December 2015 Update | Sector: Capital Goods Capital Goods India Transmission Ankur Sharma ([email protected]); +91 22 3982 5449 Amit Shah ([email protected]); +91 22 3029 5126 Capital Goods | Transmission Contents India Transmission Sector .................................................................................................. 3 Increased government focus on transmisson ..................................................................... 4 th th Mapping transmission spending over 10 –13 Plan .......................................................... 6 So what does it mean for transmission players? ................................................................ 9 Higher voltage and new technologies the way forward in transmission .......................... 14 Competitive intensity lower post implementation of domestic manufacturing clause..... 16 Tariff-based bidding for transmission projects ................................................................. 20 Planning the transmission system .................................................................................... 24 Annexures........................................................................................................................ 29 Companies .................................................................................................................. 33-63 ABB.............................................................................................................. 34 Alstom T&D India ........................................................................................ 39 Crompton Greaves....................................................................................... 48 KEC International ......................................................................................... 53 Larsen & Toubro .......................................................................................... 58 Prices as on 16 February 2016 Investors are advised to refer through important disclosures made at the last page of the Research Report. February 2016 2 Motilal Oswal research is available on www.motilaloswal.com/Institutional-Equities, Bloomberg, Thomson Reuters, Factset and S&P Capital. Capital Goods | Transmission India Transmission Transmission capex 11th -13th plan (INR b) Inter-state Intra state 1500 1125 750 375 13th Plan 12th Plan 11th Plan 0 Transmission line addition (ckm) 11th -13th plan 100,000 HVDC 400kv 765kv 220kv 75,000 50,000 25,000 13th plan 12th plan 11th Plan 0 India Transmission Sector States to drive capex Increased government focus on transmission The availability of sufficient generation capacity and resolution of fuel supply issues has driven government’s focus toward reducing transmission constraints and ensuring seamless power transfer across and within states. India’s current transformation capacity (220kva and above) stands at 2.3MVA/MW v/s the optimal ~7MVA/MW needed for uninterrupted power evacuation; this highlights the case for increased investments in the transmission sector. Transmission capex estimated at INR2.6t (+49%) in the 13th Plan (2018-2022e); states to drive spending Transmission capex is expected to grow 49% in the 13th Plan to INR2.6t, with interstate capex at INR1.3t (+8% v/s 118% in the 12th Plan) and the balance as intra-state capex (+136%). A slowdown in the 13th plan in the inter-state capex (765/400kv) is on account of a corresponding slowdown in generation capacity addition. Based on the transmission capacity expected to be rolled out in the 13th plan, we estimate a big jump in spending on intra-state transmission (220kv) and HVDC lines while capex in the 765kv/400kv segment (transformers, lines, substations) will slow down. We expect higher competitive intensity in orders at the 220kv level (versus 400/765kv) as the number of players participating would be higher. Grid shifts to higher voltages and new technologies; advantage MNC T&D players The Indian grid (>132kv) has been moving toward higher voltages and new technologies. Currently, inter-state transmission lines are primarily run at 400/765kv level. Higher voltages lead to more efficient transfer of power while using lesser space. Similarly, new technologies such as HVDC, static compensators and PMU’s are being used to make the grid more stable. MNC T&D players such as Alstom T&D India, ABB India and Siemens India have an edge over local players as they have access to their parent’s technology and can introduce these products in India. Tariff-based bidding - developers prefer players with established track record With tariff-based bidding the norm for award of projects, developers would prefer vendors with an established track record to ensure timely completion of the project and failure free operation over the 35 year time period of the project. However, aggressive bids could imply pricing pressure for equipment suppliers/EPC players. Click here for Video Link February 2016 Top picks and risks Within our coverage, our top picks to play the transmission sector capex are Alstom T&D (Buy, TP: INR470) and KEC International (Buy, TP: INR130). Other stocks with meaningful exposure to transmission capex are ABB India (Neutral, TP: INR1380), Crompton Greaves (Neutral, TP: INR165), L&T (Buy, TP: INR1,440) and Siemens India (Sell, TP: INR1,010). Key risks to our rating are a slower-than-expected pick-up in state spending and a sharp rise in imports for transmission equipment. 3 Capital Goods | Transmission Increased government focus on transmisson Transmission constraints and northern region blackout drive spending Over the past year, Central government’s focus toward transmission has increased —buoyed by the availability of sufficient generation capacity and resolution of fuel supply issues, the government’s focus has turned toward reducing transmission constraints and ensuring seamless power transfer across and within states. Exhibit 1: Power Value chain – focus has shifted to transmission and distribution Source: Ministry of Power, MOSL Strong power generation growth — focus shifts to Transmission & Distribution India cumulatively added ~110GW in generation capacity over the last eight years. With a targeted addition of 88GW(excl. renewables) in the 12th Plan ending FY17 (likely to be exceeded as 72GW already added till Dec’15), India would add ~145GW over 10 years—between FY08 and FY17; this compares very favourably to the 8th, 9th, and 10th Five-Year Plans, which saw cumulative addition of a mere 55GW. While India managed to add significant power generation capacity in the last 10 years, other inputs such as coal, transmission capacity and distribution reforms failed to keep pace with it. The current government is focusing on: Increasing coal production. The government intends to increase Coal India’s production to 1bn tons by FY20; we do note that Coal India’s production grew by 7% in FY15 and is up 9% YTD, Resolving transmission and distribution constraints. The government has already started focusing on removing transmission bottlenecks and the recent UDAY scheme should hopefully lead to a turnaround of the discoms. To ensure free and uninterrupted flow of power, every 1MW of new generation capacity needs to have ~7MVA of equivalent transformation capacity added to the system. February 2016 4 Capital Goods | Transmission Exhibit 2: Every MW of new generation capacity needs around 7MVA of transmission capacity Generation Generation Capacity Generating Transformer Sending 765 KV Receiving 765 KV 400 KV Transmission 220 or 132 KV Transmission Cap requirement. 765 KV Generating system MW MVA 660 805 22 KV to 765 kv 1080 400 KV generating system 765 KV to 400 kv 1080 400 KV to 220 1620 220 kv to 132 kv or 33kv 2430 6210 Sending 400 kv Receiving 400 KV 9.4 Transmission Cap requirement. MW MVA 22 KV to 400 kv 400 to 220 kv or 132 kv 500 610 811 811 Sending 220 KV 22 KV to 400 kv 500 Receiving 400 KV 220 kv to 132 kv 500 wt requirement wt avg 220 KV generating system MW MW 200 224 1622 3.2 Transmission Cap requirement. 1000 5 Assessment of transformation capacity 765 KV generating system-1 phase system-6 transformation 0.5 9.4 4.7 400 KV generating system-1 phase system-4 transformation 0.35 3.2 1.1 220 KV generating system-3 phase system-4 transformation 0.15 5 0.75 6.6 However, India currently has only 2.3MVA of transmission capacity per megawatt of generation capacity (far below the required 7MVA); this largely explains the congestion that is visible in inter-state transmission of power. While Power Grid has done a good job in terms of adding transmission capacity, it has not been sufficient. Understanding this need, the government opted to open the sector to the private sector (from Jan’11 for inter-state and from Jan’13 for intra state transmission). Exhibit 3: Transformation capacity analysis (220kv and above) Generation Transformation MVA/ (MW) Capacity (MVA) MW VI 42,584 46,621 1.1 VII 63,636 75,322 1.2 VIII 85,795 125,042 1.5 IX 105,045 181,942 1.7 X 132,329 257,639 1.9 XI 199,877 409,551 2.0 XII (Till December, 2015) 284,303 633,056 Plan 2.3 Source: CEA, MOSL Another important event that contributed to the renewed focus on establishing a robust and reliable transmission system was the northern region blackout in CY12 after a grid failure. Two severe power blackouts affected most of northern and eastern India on July 30 and 31, 2012. The day 1 blackout affected over 300mn while the day 2 blackout remains the largest power outage in history and affected over 620mn people, about 9% of the world population or half of India's population. February 2016 5 Capital Goods | Transmission Mapping transmission spending over 10th–13th Plan Sharp pickup expected in intra – state spending India currently has two transmission systems—Interstate Transmission System (ISTS) and Intra-state Transmission System (Intra-STS). These systems together make up 337,000ckms of transmission lines (>220kv), 15,000MW of high-voltage direct current (HVDC) terminals and 633, 000MVA of transformation capacity (incl. HVDC lines). Exhibit 4: Existing and planned transmission system capacity across India th Current 12th plan 12th addition plan end (Dec, 15) addition plan end 5,872 3,560 9,432 12,938 7,440 16,872 2,184 3,066 5,250 23,789 27,000 32,250 400kv 75,722 31,097 106,819 144,067 38,000 144,819 220kv 114,629 21,351 135,980 155,666 35,000 170,980 Total 198,407 59,074 257,481 336,460 107,440 364,921 HVDC back-to-back 3,000 - 3,000 3,000 - 3,000 HVDC Bipole terminals 5,000 1,750 6,750 12,000 12,750 19,500 Total- HVDC Terminal Capacity, MW 8,200 1,550 9,750 15,000 12,750 22,500 765 kV - 25,000 25,000 133,500 149,000 174,000 400 kV 92,942 58,085 151,027 197,932 45,000 196,027 220kv 156,497 67,277 223,774 278,588 76,000 299,774 Total- AC Substation capacity, MVA 249,439 150,362 399,801 618,056 10th plan 11th plan end HVDC Bipole lines 765kv Description 11 Transmission Lines (220kv and above) ckm HVDC terminal AC Substations transformation capacity 270,000 669,801 Source: CEA, MOSL Exhibit 5: Inter-state transmission system—current and proposed till FY17 Source: PGCIL, MOSL February 2016 6 Capital Goods | Transmission Spending on transmission in the 10th–13th Plans (FY03-22e) Based on the capacity addition required for the inter-state (ISTS) and intra-state transmission systems, a capex of INR2.6tn would be required over the 13th Plan. Out of this, NR1.3tn would be spent on the ISTS and the balance INR1.3tn would be spent by the states on the intra-state transmission network (INR300b on 400kv level and the balance INR1, 000b primarily 220kv and below). th Exhibit 6: Spending on transmission in the 10-13 Plan period 10thplan(FY03-07) INR b 11th plan(FY08-12e) 12th plan(FY13-17e) 13th plan(FY18-22e) Total PGCIL Share Total PGCIL Share Total PGCIL Share Total PGCIL Share Inter State 200 190 95% 550 553 98% 1,200 1,000 83% 1,300 650 50% Intra State 255 0% 550 100 18% 1,300 325 25% Total (transmission) 455 562 190 42% th 1,112 553 50% 1,750 1,100 63% 2,600 975 40% th Source: MOSL **13 plan capex by PGCIL assuming a 50% share in ISTS th Exhibit 7: 11 – 13 plan transmission capex (FY08-22e) INR m 11th Plan 12th Plan 13th Plan Inter State(400/765kv/HVDC) 550 1,200 1,300 Intra State (220kv, 400kvv) 562 550 1,300 1,112 1,750 2,600 57% 49% 118% 8% Total transmission capex YoY Growth (%) Inter- state transmission system growth (%) Intra state transmission system growth (%) Generation capacity addition – incl. renewables (MW) Growth vs. previous plan (%) 67,926 -2% 136% 120,000 100,000 77% -18% Source: CEA, MOSL ISTS spending growth would slow down to 8% in the 13th Plan from 118% seen in the 12th Plan. Intra-state spending would jump 136% over the 12th Plan as states step up spending to upgrade their networks to align with inter-state transmission corridors. Large growth in ISTS during the 12th Plan was driven by the INR670bn spending on setting up nine High-Capacity Transmission Corridors (HCTCs), which have been set up to link the generation plants. A slowdown in ISTS spending along with higher state spending has the following two repercussions for the sector: February 2016 With intra-state spending rising 136% to INR1.3t, states will need to step up their spending requirements in building transmission capacity. PGCIL has already started working with states to help them upgrade their existing infrastructure (JVs formed with Bihar and Orissa); this can be either done through spending by the states themselves or via the PPP route. Not only is PGCIL required to win ISTS projects on tariff-based bidding going into the 13th Plan, the spending growth on such projects is also seen slowing down (8% in the 13th Plan v/s 118% in the 12th Plan); this implies that PGCIL will need 7 Capital Goods | Transmission February 2016 to diversify its growth areas (in distribution and smart grid) to keep up its momentum. Focus will shift away from PGCIL ordering to state level orders since states would need to increase their spending on upgrading their respective networks. Working with different states vs. working only with PGCIL has its own set of challengers including an elongated working capital cycle, multiple customers vs. a single customer(PGCIL) but we are given to understand that competition in state level projects are lower than PGCIL projects. 