LEGEND SOD/TOPSOIL REMOVAL (NOTE 4) GENERAL NOTES 1. ALL EXISTING UTILITIES SHOWN ON DRAWINGS ARE FOR REFERENCE PURPOSES ONLY. THE CONTRACTOR SHALL SATISFY THEMSELVES AS TO THE ACTUAL LOCATION AND DEPTH OF ANY UTILITY AND SHALL BE LIABLE FOR ALL OR ANY DAMAGES. INFORMATION REGARDING DEPTH AND LOCATION OF EXISTING UTILITIES ARE APPROXIMATE, TO BE VERIFIED IN THE FIELD BEFORE ANY CONSTRUCTION IN THE VICINITY. 2. DRAWING TO BE READ IN CONJUNCTION WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND STRUCTURAL DRAWINGS. 3. REFER TO ARCHITECTURAL DRAWINGS FOR BUILDING LAYOUT AND LOCATION . 4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING OWNER A DETAILED STAGING AND TRAFFIC PLAN TO MAINTAIN TRAFFIC AND ACCESS TO THE SATISFACTION OF THE OWNER 4 WEEKS PRIOR TO CONSTRUCTION. 5. ANY AREA DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO EXISTING CONDITION OR BETTER TO THE SATISFACTION OF THE OWNER. THIS INCLUDES ASPHALT, GRANULAR OR PAVING STONE, TOPSOIL, SOD ETC. 6. C-SERIES PLANS ARE TO BE USED FOR GRADING ONLY. ANY OTHER INFORMATION SHOWN IS FOR ILLUSTRATION PURPOSES ONLY. 7. DRAWINGS ARE NOT FOR CONSTRUCTION UNTIL STAMPED BY DESIGN ENGINEER AND APPROVED BY THE LOCAL MUNICIPALITY. 8. ALL CONSTRUCTION WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE REQUIREMENTS FOR THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS. 9. THE CONTRACTOR WILL BECOME SOLE OWNER OF ALL EXCESS MATERIAL. 10. MAINTAIN FIRE ROUTE, VEHICULAR AND PEDESTRIAN TRAFFIC AROUND THE WORK ZONE. SW SW NOTE 3 NOTE 1 DRAWINGS DEVELOPED FROM ELECTRONIC DRAWING FILES RECEIVED FROM: 1. BETTER MEASURES - SITE SURVEY 0813.DWG 2. THA - A001SITE PLAN & BUILDING PLANS 3. PETO MACCALLUM LTD. - GEOTECHNICAL INVESTIGATIONS, DATED SEPT 2015 AND DEC 2015 COORDINATE SYSTEM UTM ZONE 17 - NAD 83 CSRS ELEVATIONS ARE RELATED TO THE CANADIAN GEODETIC VERTICAL DATUM 1972. A LOCAL BENCH MARK WAS ESTABLISHED ON A SPIKE ON THE NORTH SIDE OF THE LANEWAY ,HAVING AN ELEVATION OF 249.44 SW DRAWING NOTES 1. NOTE 3 2. 3. 4. 8 30. 36.4 NOTE 4 0 6 12 Meters CONTRACTOR LAYDOWN AND PARKING AREA TO BE RESTRICTED TO THE WORK ZONE. ANY DAMAGED AREAS TO BE RESTORE UPON COMPLETION OF CONSTRUCTION. REFER TO C-03 FOR TYPICAL CROSS SECTION THROUGH SITE. LOCATION AND GRADE OF EXISTING SWALE TO BE VERIFIED IN THE FIELD. MAINTAIN DRAINAGE OF EXISTING SWALE, REGRADE AS REQUIRED TO PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDING AND FILL PAD AND DRIVEWAY. REFER TO ARCHITECTURAL FOR DETAILS ON CONSTRUCTION FENCING, CONSTRUCTION NOTES, AND TEMPORARY REQUIREMENTS. FOR BID PURPOSES AND NOT FOR CONSTRUCTION LEGEND HEAVY DUTY PAVEMENT (50mm HL3, 70mm HL8) 150mm TOPSOIL AND SOD 2.0% GRADE SLOPE SW SWALE EXISTING ELEVATION 192.55 PROPOSED ELEVATION BOLLARD (NOTE 13) DRAWING NOTES 1. 