PROSPECT PIER St. Petersburg, Florida | PENTAGRAM | CIVITAS TILLOTSON | | FALLER MESH DAVIS | | VICKSTROM ARUP | CC&A PROSPECT PIER Contents 1 . Project Overview and Concept 2 . Team 2.1 2.2 3 . Analysis 3.1 History and Context (St. Pete Cultural Identity) 3.2 Urban Analysis 4 . Design 4.1 Program Aspiration Checklist 4.2 Activities Calendar 4.3 Urban Concept 4.4 Building Concept 4.5 Branding and Signage Strategy 4.6 The Uplands 4.7 Pier Design 4.8 Planting Palette 4.9 The Pyramid 4.10 Pubic Spaces and Circulation 4.11 Section 4.12 Plans 4.13Elevations 4.14 Facade 4.15 Sustainability Concepts 4.16 Structure Re-use 4.17 Lighting 5 . 2 Selected Project Experience Organization Chart Construction Technologies 5.1Structure 5.2 Sustainability 6. Permitting and Operations 6.1 Permit Compliance with Federal, SWFWMD and Pinellas County 6.2 Building, Fire and Zoning Official Information 6.3 Environmental Permitting Aspects 6.4 Utility Systems 6.5 Operation Impacts of the Concept 7. Schedule and Budget 7.1 Design and Construction Schedule 7.2 Projected Construction Costs 3 1. Project Overview and Concept EL CASTILLO | 800 AD PYRAMIDS OF EYGPT | 2600 BCE PROSPECT PIER HISTORY THE SYMBOLISM OF THE PYRAMID The first record of a pyramid dates back to 2650-2600BCE in Egypt, serving as a tomb for the common people and royalty alike. In America, the pyramids of Mesoamerica date back to as early as 250-300CE, representing mountains and man’s attempt to reach closer to the realm of the gods, as the first architectural heritage on the continent. The legacy for creating monumental, aspirational architecture predates us all; the pure shape of a pyramid stands for a timeless, powerful and bold statement for the generations to come. THE INVERTED PYRAMID OF ST. PETERSBURG In 1973, the City of St. Petersburg commissioned architect William B. Harvard Sr. who turned the iconic pyramid over, pushing the shape to its structural limits. Industry rose to the challenge of studying this shapes inherent qualities to devise a system for supporting it along with a program of usable space. INVERTED PYRAMID | 1973 MARKETPLACE ADDITION | 1987 For decades, this Pier has proven itself worthy of occupation. In its heyday the Pier captured the magnificence and joyous spirit of St. Petersburg. A sign of innovation, strength and pride, the building has sustained the test of time to provide generations of people with memories, good times and pleasure. Built during a specific era of architecture, when the use of concrete and structural experimentation reigned, the Pier as it is today appears bulky, heavy and layered. In the spirit of entering a new era defined by sustainability and reuse, the 21st century, the Pier shall become a reinvention of itself for a contemporary setting. PROSPECT PIER TRANSFORMS THE LEGACY Rather than start anew, Prospect Pier recognizes the legitimacy of the original pier shape in society. Far ahead of its time, the inverted pyramid shape has been proposed over and over again in recent years through competitive international competitions involving acclaimed design teams. The beauty of the context of St. Petersburg is that the Pier need not be reinvented from scratch; instead, the Pier can be transformed, modernized and optimized to rise to the needs of a new audience. Founded in Mexico, home to some of the world’s earliest Pyramid settlements, FR-EE finds significant beauty and inspiration in the elegant form of St. Petersburg’s original Pier. Moreover, FR-EE’s team believes wholeheartedly in the necessity to be stewards of the environment, protectors of a unique setting and supporters of a new vision of the City. PROSPECT PIER | 2017 TULUM MUSEUM | 2012 4 Without compromise, Prospect Pier has the potential to deliver St. Petersburg with a bold new vision for its Pier and to serve the community and new audiences alike. The following proposal is a responsible, economical, sustainable and contextual response to the City and community’s agenda for reinventing the Pier. We are excited about what potential it holds and are equally eager to engage with seeing this vision become a reality over the next few years. 5 2. Team PROSPECT PIER 2.1 SELECTED PROJECT EXPERIENCE 2.2 ORGANIZATION CHART ST. PE TERSBURG PIER MUSEUM PARK, MIAMI | CIVITAS SOUMAYA MUSEUM, MEXICO CITY | FR-EE FR-EE Design Architect Fernando Romero, FAIA Lead Designer/Principal Sergio Rebelo Design Director THE SALVADOR, ST. PETERSBURG | MESH SEATTLE PUBLIC LIBRARY, SEATTLE | TILLOTSON Unai Artetxe Project Manager CIVITAS MESH ARUP Landscape Architect Executive Architect Engineering Mark Johnson Principal-in-Charge Tim Clemmons, AIA Principal Architect Dan Brodkin Principal/Structural Engineer Chris Parezo Design Principal Jenny Miers, AIA Project Architect Raymond Quinn Lead Mechanical Engineer Patrick Green, RA Project Manager Gary LaMonica Electrical Engineer Igor Kitagorsky Plumbing Engineer TILLOTSON PENTAGR AM Lighting Graphic / Interactive Suzan Tillotson Principal-In-Charge Natasha Jen Partner-In-Charge Vincent Lee Civil Engineer Cameron Thomson LEED/Sustainability Sanjeev Malhorta Geotechnical Leonie Van Ginkel Facade OSAKA MARITIME MUSEUM, JAPAN | ARUP HIGHLINE, NEW YORK CITY | PENTAGRAM CORE DESIGN TEAM VICKSTROM FALLER DAVIS CC& A Civil Environmental Cost Analysis Daniel Vickstrom Engineer Nicole Cribbs Environmental Scientist Robert A. Kaupp Cost Estimator Bruce Hasbrouck Environmental Scientist CORE CONSULTANT TEAM 6 7 3. Analysis PROSPECT PIER 3.1 HISTORY AND CONTEXT (ST. PETE CULTURAL IDENTITY) 3.2 URBAN ANALYSIS 2023 phase 3 future development waterfront = prime real estate HISTORY CONTEXT INTEGRATING THE PIER Founded in 1888, the city of St. Petersburg has always been defined by its waterfront setting. After a few fitful years of attempting to establish an industrial waterfront, St. Petersburg made the eventful decision to convert the entire downtown waterfront to public park in 1907. Between 1908 and 1923 the small but rapidly growing town floated $1.3 million in bonds to acquire and improve over 50 acres of public park. Today, cities all over the world are working to convert their urban waterfronts into public parks, but at the time this was a bold and radical concept. Acknowledging this visionary undertaking, John Nolen, the most prominent urban planner of his day, labeled St. Petersburg America’s Riviera. St. Petersburg, a city of approximately 250,000 people, is currently working with citizens and a multifaceted team to create its first master plan for the downtown waterfront since the early 1900s. Recognizing that a new comprehensive waterfront masterplan is well underway, we offer these thoughts for how the new Pier can be integrated into the greater downtown. 2nd Avenue North offers a unique framework in which to connect the city’s public waterfront with its urban core. Stretching approximately one mile from the Pier (an manmade island surrounded by water) to Mirror Lake (a natural body of water surrounded by land), 2nd Avenue boasts a rich diversity of assets. It divides neatly into four zones of roughly equal length with a significant public space marking the transitions. Between Mirror Lake and Williams Parks is the city’s governmental center as well as an impressive array of religious and educational institutions. Continuing down 2nd Avenue to Straub Park is a vibrant retail and lifestyle center featuring Sundial and Beach Drive. From Straub Park to Spa Beach is the Uplands, a potentially spectacular public park that is currently underutilized. And the last quarter mile consists of the pier bridge culminating in the city’s iconic symbol. PROPOSED PEDESTRIAN AXIS CITY BUILDINGS RELIGIOUS Recent consensus from the meeting on November 13, 2014 suggests that the public’s vision and desire to make the waterfront “A National Model for Waterfront Stewardship,” showing interest in only small changes to the waterfront. Anticipated to be adopted on July 1, 2015, the dimensions and themes of the plan encompass: 1. Stewardship of the Waterfront Environment - A sustainable relationship between the natural and built environments; The park system was expanded and improved throughout the 20th century through the creation of the Pier Uplands and Demen’s Landing as well as the creation of a “cultural corridor” featuring a performing arts center, sports stadium, marinas and three museums. Over time waterfront parks were added north and south of downtown and today there is over seven miles of public shoreline in the city’s core. Collectively they represent the third largest urban waterfront park system in North America and are considered to be the city’s greatest physical asset. 2. Enhancing the Experience of the Water - Expanding St. Petersburg as a waterfront destination for boaters and non‐ boaters; 3. An Active Waterfront Parks System - Diversifying the activities of the waterfront to meet a growing community 4. Vibrant Downtown Places along the Water - Leveraging the economic potential of in‐water and upland areas along the waters edge; and Landscape and lifestyle define this unique American city. St. Pete’s legacy of civic commitment continues today with the city undertaking the development of a comprehensive waterfront master plan while simultaneously creating a new Pier. And as it has since 1889, it is our vision that the new Pier will celebrate St. Petersburg’s special history, geography and culture as a subtropical waterfront city. 5. A Connected, Accessible Downtown + Waterfront Continuous linkages, service oriented parking + transit, increased public access. PARKING 2018 phase 2 cultural corridors marina REAPING THE FRUITS phase 1 beach + event space pier + inverted pyramid One of the main goals of the significant public investment in the waterfront is to spur continued private investment within the downtown core. Initially this can be encouraged by establishing a park-once transportation philosophy for the 2nd Avenue North corridor. A new trolley line should be established in conjunction with the re-opening of the Pier that will allow for the Pier, the Uplands, Beach Drive and Sundial to be marketed as a single destination for both locals and tourists. This will allow for a consolidation of parking facilities allowing for reduction of surface parking within the parklands and redevelopment of prime downtown land. The third phase will see the continued beautification of 2nd Avenue South with the main goal being the creation of St. Petersburg’s Ramblas – a major pedestrian friendly boulevard seamlessly blending new and historic architecture into a vibrant mix of commercial and civic uses. Once established, phase four will take place organically with continued spin-off development radiating north and south. SECONDARY CONNECTIONS EDUCATION Our team contemplates four phases SUNDIAL ST PETE PROPOSED CLOSED PATH CULTURALof urban revitalization. The first phase focuses on the deliverables of the competition including re-inventing the Pier, re-building the pierhead and bridge and creating small “light touch” interventions on the Uplands. Phase two would consist of the improvement of the remainder of the Uplands as well as the implementation of the recommendations of the waterfront masterplan. In addition to the east-west connection via 2nd Avenue North, we recommend the city enhance the park system in the north-south direction with an improved boardwalk along North Shore Drive and eventually pedestrian bridges connecting the Uplands to both Demen’s Landing 2023 phase 3 and Vinoy Park. future development PIER+ PYRAMID UPLANDS INTERVENTION FUTURE DEVELOPMENT 2018 phase 2 waterfront = prime real estate cultural corridors marina phase 1 beach + event space pier + inverted pyramid STUDY OF THE URBAN CONTEXT AND 2ND AVENUE INCLUDING FUTURE IMPROVEMENTS SUB PIER PARK 1879 NAUTICAL CHART OF TAMPA BAY PROPOSED PEDESTRIAN AXIS CITY BUILDINGS RELIGIOUS PARKING EDUCATION PHASE III CONNECTIONS SECONDARY SUNDIAL ST PETE CULTURAL futurePROPOSED developmentCLOSED PATH PHASE II waterfront = prime real estate cultural corridors TIMELINE OF PHASED DEVELOPMENT ACCORDING TO IMPACT ON THE URBAN FABRIC 8 9 PHASE I marina beach + event space pier + inverted pyramid THE PIER’S HISTORY OF TRANSLATING ITS CONTEXT PROSPECT PIER 1889 1906 1926 1973 1987 2017 THE RAILROAD PIER THE ELECTRIC PIER THE MILLION DOLLAR PIER THE INVERTED PYRAMID MARKETPLACE ADDITION PROSPECT PIER Constructed the year after the city was founded, the Railroad Pier was built in the current location of Demen’s Landing. Originally intended to support shipping, it quickly became a sightseeing destination for locals and tourists. Due to the popularity of the Railroad Pier another pier was built. Extending 3,000 feet into Tampa Bay the Electric Pier was the first that aligned with 2nd Avenue North. After the previous pier was destroyed by a hurricane in 1921, a new concrete pier was constructed and terminated with a Mediterranean Revival style building that featured a central atrium and continuous viewing arcade on the second floor. The Million Dollar Pier building was demolished in 1967 to make way for the innovative Inverted Pyramid (the 1920’s pier and pier head were retained). With 40,000 square feet of interior space, the large fifth floor roof deck offered expansive views of Tampa Bay and the downtown skyline. In keeping with the then popular trend of “festival marketplaces”, retail space at the pier was more than doubled with a large first floor addition. A prominent glass enclosed elevator was added to the front of the structure. Due to the severe deterioration of the 1920’s bridge structure, a new pedestrian-friendly pier will be constructed. At the landside end of the pier, the Pelican parking lot will become a new 5-acre park featuring a 5,000 person capacity event lawn. The Inverted Pyramid will be re-imagined and transformed into a potent symbol of the City of St. Petersburg for the 21st century, absorbing all the history and projecting into the future. 