8 Capital Goods | Transmission So what does it mean for transmission players? Focus now shifts to the state transmission capex We expect a big jump in spending from the states on intra-state transmission and on HVDC lines while capex in the 765kv/400kv segment (transformers, lines, substations) will slow. Since state level spending would primarily be on the 220kv level, we expect higher competitive intensity (versus 400/765kv) for orders as the number of players participating would be higher. Our estimate for equipment and voltage-wise spending during the 13th plan is discussed below: Transformers: Based on transformation capacity addition of 288,000MVA (220kv and above), total spending on transformers in the 13th plan is expected to be up 7% v/s the 12th Plan and 92% v/s the 11th Plan. More importantly, transformer capex is likely to decline in the 765kv segment (INR24b, -47% YoY) and increase in the 400kv (INR15bn, +9%) in the 13th plan. Orders for 1200kv transformers are likely to start flowing only toward the beginning of the 14th Plan (2023 onwards). The 220kv segment is likely to see a sharp jump of 111% in the 13th Plan to INR48b (v/s +10% in the 12th Plan) as states upgrade their transmission network. Most players that are strong in the 400/765kv transformers have not been very aggressive in the 220kv segment, which has historically seen more competition and is a more commoditized market. Exhibit 8: Transformer capacity(MVA) across the industry in transmission and distribution Company Name ABB Ltd. 20,410 Alstom T & D India Ltd. 25,075 Crompton Greaves Ltd. 40,000 Siemens Ltd. 15,000 TBEA Shenyang 15,000 Bharat Heavy Electricals Ltd. 45,000 TRIL 33,200 Bharat Bijlee Ltd. 15,000 Emco Ltd. 20,000 Indo Tech Transformer Ltd. 7,450 Voltamp Transformers Ltd. 13,000 Schneider Electric Sub- Total Organized as a proportion of total Total Industry capacity Growth YoY (%) February 2016 FY15 7,000 256,135 65% 394,054 0% Source: MOSL, Company 9 Capital Goods | Transmission February 2016 Transmission lines: Transmission line capex is likely to rise 36% to INR1440b in the 13th Plan (+91% in the 12th plan), driven by a surge in capex in 220kv and HVDC lines. Spending in 765kv and 400kv transmission lines would decline 9% to INR574b. Spending for intra-state transmission in the 220kv lines is likely to be INR600b (+145%) while HVDC lines are likely to witness spending of INR265bn (+42%). Clearly, state spending on transmission lines is expected to pick up substantially. Substation: Overall substation capex is expected to be INR980bn in the 13th Plan (+32% over the 12th Plan), driven by spending on HVDC and 220kv substations. Spending on 220kv substations is likely to be INR400bn (+111% over the 12th Plan) while HVDC substation spending is pegged at INR195b in the 13th Plan (+39% over the 12th Plan). Cumulative spend on 765/400kv substations is seen declining 7% over the 12th Plan to INR384b. HVDC Substations: Four large HVDC terminals (as mentioned below) are envisaged during the 13th Plan, with a total 15GW capacity and estimated spending of INR195b (+39% over the 12th Plan). Champa Kurukshetra Phase 2 (3GW): Work to start from Q4FY16-Q117 and likely to commission by FY18. The order has been awarded to Alstom SA for INR33b and Alstom T&D’s share in the order is INR14.5b. Chhattisgarh (Raigarh) to Tamil Nadu (6GW): Tenders already issued and likely to be ordered by Q4FY16/Q117. The project has been given to PGCIL on nomination basis and the cost is INR200b. We estimate HVDC’s portion of the order at ~INR70-75bn. Three bidders have submitted bids for the order— ABB, Siemens and Alstom SA. This line could be extended to Kerala for evacuating another 3GW of power. Orrissa to Badarpur (3GW): Still in the planning stage. Assam (Rangia/Rowta) to Punjab (3GW): Still in the planning stage 10 Capital Goods | Transmission th Exhibit 9: Transmission capacity addition and capex over 11-13 plan (2008-2022e) Description Transmission Lines (>220kv ckm HVDC Bipole lines 765kv 400kv 220kv Total HVDC terminal HVDC back-to-back HVDC Bipole terminals HVDC Terminal Capacity, MW 10th Plan end 11th plan addition 11th plan end Current (Dec,15) 12th plan addition 12th Plan end 13th plan addition 13th Plan end 5,872 2,184 75,722 114,629 198,407 3,560 3,066 31,097 21,351 59,074 9,432 5,250 106,819 135,980 257,481 9,432 23,789 144,067 155,666 336,460 7,440 27,000 38,000 35,000 107,440 16,872 32,250 144,819 170,980 364,921 10,600 22,200 30,000 85,714 148,514 27,472 54,450 174,819 256,694 513,435 3,000 5,000 8,200 1,750 1,550 3,000 6,750 9,750 3,000 12,000 15,000 12,750 12,750 3,000 19,500 22,500 15,000 15,000 3,000 34,500 37,500 92,942 156,497 249,439 25,000 58,085 67,277 150,362 25,000 151,027 223,774 399,801 133,500 201,117 283,439 618,056 149,000 45,000 76,000 270,000 174,000 196,027 299,774 669,801 79,000 49,000 160,000 288,000 253,000 245,027 459,774 957,801 AC Substations capacity 765 kV 400 kV 220kv Total- AC Substation capacity, MVA Transformer capex 765kv 400kv 220kv Total capex YoY Growth(%) Transmission line capex HVDC Bipole 765kv 400kv 220kv Total transmission line capex YoY Growth (%) % of total transmission capex Substation spending (Rs Mn MVA) HVDC Bipole/ Back to back 765kv 400kv 220kv Total YoY Growth (%) % of total transmission capex February 2016 7,500 17,426 20,183 45,109 44,700 13,500 22,800 81,000 80% 23,700 14,700 48,000 86,400 7% 89,000 45,990 248,776 170,808 554,574 186,000 324,000 304,000 245,000 1,059,000 91% 61% 265,000 288,600 285,000 600,000 1,438,600 36% 55% 50% 19,250 75,000 145,213 168,193 407,655 37% 140,250 298,000 112,500 190,000 740,750 82% 42% 195,000 237,000 147,000 400,000 979,000 32% 38% Source: CEA, MOSL 11 Capital Goods | Transmission th Exhibit 10: HVDC lines planned (11–13 Plans) Description Type Agency Chandrapur-Padghe (Alstom) Rihand-Dadri (Siemens) Talcher-Kolar Balia-Bhiwadi Biswanath-Agra (ABB) Champa– Kurukshetra (Alstom) LILO of Bishwanath Chariyalli– Agra at Alipurduar(ABB) Mundra -Mohindergarh (Siemens) Champa - Kurukshetra - II (Alstom) Chhatisgarh -Tamil Nadu Orrisa - Badarpur +/-800kv HVDC Assam(Rangia/Rowta) Punjab(Gurdaspur) +/-800kv Sub-total (bipole) bipole bipole bipole bipole bipole bipole MSEB PGCIL PGCIL PGCIL PGCIL PGCIL bipole PGCIL bipole bipole bipole Bipole Adani PGCIL PGCIL NA Bipole NA Vindhyachal Chandrapur (Alstom) Gazuwaka Sasaram (Alstom) Sub-total (b-to-b) TOTAL – HVDC Terminal Capacity, MW b-to-b b-to-b b-to-b b-to-b PGCIL PGCIL PGCIL PGCIL th 10 Plan end 1,500 1,500 2,000 Expected at 11th 12th/early the end of Plan end 13th Plan 12th/early 13th Plan 1,500 1,500 500 2,500 13th plan End of 13th Plan 3000 3000 1,500 1,500 2,500 2,500 3000 3000 1,500 1,500 2,500 2,500 3,000 3,000 3000 3000 3,000 2,500 2,500 2,500 3,000 6,000 3,000 6,000 3,000 5,000 10,500 500 1,000 1,000 500 3,000 8,000 500 1,000 1,000 500 3,000 13,500 9,000 19,500 15000 19,500 9,000 500 1,000 1,000 500 3,000 22,500 500 1,000 1,000 500 3,000 15,000 22,500 Source: MOSL th Exhibit 11: Inter-regional transmission capacity (MW) envisaged until the 13 Plan Transmission Corridor(MW) East- North East - West East - South East- North East West - North West - South North East - North Total Addition in capacity over the plan period (in MW) 10th Plan end 11th Plan end Existing (Jan, ’16) 12th Plan balance 3,430 1,790 3,130 1,260 2,120 1,720 14,050 10,030 4,390 3,630 1,260 4,220 1,520 25,650 11,600 15,830 12,790 3,630 2,860 12,920 7,920 1,500 47,450 2,100 4,200 4,000 4,500 22,700 End of 12th 13th Plan Plan addition 17,930 12,790 7,830 2,860 16,920 7,920 6,000 72,250 46,600 8,800 8,400 4,200 15,600 14,400 3,000 54,400 End of 13th Plan 26,730 21,190 12,030 2,860 32,520 22,320 9,000 126,650 54,400 Source: CEA, MOSL, Note INR1.2trn spend in 12th plan and INR1.3trn in 13th plan February 2016 12 Capital Goods | Transmission Exhibit 12: Company-wise presence across the transmission value chain Name of company Transmission Line BHEL L&T √ Substation Transformer √ √ √ ABB India √ √ Siemens India √ √ Crompton Greves √ √ Alstom T&D India √ √ KEC International √ Conductor √ Kalpataru Power √ √ Techno Elctric √ √ Jyoti Structures √ √ Skipper Ltd √ Voltamp √ Bharat Bijlee √ TIL √ Ino Tech Tansformer √ Sterlite Technologies √ Source: MOSL Exhibit 13: Inter-regional transmission links planned till FY22e Source: CEA February 2016 13 Capital Goods | Transmission Higher voltage and new technologies the way forward in transmission Advantage MNC T&D players as limited competition The Indian transmission network (>132kv) has been continuously moving toward higher voltages and new technologies. Currently, transmission lines are primarily run at 400/765kv voltage levels; PGCIL intends to move to 1200kv in the 14th Plan. Intra state transmission networks are being upgraded from 132kv level to 220/400kv. Higher voltages lead to more efficient transfer of power while using lesser space New technologies being adopted to make the grid more reliable and efficient include HVDC, dynamic compensation, PMU based technology/wide-area monitoring system (WAMS), phase shifting transformers, series reactors, and 1200kV UHVAC. Below we discuss a few details about these technologies: HVDC: A high-voltage, direct current (HVDC) electric power transmission system uses direct current for the bulk transmission of electrical power instead of the more common alternating current (AC) systems. HVDC are less expensive for long-distance transmission and suffer lower electrical losses. Exhibit 14: Advantages of shifting to higher voltage levels Voltage Level ROW Meters(M) Capacity (MW) +800 kV HVDC HVDC 64 46 70 90 500-600 2500-3000 2000-2500 6000-6400 6000-8000 15 45 48 220 kV 400 kV 765 Kv 27 35 52 70-80 160-170 3 5 MW/m February 2016 +500 kV 132 kV 1200 kV 90 90 Source: CEA, MOSL SVC/STATCOM. To maintain voltages within limits and grid stability, STATCOM/SVC are required as dynamic compensators. A static synchronous compensator (STATCOM) is a regulating device used on alternating current electricity transmission networks; when connected to a source of power, it can also provide active AC power. PGCIL is looking to order a total of 14 SVC’s with two already ordered out (Siemens and Techno Electric/Rongxin) Wide Area Monitoring System (WAMS). The Indian power systems’ dimensions and complexity are increasing, which necessitates better visibility of the grid system. The dynamic behaviour of a power system can be observed on almost a real-time basis at the control centre, thereby improving/enhancing situational awareness for operators and increasing the grid’s deliverability. Phase Shifting Transformers. Phase shifting transformers (PST) help control the real power flow in transmission lines and systems inter-ties and allow for better utilization of existing networks by balancing the loading in parallel paths. Reactors. To meet the growing power generation (necessitated due to rising demand), new lines are being added—this has resulted in an increase in instances of short circuit. Series reactor has been considered for limiting the occurrence of fault current and the resulting short circuit. 