Bentley’s Garment Care Groundwater Remediation System Jim Schneider, Environmental Geologist II Kansas Dept. of Health & Environment SCRD Fall Meeting September 30, 2004 Kansas City, Missouri 1 Bentley’s Garment Care Neodesha, Kansas 2 Bentley’s Garment Care Neodesha, Kansas • History • Environmental Site Assessment • Corrective Action – – – – – – Decision Trenching Remediation System Modifications Operation and Maintenance Performance 3 Bentley’s Garment Care Neodesha, KS History • 1981 began operating at present location. • Coin operated laundry facility and drycleaner services. 4 Bentley’s Garment Care Neodesha, KS History • 1996 PCE detected in BP/Amoco refinery off-site monitoring well • 1997 PreCERCLIS SRE identified Bentley’s as source of PCE 5 Bentley’s Garment Care Neodesha, KS Environmental Site Assessment • 1997 Bentley’s applied for funding through the DFRTF • 2001 – Eligible for fund expenditure – ESA conducted 6 Bentley’s Garment Care Neodesha, KS Environmental Site Assessment • Total of 15 probes advanced. • Identified extent of contamination. 7 Bentley’s Garment Care Neodesha, KS Environmental Site Assessment • Installed 27 Goresorber® modules on site • Identified Primary and Secondary source areas 8 Bentley’s Garment Care Neodesha, KS Corrective Action • Installed ten monitoring wells • Include BP/Amoco well in monitoring well network 9 Bentley’s Garment Care Neodesha, KS Corrective Action - Decision • • • • • • Tight clays. Building over source area. Impacted pool sump. High profile site. BP remediation. Limited budget. 10 Bentley’s Garment Care Neodesha, KS Corrective Action - Decision • February 2003 proposed remediation system to City of Neodesha. • City requested building instead of trailer. 11 Bentley’s Garment Care Neodesha, KS Corrective Action - Decision 12 Bentley’s Garment Care Neodesha, KS Corrective Action-Site Preparation 13 Bentley’s Garment Care Neodesha, KS Corrective Action-Site Preparation 14 Bentley’s Garment Care Neodesha, KS Corrective Action-Trench Installation 15 Bentley’s Garment Care Neodesha, KS Corrective Action-Trench Installation 16 Bentley’s Garment Care Neodesha, KS Corrective Action-Trench Drain Tile 17 Bentley’s Garment Care Neodesha, KS Corrective Action-Fuse Drain Tile 18 Bentley’s Garment Care Neodesha, KS Corrective Action-Fuse Drain Tile to Sump Well 19 Bentley’s Garment Care Neodesha, KS Corrective Action-Trencher Preparation 20 Bentley’s Garment Care Neodesha, KS Corrective Action-Trencher Preparation 21 Bentley’s Garment Care Neodesha, KS Corrective Action-Overhead View of Trench 22 Bentley’s Garment Care Neodesha, KS I wouldn’t have done it that way. Are you sure it will work? How many regulators does it take to oversee a project? Is it lunchtime yet? Is that in the work plan? 23 Bentley’s Garment Care Neodesha, KS Corrective Action-Trench Installation 24 Bentley’s Garment Care Neodesha, KS Corrective Action-Trench Installation 25 Bentley’s Garment Care Neodesha, KS Corrective Action-Waste Handling 26 Bentley’s Garment Care Neodesha, KS Corrective Action-Trench Completion 27 Bentley’s Garment Care Neodesha, KS Corrective Action – Trench Completion 28 Bentley’s Garment Care Neodesha, KS Remediation Building Footings 29 Bentley’s Garment Care Neodesha, KS Corrective Action – Utility Line Installation 30 Bentley’s Garment Care Neodesha, KS Corrective Action – Remediation Building 31 Bentley’s Garment Care Neodesha, KS Corrective Action – Pool Sump Pit 32 Bentley’s Garment Care Neodesha, KS Corrective Action – Remediation System GAC Drum MSDBAS Stripper Holding Tank Transfer Pump Blower 33 Bentley’s Garment Care Neodesha, KS Corrective Action – Diffused Bubbler System 34 Bentley’s Garment Care Neodesha, KS Corrective Action – Modifications Before After 35 Bentley’s Garment Care Neodesha, KS Corrective Action – Modifications Before After 36 Bentley’s Garment Care Neodesha, KS Corrective Action – Modifications Before After 37 Bentley’s Garment Care Neodesha, KS Corrective Action – Maintenance 38 Bentley’s Garment Care Neodesha, Kansas Cost of System Installation • Trench Installation • Remediation System • System Modification – Contractor Proposed Cost – KDHE Engineering $55,000 $64,000 $3000 $0 39 Bentley’s Garment Care Neodesha, Kansas Corrective Action – Performance 40 Bentley’s Garment Care Neodesha, KS Pre-Remediation March 16, 2004 During Remediation September 17, 2004 795.8 795.3 795.0 794.5 794.2 795.7 793.8 795.2 793.3 794.7 793.0 792.5 794.2 792.2 793.7 791.8 793.2 791.3 792.7 791.0 792.2 790.5 790.2 791.7 791.2 790.7 790.2 Surfer® 41 Bentley’s Garment Care Neodesha, KS Corrective Action – Performance Influent vs. Effluent 100 10 1 0.1 3/ 29 /0 4 4/ 12 /0 4/ 4 26 /0 5/ 4 10 /0 4 5/ 24 /0 4 6/ 7/ 04 6/ 21 /0 4 7/ 5/ 04 7/ 19 /0 4 8/ 2/ 0 8/ 4 16 /0 4 8/ 30 /0 4 PCE (ug/L) 1000 Influent Effluent Date 42 Bentley’s Garment Care Neodesha, KS Lessons Learned • More consulting experience required. • Initial effectiveness of communicating with the city. 43 Bentley’s Garment Care Neodesha, KS Lessons Learned • Developed a good relationship with the City of Neodesha. • KDHE “Hands On” engineers. • Flexibility led to cost savings – Used available equipment – Subcontractor schedules 44 Bentley’s Garment Care Neodesha, KS 45 Bentley’s Garment Care Neodesha, KS 46
© Copyright 2026 Paperzz