2. F E IR C AC S ES R TE U O 3. 4. 5. SW 6. 7. 8. 9. 10. 11. R9.0 0 248.25 SW NOTE 11 R7.50 12. 13. 248.14 14. ELEVATIONS ARE RELATED TO THE CANADIAN GEODETIC VERTICAL DATUM 1972. A LOCAL BENCH MARK WAS ESTABLISHED ON A SPIKE ON THE NORTH SIDE OF THE LANEWAY ,HAVING AN ELEVATION OF 249.44 1 8.0 24 R7 .10 .50 COORDINATE SYSTEM UTM ZONE 17 - NAD 83 CSRS 247.58 248 FOR BID PURPOSES AND NOT FOR CONSTRUCTION 247.70 00 NOTE 11 0 6.0 M 0 3.0 .89 247 .91 247 R3. SW REFER TO C-01 FOR GENERAL NOTES. CONTRACTOR LAYDOWN AND PARKING AREA TO BE RESTRICTED TO THE WORK ZONE. ANY DAMAGED AREAS TO BE RESTORE UPON COMPLETION OF CONSTRUCTION. ALL AREAS OF REGRADING TO BE COMPACTED TO 98% SPMDD OR AS RECOMMEND BY THE GEOTECHNICAL CONSULTANT. ALL GRADED AREAS TO BE FINALIZED WITH 150mm OF TOPSOIL AND SOD. REMOVE AND LEVEL ANY DEPRESSED AREAS, PROVIDE MINIMUM 0.5% POSITIVE GRADE. PROVIDE MINIMUM 1.0% GRADE IN ALL SWALES. MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDINGS. REFER TO C-03 FOR TYPICAL CROSS SECTION THROUGH SITE. REFER TO MECHANICAL/ ELECTRICAL FOR SERVICE CONNECTIONS. REFER TO ARCHITECTURAL/ STRUCTURAL/ MECHANICAL/ ELECTRICAL DRAWINGS FOR BUILDING DETAILS. LOCATION AND GRADE OF EXISTING SWALE TO BE VERIFIED IN THE FIELD. MAINTAIN DRAINAGE OF EXISTING SWALE, REGRADE AS REQUIRED TO PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDING AND FILL PAD AND DRIVEWAY. 1m ROUNDING AT 2% SLOPE. BOLLARD SETBACK 200mm FROM EDGE OF SIDEWALK TO CENTRE OF BOLLARD. REFER TO DETAIL ON C-03. REFER TO ARCHITECTURAL FOR DETAILS ON CONSTRUCTION FENCING, CONSTRUCTION NOTES, AND TEMPORARY REQUIREMENTS. DRAWINGS DEVELOPED FROM ELECTRONIC DRAWING FILES RECEIVED FROM: 1. BETTER MEASURES - SITE SURVEY 0813.DWG 2. THA - A001SITE PLAN & BUILDING PLANS 3. PETO MACCALLUM LTD. - GEOTECHNICAL INVESTIGATIONS, DATED SEPT 2015 AND DEC 2015 .97 247 3 .93 NOTE 12 (TYP.) 247 .00 247.66 AT C H TO EX 246.68 IS TI N G FFE=248.00 .97 0 3.0 247 .97 EXIS 247 O CH T MAT 0 6.0 .85 247 3 .8 247 TING 245.85 .89 247 86 . 