Hillsboro High School Design and Construction Update February 15, 2017 Dr. Shuler Pelham Executive Principal, Hillsboro High School Mary Pierce Board of Education Member – District 8 Russ Pulley Metro Council Member– District 25 David Proffitt Director MNPS Facility Planning & Construction Anna Roberts Artifice, LLC Hillsboro High School Scope of Project: • 1600 student capacity upon completion • Reconfigured spaces to support the Academy model • Relocated administration with security vestibule and access to Hillsboro Pike • Enrollment center within the school building with dedicated entrance • MTA mini hub created on Hillsboro Pike • Dedicated spaces in the new design for project based learning • Enclosed Courtyard for outdoor learning • Historic façade to remain on Hillsboro Pike Hillsboro High School Scope of Project: • New cafeteria and kitchen • New library • Complete renovation of all interior spaces • Technology upgrades for entire building including a projector and audio enhancement system in each classroom • Reconfigured and new spaces created for arts programs • Outdoor sports locker area created and renovation of current indoor sports and PE locker rooms Hillsboro High School Scope of Project: • Interior Renovations include the following: • • • • • • • • New windows to replace old single pane steel windows New finishes including paint, ceilings, flooring, window shades New cabinetry Magnetic marker boards in each classroom New classroom furniture to allow flexibility for student collaboration Enhanced technology in each learning space LED lighting in all spaces New HVAC system throughout Hillsboro High School Scope of Project: • Site Improvements include the following: • Eliminating curb cuts along Hillsboro Pike except for entry near current traffic light at mall • Burro Boulevard created behind building for student/staff parking access and parent pick up line • A dedicated drive for busses • Parking garage with staff parking below and student parking above • Multi purpose sports field located on top of parking garage • Football stadium reconfiguration with 8 lane track • New softball field and tennis courts • Areas included for recycling center, fruit stand, and Christmas tree lot Place site plan here 1st Floor February 15, 2017 2nd Floor February 15, 2017 3rd Floor 4th Floor February 15, 2017 Hillsboro High School Timeline: • Construction to begin summer of 2017 • Multiple phases of construction over 32 months • Demolish the small gym and art rooms and create temporary classrooms in portions of the existing building • Construct 4 story building where small gym & arts were removed • Renovate the portions of the existing building which will remain • Demolish the voTech building • Construct the parking garage • Construction is anticipated to be completed by May 2020 • Students will remain within the portions of the building not under construction during the project. 1st Floor 3rd Floor PHASE 1 PHASE 2 PHASE 3 2nd Floor February 15, 2017 4th Floor Questions For more information visit: www.MNPSconstruction.com
© Copyright 2026 Paperzz