Mono Slab Brochure_Mono Slab Brochure

Mono Slab EZ Form Inc.
Background of Monolithic
Slab Footer Foundation
Floor Systems
Traditionally, cement forms are held in place with an
arrangement of metal and/or wood stakes, kickers
and other supporting structure. The traditional
methods for forming a monolithic building
foundation are particularly time and labor
intensive to set up and take down after the cement
monolithic foundation is poured. After the form
is removed, dirt is backfilled around the
foundation to provide support
and soil grading. In certain
climates or situations foam insulation
sheets are positioned against the
sidewall of the foundation and
extending laterally from the
sidewall after the form is
removed and before dirt is
backfilled around the foundation. The
foam insulation provides a desired R
value that helps maintain a desired
temperature in the building
within the foundation.
Mono Slab
EZ
Form LLC
Mono Slab
EZ
Form LLC
P.O. Box 371
Island Park, ID 83429
208-360-5200
P.O. Box 371
Island Park, ID 83429
208-360-5200
Mono Slab EZ Form llc
The new Mono Slab EZ Form Method
is less labor intense and requires
no heavy lifting.
It is light weight but yet extremely
strong and durable.
Mono Slab EZ Form will save you 70%
installation and take down time,
fewer trips, less fuel and labor.
It sets up with an incredible amount of ease.
The Setup is Simple
To start, prep your footer with gravel.
Check your grade as you go to create a solid and level base.
Next, grab a length of the Mono Slab EZ Form,
lay it on the prepped gravel having the flat side facing in
and the angled side out.
Next, simply grab the Transit,
and check your grade on the top of your form.
If everything is level, install the next length
of Mono Slab EZ form.
Have the two by eight staggered so that your
two by eight seems butt up together
in the middle of the form in the allowed slot.
As you proceed, pound wood stakes two per length.
(no need to fasten stakes to two by eight.)
Proceed around your perimeter instaling
Mono Slab EZ form.
Once you have each length staked off
with two stakes per form, the form can be lightly
backfilled to create a solid, secure form,
that is now ready to pour.
No need for kickers or extra stakes.
Take Down Process is Simple
Unscrew corners, remove 2x8 from slot and tap wood stakes
below grade. This process can be done same day of pour.
Mono Slab EZ Form Advantages
Labor Savings | Fast Installation
No Form Necessary | Minimal Take Down
Use Less Concrete | Improves Job Safety
Works Well With Radiant Floor Panel Systems
Meets Insulation Requirements In All 50 States