0 1 2 3 4 5 6 Kilometers

Key
Restricted Areas
Gazetted Typhoon Shelter
Gazetted Sand Dredging and Mud Disposal Area
Allocated Marine Borrow Area
Uncontaminated Mud Disposal Site
Contaminated Mud Disposal Site
Sand Deposits
extent prior to dredging
with constraints on dredging
not being used on environmental or other grounds
Anchorages
Dangerous Goods Anchorage
Immigration Anchorage
Other Anchorage
Utilities
Cable Alignment (from Confirmed Route Position Lists)
Cable Alignment (from Admiralty Chart)
Pipeline or Outfall (from Admiralty Chart)
Black Point
Power Station
Marine Traffic
Marine Vessel Fairway
Zhujiang Estuary Vessel Routing System (Trial)
Proposed Reclamation
Tuen Mun
Urm
s to
nR
Lung Kwu
Chau
oa
d
Sha Chau
Chek Lap Kok
Lantau Island
Tong Fuk
No. 5 Traffic
Separation Zone
Peaked
Hill
Chann
Adamasta
Fan Lau
Soko Islands
FIGURE 2.11
Physical Constraints to the Routing of
a Gas Pipeline from South Soko to Black Point
File: EIA/0018180_Physical_Constraint.mxd
Date: 13/11/2006
Shek Kwu
Chau
´
No. 3
Precautionary
Area
No. 3 Traffic
Separation Zone
el
0
1
Kilometers
2 3 4
Environmental
Resources
Management
5
6