14 Capital Goods | Transmission 1200kV UHVAC technology. Power Grid has lead the way in establishing 765kV AC technology for high-capacity transmission corridors in the past few years. However, in view of the growing right-of-way concerns, there is a need for augmenting transmission of power in a given right-of-way. Therefore, the world’s highest transmission voltage level of 1200kV UHV-AC was established in India in 2012 with the charging of National Test Station at Bina in MP.. Exhibit 15: Indian grid moving toward higher voltage levels over the years Year Voltage 1950 220 1960 220 1970 220 1980 220 1990 400 2000 500kv DC 2007 765kv Ac 2010 800kv Dc 2023e 1200 kv Ac Source: CEA, MOSL With most of the incremental transmission capacity likely to be put up at high voltages (765/400kv), the player-wise capabilities across various equipment types is listed below. Exhibit 16: Capabilities across high-voltage equipment Name of Company 765kv 1200kv transformer transformer HVDC StatCom 400/765kv 400kv 765kv AIS GIS GIS PMU ABB India Y Y Y Y Y Y Y Y Siemens India Y Y Y Y Y Y Y Y Alstom T&D India Y Y Y Y Y Y Y Y Toshiba India Y Y Y N Y Y Y NA TBEA Shenyang India Y Y N N N N N N Crompton Greaves Y Y N N Y Y N N Hyosung Y Y N N Y Y Y N Source: CEA, MOSL Exhibit 17: Company wise exposure to the transmission sector Name of Company 55% Siemens India 25% Alstom T&D India Crompton Greaves 100% 25%-30% BHEL 5-7% L&T 8-10% KEC international February 2016 % of total sales ABB India 70% Source: MOSL,** includes export sales and overseas markets as well 15 Capital Goods | Transmission Competitive intensity lower post implementation of domestic manufacturing clause To promote the government’s ‘Make in India’ initiative, PGCIL has already put in place stringent norms to force equipment suppliers to set up factories in India. Even before the current push, PGCIL inserted a domestic manufacturing clause for its 765kv transformers—which led to companies (Alstom T&D, ABB, and TBEA Shenyang) setting up factories at Baroda over the last 5-6 years. As highlighted in the chart below, PGCIL has expanded the domestic manufacturing clause across equipment types; this could lead to more Chinese/Korean companies setting up shop in India. Media reports indicate that Baoding (Chinese transformer manufacturer) has started constructing a 10,000MVA transformer facility at Baroda while Hyosung (Korean GIS manufacturer) is putting up a switchgear factory near Pune. Source: PGCIL The Make in India clause benefits local players in two ways: It weeds out non-serious players who were previously importing and dumping equipment from their overseas factories. This is in turn implies a bigger pie for existing players and is very evident in the case of 765kv transformers where Koreans have completely left the market after PGCIL imposed the domestic clause. Improves pricing for locally made equipment as the domestic players have a more level playing field versus foreign competition (read Chinese and Korean players). February 2016 16 Capital Goods | Transmission 765kv transformers - competition down on domestic manufacturing clause In order to promote domestic manufacturing of 765kv transformers, PGCIL had introduced a mandatory supply of transformer from the Indian factory of the vendor. This was needed since a transformer has to run for 20-25 years and there had been a surge in imports of 765kv transformers from Korea and China. As we highlight in the chart below, the Koreans had a 22% market share in 765kv transformers while the Chinese had a 44% share in FY10; in FY12, the share of Korean manufacturers came down to 2% and since then have completely exited the market since they were not willing to set up a transformer plant. Similarly, Chinese transformer manufacturers Baoding and Xian have also exited the market as they are not able to meet qualification norms as above. This has led to just 4-5 players participating in 765kv transformer bids from PGCIL namely, Alstom T&D, TBEA Shenyang, ABB India, Siemens India, and Crompton Greaves. With no new players expected to set up a factory in India, we expect the competition to be limited to these players. Exhibit 18: Market share in 765kv transformers – Power Grid 34% 43% Korean Chinese 53% 46% Indian 87% 44% 22% 2009-10 77% 86% 27% 30% 2010-11 46% 54% 2% 2011-12 0% 2012-13 13% 0% 2013-14 23% 0% 2014-15 14% YTD'16 Source: PGCIL, MOSL 765kv substations – impact yet to be seen Within 765kv substations, we note that historically the Indian players had a dominant share. However, there has been a shift of share towards the Koreans/Chinese over the past two years. This is primarily due to PGCIL moving towards award of GIS substations versus AIS earlier; ~65-70% of substation orders in FY15/YTD’16 have been for GIS. YTD FY16, Korean player Hyosung had a 44% share in the 765kv substation market at the expense of Indian players. We understand that PGCIL has introduced a domestic manufacturing clause in 765kv GIS equipment as well – this requires that at least one bay needs to be made from a factory in India. This effectively means that vendors would need to set up a factory in India. Hyosung, which is the only Korean player in this segment, is looking to set up a 765kv GIS factory near Pune. Amongst the Chinese, North East Electric and Pinggao Group have been quite aggressive in this market. These two players would also have to set up a manufacturing base in India in order to continue supplies to PGCIL – if not, they would have to exit the market. February 2016 17 Capital Goods | Transmission Exhibit 19: Market Share in 765kv substations - PGCIL Korean Chinese Indian 23% 100% 100% 82% 96% 25% 53% 2009-10 2010-11 4% 2011-12 37% 23% 63% 12% 6% 2012-13 2013-14 33% 2014-15 44% YTD'16 Source: PGCIL, MOSL Within the substation segment, PGCIL has been increasingly moving towards GIS substation with ~60-70% of substation orders during FY15 and YTD FY16 have been for GIS substations (400/765kv). The Chinese (North East Electric Group, Xian and Pinggao Group) together had a 35% share while Hyosung had another 50% share in orders YTD’16. Exhibit 20: GIS substation market share – PGCIL (%) Korean Chinese 18% 49% 33% 2014-15 Indian 15% 35% 50% YTD'16 Source: PGCIL, MOSL Transmission lines – consolidation is evident While there is no domestic manufacturing clause there for transmission line companies, PGCIL has over the past two years tried to restrict the bidders to only serious players who are able to execute on time. Vendors who have won orders earlier but not able to execute on time are not being technically qualified and therefore not able to participate in the financial bids. We note that PGCIL works on a regulated model where it gets a fixed ROE on capitalized assets – however, it does not earn anything on CWIP. A consistent delay in the execution of projects leads to higher CWIP and therefore PGCIL took the decision to prune its vendor list to only the serious bidders who have the requisite experience in execution of projects. There is a clear consolidation in the market share of players – the top four players now account for ~75% of the orders awarded by PGCIL during YTD’16. We highlight the period during FY11-FY12 when a large number of new players jumped into the transmission EPC fray – this was also on account of a sharp slowdown in orders in other infrastructure projects. However, since then we have seen quite a few of these players exit post not being able to execute the projects on time or have been February 2016 18 Capital Goods | Transmission black listed by PGCIL and therefore their financial bids are not being opened. This has led to a consolidation in the existing players who have proved their execution capability. Exhibit 21: Transmission lines market share – PGCIL Bajaj Electrical Gammon India EMC Kalpataru Power KEC International L&T TATA Project Others 100% 75% 50% 25% 0% FY09 February 2016 FY10 FY11 FY12 FY13 FY14 FY15 YTD'16 19 Capital Goods | Transmission Tariff-based bidding for transmission projects Preference for vendors with established track record The Electricity Act, 2003 opened up the transmission sector to private sector participation subject to obtaining a transmission license. The act provides for transmission licenses by the CERC and SERC and for determination of tariffs under section 61/62 through competitive tariff-based bidding. A model transmission agreement (MTA) was also notified in May, 2012. All new transmission lines (inter- state) shall be ‘bid out’ from January 2011 and only lines that are of national interest shall be given to Power Grid on a nomination basis. All intra-state transmission networks to have tariff-based competitive bidding (TBCB) from January 1, 2013. There are two ways for ‘bidding out’ the transmission networks: (1) Model transmission agreement using the lowest VGF/grant as notified by the Planning Commission or (2) the Standard Bidding Documents (SBD) as notified by the Ministry of Power. For most of the inter-state transmission projects PFC/REC use the SBD method while some states have used the VGF model as notified by the Planning Commission. Exhibit 22: Procedure for bidding out of transmission projects on tariff based bidding Project approval by empowered committee Bid process coordinator selected (PFC and REC) RFQ notification and bid invitation Bidder 1 / 2 / N Response to RFQ submission and evaluation by BPC Selection of qualified bidders. Issuance of RFP to selected bidders (a) Responsiveness check, (b) Compliance with submission requirements, (c) Evaluation of qualifying requirements Bidder 1 / 2 / N Annual transmission charges quoted for the contract years (35 years) in the RFP Transmission charges levelized over a period from the scheduled COD of the project up to 35 years Project awarded to L1 (lowest) bidder CERC Source: CERC, MOSL February 2016 20 Capital Goods | Transmission PGCIL has got 11 projects out of the 20 that it had originally bid for, which implies a ~50% market share in such projects. PGCIL was also awarded projects worth INR360b (lowered to INR260b) on a nomination basis by the government; of these, the INR260b Raichur-Pugular HVDC line project was done on Tamil Nadu’s insistence, as the state wanted this line to come up on time. Developers prefer EPC players/equipment manufacturers with established track record Competitive intensity was quite high in the initial tariff-based projects with 10-15 players participating in bids. However, in recent bids, the number of players declined to 5-7; it seems that most players have realized that executing the projects is not easy because of right-of-way and clearance-related issues that developers face. As per our discussion with project developers as also our utilities analyst, levelized tariff needs to be in the region of 13%-18% of project cost to earn 10%-28% ROE. This is also evident from CERC recommended tariff which typically are in the same range and assume a fixed ROE of 15.5% (See table on next page for detailed project wise breakup). The two key components in tariff based bidding, in our view are: February 2016 Capital Cost of the project – This would depend not only on the equipment and the related construction costs but also timely completion of the project. Quite a few times, the project developers tie up with the equipment suppliers/EPC players to lock in the capital cost of the project and then use this arrive at the bid tariff. We note that the project IRR’s/ROE’s are dependent on timely execution and delays could led to costs escalation and a fall in expected IRR’s/ROE. This would imply the project developers would like to stick to equipment manufacturers/EPC players who have a proven execution record both in terms of reliability o equipment and timely completion as per deadlines. Our discussions with a few private transmission developers indicate that they would prefer to stick with Indian equipment manufacturers since the transmission line has to be run for 35 years and an equipment failure could lead to penalties. Interest cost – This would depend on the credit worthiness of the developer as also whether the borrowing is domestic or international. PGCIL has the benefit of lower interest costs given its high credit ratings. 21 Capital Goods | Transmission Exhibit 23: Transmission project awarded on tariff based bidding Project State East North Interconnection transmission project Assam, West Bengal & Sterlite Technologies Bihar Madhya Pradesh & Sterlite Transmission Projects Chhattisgarh Gujarat, Madhya Pradesh Sterlite Transmission Projects & Maharashtra Tamil Nadu PGCIL Techno Electric and Haryana Engineering Jabalpur Transmission project Bhopal Dhule Transmission Co Ltd Nagapattinam-Madhugiri Patran Transmission Co. Ltd. Transmission System for Part ATS of Rajasthan RAPP U-7 & 8 Eastern Region System West Bengal, Jharkand Strengthening Scheme-VII Darbhanga-Motihari - ERSS VI Talcher-II Transmission Co Ltd Odisha , AP North Karanpura Transmission Co Uttar Pradesh , MP, Ltd Chhatisgarh, Haryana Raichur Sholapur Transmission Co Karnataka Ltd Vemagiri A Transmission System Ltd Andhra Pradesh Vizag Transmission Ltd NA Kudgi Transmission Ltd NA NRSS XXIX NA NRSS XXXI (A) NA NRSS XXXI (B) NA WRSSS-II Project B (Maharashtra) Maharashtra WRSSS-II Project C (Gujarat) Gujarat Transmission system for 1320MW Haryana Jhajjar TPP Bikaner-Deedwana-Ajmer-Sujangarh Rajasthan transmission Hindaun -Alwar Transmission line Rajasthan 765kV S/C Mainpuri-Bara line with Uttar Pradesh 765/400kV AIS at Mainpuri 765kV S/C Mainpuri -Hapur & Mainpuri -Gr Noida lines with Uttar Pradesh 765/400kV AIS at Hapur & Gr Noida Unchahar Transmission Uttar Pradesh NCC Project Andhra Pradesh Vindhyachal V Transmission Madhya Pradesh Strengthening Scheme Gadarwara STPS (2 x 800 MW) of Madhya Pradesh NTPC (Part A) Gadarwara STPS (2 x 800 MW) of Madhya Pradesh NTPC (Part B) Maheshwaram (Hyderabad) Andhra Pradesh 765/400 kV Pooling S/s Additional System Strengthening Madhya Pradesh Scheme, Sipat Chattisgarh (A) transmission project Chattisgarh Chattisgarh (B) transmission project Chattisgarh Vemagiri II transmission line Andhra Pradesh 400kv D/C Bikaner to Sikar Rajasthan Bhutan Interlink - Alipurduar Project Bhutan to East India February 2016 Developer Award Date Project Levellised cost Revenue (INR m) (L1) CERC tariff Tariff as % of cost Jan-10 8,000 1,188 15% Jan-11 13,000 1,421 11% Jan-11 19,000 1,995 11% Mar-12 10,250 987 10% 2,000 274 14% Sterlite Grid Sep-13 3,100 365 12% Sterlite Grid Sep-13 4,500 589 13% Essel Infraprojects Ltd PGCIL Dec-09 9,347 14,000 1,174 1,440 13% 10% PGCIL Dec-09 27,000 2,580 10% Patel Engg, Simplex Infra & BS Transcomm PGCIL - discontinued PGCIL L&T IDPL Sterlite Grid PGCIL Essel Infraprojects Ltd Reliance Infra Reliance Infra Kalpatru Power & Techno Electric Dec-10 4,400 293 Mar-12 Jul-13 Jul-13 May-14 Feb-14 Jan-14 Nov-07 Nov-07 13,000 12,777 13,500 25,000 4,000 6,780 9,736 4,064 1,197 2,311 1,796 4,377 594 887 Apr-10 4,500 540 GMR Energy Oct-10 2,000 NA GMR Energy Isolux Corsan Concesiones S.A. Oct-10 574 NA Jul-11 55,000 8,700 16% Cobra-MEIL Consortium May-11 45,000 8,750 19% PGCIL PGCIL Mar-14 1,200 10,000 167 1000 191 14% 10% PGCIL Feb-15 12,000 2,109 4,214 18% PGCIL Feb-15 25,250 2,901 5,935 11% PGCIL Feb-15 23,600 2,568 5,268 11% Strelite Grid Jul-15 3,960 550 14% Adani Power Jul-15 8,630 790 9% Adani Power Adani Power PGCIL KEC International Kalpataru Power Jul-15 Jul-15 Oct-15 Oct-15 Oct-15 8,230 19,760 63,000 2,600 18,000 1,324 1,780 3,590 294 1,294 537 2,369 2,328 4,175 923 7% 9% 18% 13% 18% 15% 13% NA NA 12% 16% 9% 6% 11% 7% Source: MOSL, PFC 22 Capital Goods | Transmission To level the playing field for the private