1 inch = 2,400 feet - Town of Holly Springs

LONG RANGE WASTEWATER
CAPITAL IMPROVEMENTS PLAN
(MAJOR PROJECTS)
Legend
"
!
Z
Proposed
East Side
Regional
Pump Station
"
!
Existing Pump Stations
WWTP Upgrade/ Improvement
Proposed Pump Stations
Proposed Interim Pump Stations
Long Range Planning Area
Town Limits
Town ETJ Area
Property Parcels
White Oak
PROPOSED REGIONAL
PUMP STATION
(as development occurs)
Water Surface
Utley Creek
PROPOSED REGIONAL
PUMP STATION
(as development occurs)
Outer Loop
Prop Future Harris Lk Water Surface 240Ft Elevation
5 To 10yr Utility Service Area
UTLEY CREEK WWTP 8.0 MGD
/
Norris Branch
PROPOSED REGIONAL
PUMP STATION
(as development occurs)
Buckhorn Creek
PROPOSED REGIONAL
PUMP STATION
(as development occurs)
0
2,400
4,800
Feet
1 inch = 2,400 feet
Jan. 2015 Update
NOTES:
1. "INTERIM" PUMP STATIONS, UPSTREAM FROM PLANNED
REGIONAL ONES, WILL CONTINUE TO BE NECESSARY AS
TEMPORARY STEPS TO SERVE UPPER REACHES
2. NEW GRAVITY SEWER LINES WILL PROGRESS FROM
UPPER REACHES OF EACH BASIN TO LOWER AREAS
OF BASIN AS "INTERIM" PUMP STATIONS MOVE
DOWNSTREAM. IN ADDITION, NEW GRAVITY SEWER
LINES WILL BE INSTALLED TO TAKE PUMP STATIONS
OFF LINE.
For More Information Contact:
Town of Holly Springs
Engineering Department
P.O. Box 8
Holly Springs, NC 27540
919.557.3938
www.hollyspringsnc.us
The Town expressly denies any and
all responsibility for errors, if any, in
the information/data or for the misuse
of the information/data by the user or
anyone else. The user understands
that he or she should verify the accuracy
of the information/data before using it.
Z:\GIS\Utilities\Town\Sewer\Approved_LR_Sewer_Map\2015\Approved_LR_Sewer_Map_Jan_2015.mxd