in Government Notice R453 in Government Gazette No.
33306 of 18 June 2010, under Section 24 of the National Environmental Management Act, 1998 (Act No.107 of 1998), as amended, that Breede Valley
Municipality is considering the rezoning and construction of a residential development on Erf 1, Transhex, Worcester, Western Cape. The development
will entail the construction of residential, business and civil service areas.
In terms of Sections 24 and 24(D) of the Act, as read with Government Notices R 453 (Chapter 3 Part 2 and 3), R 544 {items 9; 11; 18; 22 and 23}, R
545 {items 15} and R546 {items 4; 12 and 16} a Scoping Environmental Impact Assessment is required for the proposed development, which entails:
Government Notice 544
The construction of facilities or infrastructure exceeding 1000 meters in length for the bulk transportation of water, sewage or storm water – (i) with an
internal diameter of 0.36 meters or more; or (ii) with a peak throughput of 120 litres per second or more, excluding where: (a) such facilities or infrastructure
(9)
are for the bulk transportation of water, sewage or storm water drainage inside a road reserve; or (b) where such construction will occur within urban
areas but further than 32 meters from a watercourse, measured from the edge of the watercourse.
The construction of: (i) canals; (ii) channels; (iii) bridges; (iv) dams; (v) weirs; (vi) bulk storm water outlet structures; (vii) marinas; (viii) jetties exceeding
50 square meters in size; (ix) slipways exceeding 50 square meters in size; (x) buildings exceeding 50 square meters in size; or (xi) infrastructure or
(11)
structures covering 50 square meters or more where such construction occurs within a watercourse or within 32 meters of a watercourse, measured from
the edge of a watercourse, excluding where such construction will occur behind a development setback line.
(18)
The infilling or depositing of any material of more than 5 cubic meters into, or the dredging, excavation, removal or moving of soil, sand, shells, shell grit,
pebbles or rocks of more than 5 cubic meters from: (i) a watercourse; (ii) the sea; (ii) the seashore; (iv) the littoral active zone, an estuary or a distance of
100 meters inland of the high-water mark of the sea or an estuary, whichever distance is the greater – but excluding where such infilling, depositing,
dredging, excavation, removal or moving; (a) is for maintenance purposes undertaken in accordance with a management plan agreed to by the relevant
environmental authority; or (b) occurs behind a development setback line.
(22)
The construction of a road, outside urban areas, (i) with a reserve wider than 13.5 meters or, (ii) where no reserve exist where the road is wider than 8
meters, or (iii) for which an environmental authorisation was obtained for the route determination in terms of activity 5 in Government Notice 387 of 2006
or activity 18 in Notice 545 of 2010.
(23)
(15)
(4)
(12)
(16)
The transformation of undeveloped, vacant or derelict land to (i) residential, retail, commercial, recreational, industrial or institutional use, inside an urban
area, and where the total area to be transformed is 5 hectares or more, but less than 20 hectares or , (ii) residential, retail, commercial, recreational,
industrial or institutional use, outside and urban area and where the total area to be transformed is bigger than 1 hectare but less than 20 hectares; except
where such transformation takes place for linear activities.
Government Notice 545
Physical alteration of undeveloped, vacant or derelict land for residential, retail, commercial, recreational, industrial or institutional use where the total
area to be transformed is 20 hectares or more; except where such physical alteration takes place for: (i) linear development activities; or (ii) agriculture or
afforestation where activity 16 in this Schedule will apply.
Government Notice 546
The construction of a road wider than 4 meters with a reserve less than 13.5 meters (d) in the Western Cape (i) in an estuary; (ii) All areas outside the
urban areas; (iii) in urban areas: (aa) Areas zoned for use as public open space within urban areas, not applicable zoning is currently “undetermined” and
(bb) Areas designated for conservation use in Spatial Development Frameworks adopted by the competent authority, or zoned for a conservation purpose.
The clearance of an area of 300 square meters or more of vegetation where 75% or more of the vegetative cover constitutes indigenous vegetation (a)
within any critically endangered or endangered ecosystem listed in terms of section 52 of the NEMBA or prior to the publication of such a list, within an
area that has been identified as critically endangered in the National Spatial Biodiversity Assessment 2004; (b) Within critical biodiversity areas identified
in bioregional plans; (c) within the littoral activezone or 100 meters inland from high water mark of the sea or an estuary, whichever distance is the greater,
excluding where such removal will occur behind the development setback line on erven in urban areas.
The construction of (i) Jetties exceeding 10 square meters in size; (ii) Slipways exceeding 10 square meters in size; (iii) Buildings with a footprint exceeding
10 square meters in size; or (iv) Infrastructure covering 10 square meters or more; Where such construction occurs within a watercourse or within 32
meters of a watercourse, measured from the edge of the watercourse, excluding where such construction will occur behind a development setback line.
(d) In the Western Cape (i) In an estuary; (ii) Outside urban areas, in: (a) A protected areas identified in terms of NEMPAA excluding conservancies; (b)
National Protected Areas Expansion Strategy Focus areas; (c) World Heritage Sites; (d) Sensitive areas identified in environmental management
framework as contemplated in Chapter 5 of the Act and as adopted by the competent authority; (e) Sites or areas identified in terms of an International
Convention; (f) Critical biodiversity areas or ecosystem service areas as identified in systematic biodiversity plans adopted by the competent authority or
in bioregional plans; (g) Core areas in biosphere reserves; (h) Areas within 10 kilometers from national parks or world heritage sites or 5 kilometers from
any other protected area identified in terms of NEMPAA or from the core area of a biosphere reserve; (i) Areas seawards of the development setback line
or within 1 kilometer from the high water mark of the sea if no such development setback line is determined. (iii) Inside urban areas: (a) Areas zoned for
use as public open space; (b) Areas designated for conservation use in Spatial Development Frameworks adopted by the competent authority or zoned
for a conservation purpose; (c) Areas seawards of the development setback line or within 100 meters of the high water mark where no setback line.
Invitation to Register as an Interested and Affected Party: Registration Period: 23 October 2014 – 24 November 2014
If you wish to register as an Interested and Affected Party and/or give comment, please provide us with your name and address as well as the reason
for your interest to the following address: Guillaume Nel Environmental Consultants, Attention: Euonell Grundling, P.O. Box 2632, Paarl, 7620. Tel:
(021) 870 1874, Fax: (021) 870 1873, E-mail: [email protected].
Kindly provide the GNEC reference number (70072) as well as the DEA&DP reference number: 16/3/1/2/B2/32/1005/14 and indicate your preferred
method of communication (post, fax and/or e-mail address).
WRITTEN COMMENTS MUST BE SUBMITTED ON OR BEFORE MONDAY 24 NOVEMBER 2014
© Copyright 2026 Paperzz