10 11 4. Design PROSPECT PIER 4.2 ACTIVITIES CALENDAR 13% A. 7% B. 14% C. D. E. F. 28% 21% An actively ever-changing programmed pier with both indoor and outdoor activities and spaces targeting the local and visiting population 17% 17% A place79% that becomes emblematic of memorable moments Continuous programming along the full length of the pier and not only at the pier head Both commercial and recreational uses 54% 49% Considerable recreational activities for a variety of ages Transportation options to make the programming more accessible. COMMERCIAL AT THE END BOTH NON-COMMERCIAL ON LAND RESIDENTS NO OPINION/NOT SURE BOTH TOURISTS NEITHER/NOT SURE HIGHEST RATED ELEMENTS FOR THE NEW PIER (MOST IMPORTANT + SECOND MOST IMPORTANT) COMMERCIAL OR NON COMMERCIAL PIER COMMERCIAL OR NON COMMERCIAL PIER OpinionWorks Survey (Dec, 2013) CHART OF PIER WORKING GROUP VS. PROPOSED DESIGN LOCATION OF PIER PROGRAMMING LOCATION OF PIER PROGRAMMING WHO SHOULD THE PIER PRIMARILY SERVE 28% 17% 1. Fine dining or destination restaurants 13% 21% 13% 21% 10% 7% 2. Air conditioned spaces 17% 17% 7% 10% 3. Observation and 79% viewing areas 14% 17% 79% 9% 4. World class 14%design that will be a landmark 49% 54% 8.5% 5. Open-air casual dining 49% 8.5% 6. Areas for walking, jogging, and cycling COMMERCIAL AT THE END BOTH 7.5% 7. FishingNON-COMMERCIAL ON LAND RESIDENTS NO OPINION/NOT SURE BOTH TOURISTS 7.5% 8. Shopping and retail space NEITHER/NOT SURE 6% 9. Space for special events and entertainment COMMERCIAL AT THE END 5%LAND NON-COMMERCIAL ON 10. Environmental education NO OPINION/NOT SURE BOTH OpinionWorks Survey (Dec, 2013) Pier Working Group Survey (July, 2014) 4.5% 11. Boat and watercraft access NEITHER/NOT SURE 17% 3.5% 1. Fine dining or destination restaurants 1. Observation areas DEC 2013) 12. Amusement activities VOTER PREFERENCES FOR A NEW PIER (OPINION WORKS SURVEY, 10% 2. Air conditioned spaces 2. Open-air casual dining 2.5% 13. Snack barsand and fastareas food 10% 3. Observation viewing 3. Cycling / Jogging / Walking 9% 4. World class design that will be a landmark Total 8.5% 5. Open-air casual dining 8.5% 6.OpinionWorks Areas for walking, jogging, and (Dec, cycling 2013) Survey RESTAURANTS/RETAIL 7.5% 7. Fishing 7.5% 8. Shopping and retail space NATURE/SPORTS 1. Fine dining or destination restaurants 6% 9. Space for special events and entertainment OTHERS 5% 10. education 2.Environmental Air conditioned spaces 4.5% 11. Boat and watercraft access 3. Observation and viewing areas 3.5% 12. Amusement activities 4.Snack World design landmark 13. barsclass and fast food that will be a2.5% Total 5. Open-air casual dining 6.RESTAURANTS/RETAIL Areas for walking, jogging, and cycling NATURE/SPORTS 7.OTHERS Fishing 8. Shopping and retail space 9. Space for special events and entertainment 10. Environmental education 11. Boat and watercraft access 12. Amusement activities 13. Snack bars and fast food RESTAURANTS/RETAIL NATURE/SPORTS 4. Tram / Trolley 100% 5. Fishing 6. Bike / Water rental 7. Courtesy docks 8. Performance stage 17% 9. Flexible event space 10% 10. Marine discovery center 11. Cafe / Snack bar 10% 12. Water taxi 9% 13. Environmental education 14. Picnic area 8.5% 100% 15. Non-motorized Boating 8.5% 16. Shopping 7.5% 17. Community space 18. Fine dining 7.5% 19. Amphitheater 6% 20. Motorized boating 21. Exhibition vessel berth 5% 22. Support retail 4.5% 23. Family entertainment 24. Kiosks 3.5% 25. Spa Beach to Vinoy bridge 2.5% 26. Amusement / Ferris wheel 27. Water park 100% Total 28. Banquet space 29. Fast food 30. Hotel REQUIRED OTHERS 12 PROPOSED / INCLUDED IN THE CURRENT DESIGN PROPOSAL WHO SHOULD THE PIER PRIMARILY SERVE Pier Working Group Survey (July, 2014) 1. Observation 28% areas 2. Open-air casual dining 3. Cycling / Jogging / Walking 17% 4. Tram / Trolley 5. Fishing 54% 6. Bike / Water rental 7. Courtesy docks 8. Performance stage 9. Flexible event space BOTH RESIDENTS 10. Marine discovery center TOURISTS 11. Cafe / Snack bar 12. Water taxi 13. Environmental education 14. Picnic area 15. Non-motorized Pier Working Group SurveyBoating (July, 2014) 16. Shopping 1. Observation areas space 17. Community 2. Open-air casual dining 18. Fine dining 3. Cycling / Jogging / Walking 19./ Amphitheater 4. Tram Trolley 20. Motorized boating 5. Fishing 21./ Water Exhibition 6. Bike rentalvessel berth 22. Support 7. Courtesy docks retail 8. Performance 23. Familystage entertainment 9. Flexible event space 24. Kiosks 10. Marine discovery 25. Spa Beachcenter to Vinoy bridge 11. Cafe / Snack bar 26. Amusement / Ferris wheel 12. Water taxi 27. Water park 13. Environmental education 28. Banquet space 14. Picnic area 29. Fast foodBoating 15. Non-motorized 30. Hotel 16. Shopping 17. Community REQUIREDspacePROPOSED / INCLUDED IN THE CURRENT DESIGN PROPOSAL 18. Fine dining 19. Amphitheater 20. Motorized boating 21. Exhibition vessel berth 22. Support retail 23. Family entertainment 24. Kiosks The spaces allocated for programmed activities are dispersed along the length of Prospect Pier. Each element of the Pier however was designed to be actively flexible encouraging social interaction. Lighting design was integral to support the transitions between spaces as well as the activation of its program and uses. PROPOSEDMONDAY WEEKLY PROGRAMMING TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY Maintenance Maintenance Maintenance Maintenance buildings. Maintenance Maintenance Maintenance Preceding the design, we analyzed the potential uses of the surrounding The table below is a speculative exercise 6 on how the population can explore this new destination. MORNING It was evident that some of the important factors were: The Prospect Pier is designed to accommodate a variety of age groups, inclinations and schedules. It provides a platform upon and in which the events of peoples lives happen. From formal and informal gatherings of diverse sizes, to recreational activities, educational experiences, opportunities for exercise in groups or alone, entertainment and spectacle. 8 EVENING AFTERNOON AFTERNOON MORNING Through surveys with the local population of St Petersburg, the desired use, programming, and clientele became evident. As the Prospect Pier is designed people of St. Petersburg’s continual use through all seasons, our team designed COMMERCIAL OR NON COMMERCIAL PIER primarily for the LOCATION OF PIER PROGRAMMING WHO SHOULD THE PIER PRIMARILY SERVE the program directly from these surveys. EVENING 4.1 PROGRAM ASPIRATION CHECKLIST 10 6 12 8 2 10 4 12 6 2 8 4 10 6 Tai Chi Mayor’s Breakfast MONDAY Pilates TUESDAY Stretching WEDNESDAY Meditation THURSDAY Yoga FRIDAY School Field Trip Maintenance Kayak Tour Mayor’s Breakfast Yoga Maintenance Walking Tour Pilates Sea Observation Yoga Pilates School Field Trip Mirror Lake Tour Yoga Food Fest School Field Trip Food Fest Mangrove walk Stretching Kayak Tour Neighborhood Meeting Pilates Mangrove Walk Walking Tour Walking Tour Mangrove Walk Pilates Kayak Tour Yoga Farmers Market Mirror Lake Tour Science Lecture Food Fest Happy Hour Food Fest Daily Movie Kayak Tour Blues Night Stretching Stand-Up Comedy Mangrove Walk Jazz in the Park Walking Tour Movie Night Pilates Wedding Banquet Paddle Board Lessons Shakespeare Late Fitness Astronomy Night Neighborhood Meeting LED Light Show Late Fitness Science Lecture Museum Night Happy Hour Blues Night Cultural Stand-Up Comedy Food Nature Jazz in the Park Music Movie Night Shakespeare in the Park Jazz in the Park Astronomy Night LED Light Show Late Fitness Museum Night Cocktail Demo Movie Night Sea Observation 8 10 Daily Movie Sports Late Fitness Sports Cultural Food Nature Mangrove walk Maintenance Kayak Tour Meditation SUNDAY Yoga Maintenance Mirror lake tour Tai Chi Kayak Tour Mirror lake tour School Field Trip Maintenance Mangrove Walk Stretching Fishing SATURDAY Walking Tour Maintenance Farmers Market Yoga Paddle Board Lessons Walking Tour Sea Observation Maintenance Family Fest Fishing Fishing Lessons Sea Observation Mangrove Walk Family Fest Fishing Lessons Jazz in the Park Mangrove Walk in the Park Yoga Cocktail Demo Wedding Banquet Movie Night Music ANNUAL SCHEDULE The building lighting system will accommodate celebrations of the city’s most festive events. Grand Prix of St. Pete Movies in the Park Saturday Morning Market Jan Feb Mainsail Arts Festival Mar Grand Prix of St. Pete Saturday Morning Market Sunshine Blues Music Festival Jan Feb Apr May Mar American Stage in the Park Sunshine Blues Music Festival American Stage in the Park Apr Regata del Sol al Sol Fiesta May Jun Movies in the Park Jul Aug AIDS Walk Sept Oct Jun Jul Aug Fish-O-Thon 4th of July Fireworks Festival of St. Anthony’s Regata del Sol States Triathlon al Sol Fiesta Sept Walk for Life 13 Race for the Cure Oct Paddles Up Boat Race Race for the Cure Fish-O-Thon 4th of July Fireworks First Night SnowFest Ribfest Nov in St. PeteDec Florida Orchestra in the Park AVP Beach Volleyball Open Walk for Life St. Anthony’s Triathlon Florida Orchestra in the Park AVP Beach Volleyball Open Mainsail Arts Festival Festival of States Ribfest in St. Pete AIDS Walk Paddles Up Boat Race First Night SnowFest Nov Chillounge Night Dec St. Pete Boat ShowChillounge Illuminated Boat Parade Night St. Pete Boat Show Illuminated Boat Parade 4.3 URBAN CONCEPT PROSPECT PIER COMPONENTS OF 2ND AVENUE PROMENADE 1.Mirror Lake & Civic Buildings | The lake’s beauty and surrounding civic buildings begin the urban narrative towards the Pier. 2.Williams Park | Along with the adjacent churches, this park is a symbol of the city’s rich history. 3.Transportation/Parking | In conjunction with improving the pedestrian experience, new clean transportation systems will include electric buses and bike rentals. 4. Waterfront Commercial Center | Together Sundial and the Beach Drive boutiques and restaurants are a regional destination for lifestyle shopping and entertainment. 5. Cultural Corridor | Stretching the entire length of downtown’s waterfront is an incredible collection of public spaces and cultural destinations all with views of Prospect Pier. 6. The Uplands | Once it is improved this 25-acre park will define St. Pete’s relationship with its beautiful waterfront setting. 7. Prospect Pier | The culmination of the 2nd Avenue Promenade, it is both a symbol of the city and a community gathering place offering spectacular views of skyline and sunsets. URBAN NARRATIVE The renovation of the Pier creates an opportunity for a mid- and long-term strategy for the redevelopment of St. Petersburg’s city center. Prospect Pier will be the catalyst for this transformation. Extending one mile from Mirror Lake to the Pyramid, 2nd Avenue North creates a narrative that reveals St. Pete’s relationship between city and water. This promenade sits at the heart of the city and is framed by many of St. Petersburg’s most important institutions, private buildings and public spaces. Divided neatly into four quarter-mile long segments, Phase 1 entails the rejuvenation of the eastern end. Building upon this success we envision 2nd Avenue North as a world class Promenade gathering together both locals and visitors to enjoy its natural beauty and vibrant urbanity. Mirror Lake Children & Families Dept. City Hall Church Williams Park Museum of Fine Arts Sundial St Pete Museum of History Central Yacht Basin Electric Bus Route VINOY PARK NORTH STRAUB PARK NORTH YACHT BASIN MIRROR LAKE 2ND AVENUE NE CITY BUILDINGS RELIGIOUS PROPOSED PEDESTRIAN AXIS PARKING EDUCATION SECONDARY CONNECTIONS SUNDIAL ST PETE CULTURAL PROPOSED CLOSED PATH 14 E PIONEER PARK BAY SHOR E DRIVE N NE BEACH DRIVE 1ST STREET NORTH SOUTH STRAUB PARK 2ND STREET NORTH 5TH STREET NORTH WILLIAMS PARK CENTRAL YACHT BASIN DEMENS LANDING PARK 15 Prospect Pier 4.4 BUILDING CONCEPT PROSPECT PIER 1 1 2 Placing area of existing addition on top of pyramid original inverted pyramid 80’s addition of elevator 1 SELECTIVE DEMOLITION Demolish the 1980’s additions to the pyramid. Replace a portion of the lost area by adding new space on top where it is more valuable. 3 With selective demolition and extension of structure, roofhave provides shading space for 4 pureExtended we can achieve shape and moreextra valuable area in building. ourdoor activities on the pier head as well as extra observation area. original inverted pyramid Building surroundings pyramid base and prov activities such as fishi water, and contemplat Building are sloped to me Interior of pyramid is organize 5 surroundings pyramid base provide space for mu pierand street narrative. activities such as fishing, sunbathing, ju water, and contemplation of Tampa Bay observation area city observation 80’s addition of elevator extra shading extra shading 80’s addition of retail space cafeter 4 CANOPY education Extend the exterior walls and roof to wing provide shade for outdoor city placeactivities onmarine diversity the pier head in addition to increasing the open air lob size of the rooftop observation deck. restroom Placing area of existing addition on top of pyramid 2 original inverted pyramid 4 inal inverted pyramid 2 STRUCTURE RE-USE Extend the structure in order to achieve a purer shape and accommodate desired programmatic functions. 80’s addition Existing first floor level of4.5 Feet in order retail space to elevate the building above the flood zone and accommodate potential sea level rise during the next century. 3 With selective demolition and extension of structure, we can achieve pure shape and have more valuable area in building. 