Date: Ref no: 12 August 2016 CN0047 Depot Road works: Braun Street to the Gateway Motorway ramps As part of the Gateway Upgrade North project, Depot Road is being upgraded from two lanes to four between Braun Street and the Gateway Motorway ramps (refer to the map overleaf). These works are being undertaken to provide additional capacity, and improve safety and connectivity on the local road network. Works will be undertaken in stages from midAugust 2016 until late 2018. Stage One works: From mid-August until late 2016, the following works are expected to be carried out on Depot Road: vegetation trimming and clearing site establishment, including setting up site compounds and work areas on Depot Road and Braun Street installation of traffic barriers and other site controls underground and overhead service relocation works construction of new footpaths on the western side of Braun Street and the southern side of Depot Road drainage works on the western side of Braun Street and at the Depot Road/Braun Street/ Board Street/Deagon Deviation intersection commencement of earthworks and road widening activities. Future stages will be notified as the works progress. Working hours: A combination of day and night works will be undertaken to complete the Depot Road upgrade. Works will be undertaken during the day wherever possible. However due to the nature of works and their proximity to live traffic, some activities will need to be undertaken at night when traffic volumes are lower, for the safety of motorists and workers. Working hours include: Day works: Monday to Friday, 7am to 6pm and Saturday from 8am to 1pm. Night works: Monday to Friday, 8pm to 5am and Sunday 4pm to 5am. What to expect: During works, surrounding residents, businesses and motorists can expect: increased levels of noise, dust and vibration due to the use of heavy construction equipment and machinery temporary access changes for some residents and businesses along Depot Road and Braun Street localised traffic changes, including installation of traffic control devices, reduced speed limits, road shoulder/lane closures, changes to traffic flow, traffic stoppages and short-term traffic disruptions. Police/traffic controllers will be in place to direct motorists during works. localised pedestrian and cyclist changes, including temporary pathway closures and detours. Traffic controllers and signage will be in place to assist and direct pedestrians and cyclists. use of temporary lighting towers to light work areas and site compounds at night increased construction traffic accessing work areas and site compounds, fitted with flashing lights and reversing alarms for safety reasons planned service outages associated with underground and overhead service relocation works. Advanced notice will be provided prior to any planned service outages. removal of on-street parking opportunities between Braun Street and the Gateway Motorway ramps. Key works will include: widening Depot Road to two lanes in each direction upgrades to three signalised intersections on Depot Road between Braun Street and the Gateway Motorway ramps major road widening works at the Depot Road/Braun Street/Board Street/Deagon Deviation intersection construction of on-road cycling lanes, including at key intersections. Turning facilities will be included for cyclists at the Depot Road/Braun Street/Board Street/ Deagon Deviation intersection. upgrades to street lighting, concrete kerb, medians and road furniture, as well as drainage improvements closure of the Sandgate District State High School student drop-off/pick-up zone on Braun Street (new zone being constructed inside the school grounds) pedestrian footpath improvements. Depot Road works: Braun Street to the Gateway Motorway ramps Following completion of the Depot Road works in 2018, there will be a number of new traffic movements and permanent traffic changes, including: two traffic lanes in each direction between Braun Street and the Gateway Motorway ramps additional turning movements at the Depot Road/Gateway Motorway ramps and Depot Road/Braun Street/Board Street/Deagon Deviation intersections new on-road cycling lanes and new, wider footpaths in some areas changed student drop-off/pick-up zone conditions at Sandgate District State High School changes to Translink bus services 310, 326 and 335 due to the removal of the bus stop located outside The Evergreen Taoist Church of Australia. The nearest eastbound bus stop will be located near the 7 Eleven complex. Contact details The project team is committed to working with the community to better understand your views and ensure the successful delivery of the Gateway Upgrade North project. You can contact the project team via: [email protected] 1800 607 755 (freecall) www.gatewayupgradenorth.com.au For up-to-date project information and to subscribe to project updates visit the project website and click on the subscribe link. * Free call anywhere in Australia, call charges apply from mobile phones and payphones. Check with your service provider for call costs.
© Copyright 2026 Paperzz