sector vis-à-vis PGCIL, the government is looking to initiate several other measures. The measures include separation of POSOCO from PGCIL—POSOCO is in charge of five regional and central load dispatch centers. Another move being planned is to have an independent company for collection of transmission charges from states—currently, this is being done by PGCIL. Exhibit 24: Changing dynamics in the transmission sector Description Earlier Current/Proposed Grid Construction PGCIL - award on nomination basis PGCIL and Private players Grid Control PGCIL POSOCO hived off from PGCIL to control grid Collection of transmission charges PGCIL New company to be formed for collection of transmission charges Source: Industry, MOSL February 2016 23 Capital Goods | Transmission Planning the transmission system State-wise demand-supply gap rolled up to pan-India level A pickup in the pace of generation capacity addition (primarily from the private sector),the higher distance between source of generation and end-users along with power trading has led to a greater need for a robust transmission system. The 2012 northern region blackout has brought the focus back on having a reliable and dependable system that can withstand the load demand of various regions and states. Assessment the key to planning State - and region-wise import and export scenarios are assessed by using the available pipeline of generation plants (projected to come up in the 12th and 13th Plans); after this, to meet possible import/export requirements, a projection of the additional transmission system is made by using CEA’s system studies. The 18th Electric Power Survey is used as the basis for demand projection by each state/region for the 12th and 13th Plans. The transmission network is planned in a way that it meets peak load demand across seasons. On a pan-India basis, base load is ~70% of peak load—up to 80% load is present 50% of the time and peak period of 90-100% load only 5% of the time, as per CEA. Modeling the transmission system for 12th and 13th Plans (2013-2022) The transmission system requirement is modelled at the state level, following which it is aggregated at the regional level and then at the national level. In any given state, there can be state-sector generation tied up completely to the host state, central-sector generation serving more than one state, and power plants belong to state-sector and inter-state IPPs. Each state has its own power demand. Power availability from all the sources in a state minus its own demand gives net import or export of that state. The aggregation of import/export requirement of states within a region, and taking into consideration the diversity factor, translates into inter-regional power transfer requirements. The transmission system is planned to cater to the inter-state and inter-regional power transfer requirements. While planning the inter-state transmission system, the diversity in demand has to be also kept in mind. February 2016 24 Capital Goods | Transmission Exhibit 25: Planning methodology Source: CEA, MOSL As per the Electric Power Survey, peak demand would rise to ~200GW by the end of the 12th Plan (FY17) and to 284GW by the end of the 13th Plan (FY22) from 130GW by the end of the 11th Plan. The peak demand by FY22 will be more than double the load as at the end of the 11th Plan. Exhibit 26: Regionwise peak power demand th th 12 plan 13 plan Plan growth (2016-17) (2021-22) (%) NR 60,934 86,461 7% WR 62,015 86,054 7% SR 57,221 82,199 8% ER 24,303 35,928 8% 2,966 4,056 6% Andaman & Nicobar Island 67 89 6% Laskhwadeep 11 18 10% 199,540 283,470 Region wise peak demand/load NER All India 7% Source:CEA, MOSL Demand is estimated to grow by 9% in the 12th Plan and 7% in the 13th Plan; this implies electricity demand growth of 1.0x-1.5x GDP growth during the period. Transmission system planning is done is a way that it is able to meet the estimated peak and off-peak load demand in the system. Installed capacity as at end of 12th and 13th Plans After determining the peak demand by the end of the 13th Plan, it is important to understand the installed generation capacity by state/region in the same period. The knowledge would help understand the surplus/deficit situation for each state and, therefore, the resultant need for ISTS. As per the CEA, capacity added till Dec, 15 of the 12th Plan was ~72GW and a total of ~120GW could be added (inclusive renewable energy sources of 25GW) during the plan period. Another 100GW would be added during the 13th Plan to take the total installed capacity (including renewables) to 430GW by FY22. February 2016 25 Capital Goods | Transmission th th Exhibit 27: State wise projection of demand for 12 and 13 Plans (MW) State/UTs 2011-12 2016-17 CAGR(12th Plan) 2021-22 CAGR (13th Plan) Delhi 5,031 6,398 5% 9,024 7% Haryana 6,533 10,273 9% 14,244 7% Himachal Pradesh 1,397 1,900 6% 2,589 6% Jammu & Kashmir 2,385 2,687 2% 4,217 9% 10,471 12,342 3% 14,552 3% 8,188 13,886 11% 19,692 7% 12,038 23,081 14% 36,061 9% Uttarkhand 1,612 2,189 6% 2,901 6% Chandigarh 263 426 10% 559 6% 40,248 60,934 9% 86,461 7% 527 815 9% 1,192 8% 10,951 19,091 12% 26,973 7% 6,599 7% Punjab Rajasthan Uttar Pradesh Northern Region Goa Gujarat Chhattisgarh Madhya Pradesh 4,687 9,151 13,904 9% 18,802 6% 21,069 28,645 6% 39,622 7% D. & N. Haveli 615 944 9% 1,297 7% Daman & Diu 301 441 8% 605 7% Western Region 42,352 62,015 8% 86,054 7% Andhra Pradesh 14,054 22,445 10% 33,194 8% Karnataka 10,545 13,010 4% 18,403 7% 3,516 4,669 6% 6,093 5% Tamil Nadu 12,813 20,816 10% 29,975 8% Puducherry 335 630 13% 782 4% Maharashtra Kerala Southern Region 37,599 57,221 9% 82199 8% Bihar 2,031 5,018 20% 9,306 13% Jharkhand 1,030 4,616 35% 6,341 7% Orissa 3,589 5,672 10% 6,749 4% West Bengal 6,592 11,793 12% 17,703 8% 100 144 8% 176 4% 14,707 24,303 11% 35,928 8% 1,112 1817 10% 2,534 7% Sikkim Eastern Region Assam Manipur 116 346 24% 497 8% Meghalaya 319 445 7% 596 6% Nagaland 111 185 11% 271 8% Tripura 215 340 10% 472 7% Arunachal Pradesh 121 135 2% 177 6% 82 285 28% 352 4% 1,920 2,966 9% 4,056 6% 89 6% 18 10% Mizoram North Eastern Region Andaman & Nicobar Islands 67 Lakshadweep All India February 2016 11 130,006 199,540 9% 283,470 7% Source:CEA,MOSL 26 Capital Goods | Transmission th th Exhibit 28: Installed capacity by the end of 12 and 13 Plans Generation Region 11th Plan End Demand Addition in 12th Addition in 13th Total (End of Plan Plan 13th Plan) Present 12th Plan 13th Plan NR 54,467 30,849 16,890 102,206 45,934 60,934 86,461 WR 66,064 52,492 20,262 148,818 41,335 62,015 86,054 SR 55,821 20,061 23,076 118,958 39,015 57,221 82,199 ER 29,761 16,858 31,195 77,813 15,888 24,303 35,928 NER Total 2,884 3,537 8,202 14,623 2,164 2,966 4,056 208,996 120,011 99,625 430,418 1,35,918 199,540 283,470 2021-22 load generation balance report The load generation balance report at the end of the 13th Plan indicates that northern region would have a deficit of ~19-22GW while the southern region would have a deficit of 13-19GW. The surplus in the western region is pegged at 12-16GW. Thus, power from surplus regions will need to be carried into deficit regions. Exhibit 29: India Summer peak inter-regional flows (In MW) Source: CEA February 2016 27 Capital Goods | Transmission Key inter-regional transmission corridors Accounting for the deficit/surplus in various regions, the inter-regional transfer capacity is seen increasing to 127GW by the end of the 13th Plan (FY22) from 48GW currently. A total of 148,514ckms of transmission line, 15,000MW of HVDC terminal capacity and 271,000MVA of transformation capacity of >220kv would need to be set up in the 13th Plan (2017-22). th Exhibit 30: Inter-regional transmission capacity (MW) envisaged until the 13 Plan 10th Plan 11th plan Existing 12th plan end end (Jan, ’16) addition plan addition East- North 3,430 10,030 15,830 2,100 17,930 8,800 26,730 East – West 1,790 4,390 12,790 - 12,790 8,400 21,190 East – South 3,130 3,630 3,630 4,200 7,830 4,200 12,030 East- North East 1,260 1,260 2,860 - 2,860 - 2,860 West – North 2,120 4,220 12,920 4,000 16,920 15,600 32,520 West – South 1,720 1,520 7,920 - 7,920 14,400 22,320 - - 1,500 4,500 6,000 3,000 9,000 14,050 25,650 47,450 22,700 72,250 54,400 126,650 Transmission Corridor(MW) North East – North Total Addition in capacity over the plan period (in MW) February 2016 11,600 End of 12th 13th plan 46,600 End of 13th plan 54,400 Source: CEA, MOSL 28 Capital Goods | Transmission Annexures Exhibit 31: Inter-regional transmission links planned till FY22 Source: CEA Exhibit 32: Inter-state transmission system current and proposed till FY17 Source: CEA, MOSL February 2016 29 Capital Goods | Transmission Exhibit 33: Inter-regional links at the end of 12th and 13th Plans East – North (MW) Dehri-Sahupuri 220 kV S/c Sasaram HVDC back-to-back Muzaffarpur-Gorakhpur 400 kV D/c (with Series Cap+TCSC) Patna – Balia 400kV D/c (Quad) Biharshariff – Balia 400kV D/c(Quad) Barh – Balia 400kV D/c (Quad) Gaya - Balia 765kV S/c Sasaram bypassing(additional capacity) Sasaram - Fatehpur 765kV2x S/c Barh-II-Gorakhpur 400kV D/c (Quad) line Gaya-Varanasi 765 kV S/c line Biharsharif - Varanasi 400kV D/c line with quad conductor Tillaiyya – Balia 765kV D/c line, one ckt via Gaya Angul (ER- Orissa) – Badarpur (NR-Delhi) +800kV, 6000MW HVDC bipole with 3000MW terminal Capacity Sub-total EAST - WEST Budhipadar-Korba 220 kV 3 ckts. Rourkela-Raipur 400 kV D/c with series comp.+TCSC Ranchi –Sipat 400 kV D/c with series comp. Rourkela-Raipur 400 kV D/c (2nd) with series comp. Ranchi - Dharamjayagarh - WR Pooling Station 765kV S/c line Ranchi - Dharamjaygarh 765kV 2nd S/c Jharsuguda-Dharamjaygarh 765kV D/c line Jharsuguda - Dharamjaygarh (to be LILOed at Raigarh Tamnar) 765kV D/c line (2nd) Jharsuguda - Raipur Pool 765kV D/c line Sub-total WEST-NORTH Auriya-Malanpur 220 KV D/c Kota - Ujjain 220 KV D/c Vindhyachal HVDC back-to-back Gwalior-Agra 765 kV 2 x S/c Zerda-Kankroli 400kV D/c Champa Pool- Kurukshetra HVDC Bipole Gwalior-Jaipur 765kV 2xS/c lines RAPP-Sujalpur 400kV D/c Adani(Mundra) - Mahendranagar HVDC bipole Up gradation of Champa – Kurukshetra +800kV, 6000MW HVDC bipole with 3000MW terminal Capacity Jabalpur – Orai 765kV D/c line Banaskanta – Chittorgarh 765kV D/c line Dhanvahi – Fatehpur 765kV D/c line Sub-total EAST- SOUTH Balimela-Upper Sileru 220kV S/c Gazuwaka HVDC back-to-back Talcher-Kolar HVDC bipole Upgradation of Talcher-Kolar HVDC Bipole Angul - Srikakulum 765kV D/c line Angul - Srikakulum 765kV D/c line (2nd) Sub-total WEST- SOUTH Chandrapur HVDC back-to-back Kolhapur-Belgaum 220kV D/c Ponda – Nagajhari 220kV D/c Raichur - Sholapur 765kV S/c line (PG) Raichur - Sholapur 765kV S/c line (Pvt. Sector) February 2016 Balance End of During End of Present by 12th 12th Plan 13th plan 13th plan Plan (MW) (MW) (MW) (MW) (MW) 130 130 130 500 500 500 2,000 2,000 2,000 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 2,100 2,100 2,100 500 500 500 4,200 4,200 4,200 1,600 1,600 1,600 2,100 2,100 2,100 1,600 1,600 1,600 4,200 4,200 14,230 3,700 19,530 2,100 4,200 390 1,400 1,200 1,400 2,100 2,100 4,200 6,300 12,790 390 1,400 1,200 1,400 2,100 6,490 260 260 500 4,200 1,000 3,000 4,200 1,000 2,500 8,720 130 1,000 2,000 500 3,630 1,000 260 260 2,100 2,100 3000* 3,000 5,800 26,730 4,200 4,200 8,400 390 1,400 1,200 1,400 2,100 2,100 4,200 4,200 4,200 21,190 260 260 500 4,200 1,000 3,000 4,200 1,000 2,500 8,200 16,920 4,200 130 1,000 2,000 500 4,200 4,200 7,830 1,000 260 260 2,100 2,100 260 260 500 4,200 1,000 3,000 4,200 1,000 2,500 3,000 3,000 4,200 4,200 4,200 15,600 4,200 4,200 4,200 32,520 4,200 4,200 130 1,000 2,000 500 4,200 4,200 12,030 1,000 260 260 2,100 2,100 30 Capital Goods | Transmission Exhibit 33: Inter-regional links at the end of 12th and 13th Plans East – North (MW) Balance End of During End of Present by 12th 12th Plan 13th plan 13th plan Plan (MW) (MW) (MW) (MW) (MW) 2,200 2,200 2,200 4,200 4,200 6,000 6,000 4,200 4,200 5,720 2,200 7,920 14,400 22,320 Narendra - Kolhapur 765kV D/c (ch at 400kV) Wardha - Nizamabad 765kV D/c line Raigarh - Pugalur +/- 800kV, 6000 Bi-pole Warora Pool - Warangal 765kV D/c line Sub-total EAST- NORTH EAST Birpara-Salakati 220kV D/c 260 Siliguri - Bongaigaon 400 kV D/c 1,000 Siliguri - Bongaigaon 400 kV D/c (Quad) line Sub-total 1,260 NORTH EAST-NORTH Biswanath Chariali - Agra +/- 800 kV, 3000 MW HVDC Bi-pole LILO of Biswanath Chariali - Agra +/- 800 kV, 3000 MW HVDC Bi-pole at new pooling station in Alipurduar and addition of second 3000 MW module Rangia/Rowta – Gurudaspur +800kV, 6000/6500 MW HVDC bipole with 3000MW terminal Capacity Sub-total Total 40,050 1,600 1,600 260 1,000 1,600 2,860 3,000 3,000 3,000 3,000 3,000 3,000 6,000 32,200 6,000 73,850 260 1,000 1,600 2,860 - 3,000 3,000 3,000 54,400 9,000 126,650 Source: CEA Exhibit 34: Normative spending in various segments of the power sector POWER SECTOR Generation 40% Transmission 20% Distribution 40% Trans Line 60% Sub-station 40% Tower pkg. 60% Transformers 50% Conductors 25% Others 50% Others 15% Source: Company, MOSL February 2016 31 Capital Goods | Transmission Exhibit 35: Ownership-wise break-up of installed capacity (Jan, 15) Central, 26 Private, 40 State, 35 Source: CEA, MOSL Exhibit 36: 2021-22 Load generation balance report Summer Peak Region wise Dispatch (% of IC) Monsoon Peak Demand Sur(+) / Def(-) Dispatch (% of IC) Demand Sur(+) /Def(-) NR 66,000 (65%) 86,500 -20,500 64,500 (63%) 83,000 -18,500 WR 93,200 (63%) 81,700 11,500 79,500 (53%) 77,500 2,000 SR 65,000 (55%) 80,500 -15,500 57,500 (48%) 74,000 -16,500 ER 53,800 (69%) 36,000 17,800 56,800 (73%) 34,200 22,600 NER 8,000 (55%) 4,100 3,900 10,000 (68%) 3,900 6,100 Bhutan 4,000 (61%) 0 4,000 5,500 (83%) 0 5,500 1,000 -1,000 1,000 -1,000 200 -200 200 -200 290,000 0 273,800 0 Bangladesh Pakistan All India 290,000 (62%) 273,800(58%) Winter Peak Region wise Dispatch (% of IC) Winter Off-Peak Demand Sur(+) / Def(-) Dispatch (% of IC) Demand Sur(+) /Def(-) NR 59,800 (59%) 82,000 -22,200 40,000 (39%) 61,000 -21,000 WR 97,900 (66%) 86,000 11,900 75,900 (51%) 60,000 15,900 SR 62,900 (53%) 82,000 -19,100 45,000 (38%) 58,000 -13,000 ER 5,800 (75%) 33,300 24,700 45,000 (58%) 25,200 19,800 NER 6,700 (46%) 3,900 2,800 1,500 (10%) 2,900 -1,400 Bhutan 3,100 (47%) 0 3,100 600 (9%) 0 600 1,000 -1,000 700 -700 200 -200 200 -200 288,400 0 208,000 0 Bangladesh Pakistan All India February 2016 288,400 (61%) 208,000 (44%) 32 Capital Goods | Transmission Companies BSE Sensex: 23,192 S&P CNX: 7,048 February 2016BSE Se Companies ABB 34 Alstom T&D India 39 Crompton Greaves 48 KEC International 53 Larsen & Toubro 58 February 2016 33 February 2016 Update | Sector: Capital Goods ABB India BSE SENSEX S&P CNX 23,192 7,048 CMP: INR1,101 TP: INR1,380 (+25) Neutral Well geared for a recovery; valuations expensive Stock Info Bloomberg Equity Shares (m) 52-Week Range (INR) 1, 6, 12 Rel. Per (%) M.Cap. (INR b) M.Cap. (USD b) Avg Val ( INR m) Free float (%) ABB IN 211.9 1,525/963 14 /0 /-3 233.3 3.4 92 25.0 Financials Snapshot (INR b) Y/E Dec 2015 2016E 2017E Net Sales 81.4 84.8 97.6 EBITDA 7.5 9.3 10.9 Adj PAT 3.0 4.5 5.5 Adj EPS (INR) 15.8 21.1 25.8 EPS Gr (%) 22.8 34.0 22.2 146. 