80’s addition of retail space ddition on top of pyramid on r 2 Placing area of existing addition on top of pyramid 2 With selective demolition and extension of structure, we can achieve pure shape and have more valuable With selective demolition andinextension of structure, area building. Extended roof provides shading space for 4 pure shape we can achieve and have moreextra valuable ourdoor activities on the pier head as well as extra area in building. observation area. Extended roof provides extra shading space for ourdoor activities on the pier head as well as extra observation area. 80’s addition of retail space Building surroundings are sloped to meet the pyramid base and provide space for multiple Building surroundings arepyramid sloped tofishing, meet the of organized as extension of the 5 Interior activities such asis sunbathing, jumping into pyramid base and provide space for multiple pierwater, streetand narrative. contemplation of Tampa Bay. 3 6 Interior of pyramid is organized as extension of the pier street narrative. extra shading observation area bar education wing restaurant virtural aquarium city city place observation deckmarine diversity water plaza open air lobby restroom bar cafeteria extra shading Facade identity and su extra shading education wing city place snack shack restaurant Facade identity and sustainability solar panel 5 PUBLIC SPACE Organize the interior of the pyramid as a natural ascension through the pier’s functional spaces via a grand central water plaza stairwell that is the culmination of the 2nd rainwater capture solarroof panelstructure through enlarged roo avenue promenade. Tilt the flood elevation bayside place to the west providing spectacular views of skyline and sunsets. city observation deck cafeteria extra shading 6 activities such as fishing, sunbathing, jumping into water, and contemplation of Tampa Bay. 5 observation area 3 flood elevation storage virtural aquarium bayside place marine diversity open air lobby restroom d extension of structure, andExtended have more roofvaluable provides extra shading space for ourdoor activities on the pier head as well as extra observation area. tra shading space for pier head as well as extra 3 5 Building surroundings are sloped to meet the Interior of pyramid is organized as extension of the pyramid base and5provide space for multiple pier street narrative. activities such as fishing, sunbathing, jumping into water, and contemplation of Tampa Bay. Interior of pyramid is organized as extension of the pier street narrative. 6 6 snack shack storage Facade identity and sustainability Facade identity and sustainability observation area solar panel city observation deck observation area 3 LANDSCAPE cafeteria Terrace up from the pier head to a new extra shading grand 2nd level entry thereby providing dynamic outdoor space for year-round activities including fishing, sunbathing, performances extra and shading picnics. bar education wing city observation deck city place marine diversity cafeteria city place restroom virtural aquarium open air lobby 16 snack shack solar panel snack shack storage rainwater capture through enlarged roof vegetated roof rainwater capture through enlarged roof LED lighting vegetated roof bayside place LED lighting flood elevation bayside place marine diversity restroom water plaza restaurant open air lobby bar education wing restaurant virtural aquarium snack shack natural ventilation storage 17 natural ventilation 6 ICON OF SUSTAINABILITY Integrate a sophisticated façade design and sustainability strategy to further enhance the iconic character of the building while maximizing its performance. PROSPECT PIER AERIAL VIEW 18 19 4.5 BRANDING AND SIGNAGE STRATEGY PROSPECT PIER The iconic shape of Prospect Pier offers a branding opportunity for the city. The pyramid of St. Petersburg is part of its history while offering a new vision for its future. Prospect Pier represents its citizens and translates the city’s topicality and proximity to the water. Beyond the graphic logo, the branding and signage strategy for Prospect Pier develops a digital platform that engages the community in an active manner. The digital interaction encourages a symbiotic exchange between St. Petersburg’s citizens and the pier administration. The branding and user interface developments offers an iconic design, experience, and landmark to propel a new vision of St. Petersburg. 20 21 4.6 THE UPLANDS PROSPECT PIER The design for the Uplands and Pier is fundamentally about connecting people to their precious resource, their waterfront. The design is simple and pure. It creates a half mile long promenade that maximizes human experience, transitioning from an urban environment, through a Coastal waterfront landscape, to the Pier and the Pyramid. The Pyramid itself is designed as an extension of the Pier and the city. 22 23 THE UPLANDS PROGRAM PLAN PROSPECT PIER THE 2ND AVENUE PROMENADE THE THRESHOLD The 2nd Avenue Promenade is designed to be a grand vehicular and pedestrian link from the inland Cityscape to the waterfront. A formal ‘allee’ of Medjool Palms and pedestrian lighting lines the ¼ mile long street creating a grand sense of arrival while framing the Pyramid building at the end of the Pier. Pedestrian walks, bike lanes and vehicular access are carefully designed to maximize access to the History Museum, Spa Beach Park and the Pier entry itself. 2nd Avenue Promenade terminates at the Entry Plaza. The Plaza included trolley stops and an automotive drop-off turnaround and demarks the beginning of the Pier approach accessible to pedestrians, bicycles, and trolleys. Situated between Spa Beach and the Event Lawn, the ‘Threshold’ is the ceremonial entrance to the Pier. Demarcated by inwardly tilted lawn planes, the Threshold frames the distant view to the Pyramid while referencing the sky and the open and expansive nature of the bay. It is designed to be beautiful and functional, connecting the Uplands to the new Pier elevation, as well as connecting Spa Beach and the Event Lawn with a series of terraced beach and lawn planes. PHASE 1 FUTURE PED. BRIDGE ELEVATED TURF LAWN COMPARISON OF PIER FOOTPRINT / VIEW TO PYRAMID EXISTING PIER PROPOSED PIER 6 2 PALM GROVE, CRUSHED SHELL BEACH LIVE OAK SAVANNAH TURF LAWN WITH PALMS 3 4 ALLEE 1 2ND AVENUE PROMENADE 3 SPA BEACH PHASE 1 SLOPED LAWN (FRAMES VIEW TO PYRAMID) 5 1 2 2 6 TERRACED LAWN PANELS 4 EVENT LAWN 7 5 FUTURE PED. BRIDGE (TRANSITIONS PIER RAMP TO EVENT LAWN) 1 DEDICATED BIKE PATH 1 ENTRY PLAZA 2 ELECTRIC BUS STOP 2 BEACH VOLLEYBALL COURTS 3 RENOVATED PARKING 3 SPLASH PAD 4 SERVICE ACCESS / LOADING AND UNLOADING FOR EVENTS PARK 4 CHILDREN’S PLAY AREA 5 TERRACED BEACH 5 TRANSIENT DOCKS 6 KAYAK / PADDLE BOARD RENTAL (TRANSITIONS PIER RAMP TO BEACH) 6 (FOOD & DRINKS AND BEACH/PARK EQUIPMENT: LAWN GAMES, VOLLEY BALL AND BIKE RENTAL, FISHING POLES AND BIKE) 7 24 25 CONCESSION BUILDINGS W/ CAFE STYLE SEATING STAGE / PAVILLION PROGRAM ACTIVITIES PLANS PROSPECT PIER 1. THE LIVE OAK COASTAL SAVANNAH The Live Oak Coastal Savannah is a glade of coastal Live Oak trees that arise out of a coastal Savannah that features a variety of grasses, forbes and shrub lands. This shady environment will serve to create a threshold to the waterfront at the end of the 2nd Street Promenade. Along this linear journey to the end of the pier the scale must be broken down into spatial segments that not only create diversity and interest along the way but it also serves to create compression and then release. This principle is critical to the experience of this linear spine all the way from Bayshore drive to the end of the Pier. The Savannah landscape environment is not only a shady retreat from the heat it is also an environment to experience nature while strolling, picnicking and relaxing. volleyball nets and lawn games and temporary kayak and paddle boat rental center, with water access from the new transient dock located to the south, until a dedicated boat rental facility is built. 2. THE KAYAK AND PADDLEBOAT RENTAL PAVILION AND DOCKS Conveniently located on the Western side of the Spa Beach Park is the Kayak and Paddleboard rental Pavilion and docks. This facility will offer park visitors an opportunity to experience the bay via small water craft in open and calm waters. Facilities will include restrooms, seating patios and small concession. The relationship to the Coconut Grove Lawn and Spa Beach will offer park visitor’s convenient amenities that makes this park a favorite destination for both residents and visitors to St. Petersburg. 6. COMPACTED BEACH TERRACES Transitioning the vertical difference of the Pier to the Spa Beach is a series of terraces beach planes that are separated by concrete seat walls. This environment offers beach visitors flattened beach environments in an elevated position to enhance views and the water experience. The terraces will offer movable shade umbrellas that add a pop of color and atmosphere to the beach. 3. CONCESSIONS Two concession buildings are located just south of the Pier approach. These could include a small café / coffee shop, a microbrewery, lawn game equipment rentals or bike rental facility. 7. THE TERRACED LAWN PANELS On the opposite side of the pier ramp is the terraced lawn panels. Like the compacted beach panels the lawn terraces vertically transition the Pier ramp down to the Events Lawn environment. Offering a wide array of park uses such as picnicking, elevated concert viewing and views to the boat slips, the terraces are pivotal to the park function. 5. PALM GROVE CRUSHED SHELL BEACH This crushed shell environment will create a visually distinctive floor that is excellent for hosting public events, strolling and relaxing. This feature offers sand volleyball facilities and movable furnishings that allow for people sit and enjoy the bay and beach activities. 4. THE LAWN The Lawns mark a bold visual transition from the Live Oak Savannah to the Spa Beach water environment. This environment is designed to support and supplement the festival capacity of the ‘Events Lawn’, by being able to host tents, portable restroom facilities, concessions and multiple stage setups. The Lawn also features a world class children’s play environment featuring maritime themes, water play and elements that are educational, fun and engaging for children of all ages. A Concessions Pavilion with café seating and shade structures offer people a tremendous vantage point to view and enjoy the multiple park and maritime activities. The pavilion will also serve as the point source of information, restrooms and rentables such as; bikes, 8. THE EVENTS LAWN The Events Lawn, edged by a continuous bay walk is a two acre living room of the community. This space is designed to host multiple public events with a wide range of scale and capability. The space features a grand open lawn that can support music festivals, pick-up sports, arts and crafts fairs, movie nights and community gathering. A grand stage is located on south edge of the space against a dramatic backdrop of the transient boat dock marina. This location takes advantage of the terraced lawn steps as elevated viewing platforms and allows all passers-by on the pier approach to have an elevated view of all events. PICNIC 1 SHAKESPEARE IN THE PARK 2 MUSEUM NIGHT SCHOOL FIELD TRIP MANGROVE WALK KAYAK TOUR VOLLEYBALL PADDLE BOARD 5 MEDITATION YOGA FITNESS CHILDREN’S PLAY 4 JOGGING CYCLING FISHING SEA OBSERVATION ASTRONOMY NIGHT FISHING LED LIGHT NEIGHBORHOOD MOVIE SHOW NIGHT MEETING SPA BEACH 6 3 7 PICNIC 8 BIKE PATH ELECTRIC BUS STOP ELECTRIC BUS STOP JAZZ IN THE PARK PARKING BIKE RENTAL CAFE TAI CHI WATER TAXI 26 BLUES NIGHT FOOD FEST BIKE RENTAL SCIENCE LECTURE HAPPY HOUR COCKTAIL DEMO FARMERS MARKET PILATES COMMUNITY MOVIE GATHERING NIGHT BOATING SPORTS 27 CULTURAL FOOD NATURE MUSIC THE UPLANDS SITE PLAN RE D SHO BAY BE A CH DRI VE N E RIVE NE PROSPECT PIER 2ND AVENUE NE 28 29 THE UPLANDS CIRCULATION PROSPECT PIER AUTOMOBILE CIRCULATION BICYCLE CIRCULATION P P TROLLEY CIRCULATION PEDESTRIAN CIRCULATION 30 31 4.7 PIER DESIGN PROSPECT PIER 1 CROSS SECTION 1 - THE UPLANDS 2 3 4 5 6 CROSS SECTION 3 - PALM TREE GROVE 45’ 45’ PRAIRIE EXIST GRASS WALK + PALM TREES BIKE PATH DRIVE LANE DRIVE LANE PRAIRIE GRASS + PALM TREES EXIST WALK EXIST PARKING PALM TREE GROVE PIER APPROACH PALM TREE GROVE 45’ EXISTING CURB TO CURB CROSS SECTION 4 - THRESHOLD CROSS SECTION 2 - LIVE OAK COASTAL SAVANNAH At the west end of the events lawn the pier begins a gentle ascent. Over the next 400 feet the pier approach raises 4.5 Feet in order to elevate the new pier above the flood zone and accommodate potential sea level rise during the next century. BEACH 45’ LIVE OAK FOREST PIER APPROACH 32 26.50’ 45’ SLOPED LAWN PIER APPROACH LIVE OAK FOREST 33 26.50’ 10’ SLOPED TERRACED LAWN LAWN STEPS EVENT LAWN OUTDOOR MULTIPURPOSE SPACE LAYOUT FLEXIBILITY EVENT LAWN PROGRAMS SEATED PERFORMANCE VIEWING 1 2 3 4 5 6 EVENT LAWN ACTIVATED FOR LIVE PERFORMANCES FOOD TRUCKS INTERSPERSED WITHIN THE PALM TREE GROVE CROSS SECTION 5- THE SPRINGPOINT +/-500 BLANKETS , +/- 5,000 PEOPLE BLANKET (6’X6’) FOOD TRUCK STAGE STANDING PERFORMANCE VIEWING EVENT LAWN ACTIVATED WITH CONCERTS FOOD TRUCKS INTERSPERSED WITHIN THE PALM TREE GROVE +/- 3800 PEOPLE, STANDING PEOPLE FOOD TRUCK STAGE CRAFT FAIR / FOOD FESTIVAL BEACH 45’ 75’ PIER APPROACH TERRACED LAWN STEPS EVENT LAWN ORGANIZED FOR ART/FOOD FESTIVAL EVENT LAWN +/- 136, 10’x10’ POP-UP TENTS 10’X10’ TENT TEMPORARY LOADING/UNLOADING CROSS SECTION 6 - THE PIER RECREATION VOLLEY BALL EVENT LAWN ACTIVATED WITH RECREATIONAL VOLLEYBALL +/- 14 RECREATIONAL VOLLEYBALL COURTS CHILDREN’S RECREATION SOCCER EVENT LAWN ACTIVATED FOR CHILDREN’S SOCCER +/- 18 RECREATIONAL SOCCER FIELDS (6 VS. 6 PICKUP SOCCER) 10.5’ 24’ EDGE PROMENADE 45’ PIER 34 10.5’ EDGE The 24’ wide promenade is primarily a pedestrian/ bicycle zone. Trolleys will provide frequent service between the pier and downtown. Service vehicles will be limited to early mornings on a scheduled basis. 