Sheet 1 of 4 TL-4 systems 4 cables August 3, 2016 A - Alternate to 50”/1270mm other side of post (cables are interwoven) 46”/1168mm 42”/1067mm 40”/1016mm 39” 991mm 30”/762mm 30” 762mm 41.7” 1059mm 40.6”/1030mm 38.1” 968mm 29.5” 749mm 25” 635mm 20”/508mm 42”/1067mm 36.6” 930mm A 30.7” 780mm Traffic Side 40.2”/1020mm 35” 890mm 30.7”/780mm 35” 890mm 31” 790mm 28.2” 720mm 24.8” 630mm A 25.2” 640mm 25” 640mm 32” (811mm) Post Height for 31” (787mm) W-Beam Top Rail Height (MASH 2009) 28.75” (730mm) Post Height 27.75” (705mm) W-Beam Top Rail Height (NCHRP 350) - Alternate to other side of cables Applies to median and roadside installations Tolerances: Gibraltar: +/- 1” (25.4mm) Trinity: +/- 1” (25.4mm) Brifen: +/- 1.2” (30mm) Safence: +/- 0.8” (20mm) Nucor: +/- 1” (25.4mm) 25” 640mm 22” 560mm 20” 508mm 17.4” 442mm A 18.9” 480mm 18.9” 480mm 15” 380mm 15” 380mm 10”/254mm Note: If a system does not have ‘(4:1)’ specified, it is to be used for 6:1 or flatter applications. The slope refers to the slope the vehicle is travelling on in advance of impact. The slope behind the barrier is not stipulated. 0”/0mm Manufacturer FHWA Acceptance Letter # AT Product List Status Gibraltar B-137A1 Proven Trinity CASS S3 B-157 Proven Brifen WRSF B-82B Potential Gregory Safence B-88E Potential Nucor Nu-Cable (20’ post spacing) B-184A Not currently on AT Product List Nucor Nu-Cable B-167 Not currently on AT Product List For barriers that are designed for impact on the front only, the steepness of the slope behind the barrier is not relevant when determining the suitability of a HTCB for the installation. Sheet 2 of 4 TL-4 systems 3 cables August 3, 2016 A - Alternate to 50”/1270mm other side of post (cables are interwoven) 42”/1067mm 41”/1041mm Traffic Side 40”/1016mm 39” 991mm 30”/762mm 30” 762mm 32” (811mm) Post Height for 31” (787mm) W-Beam Top Rail Height (MASH 2009) 28.75” (730mm) Post Height 27.75” (705mm) W-Beam Top Rail Height (NCHRP 350) - Alternate to other side of cables Applies to median and roadside installations 38.1” 968mm 30.7”/780mm 29.5” 749mm 28.2” 720mm Tolerances: Gibraltar: +/- 1” (25.4mm) Trinity: +/- 1” (25.4mm) Brifen: +/- 1.2” (30mm) Safence: +/- 0.8” (20mm) Nucor: +/- 1” (25.4mm) 25.2” 640mm 20”/508mm 20” 508mm 21” 533mm 18.9” 480mm 10”/254mm Note: If a system does not have ‘(4:1)’ specified, it is to be used for 6:1 or flatter applications. The slope refers to the slope the vehicle is travelling on in advance of impact. The slope behind the barrier is not stipulated. 0”/0mm Manufacturer FHWA Acceptance Letter # AT Product List Status Gibraltar B-137A Proven Trinity CASS B-141 Proven Gregory Safence B-88D Potential For barriers that are designed for impact on the front only, the steepness of the slope behind the barrier is not relevant when determining the suitability of a HTCB for the installation. Sheet 3 of 4 TL-3 systems 4 cables August 3, 2016 50”/1270mm 48.5”/1232mm 46”/1168mm 40”/1016mm 41.7” 1059mm 39”/991mm 38.1” 968mm 36.6” 930mm 36” 914mm 30.7” 780mm 30.1” 765mm A 24.2” 