168. 193. BV/Sh (INR) RoE (%) 10.7 12.6 13.3 RoCE (%) 10.3 13.6 14.3 P/E (x) 69.9 52.2 42.7 P/BV (x) 7.5 6.6 5.7 Estimate change TP change Rating change Shareholding pattern (%) As On Dec-15 Sep-15 Dec-14 Promoter 75.0 75.0 75.0 DII 12.4 12.5 12.2 FII 4.4 4.6 4.8 Others 8.3 7.9 8.0 FII Includes depository receipts Stock Performance (1-year) Reorientation toward products business Products business revenue increased from INR42b in CY09 to INR55b in CY15. The increase was driven by introduction of products like solar inverters, LV products, wind generators, motors and switchgears and is commendable—given the constrained investment climate. ABB is strongly positioned in several macro themes like i) renewables (3GW capacity for wind generators)/solar inverters (5% of order book), ii) railways (with converters, turbochargers, electrification, etc.; 3% of revenue) and iii) mining (motors, electrification, automation). Project business profitability expected to revive Reorientation of projects strategy, with focus on orders entailing higher valueadded pull-through for products, better risk profiling (including contingencies) and cash over revenue. Thus, power systems margins should enter a new target range of 8%-9% (v/s ~6.5% in CY15). ABB has significant spare capacity in the business and, thus, could be an important beneficiary—given the operating leverage. Margin expansion led by focused effort in localization through ‘In Country, For Country’ initiative Gross margin at 35% expanded to near decadal-high levels CY15, led by focused localization efforts and supported by product-mix change and favorable currency. RM costs declined from peak levels of 75% in CY10 to 65% in CY15, supporting margin despite muted revenue CAGR of 5% over the same period. ABB invested INR10b over CY07-14 in greenfield capacity, leading to near trebling of gross fixed assets. ABB has commissioned factories in LV products/discrete automation/GIS/ distribution transformers/motors, etc., which led to poor fixed cost absorption. We believe that product margin will rebound as the operating leverage kicks in. As part of the ‘In Country, For Country’ initiative, local product development is an important priority. Increased focus on exports and service portfolio: key building block for improved profitability: Exports increased from INR5b in 2010 to ~INR10b in 2015. Contribution of service revenue increased to 11% of sales in CY15. Margin on exports is better than domestic and service has high double-digit margin. ABB is exploring new markets like Africa and Myanmar. Valuation and rating ABB could be one of the important beneficiaries, given the increased share of products (~65% of revenue)—which are largely beneficiaries in ‘early to mid-cycle’. ABB is also exposed to several important trends. Current earnings are impacted by legacy projects and negative operating leverage in products; thus, not a reflection of long-term potential. Maintain Neutral. February 2016 34 ABB India Exhibit 1: Revenue growth to pick up with improvement in execution of projects in hand Exhibit 2: Product revenues have increased on low project orders (INR b) Source: MOSL, Company Source: MOSL, Company Exhibit 3: Dedicated export oriented factories has helped to ramp up the exports Exhibit 4: FG imports have declined led by focus on indigenization Source: MOSL, Company Source: MOSL, Company Exhibit 5: Order inflows to pick up led by strong T&D, renewables and rail capex momentum Exhibit 6: Reorientation towards products business and introduction of new products has helped to ramp up orders from products segment Source: MOSL, Company Source: MOSL, Company February 2016 35 ABB India Exhibit 7: Key operation metrics Year ended Revenues (INR m) LV Products Discrete Automation & Motion Process automation Power products Power systems Gross Segmental Sales 2010 2011 2012 2013 2014 2015E 2016E 2017E 4,486 15,929 11,886 18,155 18,267 68,722 5,399 17,993 13,219 20,008 23,624 80,243 6,174 17,753 13,566 20,853 22,422 80,767 6,769 18,237 12,480 21,304 23,851 82,640 7,373 18,986 12,450 23,255 21,554 83,617 8,006 20,624 12,503 25,992 18,707 85,832 8,068 24,796 12,503 26,125 17,979 89,472 9,279 30,994 12,702 30,931 19,110 103,016 Revenue Growth (% YoY) LV Products Discrete Automation & Motion Process automation Power products Power systems Revenue Growth 17.3% 13.2% -1.8% -8.9% 6.3% 1.3% 20.4% 13.0% 11.2% 10.2% 29.3% 16.8% 14.4% -1.3% 2.6% 4.2% -5.1% 0.7% 9.6% 2.7% -8.0% 2.2% 6.4% 2.3% 8.9% 4.1% -0.2% 9.2% -9.6% 1.2% 8.6% 8.6% 0.4% 11.8% -13.2% 2.6% 0.8% 20.2% 0.0% 0.5% -3.9% 4.2% 15.0% 25.0% 1.6% 18.4% 6.3% 15.1% EBIT Margins (%) LV Products Discrete Automation & Motion Process automation Power products Power systems 0.4% 8.3% 6.9% 4.5% -0.6% 6.3% 11.5% 2.9% 5.0% 0.0% 6.4% 11.0% -1.1% 6.6% 2.9% 3.7% 6.9% 5.7% 8.0% 3.9% 5.4% 6.8% 8.0% 7.9% 5.3% 9.1% 8.2% 10.1% 9.1% 6.5% 10.1% 9.2% 10.1% 10.6% 8.0% 10.1% 9.2% 10.1% 11.0% 8.0% Costs, % of Revenues Material Costs Contribution Margins, % Staff Costs Other Expenses EBIDTA % Products (% of Revenues) 75.5% 24.5% 7.7% 12.6% 4.2% 54.1% 72.4% 27.6% 7.9% 13.4% 6.3% 55.4% 71.7% 28.3% 8.2% 13.7% 6.4% 56.0% 69.9% 30.1% 8.8% 13.6% 7.7% 59.3% 67.8% 32.2% 9.1% 13.8% 9.3% 63.6% 65.1% 34.9% 9.2% 14.6% 11.1% 65.9% 64.5% 35.5% 8.7% 15.5% 11.3% 69.1% 65.2% 34.8% 8.8% 14.7% 11.3% 68.1% 6.3 46.8 6.3 71.2 5.5 71.8 5.5 71.7 5.5 74.1 5.6 75.2 6.5 78.5 7.4 78.5 12.2 -38.2% 152.8 7.5 65.6% 92.3 12.4 -23.6% 120.7 9.5 35.0% 89.5 12.8 22.8% 72.9 15.8 34.0% 54.4 21.1 22.2% 44.5 25.8 14.3% 38.9 Fixed Assets Turn (x) NWC (Days) EPS (INR/sh) % YoY PER (x) February 2016 36 ABB India Financials and valuations Income Statement Y/E December Net Sales Change (%) Raw Materials Staff Cost Other Mfg. Expenses Selling Expenses Admin. & Other Exp. EBITDA % of Net Sales Depreciation Interest Other Income Extra-ordinary Items (net) PBT Tax Rate (%) PAT Adjusted PAT Change (%) (INR Million) 2011 73,703 15.9 53,954 5,868 3,703 1,099 6,753 2,325 3.2 796 307 415 253 1,890 832 44.0 1,058 1,593 151.9 2012 75,650 2.6 54,278 6,196 4,181 1,086 5,191 4,718 6.2 941 432 -20 -1,263 2,062 688 33.4 1,374 2,637 65.6 2013 77,218 2.1 53,985 6,771 4,363 1,044 6,110 4,945 6.4 1,033 1,011 70 -223 3,194 956 29.9 2,238 2,015 -23.6 2014 77,333 0.1 52,429 7,052 4,489 1,133 6,239 5,991 7.7 1,128 1,050 173 -435 3,552 1,267 35.7 2,285 2,719 35.0 2015 81,403 5.3 53,000 7,499 4,904 1,174 7,361 7,465 9.2 1,598 912 130 -340 4,746 1,747 36.8 2,999 3,339 22.8 2016E 84,834 4.2 54,713 7,385 5,128 1,226 7,068 9,313 11.0 1,642 1,379 99 0 6,390 1,917 30.0 4,473 4,473 34.0 Balance Sheet 2017E 97,604 15.1 63,646 8,552 5,811 1,413 7,287 10,894 11.2 1,784 1,399 99 0 7,810 2,343 30.0 5,467 5,467 22.2 (INR Million) Y/E December Share Capital Reserves Net Worth Loans Net Deffered Tax Liability Capital Employed 2011 424 24,921 25,345 0 -224 25,121 2012 424 25,557 25,981 3,277 -148 29,109 2013 424 26,352 26,776 6,243 -272 32,746 2014 424 27,696 28,120 3,756 -152 31,723 2015 424 30,695 31,119 6,758 -490 37,387 2016E 424 35,168 35,592 6,758 -490 41,860 2017E 424 40,635 41,059 6,758 -490 47,327 Gross Fixed Assets Less: Depreciation Net Fixed Assets Capital WIP Investments Curr. Assets Inventory Debtors Cash & Bank Balance Loans & Advances Other current Assets Current Liab. & Prov. Creditors Other Liabilities Provisions Net Current Assets Application of Funds E: MOSL Estimates 14,619 2,935 11,684 839 507 49,600 9,255 30,825 2,644 3,667 3,210 37,509 18,649 16,530 2,331 12,091 25,121 15,856 3,783 12,073 1,170 525 50,784 9,204 32,644 767 4,585 3,585 35,443 19,033 13,946 2,465 15,341 29,109 18,627 4,712 13,915 475 173 55,661 9,889 32,357 3,166 6,077 4,172 37,477 20,826 13,960 2,692 18,184 32,747 19,718 5,723 13,995 319 165 53,585 8,938 31,575 2,260 6,790 4,022 36,341 19,840 12,977 3,524 17,244 31,723 22,220 7,321 14,899 319 164 60,008 9,396 33,909 5,736 3,964 7,003 38,003 21,020 12,720 4,263 22,005 37,387 24,134 8,963 15,171 319 163 65,440 9,816 35,425 8,959 6,882 4,359 39,233 20,647 14,457 4,129 26,207 41,860 25,857 10,747 15,110 319 180 76,043 11,308 40,810 10,976 7,928 5,021 44,325 23,785 15,782 4,757 31,719 47,327 February 2016 37 ABB India Financials and valuations Ratios Y/E December Basic (INR) EPS Growth Cash EPS Book Value DPS Payout (incl. Div.Tax) Valuation (x) P/E Cash P/E EV/EBITDA EV/Sales Price/Book Value Dividend Yield (%) Profitability Ratios (%) RoE RoCE Turnover Ratios Debtors (Days) Inventory (Days) Creditors. (Days) Asset Turnover (x) Leverage Ratio Debt/Equity (x) 2011 2012 2013E 2014 2015 2016E 2017E 7.5 -38.2 11.3 119.6 3.0 39.9 12.4 65.6 16.9 122.6 3.0 24.1 9.5 -23.6 14.4 126.4 3.0 31.8 12.8 35.0 18.2 132.7 3.7 28.8 15.8 22.8 23.3 146.8 3.7 23.5 21.1 34.0 28.9 168.0 7.2 34.3 25.8 22.2 34.2 193.8 8.9 34.3 85.8 60.6 36.6 3.0 8.3 0.3 69.9 47.3 31.7 2.9 7.5 0.3 52.2 38.1 24.4 2.7 6.6 0.7 42.7 32.2 18.7 2.3 5.7 0.8 6.4 8.3 10.1 6.3 7.5 8.0 9.7 9.2 10.7 10.3 12.6 13.6 13.3 14.3 153 46 92 2.9 158 44 92 2.6 153 47 98 2.4 149 42 94 2.4 152 42 94 2.2 152 42 89 2.0 153 42 89 2.1 0.0 0.1 0.2 0.1 0.2 0.2 0.2 2011 2,425 795 307 832 467 2,855 2012 3,325 941 432 688 -5,127 -1,549 2013 2,971 1,033 1,011 956 -444 2,604 2014 3,986 1,128 1,050 1,267 34 3,881 2015 5,086 1,353 900 1,747 -1,285 3,652 2016E 6,390 1,712 200 1,917 -979 5,136 -5,081 (2,226) -339 -5,345 -1,661 (3,210) -18 -1,774 -2,180 425 352 -1,815 -1,053 2,828 8 -1,134 -2,502 1,150 1 -2,039 -1,914 3,222 1 -1,989 -1,722 2,034 -17 -1,939 (Inc)/Dec in Net Worth (Inc)/Dec in Debt Less : Interest Paid Dividend Paid CF from Fin. Activity 2 0 307 739 -737 0 3,277 432 739 2,182 -253 2,924 1,011 744 789 -30 -2,490 1,050 911 -4,157 911 -1,855 900 911 -4,537 1,784 -371 200 1,784 -2,929 2,180 -297 100 2,180 -3,714 Inc/Dec of Cash Add: Beginning Balance Closing Balance E: MOSL Estimates -3,228 5,871 2,644 -1,877 2,644 767 2,399 767 3,165 -906 3,165 2,260 3,476 2,260 5,736 3,223 5,736 8,959 2,017 8,959 10,976 Cash Flow Statement Y/E December PBT before EO Items Add : Depreciation Interest Less : Direct taxes paid (Inc)/Dec in WC CF from operations (Inc)/Dec in FA Free Cah Flow (Pur)/Sale of Investments CF from investments February 2016 (INR Million) 2017E 7,810 1,859 100 2,343 -3,495 3,756 38 February 2016 Update | Sector: Capital Goods Alstom T&D India BSE SENSEX S&P CNX 23,192 7,048 CMP: INR402 TP: INR470 (+17%) Buy Investing ahead of time Highest localization amongst MNC T&D players Stock Info Bloomberg Equity Shares (m) 52-Week Range (INR) 1, 6, 12 Rel. Per (%) M.Cap. (INR b) M.Cap. (USD b) Avg Val ( INR m) Free float (%) ATD IN 256.1 656 /380 1/-6/-5 103 1.5 70 25.0 Financials Snapshot (INR b) Y/E March 2015 2016E 2017E Net Sales 37.0 38.4 44.4 EBITDA 3.1 2.9 4.7 Adj PAT 1.2 1.4 2.6 EPS (INR) 4.7 5.3 10.0 EPS Gr. (%) 5.6 12.4 88.9 BV/Sh. (INR) 51.2 54.1 59.4 RoE (%) 9.4 10.0 17.6 RoCE (%) 10.8 10.8 16.6 P/E (x) 85.4 76.0 40.2 P/BV (x) 7.8 7.4 6.8 Estimate change TP change Rating change Well positioned to benefit from upcoming opportunities in high-tech products The Indian transmission network has been moving toward higher voltage levels and newer technologies. The shift is beneficial for MNC T&D players like Alstom T&D who have access to the parent’s product, which can be introduced in the country. The Indian grid has already moved to 765kv voltage and HVDC links are increasingly being deployed to transmit large amounts of power across the country. Post the northern grid blackout, high-technology products such as Static Variable compensators and Phase Measuring Units (PMUs) etc. are also being deployed to improve grid stability where Alstom T&D is well placed to bag orders. GE coming on board a medium-term trigger for the stock Shareholding pattern (%) As On Alstom T&D India was amongst the first MNC T&D companies to identify India as a key market for growth. Even before PGCIL mandated a domestic manufacturing clause for 765kv transformers, Alstom T&D had set up a plant in Baroda to address the Indian 765kv transformer demand. It was also the first to introduce 400/765kv GIS in India from its factory in Tamil Nadu and recently dispatched the 800kv HVDC transformer from its Baroda factory. Imported raw material content (% of total consumed) stands at 21% for Alstom T&D v/s 40% for Siemens India and 39% for ABB India. The