35 PROSPECT PIER PROSPECT PIER THE ST. PETERSBURG PIER The desired objective is only possible if the width of the pier is reduced from 100’ to 45’. This results in two very important experiential effects. First is the narrow width reduces the visual foreground depth of the hardscape to create a feeling of being completely enveloped by the bay thus maximizing the visual connection to the water on both sides of the pier. Second, the narrowing of the pier dramatically improves the visual proportions of the pier and amplifies the dramatic sense of perspective to the Pyramid building and the pier head. The reduction in pier width also results in significant cost reductions that allow for the implementation of more pedestrian amenities. SHADE STRUCTURES The design of the pier itself features elegant linear concrete and wood seating/shade elements that serve to provide for pedestrian amenity and protection from trolley traffic simultaneously. The spacing of these sculptural elements finds its inspiration from the nearby Albert Whitted Airport to the south. Air traffic controllers still use Morse code to identify airports. Using Morse code to spell St. Petersburg creates a seemingly random pattern that provides porosity from one side of the pier to the other. An interesting rhythm and cadence is created for the pedestrian to experience as the procession to the Pyramid building is experienced. PIER ELEMENT SPACING S T P E T E R S B U R G P I E R PIER RAILING DETAIL FISHING STATIONS 0 9’- ”O .C C PA .S 8’- IN /2 ” 8 -1 G C SE TIO N END POST 3/4”, 316l S.S. STRUCTURAL FINS PANEL 316l S.S. CABLE MESH TOP RAIL EXTRUDED RECYCLE ALUMINUM 36 37 4.8 PLANTING PALETTE PROSPECT PIER UPLANDS LANDSCAPE LIVE OAK SAVANNAH LIVE OAK, QUERCUS VIRGINIANA (80% OF UPLANDS FOREST) GUMBO LIMBO, BURSERA SIMARUBA (10% OF UPLANDS FOREST) RED SILK COTTON/KAPOK TREE, BOMBAX CEIBA (SELECT LOCATIONS) CABBAGE PALM, SABAL PALMETTO (10% OF UPLANDS FOREST) ENTRY PALMS PALM GROVE MEDJOOL PALM, PHOENIX DACTYLIFERA CABBAGE PALM, SABAL PALMETTO LIVE OAK SAVANNAH PALM GROVE ENTRY PALMS 38 39 PROSPECT PIER UPLANDS LANDSCAPE PRAIRIE GRASSES MUHLY GRASS, MUHLENBERGIA CAPILLARIS CORDGRASS, SPARTINA BAKERI WHITE FOUNTAIN GRASS, PENNISETUM PERENNIAL PEANUT, ARACHIS GLABRATA TURF 1 TURF 2 SEASHORE PASPALUM, PASPALUM VAGINATUM BAHIAGRASS, PASPALUM NOTATUM CRUSHED SHELLS PRAIRIE GRASSES TURF 1 TURF 2 CRUSHED SHELLS CRUSHED SHELLS 40 41 PROSPECT PIER MUHLY PYRAMID ROOF LANDSCAPE MUHLY GRASS, MUHLENBERGIA CAPILLARIS CORDGRASS CORDGRASS, SPARTINA BAKERI WHITE FOUNTAIN GRASS MUHLY GRASS CORDGRASS WHITE FOUNTAIN GRASS WHITE FOUNTAIN GRASS, PENNISETUM 42 43 4.9 THE PYRAMID PROSPECT PIER The new Prospect Pier will provide an active, iconic urban amenity for the city. Both a destination and a hub for innovation, the enlivened structure shall exceed the expectations while meeting the vision. A multi-modal pier with enhanced Uplands and water access will activate the body, while the Marine Discovery Center and various cuisines in the Pyramid will stimulate the mind and senses. 44 45 4.10 PUBLIC SPACES AND CIRCULATION PROSPECT PIER CANOPY THE JOURNEY CONTINUES By extending the roof of the original inverted pyramid form, Prospect Pier acts as a new canopy for the pier head. Prospect Pier provides additional shaded space to create comfortable areas for outdoor activities on the pier head in addition to increasing the size of the rooftop observation deck. The studies below illustrate the shadows cast at 9 AM, 12PM, and 4PM during the four seasons of the year. The masterplan for Prospect Pier creates a new urban narrative for St. Petersburg. As a culmination of this narrative, Prospect Pier redefines the relationship between the city and its waterfront. The current Pier and Pyramid does not allow a continuous path to experience the city, the bay and the sky. Prospect Pier, however, creates a new, grand public stair up to and through the core of the building thereby creating a fluid connection between the City, Uplands, Pier and Pyramid. This path finally terminates on an enlarged rooftop observation plaza that is oriented to focus views back to the starting point of one’s journey. More than just a beautiful building, Prospect Pier reaffirms the Pyramid as the symbol of a new St. Petersburg. FALL SUMMER WINTER SPRING UNITING CITY, SEA, AND SKY The Pyramid is framed by three new beautiful public places. As one approaches the Pyramid the pier widens into City Place. This square is the reception area for the Pyramid and the gathering point for activities within and around the building. This plaza relates back to the city to the west. Bayside Place is situated on the east side of the Pyramid. This plaza is dominated by terraced steps that descend down thereby highlighting the waters of Tampa Bay. It is a place for informal leisure activities such as family picnics, sunbathing, fishing and movies projected out over the bay. Above it all lays Prospect Terrace a stunning space of cascading levels simultaneously providing spectacular views of the waters of Tampa Bay, the burgeoning downtown skyline and Florida’s soaring skies. PROSPECT TERRACE OPEN NATURALLY VENTILATED SPACE BAYSIDE PLACE CITY PLACE 46 47 4.11 SECTION PROSPECT PIER OBSERVATION AREA PROSPECT TERRACE OBSERVATION AREA BAR EDUCATION WING OPEN AIR LOBBY RESTAURANT VIRTUAL AQUARIUM MARINE DIVERSITY CITY PLACE BAYSIDE PLACE OPEN AIR LOBBY RESTROOMS OPEN AIR LOWER LOBBY RESTROOMS 0 48 49 15 ft 30 ft PROSPECT PIER VIEW FROM THE SEA 50 51 4.12 PLANS PROSPECT PIER Bait store Electrical room Water reservoir + Water treatment plan City Place Open Air Lower Lobby Bike rental Bayside Place Snack Shack Storage Cafeteria INDOOR AREAS Common areas 2700 SQ. FT. Core 1200 SQ. FT. Retail 2800 SQ. FT. Mechanical 3200 SQ. FT. PIER HEAD Pier Head 51,200 SQ. FT. Fishing Platforms 9,400 SQ. FT. TOTAL PIER HEAD 60,600 SQ. FT. ACCESS TOTAL 1ST FLOOR 9,900 SQ. FT. Service Access (1st Floor) Lobby City Place Bayside Place Cafeteria (1st Floor) INDOOR AREAS Common areas 2700 SQ. FT. Core 1200 SQ. FT. LOBBY TOTAL 3,900 SQ. FT. 52 53 PROSPECT PIER VIEW TO THE OBSERVATION DECK 54 55 PROSPECT PIER Coast Office Space Marine Diversity Lobby Marine Introduction Discovery Center Institutions Shop AREAS Marine discovery Center 5940 SQ. FT. Common areas 1260 SQ. FT. Core 1200 SQ. FT. TOTAL 8,400 SQ. FT. Educational Programs Endemic species and native landscape Virtual aquarium Hologram and projection space SHOP Interactive area Auditorium AREAS Marine discovery Center 12050 SQ. FT. Common areas 1550 SQ. FT. Core 1200 SQ. FT. TOTAL 14,800 SQ. FT. Foyer MARINE DISCOVERY PROJECTION ROOM 56 57 PROSPECT PIER Banquet space (200 seats) Prospect Terrace Outdoor cafe (30 seats) Outdoor dinning (40 seats) Kitchen Bar Destination restaurant (100 seats) AREAS Destination restaurant & Banquet space 9230 SQ. FT. Common areas 10370 SQ. FT. Core 1200 SQ. FT. TOTAL 20,800 SQ. FT. OPEN AIR DINING Prospect Terrace AREAS Exterior Terrace 16600 SQ. FT. RESTAURANT 58 59 PROSPECT PIER VIEW TO THE CITY 60 61 PROSPECT PIER “Prospect Pier focuses on what we love best about St. Pete – our beautiful waterfront, our nourishing climate, our vibrant culture.” Tim Clemmons, AIA Executive Architect “The new Pier translates the historic site into a vibrant destination becoming an icon for the current and future populations of St. Pete and its visitors.” Fernando Romero, FAIA Design Architect “The Prospect is for the people of St. Petersburg - for education, entertainment and relaxation. It will bring the community closer together, growing the historic roots of the pier into a vibrant future.” Mark Johnson Landscape Architect 62 VIEW FROM OVER TAMPA BAY 63 4.13 ELEVATIONS PROSPECT PIER WEST ELEVATION EAST ELEVATION SOUTH ELEVATION NORTH ELEVATION 64 65 4.14 FACADE PROSPECT PIER MATERIALS FACADE ILLUMINATION Glass Fiber Reinforced Concrete Glass fiber reinforced concrete (GFRC) cladding is composed of a cement: sand (typically 1:1) matrix with 2-5% volume of glass fibers added. These fibers are a special Alkali Resistant Glass (ARG) to resist deterioration of the glass under exposure to the cement. Further resistance to damage is achieved with mineral and organic polymer additions. Typical Use: Cladding panels where high level of detailing and a minimum thickness is required. Used for small non-structural panels, and typically fixed onto a backing frame or regular substrate. Panels may be also formed with ribs molded in to allow self-spanning behavior. Manufacture: GRC panels can be manufactured in two ways: - Spraying - which allows higher fiber content and makes thin sections. - Casting - remix with max fiber content 3.5% and cast as for concrete. 1 Moldable and non-flat panels can be made; repetition in formwork molds essential for economic reasons. We will look to recent developments in concrete formwork to devise a strategy with the contractor. 2 GLAZING SYSTEM Operable Windows for easy cleaning from interior EXISTING STRUCTURE Durability: As there is no steel reinforcement present, GFRC panels have proved corrosion resistance in a marine environment. GFRC products have low water, water vapor and air permeability, providing a durability against abrasion, chemical attack, corrosion and ultra-violet radiation. They are also non-combustible. 3 FACADE LIGHTING PYRAMID GENERAL ILLUMINATION FACADE ASSEMBLY 1 4 STEP LIGHTS FOR LOW LEVEL WALKWAY LIGHTING GFRC LOUVERS Glass Fiber Reinforced Concrete offers great durability and low maintenance requirements GLAZING SYSTEM 3’-2” Operable Windows for easy cleaning from interior 5 2 EXISTING COLUMNS Frame new Windows METAL BRACKETS 1’-4” EXISTING STRUCTURE 1’-4” continuous linear LED Opt. 1: Ketra G2 color tunable (interior location) Opt 2: LedLinear Dynamic White or equal (exterior location) 25mm continuous flangeless linear white LED (HESS LEDIA LL) glazing concrete louver 3 4 5 EXISTING COLUMNS seating / step VIEWS THROUGH FACADE Frame new Windows GFRC LOUVERS Glass Fiber Reinforced Concrete offers great durability and low maintenance requirements METAL BRACKETS Energy Star hurricane-impact aluminum curtain wall system with doubleinsulated low-E glazing, operable windows for easy cleaning from inside 66 THE HORIZONTAL LOUVERS OFFER UNINTERRUPTED VIEWS WHILE PROTECTING THE AIRCONDITIONED SPACES FROM DIRECT SUN EXPOSURE 67 4.15 SUSTAINABILITY CONCEPTS PROSPECT PIER LEED CERTIFICATION The goal desired for this project is to achieve LEED Gold rating under the LEED-Major Renovations v2009. This project can also achieve Platinum Certification. Conditioning Zone Highly Conditioned Moderately Conditioned ASHRAE 55 Adaptative Comfort Unconditioned High Albedo Roof Vegetated roof with high albedo materials reflects sunlight and keeps building cooler Optional Solar Photovoltaics on Roof Solar panels generate electricity for the building will providing shading and keeping occupants cooler, and provide electricity for the building lighting on facades Reusing Structure Avoid sending large volumes of waste to landfill and consuming new materials LED Lighting Efficient LED light fixtures shall be used to further conserve energy and limit contribution to landfill due to the long life of the lamps Natural Ventilation Utilize adaptive comfort in flex spaces to reduce HVAC loads Low-Flow Fixtures Reduce water usage and discharge Mixed Mode Use HVAC systems only when necessary, and allow opening of windows and auto-system shutoff during optimal conditions Battery Rainwater Harvesting Water flowing from the roof will be directed into a tank within the building where it will be treated and re-used as non-potable water Optional Heat Rejection to Bay Provides more efficient cooling mechanism and eliminates cooling towers on roof 68 69 4.16 STRUCTURE RE-USE PROSPECT PIER STRUCTURAL DRAWINGS 1 2 STRUCTURAL AXONOMETRIC DIAGRAM 3 4 5 6 6 LEVEL 7 1 TH 8 2 9 3 10 4 11 5 12 6 7 1 8 9 10 11 NEW BEAMS SPAN DIRECTLY BETWEEN THE CORE AND PERIMETER IN ORDER TO 1 LOAD ONTO AVOID ADDING NEW NEW BEAMS SPAN DIRECTLY BETWEEN EXISTING INTERIOR FRAMING 12 NEW STRUCTURE 5TH LEVEL THE CORE AND PERIMETER IN ORDER TO AVOID ADDING NEW LOAD ONTO2 EXISTING INTERIOR FRAMING NEW PERIMETER COLUMNS 6TH LEVEL 4TH LEVEL 3RD LEVEL 2ND LEVEL 5TH LEVEL REINFORCED STRUCTURE 4TH LEVEL EXISTING STRUCTURE 3RD LEVEL TRANSFER2THE LOAD TO THE EXISTING PERIMETER COLUMNS NEW PERIMETER COLUMNS REINFORCED STRUCTURE TRANSFER THE LOAD TO THE EXISTING PERIMETER COLUMNS EXISTING STRUCTURE PIER LEVEL 2ND LEVEL NEW STRUCTURE PIER LEVEL MEAN SEA LEVEL MEAN SEA LEVEL SEA BED SEA BED SECTION SECTION 1 2 3 4 5 6 7 1 A 8 2 9 3 10 4 11 5 12 6 7 8 9 10 11 12 A B B C C D D E E F F G G H H I I J J 3 K K L L M EXISTING PERIMETER SLOPING COLUMNS GET REINFORCED FOR THESLOPING ADDED ROOF LOAD EXISTING PERIMETER 3 COLUMNS GET REINFORCED FOR THE ADDED ROOF LOAD M PLAN PLAN THE MAJORITY OF THE STRUCTURE IS REUSED FROM THE CURRENT BUILDING THE MAJORITY OF THE STRUCTURE IS REUSED FROM THE CURRENT BUILDING 70 71 4.17 LIGHTING PROSPECT PIER CONNECTING CITY TO PYRAMID custom street lighting element DEFINITION path lights AMBIENT tree uplights for soft glow and sparkle LOW LEVEL rail lights, shade uplighting, + bench underlighting for unobstructed views of water BEACON glow from pyramid as focal point for pier 2ND AVE. CONNECTING CITY TO PYRAMID Custom street lighting post to reflect the angles of the pyramid 2ND AVE. SECTION PIER city museums 2nd ave. park approach pier pyramid LOW LIGHT LEVEL water’s edge MED. LIGHT LEVEL emergency vehicles LOW LIGHT LEVEL water’s edge THE PARK AND APPROACH Integrated shade + bench lighting TREE UP LIGHTS FOR GLOW IN FOREST & SPARKLE ON BEACH Rail lights for low level walkway lighting unobstructed views PIER SECTION PATH LIGHT FOR GUIDING PEDESTRIANS HIGH MAST POLES FOR EVENTS Linear LED for underbench lighting water PIER PLAN 72 73 PROSPECT PIER NIGHT VIEW 74 75 5. Construction Technologies PROSPECT PIER 5.1 STRUCTURE COMPOSITE CONCRETE PLANCKS ON SLEEPERS FOR DRAINAGE 5 18” DEEP PRECAST CONCRETE DOUBLE TEE FDOT 18 WITH 20 STRANDS, 8’WIDE MODULES 4 COMPOSITE ELASTOMERIC BEARING PADS 32’-0” 3 0 128’-0” 64’-0” PILING PLAN 2 36” DEEP X 30” WIDE CAST IN PLACE CONCRETE PIER CAP 1 30” DIAMETER CONCRETE DRILLED PIE WITH 3/4” THCK STEEL CASING, 70’ LONG WITH 5’ ROCK SOCKET FOUNDATIONS The existing structure uses steel H-pile foundations to transfer its gravity and lateral loads to the ground and the new scheme aims to reuse the existing foundations. The higher building height and increased width increase the projected area of the building exposed to the wind and consequently increase the load demands on the foundations. While, current estimates show that the perimeter piles may be overstressed by as much as 35 percent under certain wind events, we anticipate that a detailed review of existing construction data could demonstrate that the piles have adequate capacity. This review would include a review of existing pile load tests, pile driving records and pile hammer information as well as a corrosion assessment and wave equation analyses of the piles using actual driving data. In the event that such investigation does not justify sufficient capacity, the retrofit strategy would be to connect the existing caissons to the new pier head piles via grade beams. Depending on the results of the corrosion assessment, corrosion protection measures such as cathodic protection may be required. 