615mm 32”/813mm A 30”/762mm 29.5” 749mm 28.4” 720mm A A 38.4” 975mm 37.5” 953mm Traffic Side 32” (811mm) Post Height for 31” (787mm) W-Beam Top Rail Height (MASH 2009) 28.75” (730mm) Post Height 27.75” (705mm) W-Beam Top Rail Height (NCHRP 350) - Alternate to other side of cables Applies to median and roadside installations Tolerances: Gibraltar: +/- 1” (25.4mm) Trinity: +/- 1” (25.4mm) Brifen: +/- 1.2” (30mm) Safence: +/- 0.8” (20mm) Nucor: +/- 1” (25.4mm) 34.6” 880mm 30.9” 785mm other side of post (cables are interwoven) 30.5” 775mm A 26.6” 675mm 20”/508mm 41.5” 1054mm 41.3”/1050mm 40.6”/1030mm A - Alternate to 20” 508mm 17.4” 442mm 24.8” 630mm A 18.9” 480mm 18.3” 465mm 19.7” 500mm 18.5” 470mm 10”/254mm Note: If a system does not have ‘(4:1)’ specified, it is to be used for 6:1 or flatter applications. The slope refers to the slope the vehicle is travelling on in advance of impact. The slope behind the barrier is not stipulated. 0”/0mm Manufacturer FHWA Acceptance Letter # AT Product List Status Trinity CASS S3 (4:1) B-232 Proven Brifen WRSF B-82 Potential Brifen WRSF (4:1) B-82B1 Potential Gregory Safence B-88 Potential Gregory Safence (4:1) B-88F Potential Nucor Nu-Cable (4:1) B-193 Not currently on AT Product List For barriers that are designed for impact on the front only, the steepness of the slope behind the barrier is not relevant when determining the suitability of a HTCB for the installation. Sheet 4 of 4 TL-3 systems 3 cables August 3, 2016 50”/1270mm A - Alternate to 49.5”/1257mm other side of post (cables are interwoven) 42”/1067mm 41.7” 1059mm 40”/1016mm 39” 991mm 33”/838mm 30”/762mm 30” 762mm 20”/508mm 20” 508mm 33”/838mm 30” 762mm 32”/813mm 29.5” 749mm 25” 635mm 25” 635mm 20” 508mm 28.75” (730mm) Post Height 27.75” (705mm) W-Beam Top Rail Height (NCHRP 350) - Alternate to other side of cables Applies to median and roadside installations 38.4” 975mm 32.3”/820mm 30” 762mm Traffic Side 41.3”/1050mm 32” (811mm) Post Height for 31” (787mm) W-Beam Top Rail Height (MASH 2009) 17.4” 442mm 29.5” 749mm 28.4” 720mm A 20” 508mm 30.9” 785mm 18.1” 460mm 25.5” 648mm 23.6” 600mm A Tolerances: Gibraltar: +/- 1” (25.4mm) Trinity: +/- 1” (25.4mm) Brifen: +/- 1.2” (30mm) Safence: +/- 0.8” (20mm) Nucor: +/- 1” (25.4mm) 19.7” 500mm 21.5” 546mm 10”/254mm Note: If a system does not have ‘(4:1)’ specified, it is to be used for 6:1 or flatter applications. The slope refers to the slope the vehicle is travelling on in advance of impact. The slope behind the barrier is not stipulated. 0”/0mm Manufacturer FHWA Acceptance Letter # AT Product List Status Gibraltar B-137 Proven Gibraltar (4:1) B-137C Proven Trinity CASS B-141 Proven Trinity CASS (4:1) B-141C Proven Brifen WRSF B-82C Potential Gregory Safence (4:1) B-88F Potential Nucor Nu-Cable B-96 Not currently on AT Product List For barriers that are designed for impact on the front only, the steepness of the slope behind the barrier is not relevant when determining the suitability of a HTCB for the installation.
© Copyright 2025 Paperzz