government’s recent initiatives to promote “Make In India” would benefit Alstom T&D the most as its products are amongst the most localized in the country. Sep-15 Jun-15 Sep-14 Promoter 75.0 75.0 75.0 DII 14.1 14.6 15.2 FII 2.1 2.0 1.5 Others 8.8 8.4 8.4 FII Includes depository receipts Stock Performance (1-year) Post the recent approval from regulators, GE w a 50% stake in Alstom SA’s Grid JV—through the transaction, GE will also acquire a 37.5% stake in Alstom T&D India where Alstom SA was earlier holding a 75% stake. In our view, it is too early to guess as to the operational synergies that would accrue as a result of GE coming on board; however, we do note that GE has highlighted in recent analyst interactions that it would like to a) increase its market share in the transmission segment in both India and China and is targeting higher volumes as it starts to offer a combined GE-Alstom product offering to its customers, b) focus on profitability over volumes, and c) focus on exports for growth. Valuation and key triggers We forecast earnings to see a 41% CAGR over FY15-18e, driven by execution of the Champa-Kurukshetra Phase 1 and Phase 2 HVDC orders. Alstom T&D is currently trading at 41x/31x FY17E/FY18E EPS. We initiate coverage on the stock with a Buy rating and a target price of INR470 (35x FY18e EPS). Key triggers for the stock are the favorable outcome of the company’s bid for the 6000MW RaigarhPugular HDVC line (~INR70b with Alstom T&D’s share at ~INR40b) and improvement in margins with the commencement of Champa-Kurukshetra Phase II order execution in 2H16. February 2016 39 Alstom T&D India Exhibit 7: Revenue growth to pick up as execution of Champa-Kurukshetra Phase 2 starts from Q416-Q117 25 32 35 Net Sales 12 Switchgear YoY growth 16 13 5 3 Exhibit 8: Segment wise revenue bifurcation for FY15 4 14 7 0 Control Panels Transformers 18 7 4 3 Project Items 50,680 Others 17 Services 44 FY18E 44,355 FY17E 38,353 FY16E 37,030 FY15 35,171 FY14 31,519 FY13 41,391 FY12 40,200 CY10 35,659 CY09 26,412 CY08 CY07 20,063 -24 HVDC Source: MOSL, Company Source: MOSL, Company Exhibit 9: EBIDTA margins to improve led by better operating leverage Exhibit 10: Exports to contribute15% to sales led by focus on SAARC grid development orders 4,885 5,280 FY14 FY15 7,733 3,952 FY13 FY18E 3,754 FY12 6,768 7,236 CY10 15.3 FY17E 10,829 CY09 5,852 6,008 FY18E 3,102 FY14 15.3 15.3 14.3 13.9 4,688 2,975 FY13 8.5 12.5 FY17E 4,182 FY12 18.0 7.7 2,948 4,238 CY10 11.9 NPM FY16E 4,015 CY09 10.6 Exports 30.4 3,063 4,251 CY08 8.8 8.3 3,579 9.4 CY07 11.3 10.5 10.1 EBITDA Margin FY16E EBITDA 16.1 FY15 17.8 Source: MOSL, Company Source: MOSL, Company Exhibit 11: Net working capital cycle normalized post recovery of retention money in FY15 Exhibit 12: Order book can see significant ramp up if Alstom bags Raigarh-Pugular (6GW)project (~INR40b share) Net working Capital days 81 67 64 62 69 92 68 67 77 87 87 Orderbook 46.3 49.1 YoY growth 33.0 25.8 Source: MOSL, Company February 2016 72369 69986 FY18E 64600 FY14 (5.4) (3.3) FY17E 62257 FY13 76475 46818 FY12 FY16E 48765 CY10 81288 47717 CY09 (5.9) FY15 40948 CY08 3.8 27465 2.2 (4.0) CY07 FY18E FY17E FY16E FY15 FY14 FY13 FY12 CY10 CY09 CY08 CY07 16.5 Source: MOSL, Company 40 Alstom T&D India Exhibit 13: Alstom T&D factories across India Source: Alstom, MOSL, ** HVDC transformer factory is also at Vadodara Industry positioning for Alstom T&D remains strong versus peers Industry positioning for Alstom T&D remains the best amongst its peers as per our proprietary ranking methodology. We have used five key parameters to compare the three MNC T&D companies and rank them based on a score of 1 to 3, with 3 being the highest. We discuss each of these pointers in detail below: Exhibit 14: Ranking on Industry positioning for the MNC T&D players Alstom T&D ABB Siemens India India India Access to Technology 3 3 3 Localization 3 2 2 Export contribution 3 2 3 Management focus on India 3 3 3 Focus on transmission 3 2 1 3.0 2.4 2.4 Name of company Average ranking Comments All 3 MNC's have access to the latest technology and products from their parent Alstom T&D has been the leader in terms of product localization Exports for Alstom T&D and Siemens at ~14-16% of sales vs. ABB India at 12% All three MNC's have highlighted their increased focus on India and see India as a key growth market Alstom T&D has the widest product portfolio on offer in the country and also is the first to market Source: Company, MOSL, Score of 3 is the highest February 2016 Access to technology: As we had highlighted earlier in our sector note, the Indian grid is moving towards higher voltage levels and technologies. PGCIL has been adopting newer technologies such as HVDC lines, GIS substations, Phase shifting transformers and Static compensators. All the three Indian MNC T&D 41 Alstom T&D India February 2016 companies have access to their parent’s technology and can offer such equipment and technologies to Power Grid. Localization. Alstom T&D (erstwhile Areva T&D) was amongst the first companies to realize the potential of the Indian transmission market. This is evident in the fact that it has been at the forefront in indigenizing manufacturing in the country; Alstom T&D India was the first to start 765kv transformer manufacturing, first to localize 400/765kv GIS and now amongst the few companies to have a 800kv HVDC transformer manufacturing facility in India. Imported raw material cost (as % of total) is 21% for Alstom T&D vs. 39% for ABB India and 40% for Siemens India Exports. Exports for Alstom T&D and Siemens at ~14-16% of sales vs. ABB India at 12%. We note that with the slowdown in the domestic markets and increases in competition, an increasing no. of T&D players are eyeing the markets in SE Asia, Africa and M. East for exports using India as a low cost base. Management focus on India. All the three MNC’s have been very outspoken of their continued focus on the Indian market and the importance of India in the global scheme of things. With GE acquiring a stake in the Alstom T&D India business, we expect the focus to improve even further as GE targets to increase its market share. Focus on transmission. Alstom T&D had identified India as a key focus market for transmission in 2007 and has been using the Indian factories as a source for global markets as well. Since CY07, it has invested ~INR15b on setting up new capacities in transformers, switchgear in Vadodaram, Hosur and Padappai. This has led to Alstom T&D being the market leader in 765kv transformers and it also has the highest installed base of 765kv substations. It has also won the last two HVDC orders placed by PGCIL for Champa-Kurukshetra Phase 1 and Phase 2. However, its peers ABB India and Siemens India due to their diversified presence and industrial capex exposure have not had similar success in transmission. Alstom T&D derives 100% of its sales from the transmission segment, ABB India has 55% from transmission while Siemens India has ~25% of its overall sales exposed to the transmission sector. 42 Alstom T&D India Reflected in strong operational performance for Alstom T&D India vs. peers Alstom T&D India’s operational performance is better than ABB India and second to Siemens India which is ranked one. We discuss each of these parameters in more detail below: Exhibit 15: Ranking on Operational performance – Alstom T&D vs. peer MNC T&D companies Name of company Alstom T&D India ABB India Siemens India Fixed Asset turnover (5 year average) 3 2 3 EBITDA growth (3 year average) 1 3 2 ROE’s 3 1 2 Royalty Payment 3 1 2 NWC days 1 2 3 1.8 2.2 Average ranking 2.2 Source: Company, MOSL , Score of 3 is the highest Fixed Asset Turnover. Alstom T&D’s average asset turnover over the last five years is at 5.4x and ahead of Siemens 5x and ABB at 3x. This implies higher utilization of its factories vs. peers. EBITDA growth. ABB India has seen the highest EBITDA growth of 17% CGAR over the last three years(coming off a weak base) followed by Siemens India(6% CAGR over FY13-15) and Alstom T&D India. ROE. FY17 ROE is seen at 18% for Alstom T&D India vs. 12% for ABB India and 14% for Siemens India. Part of the reason for higher ROE’s for Alstom T&D is higher utilization/asset turnover as it has limited exposure to industrial capex relative to its peers. Royalty payments – Alstom T&D India has the lowest royalty payments (1.2% of sales) within the three MNC‘s while ABB India(4.3% of sales,5 year average) has the highest. Lower royalty payment is also because of the fact that Alstom T&D has been able to indigenize a larger part of its product portfolio vis. a vis. its peers which is reflected in lower imported raw material as % of total Net working Capital days. Alstom T&D has a higher NWC day since it has a higher proportion of projects business (51%) compared to ABB (40%) and Siemens India (35%). This leads to a longer receivable cycle and therefore higher NWC days. “Investing ahead of time” – key strategy adopted by Alstom T&D in India February 2016 Post 2007, the Indian grid moved to 765kv voltage levels – Alstom T&D was the first Indian company to start off its manufacturing facility for 765kv transformer in Baroda with its first transformer being flagged off by Mr. Narendra Modi in 2010. In 2008, the National Load Dispatch Centre was set up where too Alstom T&D participated by providing the energy management system In 2009, it was the first MNC T&D players to indigenize the 400kv GIS in India with its factory at Padappai, Tamil Nadu. In FY14, Alstom T&D also localized manufacturing of the 765kv GIS much before PGCIL bough in the domestic manufacturing clause for the same. 43 Alstom T&D India Earnings growth at 41% CAGR over FY15-18E; ROE’s expand to 22% in FY18E We build in a 41% CAGR in earnings from FY15-FY18E as delivery of the Champa – Kurukshetra Phase 2 HVDC order picks up. We build in sales to grow 11% CGAR over FY15-18E to INR51b. Alstom T&D has a strong order book of INR80b primarily composed of orders from PGCIL and SEB’s (80% of order book as per our estimate). We have not built in the Raigarh – Pugular HVDC order (6000MW, +/-800kv HVDC order) in our order estimates for FY17. If Alstom T&D is able to win this order, our FY18 earnings would increase by ~60% to INR23. YoY growth 8.1 5.6 50,680 1,299 2,163 2,544 1,988 1,867 1,479 1,171 FY18E CY06 CY07 CY08 CY09 CY10 FY12 FY13 35,171 FY14 44,355 31,519 FY13 FY17E 41,391 FY12 38,353 40,200 CY10 3.7 3.2 FY16E 35,659 CY09 3.6 37,030 26,412 CY08 5.8 FY15 20,063 CY07 -24 4.6 3.3 3.5 2,559 4 Source: Company, MOSL NPM FY17E 5 3 14 Recurring PAT 9.6 1,355 16 13 10.8 FY16E 12 1,205 Net Sales FY15 35 1,142 25 32 Exhibit 17: Recurring PAT and margin % FY14 Exhibit 16: Sales and YoY growth (%) Source: Company, MOSL EBITDA margins are seen expanding 360bps over FY15-18e to 12%. The expansion in margins is being driven by a mix of operating leverage and better margins products contributing to sales. Margins are expected to be better in Phase 2 of Champ Kurukshetra – Phase 1 of Champa Kurukshetra was won by Alstom SA at INR25b of which Alstom T&D’s share was at INR11b. Phase 2 of Champa Kurukshetra was won for INR33b (35% higher) and there were only 2 bidders for this project – Alstom T&D India’s share in this is at INR15b. The reason we believe that margins should be higher are: February 2016 Since Phase 2 is a parallel line to Phase 1, we expect design, engineering costs to be much lower since Alstom has already done this while executing Phase 1 of this line The price at which Phase 2 has been won is 35% higher than of Phase 1. We understand that this could have been a strategy to pick up Phase 1 at an aggressive price and make up for this by building in higher margins in Phase 2 of the projects Competitive intensity was lower in Phase 2 than Phase 1. Phase 1 saw participation from all the 3 MNC T&D companies, namely ABB India, Siemens India and Alstom T&D India. For Phase 2, competition was limited to ABB India and Alstom T&D India as Siemens did not participate in the financial bids 44 Alstom T&D India Exhibit 18: Key assumptions INR M Order Intake Closing Order-book Book-to-Bill (TTM) Revenues (INR m) Switchgears Control Panels Line Taps Current Transformers Bushings Transformers Project Items Others Growth % YoY Switchgears Control Panels Line Taps Current Transformers Bushings Transformers Project Items Others Revenue Composition (INR M) - Domestic - Overseas Total Revenues Margins Contribution Margins, % Staff Cost, % Other Expenses, % EBIDTA, % Working Capital, Days Inventories Sundry Debtors Other Current Assets Loans and advances Total Current assets Sundry Creditors Other Current liabilities Provisions Total Current Liabilities Net Working Capital CY10 FY12 FY13 FY14 FY15 FY16E FY17E FY18E 41,848 48,765 1 37,852 46,818 1 46,902 62,257 2 37,831 64,600 2 51,600 81,288 2 33,540 76,475 2 40,248 72,369 2 48,298 69,986 1 9,332 501 214 620 245 12,619 18,287 1,237 7,237 849 506 950 308 9,754 19,163 5,430 6,914 1,254 7,229 1,490 6,752 1,115 6,875 15,119 3,157 7,485 15,260 4,246 6,207 18,769 1,596 19 -24 -9 13 -2 57 -2 35 -22 69 137 53 26 -23 5 339 -4 48 -30 -21 -42 5 19 9 1 34 -7 -25 -17 23 -62 35,435 7,236 42,671 40,543 3,754 44,297 27,567 3,952 31,519 30,286 4,885 35,171 31,750 5,280 37,030 32,500 5,852 38,353 37,587 6,768 44,355 42,947 7,733 50,680 31.5% 8.6% 12.4% 10.5% 28.3% 8.8% 9.4% 10.1% 33.5% 10.3% 13.8% 9.4% 31.9% 9.8% 13.4% 8.8% 31.4% 9.3% 13.8% 8.3% 31.4% 9.9% 13.9% 7.7% 31.9% 8.9% 12.5% 10.6% 32.4% 8.1% 12.5% 11.9% 44 194 47 29 314 166 58 9 233 81 49 159 34 27 269 137 52 10 199 69 80 199 70 44 393 210 95 19 325 68 71 238 59 38 406 205 88 21 315 92 68 212 44 36 359 179 90 22 292 67 68 212 44 36 359 169 