76 BRIDGE The existing pier is the most typical way to construct piers and the structure selection is driven by two reasons. The short spans and driven piles allow for leap-frog construction avoiding marine equipment. Leap frog construction is when the next span is constructed from a crane sitting on a previously constructed span (even small piles as the ones put forward can be driven off the bridge if design correctly). The integral detailing (beams on the same level as pier caps with piles or pier caps acting as shelves) allow for a durable solution in the abrasive marine environment while accommodating easy construction of laying light beams down first and then casting concrete pockets after to make composite. The solution was further refined to allow for drilled shafts which reduce the noise during construction. The shafts are more expensive to construct as they require marine equipment, but their higher capacity reduce the foundation footprint by 45% (making them a great environmental option) and make them cost competitive with the driven piles. The framing of both drilled and driven shaft solutions (20ft/40ft) spans allows to completely avoid existing (20ft spacing) foundation footprint. This is desirable for many reason – it’s better to put foundation in undisturbed soil, and this will allow construction flexibility depending on the solution for removing piles or leaving in place but cut off. The longer spans of 40ft which are most optimal for drilled shafts are starting to fall outside the leap frog construction, but the marine equipment already in place to drill the shafts can be engaged to lay down the superstructure. The longer spans of the drilled shaft solution make it competitive to introduce pre-stress beams solution which is a great off the shelf solution but more targeted toward 30ft+ span lengths. Lastly, the easiest construction method is that using FDOT standard detail of pier cap below the beams which sit on bearings. The client has asked us to pursue this option. While recognizing this will facilitate construction, this may pose durability challenges in the future. An entire width of the bridge must be lifted between expansion joints (locations to be determined) with marine equipment. However, noting that this is a very low traffic bridge bearing replacement may not be required for 50-70 years. The choice of this option will have no impact on the elevation of the bridge, as the 2ft clearance is above beams and not on the transverse pier cap element. 77 PROSPECT PIER INCREASED LOAD IN STRUCTURAL CORES PYRAMID SUPERSTRUCTURE The main ambition of the structural scheme for the proposed building structure is to enable the architectural vision with the least intervention to the existing structure as possible. Based on current engineering reports provided by the city the existing super structure appears to be in good condition and capable of sustaining current building code loads. The existing load path provided in the building directs all gravity loads from the concrete slabs to the existing floor beams which in turn transfer it to the interior columns, which lead it to the exterior sloping columns and then compile it all in the elevator cores at Level 2. (See Figure 1) This load path manages to maintain most of the gravity load in either the perimeter sloping columns or the elevator cores and then congregates all of the gravity load into the concrete cores at Level 2 which then lead it to the core foundations and into the ground. Our aim is to respect this force flow and redirect any new gravity load to the elevator cores and perimeter columns. This will avoid any interface with the existing interior columns and avoid reinforcement of interior building elements, keeping any reinforcement work to the perimeter of the building. This will be accomplished by using long span floor trusses which span the whole way between the building cores and perimeter columns. Below is a diagram illustrating this as well as one illustrating the increase in load in the perimeter columns and concrete cores. (See Figure 2 & 4) INCREASED LOADS IN SLOPED COLUMN EXISTING GRAVITY SYSTEM LOAD PATH FIGURE 1 AXIAL LOADS IN STRUCTURE UNDER GRAVITY IN PROPOSED CONDITION FIGURE 4 NEWLY ADDED PROGRAMING LOAD PATH FOR NEWLY ADDED AREA ONTO EXISTING STRUCTURE There are multiple ways to reinforce the existing perimeter columns for the newly added gravity loads and we can use any of them based on what the construction team deems most viable. We have suggested one concept option below which keeps the reinforcement on the exterior side of the columns and does not involve any local demolition of the concrete encasement of the columns. (See Figure 3) DESIGN GRAVITY LOADS IN EXISTING STRUCTURE FIGURE 2 FOUR INDEPENDENT CORES RESIST THE LATERAL LOADING IN FLEXURE AND SHEAR LARGER PROJECTED AREA INCREASES SIGNIFICANTLY THE LARGER PROJECTED AREAWIND INCREASES THE LOAD ONSIGNIFICANTLY THE BUILDING WIND LOAD ON THE BUILDING FOUR INDEPENDENT FOUR INDEPENDENT CORES THE CORES RESISTRESIST THE LATERAL LOADING IN LATERAL LOADING IN FLEXURE AND SHEAR FLEXURE AND SHEAR LOAD PATH NEWLY LOAD PATH FORFOR NEWLY ADDED ADDED PROJECTED AREA PROJECTED AREA ONTO EXISTING ONTO EXISTING STRUCTURE STRUCTURE EXISTING LATERAL SYSTEM LOAD PATH FIGURE 5 UNCONSERVATIVE ANALYSIS OF THE CORE CAPACITY Besides any gravitational loads, the building is also exposed to significant wind loading. All of this load is confronted first by the façade, which then distributes it to the concrete diaphragms, which then release it as shear to the four concrete cores. All concrete cores act in parallel to resist this loading and transfer it as shear and bending to the core foundations below. (See Figure 5) EXISTING CONCRETE ENCASEMENT FOR FIREPROOFING CONSERVATIVE ANALYSIS OF THE CORE CAPACITY EXISTING CONCRETE ENCASEMENT FOR FIREPROOFING The new scheme for the building supports the lateral loads in much the same way. However, since the projected elevation area of the building has increased the total wind load to which the building is exposed is considerably higher. The higher load as well as its higher elevation of application increase the shear and moment demands on the concrete cores. In order to verify that the existing cores will be able to sustain the new loads, we performed a section analysis of the cores for the new axial and moment demands. (See Figure 6) 78 NEW COLUMN STEEL PLATE REINFORCEMENT EXISTING PERIMETER DIAGONAL COLUMNS FIGURE 3 FIGURE 6 79 5.2 SUSTAINABILITY PROSPECT PIER The redevelopment of St Petersburg Pier provides a great opportunity to integrate sustainability holistically in the pier and its buildings as a public project. Its relative isolation at the end of the pier makes sustainability a key imperative as utilities need to be transported further and are exposed to the harsh maritime climate. Using adaptive comfort criteria for the St Petersburg Pier, some spaces can use outside air with little to no mechanical heating or cooling for about 40% of the year. There are certain areas within the St. Petersburg Pier building where comfort conditions can be relaxed due to the activities that will be carried in this spaces. By reusing the building and much of the pier we are already making a significant impact by not sending large volumes of waste to landfill and consuming new materials. Dehumidification of outside air will be required for some spaces. The heating required for the spaces during the coldest part of the year will help bring Relative humidity levels back inside the limits – meaning less specialized air conditioning will be required. Using outside air for free cooling may be a viable option during some hours of the year. Our design also works with the climate to take advantage of the constant winds to provide cooling without less mechanical energy in various spaces. Working with the buildings unique inverted pyramid design we provide shading to facades to reduce heating loads while maximizing the roof area for power generation from photovoltaics. The redevelopment of the pier also provides a potential opportunity to incorporate heat rejecting (for cooling) into the bay which will reduce our energy use further. We will also capture water for reuse within the building. Sustainability has also been incorporated into the wider development with the introduction of public transport facilities including electric buses and bike facilities. More green spaces will also private greater public amenity as well as shelter and cooling effect for visitors. 1.2 HVAC STRATEGY The building will be served by a modular air cooled chiller system, providing 150tons (5-duty modules) of 44°F chilled water through duty-standby 300gpm variable primary pumps. These chillers will be located on the roof of the building, and can be concealed by vegetation. Normally, the vertical discharge of the condensing fans cannot be obstructed. However, these is also an option to use heat rejection to the bay instead (see next section). Building heating will be through a single natural gas fired 750mbh condensing boiler, which must be located in a rated enclosure. Interior conditioning will be through two modular VAV indoor air handling units with airside economizer. A 20,000cfm unit will serve the restaurant, and a 22,000cfm unit will serve the remainder of the spaces. Cooling will be through chilled water coils. Heating will be through hot water preheat coils in the AHUs and heating coils in the VAV boxes. 1 ENERGY Energy consumption is a critical part of any sustainability strategy for a building. Our focus here has been to work with the climate to reduce energy consumption then produce power with renewable sources. Space conditioning will be through VAV terminal boxes to serve the separate zones. Each VAV box will be provided with a temperature sensor. A central building automation system (BAS) will control all components of the HVAC system. 1.1 ADAPTIVE COMFORT For over 50 years public buildings HVAC systems have been designed around the principal of: “Keep everything at approximately 21oC and 55% Relative Humidity (RH).” VAV / CAV OCCUPANT COMFORT FREE COOLING POSSIBLE COOLING UP TO 120 W/M2 LARGE FAN ENERGY LOADS These targets work well because they: • • Are comfortable for occupants Provide safe conditions for practically every activity However, meeting these set points typically: • • • Requires costly HVAC systems Consume relatively large quantities of energy working overtime to stay within the tight design limits (± 1-2oC for the temperature and ±5% for RH) Where possible, spaces should be designed to achieve an Adaptive Comfort standard, which accounts for seasonal variation in naturally ventilated buildings All AHU cooling coils and chiller condenser coils shall be copper-copper or be copper-aluminum with Electrofin coating. ECONOMIC VIABILITY UNOBTRUSIVE The initial loads are based on the following: • • • • Net conditioned area: 32,800sf Well insulated façade All wall surfaces in the naturally ventilated circulation zone are insulated like exterior walls No more than 40% glazing area 1.3 HEAT REJECTION TO THE BAY ENERGY EFFICIENT 80 The location of the St. Petersburg Pier on the water allows for the use of water source cooling/heating. The water temperature of the bay will not be generally cold enough to provide direct (free) cooling. However, they may offer a lower energy alternative to air-side heat rejection due to the lower temperature and higher specific heat capacity. Systems may be open-loop (where water is extracted directly and pumped through heat exchangers) or closed loop (where a pipework loop is installed on the bed water body). With salt water systems, closed loop is preferable to alleviate corrosion concerns. The redevelopment of the pier columns provides an integrated (low cost) way to reject heat to the bay. 81 PROSPECT PIER 1.4 SHADING ANALYSIS Overheating occurs throughout the year as a result of the transformation of radiant energy emitted by the sun into thermal energy passing into a building space. The St. Petersburg Pier building shape is already optimal as the building self-shades throughout the year. The following figures show the shading projection on an average summer and winter day. Despite reducing the heat gains due to radiation, a high-performance envelope will still be incorporated where the building is enclosed to reducing the energy consumption. Given the high amount of roof area and strength of solar radiation, a cool roof (highly-reflective roof) or potentially green roof system is an easy and effective strategy to mitigate solar gains. 