West Sunset Playground Renovation

Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Replacement Project
CIVIC DESIGN
PHASE I
March 19, 2012
1
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Renovation Work Includes:
ƒ New Men’s and Women’s Restrooms
ƒ New Accessible Paths to and from the Restroom
ƒ Signage
ƒ Related Site Improvements
Aerial View of the Rossi Park
4
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Rossi Restroom Bldg Location
Annex Location
5
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Neighborhood Context
6
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Proposed Rossi Restroom Bldg: “Traditional” Design
7
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Existing Annex Site & Project Limit
Existing Restroom
ƒ Elevation difference between sidewalk and the east side of the Annex: 1.5 feet. Min. 18 feet of ramp needed.
Project Limit
Annex
ƒ Elevation difference between sidewalk and the west side of the Annex: 4 feet. Min. 48 feet of ramp needed.
ƒ Lowest drainage point of Annex: northwest corner.
8
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Proposed Site Plan
Playground
Proposed Curb Ramps & Crossing
Proposed Restroom
Annex
Section Elevation Looking from Edward Street
9
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Proposed Restroom at Existing Site
10
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Site Materials
Concrete Paving
Dietes vegeta
Fortnight Lily
Asphalt Print Paving
Ceanothus griseus
horizontalis
Metal Picket Fence
Arbutus unedo
11
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Project
Preferred Fence Layout
Fence @ Front
12
Clean and Safe Neighborhood Parks Bond,
Neighborhood Parks Project
Rossi Playground Restroom Replacement Project
Community Planning Process
ƒ
Restroom Task Force
•
ƒ
8 Public Meetings between January and July 2009
Rossi PG Restroom Replacement Project
•
2 Community Meetings
¾ February 1 and March 8, 2012
¾ Estimated 20 Participants, combined
March 19, 2012
1