90 22 282 77 68 212 44 36 359 159 90 22 272 87 68 212 44 36 359 159 90 22 272 87 Source: Company, MOSL February 2016 45 Alstom T&D India Financials and valuations Income Statement Y/E March Total Revenues Change (%) Raw Materials Staff Cost Other Expenses EBITDA % of Total Revenues Other Income Depreciation Interest PBT Tax Rate (%) Adjusted PAT Change (%) Exceptional Items Reported PAT Change (%) FY12 41,391 3.0 29,672 3,636 3,900 4,182 10.1 153 1,014 1,090 2,231 752 33.7 1,479 -20.8 145 1,624 -13.0 FY13 31,519 -23.9 20,953 3,246 4,345 2,975 9.4 169 813 775 1,556 385 24.7 1,171 -20.8 -330 841 -48.2 FY14 35,171 11.6 23,936 3,434 4,699 3,102 8.8 302 870 788 1,746 604 34.6 1,142 -2.5 29 1,170 39.1 FY15 37,030 5.3 25,388 3,457 5,122 3,063 8.3 190 819 734 1,701 496 29.2 1,205 5.6 0 1,205 3.0 FY16E 38,353 3.6 26,294 3,789 5,321 2,948 7.7 427 873 589 1,913 558 29.2 1,355 12.4 0 1,355 12.4 FY17E 44,355 15.7 30,188 3,954 5,525 4,688 10.6 542 902 716 3,613 1,054 29.2 2,559 88.9 0 2,559 88.9 (INR Million) FY18E 50,680 14.3 34,239 4,120 6,313 6,008 11.9 538 930 801 4,815 1,404 29.2 3,411 33.3 0 3,411 33.3 Balance Sheet Y/E March Share Capital Reserves Net Worth Minority Intetest Loans Deferred Tax Liability Capital Employed FY12 478 8,286 8,764 0 5,935 150 14,849 FY13 478 8,624 9,102 0 4,177 124 13,402 FY14 512 11,976 12,488 0 4,152 40 16,680 FY15 512 12,605 13,117 0 2,166 -86 15,197 FY16E 512 13,332 13,844 0 3,666 -86 17,424 FY17E 512 14,705 15,218 0 4,166 -86 19,297 (INR Million) FY18E 512 16,536 17,048 0 4,666 -86 21,628 9,640 3,153 6,487 182 0 30,794 5,554 18,023 331 3,012 3,875 22,615 15,576 7,038 8,180 14,849 10,033 3,835 6,198 535 0 34,692 6,942 17,146 781 3,766 6,057 28,024 18,128 9,896 6,669 13,402 10,982 4,588 6,394 1,101 0 39,502 6,830 22,961 364 3,628 5,719 30,317 19,773 10,544 9,185 16,680 12,126 5,259 6,867 702 0 37,268 6,932 21,478 815 3,624 4,419 29,640 18,202 11,438 7,628 15,197 12,526 6,132 6,394 702 0 39,976 7,180 22,245 2,221 3,754 4,576 29,648 17,801 11,847 10,328 17,424 12,926 7,034 5,892 702 0 45,776 8,303 25,727 2,112 4,341 5,293 33,073 19,372 13,701 12,703 19,298 Gross Fixed Assets Less: Depreciation Net Fixed Assets Capital WIP Investments Curr. Assets Inventory Debtors Cash & Bank Balance Loans & Advances Other Current Assets Current Liab. & Prov. Creditors Other Liabilities Net Current Assets Application of Funds E: MOSL Estimates February 2016 13,326 7,964 5,362 702 0 53,352 9,487 29,395 3,462 4,960 6,047 37,789 22,134 15,655 15,564 21,628 46 Alstom T&D India Financials and valuations Ratios Y/E March Basic (INR) Adj EPS Cash EPS Book Value DPS Payout (incl. Div. Tax.) Valuation (x) P/E EV/EBITDA EV/Sales Price/Book Value Dividend Yield (%) Profitability Ratios (%) RoE RoCE Turnover Ratios Debtors (Days) Inventory (Days) Creditors. (Days) Asset Turnover (x) Leverage Ratio Debt/Equity (x) FY12 FY13 FY14 FY15 FY16E FY17E FY18E 6.2 10.4 36.7 1.7 25.0 4.9 8.3 38.1 1.8 51.2 4.5 7.9 48.8 1.8 39.4 4.7 7.9 51.2 1.8 38.5 5.3 8.7 54.1 2.0 38.5 10.0 13.5 59.4 3.8 38.5 13.3 17.0 66.6 5.1 38.5 90.2 34.4 3.0 8.2 0.4 85.4 34.0 2.8 7.8 0.4 76.0 35.4 2.7 7.4 0.5 40.2 22.4 2.4 6.8 1.0 30.2 17.3 2.1 6.0 1.3 17.3 13.9 9.4 10.2 10.8 11.3 9.4 10.8 10.0 10.8 17.6 16.6 21.1 19.4 159 49 137 2.8 199 80 210 2.4 238 71 205 2.1 212 68 179 2.4 212 68 169 2.2 212 68 159 2.3 212 68 159 2.3 0.7 0.5 0.3 0.2 0.3 0.3 0.3 Cash Flow Statement Y/E March PBT before EO Items Depreciation Interest Direct Taxes Paid (Inc)/Dec in WC CF from Operations Others CF from Oper. Incl. Others FY12 2,231 1,014 492 -643 -1,104 1,990 531 2,521 FY13 1,556 813 537 -82 1,047 3,871 657 4,528 FY14 1,774 870 685 -543 -4,090 -1,303 -108 -1,412 FY15 1,702 819 639 -676 2,548 5,031 -10 5,021 FY16E 1,913 873 589 -558 -1,294 1,523 0 1,523 FY17E 3,613 902 716 -1,054 -2,484 1,693 0 1,693 (Inc)/Dec in FA Free Cash Flow Investment in liquid assets & Others CF from Investments -1,078 1,443 221 -857 -890 3,638 272 -617 -1,779 -3,191 585 -1,194 -787 4,234 -582 -1,369 -400 1,123 0 -400 -400 1,293 0 -400 -400 3,231 0 -400 (Inc)/Dec in Shares (Inc)/Dec in Debt Interest Paid Dividend Paid CF from Fin. Activity -863 0 -656 -499 -2,018 -1,801 0 -662 -497 -2,960 2,752 636 -700 -498 2,189 0 -1,986 -678 -538 -3,202 0 1,500 -589 -628 283 0 500 -716 -1,186 -1,402 0 500 -801 -1,580 -1,881 -353 684 331 950 -169 781 -417 781 364 450 364 814 1,406 815 2,221 -109 2,221 2,112 1,350 2,112 3,462 Inc/Dec of Cash Add: Beginning Balance Closing Balance E: MOSL Estimates February 2016 (INR Million) FY18E 4,815 930 801 -1,404 -1,510 3,631 0 3,631 47 February 2016 Update | Sector: Capital Goods Crompton Greaves BSE SENSEX S&P CNX 23,192 7,048 CMP: INR124 TP: INR165 (+33%) Neutral Overseas power sale and consumer listing key triggers Stock Info Bloomberg Equity Shares (m) 52-Week Range (INR) 1, 6, 12 Rel. Per (%) M.Cap. (INR b) M.Cap. (USD b) Avg Val ( INR m) Free float (%) CRG IN 626.8 204 /114 -25 /-17/-8 77.7 1.1 500 65.6 Financials Snapshot (INR b) Y/E March 2015 2016E 2017E 105. Net Sales 88.6 99.8 EBITDA 1.0 3.4 4.5 Adj PAT -2.1 1.1 1.7 EPS(INR) -3.3 1.7 2.7 EPS Gr. (%) 55.6 BV/Sh. (INR) 60.3 61.6 63.5 RoE (%) -5.2 2.9 4.4 RoCE (%) 0.0 3.0 4.1 P/E (x) -37.8 70.9 45.6 P/BV (x) 2.1 2.0 2.0 Estimate change TP change Rating change Shareholding pattern (%) As On Dec-15 Sep-15 Dec-14 Promoter 34.4 34.4 34.4 DII 31.0 31.6 30.9 FII 18.3 16.9 15.0 Others 16.4 17.2 19.7 FII Includes depository receipts Stock Performance (1-year) February 2016 Near term set back to hive-off of overseas power division: Crompton had planned to hive off its European, North American and Indonesian activities of the power division and the deal was expected to be completed by endCY15/early16. However post receiving the offer CG board rejected the proposal. CG is currently renegotiating the proposal and if deal does not go through, focus would be to reduce losses by severing the power systems business ($20-25m of the total $60m loss). CG has already closed down the Brazil power systems business and decision with the US/UK business would be taken over the next one year. CG will also restructure the Hungry business as it remains loss making entity ($15m loss). Demerger of consumer business to unlock value: CRG has announced a demerger of the consumer business with effect from October 1, 2015. As part of the demerger, Avantha Holdings (the promoter group) divested its entire 34.4% stake in Crompton Greaves Consumer Electricals Limited (CGCEL) to Advent and Temasek. We expect consumer business listing by April, 2016 post the requisite approvals from the stock exchanges. Increased focused on India and global automation: CRG intends to focus on the India business and the global automation business (with revenue of INR58b for the retained business). The revised strategy will entail bridging technology gaps in India in key segments (power and industrial), capitalizing on the earlymover advantage in smart grids and capacity augmentation. CRG will attempt to strengthen its positioning—particularly in the UHV segment: i) Power transformers, including setting up manufacturing facilities for 1200kva as the market expands; ii) AIS breakers (as most 765kv products have been certified and expect intake to pick up going forward); iii) GIS (will need to enter into partnerships for expanding portfolio to 400/765kva); iv) industrial (new products for railways, including electrics for diesel locos; need to enter into technology partnerships for strengthening the drives portfolio, etc.). Correcting balance sheet and cost rationalization priorities for FY16: Consolidated net debt stands at INR9b as against INR22b (Mar’15). The company intends to sell another INR4-5b of assets and bring down net debt further. Planned sale of CG House (say ~INR2b) by March 2016 and hive off of the overseas business will possibly lead to a debt-free status. The company is also targeting cost reduction of INR1b over the next few years owing to the need for streamlining several functions due to the shift from B2C to complete B2B operations. Maintain Neutral; price target INR165: Our SOTP values the Consumer business at INR140 (25x FY18E EPS), Power/industrial business at INR25 (10x FY18E EPS) . The Street will focus on the sale of overseas subsidiaries and this will be the key trigger for rerating the stock along with the listing of the consumer business by April, 2016. 48 Crompton Greaves Exhibit 19: Constrained revenue growth led by muted demand in overseas market -0.3 -4.0 3QFY16 1QFY16 3QFY15 1QFY15 3QFY14 -2.4 -0.4 -0.8 0.1 0.2 0.1 0.2 -0.1 -0.6 3QFY13 1QFY13 3QFY16 1QFY16 3QFY15 1QFY15 3QFY14 1QFY14 3QFY13 1QFY13 3QFY12 1QFY12 3QFY11 1QFY11 1QFY14 -3.9 -14 -9-15 1.8 4 -2 -5 -4.8 -13 0.2 5.2 13 1.4 0 -1 0.5 1 32 3QFY12 4 -2 17 18 16 23 19 9,593 9,531 9,984 11,428 9,689 12,541 14,035 11,367 11,520 12,540 12,258 13,274 13,541 14,546 15,026 17,495 15,369 15,068 14,750 16,605 13,253 12,047 10,787 -6 41 Overseas EBITDA Margin (%) -0.5 32 28 Revenue growth, %YoY 1QFY12 Overseas Revenue (INR m) Exhibit 20: Overseas operation slipped into losses after breaking even at EBIDTA levels for the previous 10 quarters Source: MOSL, Company Source: MOSL, Company Exhibit 21: Overseas Sales bifurcation for FY15- Power portfolio planned to be hived off Exhibit 22: Consolidated Debt to come down post hive off of overseas power business and demerger of domestic consumer business Source: MOSL, Company 21,905 2QFY16 revenue and 1,500 2,010 Appliances 4,901 9,836 Cost of Purchase Goods (INR m) 5,061 14,782 the Electric Lamps Power driven pumps Fans, etc, 45 February 2016 Revenues (INR m) 6,585 Electric Lamps, 30 Exhibit 24: Segmental breakup of proportion of outsourced products Electric fans and ventillation equipments Appliances, 6 Pumps, 20 Source: MOSL, Company 3,933 Exhibit 23: Consumer business revenue break up for FY15(%) 25,265 21,930 4QFY14 Source: MOSL, Company 4QFY15 22,906 2QFY14 26,592 18,515 4QFY13 2QFY15 16,456 2QFY13 Power 50% 9,849 Industrial 34% 4QFY12 Automation 16% Source: MOSL, Company 49 Crompton Greaves Exhibit 25: Key operating metrics FY12 FY13 FY14 FY15 FY16 FY17E FY18E 27,474 44,474 21,336 18,202 1,456 (456) 112,486 12.4 27,247 46,112 25,927 18,346 3,896 (584) 120,944 7.5 28,235 56,540 28,470 18,164 3,942 (547) 134,805 12.0 27,341 58,399 32,327 18,409 4,187 (531) 140,131 3.1 24,617 45,210 0 19,144 125 (531) 88,564 0.4 26,975 52,136 0 21,058 125 (531) 99,763 8.9 29,004 52,522 0 24,041 125 (531) 105,161 0.0 11.6 -1.6 12.3 11.6 -3.7 8.5 -9.3 10.7 11.6 3.0 9.2 -1.5 11.9 7.1 0.6 8.1 -2.6 12.4 7.6 -9.0 4.0 -6.5 0.0 9.2 -24.0 8.0 -5.0 0.0 10.4 -24.0 8.5 -4.0 0.0 10.5 -24.0 8.3% -0.2% 4.6% 5.2% -2.2% 1.2% 9.2% -1.3% 3.4% 9.7% -0.5% 4.3% 8.3 -5.3 2.9 2.5 -5.8 -3.3 4.3 -2.6 1.7 5.0 -2.3 2.7 (3,534) (14,150) (18,372) 892 (18,214) (4,859) 2,002 (16,898) (5,177) 3,431 (15,303) (3,847) 115 55 119 69 121 66 122 69 4.3 4.0 8.3 3.7 -1.2 2.5 4.4 -0.1 4.3 5.5 -0.5 5.0 Revenue (INR m) Power Systems - Standalone Power Systems - Overseas Consumer Products Industrial Systems Others Less: Inter Segmental Total sales Growth % EBIT Margins (%) Power Systems - Standalone Power Systems - Overseas Consumer Products Industrial Systems Others Adjusted EBIDTA % Standalone 11.1% 8.3% 7.6% Subsidiaries 1.7% -4.3% 1.8% Consolidated 7.1% 3.2% 5.1% EPS (NR/Share) Standalone 7.9 7.1 6.8 Subsidiaries -2.0 -5.6 -2.9 Consolidated 5.8 1.4 3.9 Net (Debt) / Cash Standalone 3,188 2,751 4,123 Subsidiaries (8,059) (15,430) (17,901) Consolidated (5,465) (12,681) (13,781) Net Working Capital (Days) Standalone 39 51 67 Consolidated 33 25 30 Standalone EPS (INR/Sh) Consumer 2.9 3.0 3.8 Non-Consumer 5.0 4.0 3.1 Total 7.9 7.1 6.8 Consumer EPS calculated assuming Segment EBIT = PBT, and approx tax rate of 27% February 2016 50 Crompton Greaves Financials and valuations Income statement Y/E March Net Sales Change (%) Raw Materials Staff Cost Other Mfg. Expenses EBITDA % of Net Sales Depreciation Interest Other Income EO Items (as rep.) PBT Tax Rate (%) Reported PAT Extra-ordinary Inc.