247 NOTE 14 :1 X6 MA 247.16 245.49 247.05 0 6 12 Meters DRAWINGS DEVELOPED FROM ELECTRONIC DRAWING FILES RECEIVED FROM: 1. BETTER MEASURES - SITE SURVEY 0813.DWG 2. THA - A001SITE PLAN & BUILDING PLANS 3. PETO MACCALLUM LTD. - GEOTECHNICAL INVESTIGATIONS, DATED SEPT 2015 AND DEC 2015 COORDINATE SYSTEM UTM ZONE 17 - NAD 83 CSRS NOTE 13 ELEVATIONS ARE RELATED TO THE CANADIAN GEODETIC VERTICAL DATUM 1972. A LOCAL BENCH MARK WAS ESTABLISHED ON A SPIKE ON THE NORTH SIDE OF THE LANEWAY ,HAVING AN ELEVATION OF 249.44 NOTE 13 NOTE 12 (TYP.) 249.48 249.63 HT TC MA 249.20 OE 10.0 .98 G 248 TIN 3:1 XIS MAX 9 249.4 15.2 FFE=249.51 GE 248.91 249.26 GAR A GAR AGE 249.48 0 6 FOR BID PURPOSES AND NOT FOR CONSTRUCTION 12 0 Meters 260 LEGEND DRAWING NOTES TYPICAL GRADING AROUND BUILDING N.T.S. SOD/TOPSOIL REMOVAL (NOTE 4) 1.00 ROUNDING 6.00 PAVING N.T.S. 200mm DIAMETER GALVANIZED STEEL PIPE (SCHEDULE 40), CONCRETE FILLED, AND PROTECTED WITH 3mm MINIMUM THICK HIGH DENSITY POLYETHYLENE 'SAFETY YELLOW' (OR OTHER COLOUR AS SPECIFIED BY OWNER) COLOURED COVER. 50mm HL3 70mm HL8 150mm GRANULAR 'A' 600mm GRANULAR 'B' 250 150mm TOPSOIL AND SOD BUILDING/FOUNDATION (REFER TO ARCHITECTURAL/ STRUCTURAL DRAWINGS) 1200 2.0% MATCH EXISTING 1200 SIDEWALK (REFER TO ARCHITECTURAL/ STRUCTURAL DRAWINGS) SWALE 192.55 3. REFER TO GEOTECHNICAL CONSULTANT FOR ENGINEER FILL RECOMMENDATION PROPOSED ELEVATION 4. 5. 6. 7. 8. 9. 10. 150mm TOPSOIL AND SOD, ON 98% SPMDD COMPACTED NATIVE FILL OR AS DIRECTED BY THE GEOTECHNICAL CONSULTANT 11. 240 REFER TO GEOTECHNICAL CONSULTANT FOR DEPTH OF TOPSOIIL REMOVAL 150 SW 250 EXISTING GROUND 600 230 GRADE SLOPE EXISTING ELEVATION 6:1 MAX GRADE MATCH EXISTING 240 2.0% 6:1 MAX GRADE FINISHED GRADE 30 mPA CONCRETE PLACED IN SONO TUBE 1. 2. PROPOSED FINISHED FLOOR 2.0% 12 Meters 260 TYPICAL BOLLARD DETAIL 6 230 12. 13. REFER TO C-01 FOR GENERAL NOTES. CONTRACTOR LAYDOWN AND PARKING AREA TO BE RESTRICTED TO THE WORK ZONE. ANY DAMAGED AREAS TO BE RESTORE UPON COMPLETION OF CONSTRUCTION. ALL AREAS OF REGRADING TO BE COMPACTED TO 98% SPMDD OR AS RECOMMEND BY THE GEOTECHNICAL CONSULTANT. ALL GRADED AREAS TO BE FINALIZED WITH 150mm OF TOPSOIL AND SOD. REMOVE AND LEVEL ANY DEPRESSED AREAS, PROVIDE MINIMUM 0.5% POSITIVE GRADE. PROVIDE MINIMUM 1.0% GRADE IN ALL SWALES. MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDINGS. REFER TO C-03 FOR TYPICAL CROSS SECTION THROUGH SITE. REFER TO MECHANICAL/ ELECTRICAL FOR SERVICE CONNECTIONS. REFER TO ARCHITECTURAL/ STRUCTURAL/ MECHANICAL/ ELECTRICAL DRAWINGS FOR BUILDING DETAILS. PROVIDE TREE PROTECTION WHEN WORKING IN VICINITY OF EXISTING TREES. 1m ROUNDING AT 2% SLOPE. REFER TO ARCHITECTURAL FOR DETAILS ON CONSTRUCTION FENCING, CONSTRUCTION NOTES, AND TEMPORARY REQUIREMENTS.
© Copyright 2025 Paperzz