245 Park Avenue New York, NY 245 PARK AVENUE 245 Park Avenue is a soaring 45-floor office tower recently refurbished to surpass its original quality. Imposing in scale but comprehensively detailed, the building provides Floor 44 a perfect working environment for the corporations housed within its gleaming façade. Floor 43 Located in prestigious Midtown Manhattan on a full square block at the foot of Park Avenue, the 1965 building is the first in a series of modern corporate headquarters that transformed Floor 42 21,348 RSF the Avenue into one of the most distinguished corporate corridors in the world. 13,288 RSF Floor 41 Floor 40 Floor 39 Floor 38 Floor 37 Floor 36 Floor 35 Floor 34 Floor 33 Floor 32 Floor 31 Floor 30 Floor 29 Floor 28 Constructed of glazed brick, glass and steel with a sprawling, impeccably maintained outdoor plaza for both employee and community use, the tower has an unsurpassed presence on the local landscape – a presence that its renovation in 2000 has only enhanced. Shreve, Lamb & Harmon Associates 37,923 RSF Uris Construction Company Jaros Baum & Bolles James Ruderman 1967, Renovation completed 2000 Floor 27 Floor 26 Floor 25 45 stories Floor 24 100 lbs/sq. ft. Floor 23 Floor 22 Floor 21 Rentable Area Approximately: Floor 20 Floor 19 Floor 18 Floor 17 Floor 16 Floor 15 50 – 100 lbs/sq. ft. 37,812 RSF 37,782 RSF 35,802 RSF 300 lbs/sq. 1,784,480 SF Floors 1-5: Approximately 76,000 SF, Floors 7-44: Approximately 37,000 SF Slab-to-slab heights on office floors average 12’ 6”. Standard floor to ceiling height is 8’6’’-9’ Floor 14 Floor 13 5 feet Floor 12 Floor 11 Floor 10 Generally every 22 feet Floor 9 The Building Automation and Energy Management System is primarily Honeywell Floor 8 equipment. In addition to equipment operation and control, the system performs demand totalization, load shedding, duty cycling, etc. functions. Floor 7 Mechanical The building’s HVAC systems are designed to exceed New York City Building Code Floor 5 Building Code requirements. Design conditions are based upon occupancy of not more Floor 4 than one person per 100 usable square feet. Floor 3 Floor 2 Heat is supplied by high-pressure utility steam. After pressure reduction, the steam is Parking distributed to preheat coils for the interior system and to secondary water loop heaters for Lobby the perimeter induction units. 245 Park Avenue New York, NY The air distribution system incorporates variable air volume boxes to serve interior areas Floor 44 and constant volume perimeter induction units to serve offices along the exterior walls. Floor 43 Sophisticated computer systems (BAS) control the air handling units to conserve energy while optimizing indoor air quality. Floor 42 Floor 41 Floor 40 Floor 39 Floor 38 21,348 RSF 13,288 RSF Chilled water for air conditioning is generated on site by energy efficient centrifugal chillers. Perimeter areas are cooled by either direct chilled water injection or by chilled water/heat exchangers in isolated loops. Supplemental HVAC is available 24 hours a day. Standard Hours of HVAC Op eration Floor 37: 8:00 AM to 6:00 PM, Monday through Friday Floor 36 8:00 AM to 1:00 PM Saturday 37,923 RSF Floor 35 General Building-standard power consists of 6 watts per usable square foot, connected Floor 34 load, provided by Consolidated Edison (Con-Ed). Floor 33 Floor 32 Floor 31 Floor 30 Floor 29 Floor 28 Floor 27 Floor 26 Floor 25 Floor 24 Floor 23 Floor 22 Floor 21 Floor 20 Floor 19 Floor 18 Floor 17 Additional power is available based upon demonstrated need. Two per floor, both high and low voltage Two per floor Number of Elevators 30 elevators organized into six banks: Floors 1 – 5 37,812 RSF Floors 1 – 14 Floors 1, 15 – 20 37,782 RSF Floors 1, 21 – 26 35,802 RSF Floors 1, 27 – 35 Floors 1, 36 – 44 3,500 lbs. 500 – 1,000 FPM (ft. per minute), depending on bank Floor 16 Floor 15 2 Floor 14 Floor 13 Floor 12 Floor 11 Floor 10 4,000 lbs. 78 ¾ in. wide, 72 ¼ in. deep, 95 ½ in. high. • Upscale contemporary Indian-Latin American restaurant, At Vermilion Floor 9 • Other casual eateries include: Financier Patisserie, Oaxaca/Wahaka Mexican Grill and Wichcraft Floor 8 • Lobby access from both Park & Lexington Avenues • Newly renovated lobby and public plazas including outdoor seating areas Floor 7 Mechanical• In building access to Metro North and Grand Central Terminal • Voice, data, high-speed Internet and cable television available Floor 5 Floor 4 Floor 3 Floor 2 Parking Lobby • Captivate elevator display screens
© Copyright 2026 Paperzz