1.5 ROOFTOP SOLAR Solar photovoltaics on the roof will provide a canopy, shading occupants in some areas. Approximately 8,000 – 10,000 ft2 of PV will provide approximately 180,000 kWh/yr in electricity for the building. This equates to approximately 25% of the building’s energy load. The system will still be grid connected but the PV system will reduce operational cost and potentially generate income through net metering. The array will face South and be tilted at least 5° to allow water to drain from the panels. CUMULATIVE SHADING – SUMMER CUMULATIVE SHADING – WINTER 82 Providing insulation, and thereby reducing the U-value (conductance) of key building envelope components (roof and wall, specifically) will also reduce cooling loads. The following figures show the percentage of hours each surface is shaded on an average summer and winter day and show the effectives of keeping the inverted pyramid design. SOUTH – WEST FACADES SHADING - SUMMER NORTH – EAST FACADES SHADING - SUMMER 83 PROSPECT PIER 3 OTHER SUSTAINABILITY STRATEGIES The glare effects from water should not be a concern. Water typically reflects 20% of solar load as it tends to scatter the light. In terms of glare, water does increase glare but it can be a pleasant effect. Its distance from the water will also reduce this effect. The following figures show the percentage of hours the outdoor sloped areas are shaded on an average summer and winter day. 3.1 MATERIALS Materials can have a major impact on sustainability in the way that they are sourced. The extraction and processing of materials into useful forms, delivery to projects and installation are energy intensive processes. In fact, the construction sector consumes 40% of all extracted materials. Whether a material is part of a the façade, landscape, bridge, building structure or machinery, a philosophy of considering the life cycle of the material and also the contribution of its deployment to the total design can be adopted. Refurbishment offers an excellent opportunity to generate a supply of materials suitable for reuse in either that particular refurbishment or during the construction or refurbishment of other structures. These include large energy and carbon savings that would otherwise be accumulated during the life-cycle of new materials; including extraction, transportation, refining and production of these materials. Other benefits include a diversion of waste from landfill and the potential for revenue generation and cost savings. By reusing the building and much of the pier we are already making a significant impact by not sending large volumes of waste to landfill and consuming new materials. Based on previous experience, projects can potentially achieve Embodied Carbon savings up to 25%. Our design also works with the climate to take advantage of the constant winds to provide cooling without less mechanical energy in various spaces. Working with the buildings unique inverted pyramid design we provide shading to facades to reduce heating loads while maximizing the roof area for power generation from photovoltaics. The redevelopment of the pier also provides a potential opportunity to incorporate heat rejecting (for cooling) into the bay which will reduce our energy use further. We will also capture water for reuse within the building. SOUTH AND WEST SLOPES SHADING - SUMMER NORTH AND EAST SLOPES SHADING - SUMMER TRANSPORTATION AND ACTIVATING THE PIER Sustainability has also been incorporated into the wider development with the introduction of public transport facilities including electric buses and bike facilities. More green spaces will also private greater public amenity as well as shelter and cooling effect for visitors. By activating the spaces along the pier and providing shelter this will encourage walking and biking providing health benefits to users. 2 WATER STRATEGY 4 LEED CERTIFICATION STRATEGY The Pier water strategy is focused on reducing potable water used in the building and capturing run-off and rainwater for irrigation and other non-potable uses. 4.1 INTRODUCTION Water consumption in the building will be reduced at least 20% from a base design scenario by integrating low flow fixtures and incorporating metering and sub-metering to determine the amount of water required by a specific use, building tenant or central use. LEEDTM, or Leadership in Energy and Environmental Design, is an internationally-recognized green building certification system. Developed by the U.S. Green Building Council (USGBC), LEED is a matrix based rating system targeted at building level sustainable assessment. Projects are scored against a set of standard credits and the sum of points determines the level of certification (Certified, Silver, Gold, and Platinum). Rainwater from the roof will be collected and used for non-potable uses such as toilet flushing, irrigation and maintenance. The rainwater tank will be located at the bottom of the structure. LEED provides building owners and operators with a framework to identify and implement practical and measurable green building design, construction, operations and maintenance strategies. The project shall include a comprehensive, integrated hydrology strategy to reduce runoff and the burden on the municipal system. The design will include green infrastructure systems such as bioswales, rain gardens, permeable pavements and green roofs that contribute to runoff reduction. These are intended to ensure that both the waters discharged from the system meet water quality requirements, while attenuating the peak flows associated with large storm events. 84 85 PROSPECT PIER 5.1 LEED MANDATORY REQUIREMENTS In addition to providing strategies for achieving a green building, LEED certification can also be used as a marketing tool, since the project will acquire advantage over competitors and third-party validation of its sustainable accomplishments. The LEED rating system establishes several mandatory requirements that must be met and accepted by the city of St. Petersburg in order to be eligible for any level of certification: LEED promotes best practices in: • • • • Water and energy efficiency Sustainable land use Responsible materials selection Improved indoor environmental quality And can be used as: • • A framework for assessing design options early in the design process, and A rating system for final building certification. Since LEED is a performance based set of criteria, there are numerous design strategy options that will meet the LEED requirements. This design guideline for St. Petersburg Pier, will use the LEED criteria to track design strategy as a decision making tool to keep the project on the sustainable design track. After considering different options for the LEED certification process for this project, we reached the conclusion that LEED- Major Renovation is best suited for the project. As per the LEED Reference guide, a major renovation involves major HVAC renovation, significant envelope modifications, and major interior rehabilitation. St. Petersburg Pier upgrade will maintain the existing structure but the façade will be dismounted, and replaced with a high energy performance envelope, as well as all of the systems and interiors of the building. This design guideline will contain all the specific requirements for the design and construction teams to develop a building that can achieve the desired level of certification following the standard certification process: The goal desired for this project is to achieve LEED Gold rating under the LEED-Major Renovations v2009. The goal desired for this project is to achievee LEED Golld rating undder the LEED D-Major Renovatiions v2009. 5 LEED INITIAL ASSESSMENT 5 ARUP’s detailed assessment reviews individual compliance of each LEED credit and pre-requisite and it is based on information This deta ailed initial assessment a credit requirements reviews indiv vidual comp liancestatus of eacchand LEED creedit and pre-currently available. The following sections outline and their current intent. requisite and it is bassed on inform mation curreently available. The folloowing sections outline crredit ments and the eir current sta atussection, and inteent. requirem Based on the credits classification indicated in the following the results of the assessment indicate that Prospect Pier would attain the following score: Based on n the credits classification indicated in i the follow wing section,, the results of the assessmeent indicate that t the curreent design would w attain tthe followinng score: Po oints Yes 60 Maybe 29 Not a target 21 Total po ossible crediits 110 1 86 Project Status The project building must comply with environmental laws St. Petersburg Pier will comply with all local, regional and national legislation during both design construction phases. The project must be a complete, permanent building or space The project is a complete building. The building must use a reasonable project boundary The LEED boundary comprises the entire the site area it is owned by a single property. The project must comply with minimum floor area requirements (1,000 square feet) gfa. The building exceeds the minimum required area The project must comply with minimum occupancy rate The occupancy exceed the minimum occupancy rate of 1 occupant The owner must commit to sharing whole-building energy and water usage data The owner must submit the agreement at the time of project registration The project must comply with a minimum building area to site area ratio The building area to site ratio exceeds the minimum 2% defined by LEED 5.2 LEED CREDITS 5.2 LEED Credits Each individual credit has been assessed in this section for each LEED category. Each individual credit has been assessed in this section for each LEED category. The individual credit intent, the compliance requirements, the potential and assigned score, credit status and action plan are The individual credit intent, the compliance requirements, the potential and assigned score, credit included in each credit assessment. LEED D Initiall assessm ment LEED v2 2009 Minimum Program Requirements status and action plan are included in each credit assessment. Credits have beenCredits categorized according as follows: have been categorized according as follows: Yes:achieved credits already achieved with the current designwe or believe credits we believe the Yes: Credits already with the current design or credits that, giventhat, the given characteristics and nature of the characteristics and nature of the project, should be achieved (These credits will require the project, should be achieved (These credits will require the design team and contractor to provide supporting documentation to design team andthe contractor to provide supporting documentation to demonstrate compliance demonstrate compliance during certification process). during the certification process). Maybe: credits which require more to be feasibility Maybe: Credits which require more information to beinformation assessed or its assessed feasibilityorisitsstill unclear.is still unclear. LEED Certificattion 40-49 LEED Sillver 50-59 LEED Goold 60-79 LEED Plaatinum 80-110 Not a target: Credits that are not feasible to be implemented due to site and/or building design characteristics. 87 PROSPECT PIER LEED CHECKLIST PROSPECT PIER 88 89 6. Permitting and Operations PROSPECT PIER 6.1 PERMIT COMPLIANCE WITH FEDERAL, SWFWMD AND PINELLAS COUNTY The FR-EE team will address the design of Prospect Pier for compliance with the demolition permit application currently under review by the U.S. Army Corps of Engineers (USACE), the existing construction permit obtained from the Southwest Florida Water Management District (SWFWMD), and the permitting requirements by the Pinellas County Water and Navigation Code. The placement of pier demolition material will require a dredge and fill permit from the USACE as concrete rubble is considered fill. The project team will prepare a Section 10 of the Rivers and Harbors Act of 1899 permit application for the placement of the demolition material. The application accurately and thoroughly will present the project approach, the function and values of the unconsolidated bottom, and the benefits provided by the viable substrate. The assessment will include detailed documentation of the existing seagrass beds and a thorough discussion of the various project elements and the avoidance of impacts from construction activities and final configuration of Prospect Pier. Our biologists have extensive experience with the permitting of artificial reefs, concrete breakwaters, fishing piers, and bridges. The SWFWMD permit issued was based on the previous pier design and included 0.03 acres of seagrass impacts. Prospect Pier does not include any seagrass impacts. As a result, a permit modification will be submitted to document the reduction in impacts. It is anticipated the demolition of the existing pier approaches will be in compliance with the existing SWFWMD permit. Additionally, the surface water management system proposed by the project team is consistent with the existing SWFWMD permit and will still qualify for the waiver for certification of compliance with state water quality standards under Section 401 of the Clean Water Act, 33 U.S.C. 1341. Pinellas County Commercial and Multi-use Dock permit applications will be prepared for the wet slips and a Pinellas County Water and Navigation Dredge and Fill permit application will be prepared for the pier and the disposal of the concrete demolition material. FR-EE’s project team will assess the option of placing the clean concrete substructure and decking for ecological restoration at a site just north of the Pier and adjacent to North Shore Park. The area shown in the figure on the opposite page is approximately 92,000 square feet. A report presented in 2005 assessed the ecological values of selected dredge holes in Tampa Bay. The report concluded that the location identified as North Shore was described as the “most degraded biologically”. According to the report, the site is generally 12 feet deep. The placement of material will provide viable artificial reef habitat. Benthic surveys will be performed by qualified biologists to assure additional seagrass areas have not become established since the July 19, 2012 survey. This effort will avoid unexpected permit compliance issues during construction. Clear construction documents will be prepared to provide specific approaches for Skanska for the avoidance of impacts to adjacent seagrasses, including secondary impacts from activities such as dewatering, pile driving, barge and other water craft staging and access. NORTH SHORE 90 91 6.2 BUILDING, FIRE, AND ZONING OFFICIAL INFORMATION PROSPECT PIER SERVICE AND EMERGENCY VEHICLES CONSTRUCTION TYPE Emergency and service vehicles will utilize the 24 foot wide center lane of the new pier in order to access the renovated building. A public plaza on the west side of the building doubles as a cul-de-sac for emergency and service vehicles and accommodates vehicles requiring a 90 foot diameter turning radius. Temporary parking in the plaza will be allowed by service vehicles during limited morning hours. The new main entry to the facility has been elevated to the existing second floor via terraced steps surrounding the building. The north portion of the first floor will be a service area with a loading dock and trash room, both having easy access to the service elevator. Type 1B, fully sprinklered OCCUPANCY GROUPS A2 and A3 PROPOSED FINISH FLOOR ELEVATION To service the new Event Lawn at the southeast corner of the Uplands, a new parking and service lot is proposed west of the Event Lawn. This lot will accommodate approximately 40 cars and 4 semi-trailer trucks or buses. This lot is not generally open to the public but is intended for supporting the staging of a variety of different events and activities. 