Memorandum of Site Visit

Memorandum of Site Visit Present during Site Visit Project: Cumberland County Civic Center Renovation WBRC Project Number: 3757.00 Date: 11/13/13 Temperature: 36° @ 2:50 pm Weather: Partly Cloudy Company / Affiliation
Phone / e‐mail Michael Johanning WBRC A/E ‐ Project Architect 828‐4511 / [email protected] Adam Gillespie, P.E. WBRC A/E ‐ Structural Engineer 947‐4511 / [email protected] # Noted / Observed 1 Seating installation continues in the bowl and the telescopic platforms are being completed at the East side of the Bowl (see image 3). 2 Concourse and Bowl Painting continues at all areas (see image 5). 3 Exterior brick veneer placement continues at the Center St. elevation and precast concrete is being placed at the SE and SW corners (see image 1 & 2). 4 Free St gas service remains connected, meter in place and operational, AHU‐5 serving NW Entry Phase 1 is operating and heating well, and there are 2 temporary gas indirect fired heaters on the concourse that are operational and seem to be heating well. The Center St gas service has been temporarily reconnected, meter in place and operational, and there is a temporary gas indirect fired heater in the loading dock area that is operational and seems to be heating well. The timeline of gas upgrade/extension for permanent service to Center St. is still pending confirmation from the gas company. Site Progress Images 1. View North from the Spring St. median. Addition for the new entry, Club room, and Home Team Locker room in progress. Exterior sheathing up in preparation for masonry and curtain wall. 375700 - CC Civic Center Reno - Site Review Memo 111313 - mej.doc
Page 1 of 4
Memorandum of Site Visit Project: Cumberland County Civic Center Renovation WBRC Project Number: 3757.00 Date: 11/13/13 Temperature: 36° @ 2:50 pm Weather: Partly Cloudy 2. View West from Center St. Brick veneer work continues at the area above the loading bays. 3. Telescopic seating platform installation continues at the East side of the Bowl. 375700 - CC Civic Center Reno - Site Review Memo 111313 - mej.doc
Page 2 of 4
Memorandum of Site Visit Project: Cumberland County Civic Center Renovation WBRC Project Number: 3757.00 Date: 11/13/13 Temperature: 36° @ 2:50 pm Weather: Partly Cloudy 4. Roof area above the SW corner addition. Parking garage and existing stone ballasted roof area beyond. Roof mounted Air Handling Units 6 & 7 in place. New roofing work underway at left side of image. 5. View West along the Free St. Concourse. Painting work at the existing concrete in this area is nearing completion. 375700 - CC Civic Center Reno - Site Review Memo 111313 - mej.doc
Page 3 of 4
Memorandum of Site Visit Project: Cumberland County Civic Center Renovation WBRC Project Number: 3757.00 Date: 11/13/13 Temperature: 36° @ 2:50 pm Weather: Partly Cloudy 6. View South from the Upper Level Suite at the SW corner. Roof work underway at the areas of the SW corner addition. # Action Items 1 11‐04‐13: New Bowl Aisle concrete stairs have been placed at the new aisle adjacent to the SW corner suites. The step at the Mid Suite level access was not placed as per the RFI 393 response on June 12th. 2 11‐04‐13: Bulletin to be issued to address the triangular floor opening in the Event Level corridor 1326 floor outside of Visitor Locker Room #6. Respectfully Submitted, Michael Johanning, AIA Project Architect WBRC ARCHITECTS · ENGINEERS 30 Danforth Street, Suite 306 Portland, ME 04101 207‐828‐4511 375700 - CC Civic Center Reno - Site Review Memo 111313 - mej.doc
Page 4 of 4