Possible Design-Build Projects

Possible
Design-Build Projects
Outdoor Physical Education and Athletics
•
•
•
•
•
•
•
Welcoming Arrival and Perimeter Security
ADA Accessibility
Spectator Seating and Services
Football Field
Track
Baseball Field
Tennis
Daniel D. Rawlins, RA, DBIA
INTERDESIGN
Indianapolis, Indiana
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
Outdoor Physical Education & Athletic Facilities
Lake Ridge Schools
Possible Design-Build Projects
Welcoming Entry and Perimeter Security
Entry Plaza:
Lake Ridge Schools
Possible Design-Build Projects
Welcoming Entry and Perimeter Security
Secondary
Entry
Perimeter Fence
Entry Plaza:
Lake Ridge Schools
Possible Design-Build Projects
Handicapped Accessibility
Access From South:
Tennis Court Access:
• (2) Parking spaces
• (12+) Parking spaces
• Access to home
grandstands via
ramp or elevator
Services
S
S
• Accessible assisted
toilet - South
• Central accessible
toilets and concessions
Lake Ridge Schools
Access From North:
• (4) Parking spaces
• Walkways to home and visitor
grandstands at Football and
Baseball
Possible Design-Build Projects
Central Public Services Building
• Concessions Stand
• Restrooms
–
–
–
–
1,200 sq. ft.
2,600 sq. ft.
Men’s Restroom
Women’s Restroom
Family / Assisted Toilet
Janitor’s Closet
• Track & Field Equipment Storage
• Officials Room
• Electrical Room
2,400 sq. ft.
300 sq. ft.
200 sq. ft.
+ 6,700 sq. ft.
Lake Ridge Schools
Possible Design-Build Projects
Football Field and Track improvements
Renovate
Home side
grandstand
Re-Build
Track
New Synthetic Turf
Football Field
Replace
Visitors side grandstand
New Lighting
Lake Ridge Schools
Possible Design-Build Projects
New
Scoreboard
and PA system
Renovate Grandstand
Access
Structure
Remove existing seat boards & brackets
Repair concrete risers. Make watertight
•
•
•
Epoxy injection crack repair
New traffic-bearing expansion joints
New sealants and water proofing
Access Structure
New seating for 2,100, including handicapped
New code-compliant railings
•
•
•
Handicapped entrance
Ramp to bleachers
Accessible family toilets
Home-Side Grandstand improvements
Lake Ridge Schools
Possible Design-Build Projects
Infield skin and
drainage
Outfield turf
restoration
Perimeter fencing
and warning track
New scoreboard
New PA system
New bleachers
w/ ADA Access
Baseball Field improvements
Lake Ridge Schools
Possible Design-Build Projects
Tennis Court improvements
• Mill surface
• Repair cracks & add
reinforcing fabric
• Straighten & reset
net posts
• New asphalt finish course
• New color-coating and
game markings
• Option to add lighting
Lake Ridge Schools
Possible Design-Build Projects
Site Improvements: Preliminary Budget
• Outdoor Athletics Campus Perimeter
$163,000 to $438,000
• ADA Accessibility & Spectator Amenities
$1,146,000 to $1,434,000
• Football Field & Track Replacement
$1,777,000 to $2,060,000
• Football Grandstands
$385,000 to $446,000
• Baseball Field
$270,000 to $441,000
• Tennis Courts
$122,000 to $232,000
Preliminary project budget range,
including Construction Costs,
plus Soft Costs and Financing Costs
Lake Ridge Schools
$4,250,000 to $5,800,000
Possible Design-Build Projects
Possible
Design-Build Projects
Calumet New Tech High School Building
•
•
•
•
•
•
•
•
Gymnasium | Fieldhouse
Locker Rooms
Auditorium
Building Envelope
Restrooms
Cafeteria | Commons
Band Area
Community Clinic
Daniel D. Rawlins, RA, DBIA
INTERDESIGN
Indianapolis, Indiana
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
• New Gym Floor
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
• New Gym Floor
• Replace Bleachers
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
• New Gym Floor
• Replace Bleachers
• Replace Railings
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
•
•
•
•
New Gym Floor
Replace Bleachers
Replace Railings
Replace Scoreboard & Goals
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
•
•
•
•
New Gym Floor
Replace Bleachers
Replace Railings
Replace Scoreboard & Goals
•
•
•
•
•
Repair masonry settlement & expansion cracks
Replace loose locker room tile
Repaint walls & structure – general refurbishment
Improve room acoustics and sound system
Weight Room and Locker Room improvements
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
Second Floor Plan
Fieldhouse & Locker Rooms
• Fill-in Pole Vault Pit
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
Second Floor Plan
Fieldhouse & Locker Rooms
• Fill-in Pole Vault Pit
• Replace Running Track Surface
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
Second Floor Plan
Fieldhouse & Locker Rooms
• Fill-in Pole Vault Pit
• Replace Running Track Surface
• Convert Handball Courts
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
Lake Ridge Schools
Auditorium
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Auditorium
• Replace audience seating
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Auditorium
• Replace audience seating
• Replace Theatrical Lighting
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Auditorium
• Replace audience seating
• Replace Theatrical Lighting
• Replace Stage Curtains
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Auditorium
• Renovate house and stage finishes
• Improve sound system & acoustics
Note: House Lighting replaced under
Guaranteed Energy Savings Project
Lake Ridge Schools
• Replace audience seating
• Replace Theatrical Lighting
• Replace Stage Curtains
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
Cafeteria
Auditorium
• Improvements that Chartwells cannot do
• Scope to be determined
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
Band/Choir
Cafeteria
Auditorium
• Sound Isolation and Acoustics
Lake Ridge Schools
Possible Design-Build Projects
Calumet New Tech High School
First Floor Plan
Fieldhouse & Locker Rooms
Band/Choir
Cafeteria
Auditorium
Other General Improvements:
•
•
•
Exterior Brickwork Tuck Pointing
Community Clinic improvements
Major Aesthetic Renovations
Lake Ridge Schools
Possible Design-Build Projects
Restrooms
• General
Renovation
High School: Target Value Approach
• Design-Build Budget:
Remaining funding available
after all needs have been
addressed with other projects
$4,000,000 to $8,000,000
• Assign Priority of Work Items
Competing Design-Build Teams
propose the number of Work
Items that can be completed
within the project budget
Lake Ridge Schools
Priority by Risk Analysis
Possible Design-Build Projects
Guaranteed Savings
• Calumet HS
–
–
–
–
–
–
–
–
Natatorium Issues
Locker Room Upgrades
Building HVAC
Building Lighting
Windows & Entry Doors
Auditorium House Lighting
Classroom Data/Power
Main Office Security &
Renovations
– Building PA Systems
– Building Clock Systems
Lake Ridge Schools
Design-Build
• Outdoor PE & Athletics
–
–
–
–
–
–
–
–
Perimeter Security & Entry
ADA Compliance
Spectator Seating
Restrooms / Concessions
Football Field
Track
Baseball Field
Tennis Courts
• Calumet HS
–
–
–
–
Gymnasium / Fieldhouse
Locker Room Upgrades
Auditorium
Other Items
Summary
Possible Design-Build Projects
Thank You!
Lake Ridge Schools
Summary
Possible Design-Build Projects