13.25 (NAVD 88). The lowest horizontal structural member is at elevation 10.71. Because this is a Category III building (as defined by ASCE 24-05) the lowest horizontal structural member is required to be at 9.74 (base flood elevation of 7.74 + 2.00). TRANSPORTATION REQUIREMENTS OCCUPANT LOAD Two main goals underlie our scheme’s approach to transportation issues for the new pier. First, we are favoring pedestrians and bicycles over automobiles while still providing for reasonable accommodation for private vehicles. Second, it is critical that the St. Petersburg Pier be better integrated into the downtown experience. 1st Floor: 90 2nd Floor: 0 3rd Floor: 110 4th Floor: 320 5th Floor: 600 Towards the first goal the Pelican lot is being converted to parkland and private vehicles will not be allowed on the new pier. A trolley stop is located at the east end of the Dolphin lot and there will be a drop-off zone immediately adjacent to the trolley stop. 72 feet above the pier deck The new pier will be 45 feet wide and designed in a manner that seamlessly allows for pedestrians to have full access to the bridge. Vehicles will be limited to the central 24 feet. The central area will function as a woonerf shared between trolleys, bicycles and pedestrians. Service vehicles will be limited to morning hours and of course emergency vehicles will have access as needed. The north and south zones of the pier will be limited to pedestrians. Between the center zone and the pedestrian zones will be an alternating series of heavy duty seating and shade structures to separate the vehicles and also allow the outer guardrail to be lightweight and transparent. Lastly the entire surface of the pier will be topped with a composite concrete deck installed at the same level to again allow easy access for pedestrians. PARKING REQUIREMENTS In addition to free trolleys running between the Uplands and Prospect Pier, we envision that premium smaller shuttles could operate at select times (i.e. Friday and Saturday evenings) and during special events (i.e. weddings, black tie dinners) for a fee. The renovated building has a total of 47,400 square feet of interior space and 27,000 square feet of outdoor terrace (not including the pier and pier head). At one space per 500 square feet, the building will require 149 parking spaces including 5 handicap accessible spaces. The existing Dolphin parking lot on the Uplands has 312 spaces thereby meeting the minimum parking requirements. The Dolphin lot also has several parking spaces for large vehicles such as school buses. The Pelican parking lot has been eliminated in favor of a new 5-acre park. Parking on the pier has also been eliminated. In order to better integrate the Pier into downtown, we propose that the trolley route be extended to include Beach Drive, Sundial and the Sundial parking garage. Individually these are each local and metropolitan attractions; together they become regional or even national in scope. A park-once philosophy should be applied that encourages visitors to one location in downtown to visit others. To achieve this goal a free trolley running at 10 to 12 minute intervals needs to provide easy access from one attraction to the next. Total: 1,120 BUILDING HEIGHT In the long term the goal is to better utilize St. Petersburg’s assets both public and private. For too long too much of the Uplands has been dedicated to asphalt and too little for beautiful, functional parkland. 92 93 64’-0” 0 6.3 ENVIRONMENTAL PERMITTING ASPECTS 32’-0” 96’-0” PROSPECT PIER COMPARISON OF EXISTING PIER FOOTPRINT TO PROPOSED AREA OF EXISTING SEAGRASS IMPACTED BY NEW PIER The footprint for the proposed pier and pier head is 108,600 square feet which is less than half the size of the existing footprint of 226,000 square feet thus providing a design that is consistent with the existing SWFWMD permit. The proposed design will not impact any seagrass beds. The construction documents will provide specific performance criteria for the construction of the new pier to assure impacts do not occur in the adjacent seagrass beds. Specific criteria will include detailed water quality monitoring to document the contractor’s successes during construction as well as seagrass surveys immediately prior to construction and immediately after construction. 32’-0” ROOF AREA OF STRUCTURES ABOVE PIER DECK LEVEL Existing Pier + Pier Head + Fishing Pier 226,000 SQ.FT. 0 128’-0” 64’-0” The proposed roof area of the renovated pyramid will be 35,800 square feet. Proposed Pier + Pier Head + Fishing Pier 111,500 SQ.FT. EAST ELEVATION 9,650 SQ.FT. Existing Pier Head Proposed Pier Head Existing Pier Existing Pier + Pier Head + Fishing Pier 226,000 SQ.FT. ProposedPier Pier+ Pier Head + Fishing Pier 111,500 SQ.FT. Proposed 100’ 45’ Existing Pier Head Proposed Pier NORTH ELEVATION Proposed Pier Head Existing Pier 8,620 SQ.FT. 100’ 45’ 64’-0” 0 32’-0” 96’-0” APPROXIMATE NUMBER OF PILES IN NEW PIER CHANGES TO FISHING ELEVATION AND EXTENT OF FISHING AREAS The selected structural system will greatly reduce the number of piles from approximately 1,500 under the existing pier to 125 in the proposed design. The new piles are placed in rows with 40 foot spans in comparison to the existing piles which have 20 foot spans. The new rows are offset 10 feet from the existing so that there will be no conflict with installing the new piles. None of the existing piles are proposed to be re-used. Generously sized fishing areas have been distributed around the pier head. We are proposing three fishing docks totaling 340 linear feet and 3,700 square feet. The fishing docks are 6 feet lower than the pier head at an elevation of 7’-4” above mean sea level. A bait shop has been located within the first floor of the Pyramid and has direct access to the pier head. Fish cleaning tables are proposed to be located on both the southwest and northwest fishing docks. In addition several fishing stations have been located on the Uplands and along the length of the pier. 64’-0” 0 32’-0” 32’-0” 0 94 128’-0” 64’-0” 32’-0” 0 96’-0” 128’-0” 64’-0” 95 6.4 UTILITY SYSTEMS PROSPECT PIER PROJECTED AREAS OF BUILDINGS/STRUCTURES ABOVE PIER THE PIER CIVIL SITE NARRATIVE The only proposed structure above the pier is the main pyramid building and the stepped terraces leading up to the second floor. The railing to the new pier will be made of stainless steel posts and cables, so is not counted towards these calculations. The proposed projected area of the east and west elevation is 9,650 square feet as compared to the existing projected area of 9,680 square feet. The proposed projected area of the north and south elevation is 8,620 square feet as compared to the existing projected area of 17,124 square feet. For the re-development of the proposed project area, it will be necessary to make connections to the City’s water distribution system and wastewater collection system. The availability and location for each of these systems are discussed below. WATER DISTRIBUTION SYSTEM There are two water lines located within the ROW of Second Avenue NE. An eight (8) inch water line is located on the south side and a six (6) inch water line is located on the north side of the road. See following Atlas Sheet from the City. These lines are looped (interconnected) and will have adequate flow to provide both potable water as well as fire flow to the pier building and surrounding areas. No water line extension or upgrades would be needed for this project. Additional fire hydrants may be needed to provide adequate coverage of the new land side areas. WASTEWATER COLLECTION SYSTEM EAST ELEVATION 9,650 SQ.FT. A 10 inch VCP wastewater collection pipe is located along the centerline of Second Avenue NE. See the attached Atlas Sheets from the City. This sewer line has adequate capacity to accept flows from the proposed project. The VCP material is usually indicative of an older system, so it would be expected that this line may need to be lined or replaced due to its age and condition. The force main from the current lift station at the pier is connected to the east end of this wastewater collection system. RECLAIMED WATER A four (4) inch reclaimed water line is located along the north side of Second Avenue NE. This line would supply the irrigation system for the project area. STORM DRAINAGE SYSTEM It is expected that the storm drainage system in the area of the project would need to be reconstructed to meet the project needs. Discharge from the drainage system would be directed to a water quality treatment system before being discharges to the bay. Because the bay is tidal, no storm attenuation would be required, just water quality treatment of the first 0.75 inch of site runoff. NORTH ELEVATION 8,620 SQ.FT. 96 97 ATLAS SHEET PROSPECT PIER 98 99 PROSPECT PIER LANDSIDE ELECTRIC SERVICES MECHANICAL Landside electric services will include power pedestal(s) suitable for event connections. Event connections are estimated to be not more than a total of 400 amps at 208 volts. Parking and street lighting is anticipated to be served from an existing electric service. The building will be served by a modular air cooled chiller system, providing 150tons (5-duty modules) of 44°F chilled water through duty-standby 300gpm variable primary pumps. These chillers will be located on the roof of the building, and can be concealed by vegetation, but the vertical discharge of the condensing fans cannot be obstructed. Building heating will be through a single natural gas fired 750mbh condensing boiler, which must be located in a rated enclosure. BRIDGE Bridge lighting and power is anticipated to be served from an existing electric service. New loads are anticipated to be approximate to the existing loads. Interior conditioning will be through two modular VAV indoor air handling units with airside economizer. A 20,000cfm unit will serve the restaurant, and a 22,000cfm unit will serve the remainder of the spaces. Cooling will be through chilled water coils. Heating will be through hot water preheat coils in the AHUs and heating coils in the VAV boxes. Space conditioning will be through VAV terminal boxes to serve the separate zones. Each VAV box will be provided with a temperature sensor. A central building automation system (BAS) will control all components of the HVAC system. PIER BUILDING An upgraded 2500A electric service from the utility to metering and free standing switchgear is anticipated to serve the pier building. The conduit pathway and delineation of service between the utility company and building shall be reviewed and agreed. It is anticipated that the existing electric service pathway crosses the bridge, and that a replacement pathway will be required. Tenant metering will be incorporated at the main service equipment level. It is anticipated that the existing electrical room for this purpose will be enlarged since the original service was smaller and did not have separate tenant metering. There shall be a quantity of 8 tenant meter compartments. All AHU cooling coils and chiller condenser coils shall be copper-copper or be copper-aluminum with Electrofin coating. The initial loads are based on the following: 1. 2. 3. 4. Net conditioned area: 32,800sf Well insulated façade All wall surfaces in the naturally ventilated circulation zone are insulated like exterior walls No more than 40% glazing area From the tenant metering compartments, 480 volt feeders will be routed up through the stacked electrical closets and out to the individual tenant spaces. It is assumed that the electric service provided to each tenant will be terminated in an enclosed circuit breaker within the tenant’s space. Electrical distribution, including transformation to 208 volts, specific to the tenant’s loads will be by the tenant. The common building services will be served via 2000 amp copper busway routing up through the electrical closet stack at 480 volts. Individual bus tap boxes, mounted to the busway, will be required at each floor to serve local 480 volt distribution panels. This shall include bus tap boxes serving each elevator, as well as feeders to major mechanical equipment such as the rooftop chillers. 208 volts for common building services will be derived from 480 volts at the busway via energy efficient, K-rated dry type transformers. Additional branch electrical closets are anticipated specifically to serve Level 6 and the rooftop mechanical equipment. All wiring shall be copper. All bussing shall be copper. It is assumed that any backup power requirements will be limited to those supporting life safety functions. Local battery packs at egress lighting and exit fixtures shall be provided. Banquet space (200 seats) Prospect Terrace Prospect Terrace Water reservoir + Water treatment plan City Place Outdoor cafe (30 seats) Bait store Electrical room Open Air Lower Lobby Bike rental Bayside Place Snack Shack Outdoor dinning (40 seats) Storage Kitchen Bar Destination restaurant (100 seats) Cafeteria INDOOR AREAS Common areas 2700 SQ. FT. Core 1200 SQ. FT. Retail 2800 SQ. FT. Mechanical 3200 SQ. FT. AREAS Destination restaurant & Banquet space 9230 SQ. FT. Common areas 10370 SQ. FT. Core OSA Intake Louvers: 120 SF total 1200 SQ. FT. (assuming 50% free area) TOTAL 20,800 SQ. FT. PIER HEAD Pier Head 51,200 SQ. FT. Fishing Platforms 9,400 SQ. FT. TOTAL PIER HEAD 60,600 SQ. FT. AREAS Exterior Terrace 16600 SQ. FT. Exhaust louvers: 120 SF total (assuming 50% free area) (2) Chilled water and (2) heating hot water pumps TOTAL 1ST FLOOR 9,900 SQ. FT. 100 101 Boiler in enclosed, rated boil room (2.98’ x 4.07’) Rooftop air-cooled chiller (6’ x 35.30’) 6.5 OPERATION IMPACTS OF THE CONCEPT PROSPECT PIER Petersburg Prospect Pier ST.St. PETERSBURG PROSPECT PIER AREA ANALYSIS TOTAL AREA OF AIR-CONDITIONED SPACE PROPOSED Area Analysis Over five levels the renovated building will have 32,800 square feet of air-conditioned space. In addition there will be 14,600 square feet of interior non-conditioned space and 27,000 square feet of roof terraces. TOTAL AREA OF PROPOSED LEASABLE SPACE AND TOTAL COMMON AREA There will be 27,200 square feet of leasable space, all of which will be air-conditioned. There is a total of 20,200 square feet of interior common area – 5,600 square feet that is air-conditioned and 14,600 square feet that is non-conditioned. In addition there is 27,000 square feet of common area roof terraces. The 5th floor restaurant would have access to a large portion of the adjacent roof terrace for outdoor dining. GENERAL DESCRIPTION OF THE PROPOSED USE FOR EACH SPACE 1st Floor – The lowest level of the building will have the main service spaces including loading dock, trash room, main electrical room, rainwater cistern and general storage. Public spaces include the lower lobby and restrooms. The three 1st floor leasable spaces are a Snack Shack, Bait Shop and Bicycle Rental Shop. 2nd Floor – The entire 2nd floor is the Open-Air Lobby. Open to views and breezes on all four sides it is the main entry to the building and is accessed by grand steps and terraces that surround the building and integrate it into the pier head. A monumental stair continues the public pathway up from the 2nd floor. 