Key Restricted Areas Gazetted Typhoon Shelter Gazetted Sand Dredging and Mud Disposal Area Allocated Marine Borrow Area Uncontaminated Mud Disposal Site Contaminated Mud Disposal Site Sand Deposits extent prior to dredging with constraints on dredging not being used on environmental or other grounds Anchorages Dangerous Goods Anchorage Immigration Anchorage Other Anchorage Utilities Cable Alignment (from Confirmed Route Position Lists) Cable Alignment (from Admiralty Chart) Pipeline or Outfall (from Admiralty Chart) Black Point Power Station Marine Traffic Marine Vessel Fairway Zhujiang Estuary Vessel Routing System (Trial) Proposed Reclamation Tuen Mun Urm s to nR Lung Kwu Chau oa d Sha Chau Chek Lap Kok Lantau Island Tong Fuk No. 5 Traffic Separation Zone Peaked Hill Chann Adamasta Fan Lau Soko Islands FIGURE 2.11 Physical Constraints to the Routing of a Gas Pipeline from South Soko to Black Point File: EIA/0018180_Physical_Constraint.mxd Date: 13/11/2006 Shek Kwu Chau ´ No. 3 Precautionary Area No. 3 Traffic Separation Zone el 0 1 Kilometers 2 3 4 Environmental Resources Management 5 6
© Copyright 2026 Paperzz