3rd and 4th Floor – These two floors comprise the Marine Discovery Center. The main entry to the Discovery Center is on the 3rd floor. In addition to exhibition space this floor contains the gift shop and administrative offices and support spaces. The 4th floor continues the exhibitions which spiral around the perimeter of the building. Also on this level is the educational wing of the Discovery Center and an auditorium space. The public pathway to the roof continues up through the center of the building with views of Tampa Bay on the 3rd floor. Public restrooms are located on the 4th floor. 5th Floor – The top and largest floor is split roughly in two. The east half contains a large destination restaurant with the dining room in the southeast corner and banquet room located in the northeast corner – both served by a central kitchen. The west portion of the 5th floor is an observation deck with outdoor dining enhanced by spectacular views of the downtown skyline. The vertical public pathway arrives at the 5th level where it also enjoys these same views. Roof Terrace – Via two access points the 5th floor observation deck continues up and over the restaurant. The terraced deck is interspersed with subtropical landscaping and provides additional space for informal gatherings and decks while having 360 degree views of the entire Tampa Bay area. PROPOSED TYPE AND TONNAGE OF HVAC SYSTEM The building will be served by a modular air cooled chiller system providing 150 tons off 44 degree chilled water through duty standby 300 gpm variable primary pumps. Building heating will be through a single natural gas fired 750 mbh condensing boiler. Interior conditioning will be through two modular VAV indoor air handling units. See section 5.2 for a more complete description of the proposed system. TYPE AND NUMBER OF PROPOSED ELEVATORS Our design calls for two new passenger elevators and one new service elevator. In each of the existing twin elevator shafts a new single custom width passenger elevator would be installed. These would be high efficiency, machine room-less, gearless, mid-rise elevators with a capacity of 4,000 pounds and speed of 200 fpm. Both passenger elevators would accommodate stretchers for medical emergencies. The existing service elevator would be replaced with a new elevator. It too would be a high efficiency, machine room-less, gearless, mid-rise elevator with a capacity of 2,500 pounds and speed of 150 fpm. 102 Area PIER Pier bridge Pier head Subtotal 48,000 s.f. 60,600 s.f. 108,600 s.f. 1ST FLOOR Air-conditioned space Non-conditioned space Subtotal 4,800 s.f. 5,100 s.f. 9,900 s.f. 2ND FLOOR Air-conditioned space Non-conditioned space Subtotal 500 s.f. 3,400 s.f. 3,900 s.f. 3RD FLOOR Air-conditioned space Non-conditioned space Subtotal 6,300 s.f. 2,100 s.f. 8,400 s.f. 4TH FLOOR Air-conditioned space Non-conditioned space Subtotal 12,000 s.f. 2,800 s.f. 14,800 s.f. 5TH FLOOR Air-conditioned space Non-conditioned space Exterior Terrace Subtotal 9,200 1,200 10,400 20,800 6TH FLOOR Exterior Terrace Subtotal 16,600 s.f. 16,600 s.f. TOTALS Air-conditioned space Non-conditioned space Exterior Terrace Subtotal 32,800 14,600 27,000 74,400 s.f. s.f. s.f. s.f. LEASABLE SPACE (AIR-CONDITIONED) Bait Shop 600 Snack Shack 1,100 Bicycle Rental Shop 1,000 Marine Discovery Center 16,300 Restaurant 8,200 Subtotal 27,200 s.f. s.f. s.f. s.f. s.f. s.f. s.f. s.f. s.f. s.f. 103 7. Schedule and Budget PROSPECT PIER 7.2 PROJECTED CONSTRUCTION COSTS 7.1 DESIGN AND CONSTRUCTION SCHEDULE Our team has reviewed the project schedule and is confident we can meet all of the required milestones. We hereby commit to exceeding the city’s established goals for quality and function while delivering it on time and in budget. PROJECT: St. Petersburg Pier Replacement EST. TYPE: Conceptual DATE: December 15, 2014 TEAM: FR-EE SCHEDULE OF VALUES St. Petersburg Pier Design & Construction Timeline 1 2014 2 3 January 4 5 6 7 February 8 9 10 11 March 12 13 14 15 April 16 17 18 19 20 May 21 22 23 24 June 25 26 27 28 July 29 30 31 32 33 August 34 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 Consultant Selection Phase Pier Working Group Staff Commences RFQ Public Outreach & Program Input Issue RFQ and Receive Submissions Selection Committee Shortlist to 5-8 Issue PO and Commence Concept Develop Concepts Technical Review & Comment 37 38 September 39 40 41 42 October 43 44 45 46 November 47 48 49 50 51 December 52 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 A B Total GSF/ Component GSF 436,000 C COMPONENT VALUES D E F G I J K 280,000 108,600 47,400 Uplands Pier and Pier Head The Pyramid Pier Working Group Public Outreach Unit Cost ($/unit or %) Quantity RFQ Submissions Selection Committee DIVISION Develop Concepts Technical Reviews 2 3 4 January 2015 5 6 7 8 9 February 10 11 12 13 14 March 15 16 17 18 April 19 20 21 22 May 23 24 25 26 27 June 28 29 30 31 July 32 33 34 35 August 36 37 38 39 40 September wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 Technical Review & Comment Continued Selection Committee Picks Feasible Concepts Public Outreach & Vote on all finalists Selection Committee Ranks all finalists Council Recommendation and Approval Negotiate A/E Contract City Council Approval of A/E contract Design Phase Concept Refinement Phase - cont. Public Review & Input City Council Approval of Concept Refinement Commence Schematic Design CMAR Pricing & Review Commence Permitting Design Development 41 42 43 October 44 45 46 47 48 November 49 50 51 52 December wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 ublic Input/ Vot Ranking Council Approval Public Input Council Approval Schematic Design Pricing Permitting Design development 1 2 3 January 4 5 6 7 February 8 9 10 11 March 12 13 14 15 April 16 17 18 19 20 May 21 22 23 24 June 25 26 27 28 July 29 30 31 32 33 August 34 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 208,500 $208,500 $0.48 1 $ 457,330 $457,330 $1.05 2B Landscape & Irrigation, hardscape 1 $ 2,492,250 $2,492,250 $5.72 3A Structural Concrete/ 1 $ 17,416,009 $17,416,009 $39.94 3B 39 40 41 42 October 43 44 45 46 November 47 48 49 50 51 December w/above $0 L $208,500 $208,500 $457,330 $12,146,857 $5,269,152 3 4 5 6 7 February $0 $0 $0 500,750 $500,750 $1.15 $500,750 $500,750 1 $ 3,695,511 $3,695,511 $8.48 $3,695,511 $3,695,511 1 $ 375,000 $375,000 $0.86 $375,000 $375,000 Fire Protection, incl. underground 1 $ 254,250 $254,250 $0.58 $254,250 $254,250 Plumbing, incl. underground 1 $ 278,244 $278,244 $0.64 $278,244 $278,244 23 HVAC, incl. underground 1 $ 516,800 $516,800 $1.19 $516,800 $516,800 26 Electrical, Comm. & Security, incl. u/g 1 $ 960,950 $960,950 $2.20 $960,950 $960,950 99 Construction Contingency $900,000 $2.06 P TOTALL ALL DIVISIONS Gen. Conditions/Insurances/Bonds/CM Fees $28,055,594 $64 7A Roofing & Waterproofing 1 $ Interior finishes Elevators 21 22 CONSTRUCTION COST (P+Q) $4,800,000 $11 $32,855,594 $75 COST PER SQ-FT TOTALS 8 9 10 11 March 12 13 14 15 April 16 17 18 19 $900,000 $2,492,250 $12,146,857 $11,850,657 $0 $0 $0 $0 $28,055,594 $2,492,250 $12,146,857 $11,850,657 $0 $0 $0 $0 $32,855,594 $4,800,000 $8.90 $111.85 COMPONENT COST PER SQ-FT TOALS $8.90 U 20 May 21 22 23 24 June 25 26 27 28 July 29 30 31 32 33 August 34 Construction Phase - Cont. Construction Phase Cont. Tenant fit -Out & Close-out Occupancy 35 36 37 38 September 39 40 41 42 October 43 44 45 46 November 47 48 49 50 51 December TOTAL CONSTRUCTION COST (R+S+T+Demo) $32,855,594 52 TOTAL CONSTRUCTION BUDGET wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 $33,000,000 Construction Close Out Grand Opening 1 2 3 January 4 5 6 7 February 8 9 10 11 March 12 13 14 15 April 16 17 18 19 20 May 21 22 23 24 June 25 26 27 28 July 29 30 31 32 33 August 34 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 35 36 37 38 September 39 40 41 42 October 43 44 45 46 November 47 48 49 50 51 December 52 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 Print Date: 12/15/2014 104 $17,416,009 $0.00 Construction 2 $457,330 $2,492,250 $250.01 Council GMP Approval January Base Design Cost $2,492,250 Final GMP 1 P $0.00 w/above CD Phase wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 O $0.00 Pricing 2017 N $0 Design Devel cont Permit Agency - Final Approval & Isuance of Permit M $0 R 38 w/above Masonry Structural Steel Q 37 Exterior Concrete 5A 52 36 September F/B 1 $ Selective Demolition wk1 wk2 wk3 wk4 wk5 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk1 wk2 wk3 wk4 wk5 35 DxE Site Demolition 14A Basis of Design Phase Comments Cost/SF 2A 8 through 12 Negotiate A/E Contract DESCRIPTION Base Design Cost 2A 4 Selection 2016 2018 36 Staff delops RFQ 1 Design Phase - Cont. Design Development Cont. CMAR Pricing & Review Construction Document Phase Negotiate GMP Council Approval of GMP Construction Phase Construction Phase Permitting Permit Submission & Review 35 105 $111.85 $250.01 $75.36 PROSPECT PIER St. Petersburg Pier St. Petersburg, Fl DATE : 12/15/14 PROJECT # : 2014.132 PAGE : 2 of 3 St. Petersburg Pier St. Petersburg, Fl DATE : 12/15/14 PROJECT # : 2014.132 PAGE : 1 of 3 PROJECT : LOCATION : PROJECT : LOCATION : DESCRIPTION QTY. UNIT UNIT COST TOTAL TOTAL COST Preliminary Design Budget FOUNDATIONS Drilled Shaft 30" Pier 54ea Drilled Shaft 30" Pier Head 72ea PIP Cap 36x30 - Pier PIP Cap 36x30 - Pier Head Demo Existing Landside pier structure DESCRIPTION QTY. UNIT UNIT COST TOTAL TOTAL COST Preliminary Design Budget $4,516,300 3,780 5,040 308 444 lf lf cy cy 450.00 450.00 650.00 650.00 39,000 sf 1.50 1,701,000 2,268,000 200,200 288,600 49,000 62,000 953 1,206 sf sf cy cy BUILDING STRUCTURE Structure Rehab - Pyramid Structure New - Pyramid Monumental Stairs - Pyramid Stairs/Handrails - Pyramid 39,000 23,500 4 400 sf sf flts risers EXTERIOR CLOSURE Alum/Glass - Pyramid GFRC - Pyramid 19,200 sf 16,500 sf 35.00 35.00 450.00 450.00 1,715,000 2,170,000 428,750 542,500 35.00 100.00 50,000.00 650.00 1,365,000 2,350,000 200,000 260,000 110.00 110.00 2,112,000 1,815,000 $4,175,000 3.50 12.50 40.00 29,750 375,000 96,000 INTERIOR FINISHES CONSTRUCTION Interior Selective Demolition Finished Interior Shell Space 45,733 sf 17,200 sf 25,900 sf 10.00 30.00 15.00 457,330 516,000 388,500 1.00 10,000.00 150.00 125.00 125.00 25.00 125.00 44,761 10,000 330,000 275,000 87,500 1,900,000 143,750 25,000.00 375,000 3.00 40.00 40,000.00 4.00 50,000.00 40.00 18.00 8.00 165,000 49,200 40,000 179,044 50,000 49,200 309,600 207,200 SPECIAL CONSTRUCTION Specialties Equipment Traffic Barrier/Conc Seating - Pier Railings - Pier Railings - Pyramid Traffic Decks - Pier Railings - Pier, floors 5&6 F.F. & E. - N.I.C. Seagrass mitigation - None CONVEYING SYSTEMS Traction Elevator 3500lb $3,927,000 106 8,500 sf 30,000 sf 2,400 sf $1,361,830 58,500 $4,856,250 SUBSTRUCTURE Precast Dbl Tees - Pier Precast Dbl Tees - Pier Head 6" Precast Deck - Pier 6" PIP Conc Deck - Pier Head $500,750 MOISTURE PROTECTION Waterproofing - Pyramid Roofing - Pyramid Green Roof MECHANICAL Fire Sprinkler Sys FS Piping to Landside Fire Pump Tower Plumbing System Plb Lift Station & Grease Trap Plb Piping to Landside HVAC System - A/C space HVAC System - Shell space $2,791,011 44,761 1 2,200 2,200 700 76,000 1,150 sf ls lf lf lf sf lf $375,000 15 stop $1,049,244 55,000 1,230 1 44,761 1 1,230 17,200 25,900 sf lf ls sf ls lf sf sf 107 PROSPECT PIER St. Petersburg Pier St. Petersburg, Fl DATE : 12/15/14 PROJECT # : 2014.132 PAGE : 3 of 3 PROJECT : LOCATION : DESCRIPTION QTY. UNIT UNIT COST TOTAL TOTAL COST Preliminary Design Budget ELECTRICAL Electrical System - A/C space Electrical System - Shell space Electrical Service to Landside Electrical - I.T Cable Electrical - Security Electrical - Generator Electrical - Pier Level Lighting Electrical - Uplands Uplands Demolition Backfill area fill dirt Retaining walls Repairs to existing parking New Parking New roadway New curbs New sidewalk New pavers Shelters - Trolley Stop Events Pavillion Stage Site Furniture - benches Landscape Irrigation Sod area Sand Fill at Beach Terraces North Park - Rework - N.I.C. $960,950 17,200 25,900 1,230 1 1 1 81,000 1 sf sf lf sf ls ls sf ls 20.00 8.00 75.00 5,000.00 10,000.00 50,000.00 2.50 50,000.00 344,000 207,200 92,250 5,000 10,000 50,000 202,500 50,000 150,000 27,778 3,490 4,444 5,556 1,911 2,500 20,000 23,700 2 1 30 200,000 200,000 200,000 303 sf cy lf sy sy sy lf sf sf ea ls ea sf sf sf cy 1.00 20.00 200.00 5.00 40.00 40.00 15.00 6.00 7.50 15,000.00 20,000.00 1,500.00 1.50 0.25 0.65 25.00 150,000 555,556 698,000 22,222 222,222 76,444 37,500 120,000 177,750 30,000 20,000 45,000 300,000 50,000 130,000 7,564 2,642,259 Subtotal: 27,155,594 Construction Manager General Conditions Permitting, Const. Manager Fee, Ins, Bonds, Escalation Estimate Contingency BUILDING BUDGET TOTAL: 27,155,594 4,800,000 900,000 $32,855,594 SOFT COSTS - Excluded A/E Fees, Testing, Surveys, Geo Tch, Threshold Insp TOTAL CONSTRUCTION BUDGET $32,855,594 108 109 PROSPECT PIER COMPETITION TEAM 110 FR-EE/ FERNANDO ROMERO ENTERPRISE MESH ARUP Fernando Romero Sergio Rebelo Yuri Jeong Celia Julve Francisco Rocha Alex Zee Qingyi Chen Joao Urbano Feifei Song Wen Zhu Jessica Wang Unai Artetxe Sunny Wang Daniela Gallo Fatimah Azzahra Christopher Shelley Tim Clemmons Gary Grooms Jenny Miers Daniel Brodkin Sanya Levi Vincent Lee Sanjeev Malhotra Cameron Thomson Nubia Herrera CIVITAS Mark Johnson Chris Parezo Ilana Fowler PENTAGRAM TILLOTSON FALLER DAVIS Natasha Jen Larissa Marquez Suzan Tillotson Nicole Cribbs Bruce Hashbrouck VICKSTROM CC&A Daniel Vickstrom Robert A. Kaupp 111 DEC E M BE R 15, 2014
© Copyright 2025 Paperzz