(net) Adjusted PAT Minority Int Consolidated PAT Change (%) (INR Million) 2012 112,486 12.4 76,850 14,662 12,937 8,036 7.1 2,600 567 628 0 5,497 1,821 33.1 3,676 0 3,676 59.9 3,736 -59.7 2013 120,944 7.5 83,461 17,405 16,247 3,832 3.2 2,029 955 1,000 -1,207 640 1,009 157.6 -369 -2,287 1,918 7.3 1,926 -48.4 2014 136,315 12.7 91,353 19,521 19,322 6,120 4.5 2,621 1,366 1,890 924 4,947 2,361 47.7 2,586 924 1,662 -143.4 1,519 -21.2 2015 140,131 2.8 95,305 19,936 18,466 6,424 4.6 2,620 1,443 1,670 252 4,283 2,220 51.8 2,064 252 1,811 29.9 1,841 21.2 2016E 88,564 -36.8 58,016 16,650 12,865 1,032 1.2 2,531 1,070 1,483 1,571 485 997 205.9 -513 1,571 -2,084 29.9 -2,054 -211.5 2017E 99,763 12.6 63,109 18,755 14,492 3,406 3.4 2,586 821 1,813 0 1,811 745 41.1 1,067 0 1,067 29.9 1,097 -153.4 Y/E March Share Capital Reserves Net Worth Loans Deffered Tax Liability Minority Interest Capital Employed 2012 1,283 34,826 36,109 9,849 -122 157 45,992 2013 1,283 34,332 35,615 18,515 -1,681 95 52,544 2014 1,254 35,192 36,446 21,930 -1,532 118 56,962 2015 1,254 36,906 38,159 27,438 -1,110 203 64,690 2016E 1,254 36,559 37,812 15,038 -1,110 217 56,786 2017E 1,254 37,347 38,600 13,038 -1,110 232 55,589 2018E 1,254 38,573 39,826 13,138 -1,110 246 56,929 Gross Fixed Assets Less: Depreciation Net Fixed Assets Capital WIP Investments 44,087 23,005 21,083 1,493 7,864 53,424 24,726 28,699 1,965 7,907 59,233 26,825 32,408 2,184 2,989 55,786 26,622 29,164 737 4,414 57,286 29,153 28,133 737 4,414 58,786 31,739 27,047 737 4,414 60,286 34,392 25,894 737 4,414 Curr. Assets Inventory Debtors Cash & Bank Balance Loans & Advances 55,343 12,233 31,432 4,976 6,702 59,807 16,367 31,605 5,834 6,002 69,171 16,714 35,913 8,150 8,395 72,485 14,552 37,318 6,893 13,722 51,633 9,197 23,585 10,179 8,672 54,558 10,360 26,567 7,861 9,769 58,515 10,920 28,005 9,292 10,298 Current Liab. & Prov. Creditors Other Liabilities Provisions Net Current Assets Application of Funds E: MOSL Estimates; Consolidated Financials 39,790 21,076 14,923 3,791 15,553 45,993 45,834 24,618 16,994 4,222 13,973 52,543 49,790 27,737 17,988 4,064 19,381 56,961 42,109 25,281 12,704 4,124 30,375 64,691 28,131 15,978 8,029 4,124 23,502 56,787 31,167 17,998 9,044 4,124 23,391 55,589 32,630 18,972 9,534 4,124 25,884 56,930 Balance Sheet February 2016 2018E 105,161 5.4 65,630 19,770 15,276 4,485 4.3 2,653 765 1,760 0 2,827 1,151 40.7 1,676 0 1,676 29.9 1,706 55.6 (INR Million) 51 Crompton Greaves Financials and valuations Ratios Y/E March Standalone EPS Consolidated EPS Growth (%) Cash EPS Book Value DPS Payout (incl. Div. Tax.) Valuation (x) P/E (standalone) P/E (consolidated) Cash P/E EV/EBITDA EV/Sales Price/Book Value Dividend Yield (%) Profitability Ratios (%) RoE RoCE Turnover Ratios Debtors (Days) Inventory (Days) Creditors. (Days) Asset Turnover (x) Leverage Ratio Debt/Equity (x) 2012 7.9 5.8 -59.7 10.0 56.3 1.2 20.7 2013 6.9 3.0 -48.4 6.3 55.5 1.2 20.1 2014 6.8 2.4 -19.3 6.8 58.2 1.1 11.3 2015 8.3 2.9 21.2 7.1 60.9 0.8 24.0 2016E 2.5 -3.3 -211.5 0.7 60.3 -0.2 24.0 2017E 4.3 1.7 -153.4 5.8 61.6 0.4 24.0 2018E 5.0 2.7 55.6 6.9 63.5 0.7 24.0 27.6 78.0 22.9 21.6 1.0 3.2 0.5 15.0 42.2 17.4 15.3 0.7 2.0 0.6 48.8 -37.8 163.0 80.0 0.9 2.1 -0.1 28.6 70.9 21.1 24.3 0.8 2.0 0.3 24.8 45.6 17.8 18.2 0.8 2.0 0.5 10.7 9.8 -1.0 2.8 7.2 4.3 4.9 4.0 -5.2 0.0 2.9 3.0 4.4 4.1 102 40 68 2.4 95 49 74 2.3 96 45 74 2.4 97 38 66 2.2 97 38 66 1.6 97 38 66 1.8 97 38 66 1.8 0.2 0.4 0.4 0.5 0.1 0.1 0.1 2012 2013 2014 2015 2016E 2017E 2018E 5,497 2,600 567 2,495 -2,310 3,859 0 3,859 -5,758 -1,898 -1,117 -6,875 725 5,894 567 1,044 5,008 1,992 2,984 4,981 1,848 2,029 955 2,177 2,046 4,701 -1,207 3,494 -10,117 -6,623 -43 -10,160 709 8,666 955 897 7,524 857 4,976 5,833 4,023 2,621 1,366 2,211 -3,093 2,707 924 3,631 -6,550 -2,919 4,919 -1,631 -1,146 3,415 1,366 587 316 2,316 5,834 8,150 4,031 2,620 1,443 2,220 -12,250 -8,070 252 -7,818 2,743 -5,075 -1,425 1,348 209 5,508 1,443 589 5,214 -1,257 8,149 6,893 -1,086 2,531 946 997 10,159 5,405 5,201 10,606 -1,500 9,106 6,400 4,930 0 -12,400 946 -136 -12,250 3,286 6,893 10,179 1,811 2,586 778 745 -2,206 1,447 0 1,447 -1,500 -53 0 -1,470 0 -2,000 778 309 -2,294 -2,317 10,179 7,861 2,827 2,653 461 1,151 -1,064 3,266 0 3,266 -1,500 1,766 0 -1,470 0 100 461 480 -366 1,430 7,861 9,292 Cash Flow Statement Y/E March PBT before EO Items Add : Depreciation Interest Less : Direct Taxes Paid (Inc)/Dec in WC CF from Operations EO Income CF from Oper. incl. EO Items (Inc)/Dec in FA Free Cash Flow (Pur)/Sale of Investments CF from Investments (Inc)/Dec in Net Worth (Inc)/Dec in Debt Less : Interest Paid Dividend Paid CF from Fin. Activity Inc/Dec of Cash Add: Beginning Balance Closing Balance E: MOSL Estimates February 2016 (INR Million) 52 February 2016 Initiating Coverage | Sector: Capital Goods KEC International BSE SENSEX S&P CNX 23,192 7,048 CMP: INR106 TP: INR130 (+23%) Buy Leader in domestic transmission EPC Stock Info Bloomberg Equity Shares (m) 52-Week Range (INR) 1, 6, 12 Rel. Per (%) M.Cap. (INR b) M.Cap. (USD b) Avg Val ( INR m) Free float (%) KECI IN 257.1 165 /72 -14/-9/46 27.3 0.4 154 49.5 Financials Snapshot (INR b) Y/E March 2015 2016E 2017E Net Sales 84.7 86.7 94.6 EBITDA 5.1 6.8 7.7 Adj PAT 0.5 1.9 2.4 EPS (INR) 2.1 7.6 9.4 EPS Gr. (%) -37.6 266.7 24.1 BV/Sh. (INR) 51.7 58.0 65.8 RoE (%) 4.0 13.8 15.1 RoCE (%) 13.0 10.0 10.8 P/E (x) 51.9 14.0 11.3 P/BV (x) 1.9 1.8 1.6 Estimate change TP change Rating change Shareholding pattern (%) As On Dec-15 Sep-15 Dec-14 Promoter 50.5 50.5 50.0 DII 25.9 26.0 28.0 FII 6.8 5.9 5.9 Others 16.8 17.6 16.1 FII Includes depository receipts Stock Performance (1-year) February 2016 Domestic transmission business witnesses’ strong traction. The domestic transmission business of KEC Intl. has witnessed strong traction over the last few years, led by market share gains in PGCIL orders (28% share YTD in FY16) and pick-up in capex from SEBs. Capex from SEBs is primarily to upgrade existing transmission networks to 220kv/400kv. KEC’s addressable market has increased meaningfully as SEBs award projects on turnkey basis. SEB orders offer better margins and lower competition than PGCIL orders; however, payment schedule continues to be long (~120 days). KEC has also entered in the 765kv GIS market, having won orders from PGCIL in FY15, and this opens another big opportunity (INR20b-25b annually) for the company. Overseas transmission scenario remains healthy. Overseas T&D business continues to witness traction from Africa and Middle East(Saudi Arabia, Oman, UAE) despite a fall in crude oil prices. African countries like Ethiopia, Kenya, Uganda and Zambia have strong T&D capex pipeline backed by international agencies. KEC expects business growth of 10-15% in Africa and the Middle East. The company has witnessed strong order pipeline, driven by spending in Saudi Arabia (INR20b order book as of 3QFY16; tenders worth INR100b to be awarded as of 3QFY16). Current order book provides reasonable medium-term revenue visibility. Order book stands at INR94b, up 7% YoY and BTB of 1.1x. Order intake in Q316 at INR23b improved 59% YoY, as led by improvement in finalization of orders; besides, the order pipeline remains healthy (L1 in orders worth INR30b). In the international market, improved ordering is expected from the MENA region, Southeast Asia and select African countries like Tanzania, Uganda and Kenya. Low-margin legacy orders are largely over with Q316 margins at 7.8%(+270bps YoY). Competition intensity moderating in PGCIL orders, led by stringent project clause implementation: Competition intensity has been moderating in large projects of PGCIL as it has included stringent clauses to ensure smooth execution of projects. The company has included LD clauses in projects and has confiscated BG from a vendor for a project while blacklisting vendors who are unable to complete projects on time. The stand has led to a moderation in competition intensity. On an average, 8-9 bidders participate in the domestic tower package order. Top 4 players had ~75% of the market in YTD16. SAE turns EBITDA positive; PAT breakeven likely in FY17. SAE reported losses in FY15 as a result of depressed pricing in the North American market, low order intake in Mexico and weak execution in Brazil. Presently, SAE’s Brazil is fully booked till FY17. Pricing in the North American market is improving and with an improvement in execution, the under-recovery of costs is expected to improve—we expect SAE to break even in FY17. Valuation and rating. We estimate earnings to grow at a CAGR of 59% over FY15-18e, driven by an improvement in margins as legacy orders are finished. We initiate coverage with a Buy and a target price of INR130 (12x FY18E EPS). 53 KEC International Exhibit 26: Geography wise order book bifurcation Exhibit 27: Segment wise order book bifurcation Railways , Water, 2% 4% Cables , 12% AmericasKEC, 10% Africa and Central Asia , 12% South Asia including india , 61% Middle East, 16% Transmissio n , 82% Source: MOSL, Company Exhibit 28: Strong order book providing medium term revenue visibility Total Order Book 41.7 Exhibit 29: Well managed net working capital cycle growth YoY Networking Capital (Days) 84 94 94 94 FY18E 88 FY17E 80 FY16E 79 FY14 FY11 FY09 59 FY08 116,545 FY18E 102,000 FY14 109,373 94,700 FY13 FY17E 85,720 FY12 6.6 101,331 77,922 FY11 7.9 FY16E 55000 FY10 6.6 95,080 51630 FY09 -6.8 FY15 42000 7.7 FY08 6.5 10.0 10.5 83 FY13 83 22.9 FY12 118 FY10 36.1 Source: MOSL, Company FY15 South East Asia, 1% Source: MOSL, Company Source: MOSL, Company Exhibit 30: Revenue growth to pick up with improvement in the execution cycle of the transmission projects Exhibit 31: Operating margins to improve with completion of legacy orders from the order book Growth YoY (%) 8.2 8.3 FY17E FY18E 6.0 7.8 FY16E 106,064 FY15 94,560 86,735 6.2 FY14 FY13 79,018 FY14 FY12 69,795 FY13 FY11 58,147 FY12 8.1 5.5 FY09 44,765 FY11 10.4 10.7 12.2 Source: MOSL, Company February 2016 8.8 FY08 39,072 FY10 9.0 7.2 FY18E 34,289 FY09 2.4 FY17E 28,145 FY08 13.2 FY16E 14.0 14.6 FY15 20.0 84,680 29.9 21.8 Consolidated Operating profit margin 12.6 FY10 Consolidated Revenue (INR m) 37.9 Source: MOSL, Company 54 KEC International Exhibit 32: Key operating metrics INR M FY12 FY13 FY14 FY15 FY16 FY17E FY18E 85,720 94,700 101,796 95,080 101,331 109,373 116,545 Y-o-Y growth 9.9% 10.5% 7.5% -6.6% 6.6% 7.9% 6.6% Order inflow 65,867 74,840 84,820 82,230 92,986 102,602 113,237 Y-o-Y growth 6.2% 13.6% 13.3% -3.1% 13.1% 10.3% 10.4% Execution 58,147 69,795 79,018 84,680 86,735 94,560 106,064 Y-o-Y growth 29.9% 20.0% 13.2% 7.2% 2.4% 9.0% 12.2% 1.47 1.36 1.29 1.12 1.17 1.16 1.10 Order Book 85,720 94,701 101,796 95,080 114,206 135,123 155,170 T&D (incl Power Systems, Telecom) 67,719 77,560 80,784 71,310 87,961 104,500 118,057 SAE Towers 7,543 7,292 8,568 9,508 9,200 9,660 10,143 Cables 1,457 1,042 2,448 5,705 7,240 9,926 14,512 Railways 3,429 4,356 4,488 4,754 5,922 6,999 8,182 Water 5,572 4,451 5,508 3,803 3,883 4,037 4,276 Order Intake 65,867 74,840 84,820 82,230 92,986 102,602 113,237 T&D (incl Power Systems, Telecom) 51,500 51,714 59,544 55,916 69,896 83,875 104,843 SAE Towers 7,753 10,253 10,009 12,335 13,568 15,603 17,944 Cables 6,020 7,640 8,567 11,512 11,512 12,663 14,563 Railways 1,430 5,160 2,375 2,549 2,880 3,168 3,643 Water 5,470 1,640 4,411 0 1,400 1,540 1,694 Revenues 58,150 69,790 79,010 84,590 86,735 94,560 106,064 T&D (incl Power Systems, Telecom) Closing order book Book to bill ratio 40,730 48,470 61,160 64,840 66,120 73,221 83,891 SAE Towers 9,130 10,320 8,540 8,030 7,606 7,886 8,280 Cables 5,710 5,520 6,310 9,070 9,977 9,977 9,977 Railways 1,640 2,700 1,690 1,330 1,712 2,091 2,461 940 2,780 1,310 1,320 1,320 1,386 1,455 30.0% 20.0% 13.2% 7.1% 2.5% 9.0% 12.2% 17.4% 19.0% 26.2% 6.0% 2.0% 10.7% 14.6% Water Revenues, % YoY T&D (incl Power Systems, Telecom) 157.9% 13.0% -17.2% -6.0% -5.3% 3.7% 5.0% Cables 19.0% -3.3% 14.3% 43.7% 10.0% 0.0% 0.0% Railways 80.2% 64.6% -37.4% -21.3% 28.7% 22.1% 17.7% 195.7% -52.9% 0.8% 0.0% 5.0% 5.0% 10,351 15,133 19,830 18,388 19,530 20,104 20,848 79 80 88 84 94 94 94 SAE Towers Water Net Debt (INR M) Reported NWC (Days) February 2016 55 KEC International Financials and valuations Income Statement Y/E March Total Revenues Change (%) Raw Materials Staff Cost Other Expenses EBITDA % of Total Revenues Other Income Depreciation Interest PBT Tax Rate (%) Adjusted PAT Change (%) Exceptional Items Reported PAT Change (%) 2012 58,147 29.9 43,173 4,274 5,987 4,713 8.1 113 479 1,597 2,749 984 35.8 1,765 -17.6 328 2,093 1.8 2013 69,795 20.0 53,301 4,829 7,852 3,814 5.5 161 561 1,944 1,470 818 55.7 652 -63.1 -1 650 -68.9 2014 79,018 13.2 59,594 5,661 8,831 4,933 6.2 138 705 2,633 1,733 883 51.0 849 30.3 -182 668 2.7 2015 84,680 7.2 64,527 5,865 9,168 5,120 6.0 116 881 3,089 1,266 561 44.3 705 -16.9 905 1,610 141.1 2016E 86,735 2.4 64,532 6,007 9,391 6,805 7.8 127 893 2,802 3,237 1,295 40.0 1,942 175.4 0 1,942 20.6 2017E 94,560 9.0 70,034 6,549 10,238 7,739 8.2 241 958 3,197 3,826 1,416 37.0 2,410 24.1 0 2,410 24.1 (INR Million) 2018E 106,064 12.2 78,441 7,346 11,484 8,794 8.3 391 1,022 3,677 4,486 1,660 37.0 2,826 17.2 0 2,826 17.2 Balance Sheet Y/E March Share Capital Reserves Net Worth Minority Intetest Loans Deferred Tax Liability Capital Employed 2012 514 10,564 11,078 0 12,380 513 23,971 2013 514 10,958 11,472 0 16,690 621 28,783 2014 514 11,402 11,916 0 21,270 514 33,699 2015 514 12,784 13,298 0 20,451 527 34,277 2016E 514 14,399 14,913 0 23,451 527 38,892 2017E 514 16,404 16,918 0 26,451 527 43,897 (INR Million) 2018E 514 18,755 19,269 0 29,451 527 49,248 10,949 2,852 8,097 1,122 0 3,209 43,081 4,401 29,448 2,029 5,104 2,099 31,538 21,835 9,702 20,274 23,971 13,332 3,519 9,813 301 0 3,424 48,809 3,960 34,305 1,556 6,613 2,375 33,564 24,671 8,893 23,252 28,783 14,026 4,283 9,742 180 0 3,778 60,197 5,052 43,390 1,440 8,520 1,794 40,197 32,131 8,067 26,815 33,699 13,393 4,747 8,646 164 0 3,943 64,519 4,764 38,529 2,063 9,507 9,655 42,995 33,248 9,747 30,052 34,277 14,396 5,640 8,757 164 0 3,943 70,035 4,880 41,841 3,921 9,738 9,655 44,006 34,055 9,951 34,761 38,892 15,400 6,597 8,803 1,464 0 3,943 74,963 5,320 43,025 6,347 10,616 9,655 45,276 34,537 10,739 39,208 43,897 Gross Fixed Assets Less: Depreciation Net Fixed Assets Capital WIP Investments Goodwill Curr. Assets Inventory Debtors Cash & Bank Balance Loans & Advances Other Current Assets Current Liab. & Prov. Creditors Other Liabilities Net Current Assets Application of Funds E: MOSL Estimates February 2016 16,403 7,619 8,784 2,764 0 3,943 84,393 5,967 48,259 8,604 11,908 9,655 50,636 38,738 11,898 44,436 49,248 56 KEC International Financials and valuations Ratios Y/E March Basic (INR) Adj EPS Cash EPS Book Value DPS Payout (incl. Div. Tax.) Valuation (x) P/E EV/EBITDA EV/Sales Price/Book Value Dividend Yield (%) Profitability Ratios (%) RoE RoCE Turnover Ratios Debtors (Days) Inventory (Days) Creditors. (Days) Asset Turnover (x) Leverage Ratio Debt/Equity (x) 2012 2013 2014 2015 2016E 2017E 2018E 6.9 8.7 43.1 1.2 14.7 2.5 4.7 44.6 0.5 19.8 3.3 6.0 46.3 0.6 23.1 2.7 6.2 51.7 0.9 14.4 7.6 11.0 58.0 1.1 14.4 9.4 13.1 65.8 1.3 14.4 11.0 15.0 75.0 1.6 14.4 15.4 8.0 0.6 2.5 1.1 41.8 11.1 0.6 2.4 0.5 32.1 9.5 0.6 2.3 0.6 38.6 8.9 0.5 2.0 0.8 14.0 6.9 0.5 1.8 1.0 11.3 6.1 0.5 1.6 1.3 9.6 5.5 0.5 1.4 1.5 20.4 13.4 5.8 5.9 5.7 6.4 12.8 10.0 13.8 10.0 15.1 10.8 15.6 11.2 185 28 137 2.4 179 21 129 2.4 200 23 148 2.3 166 21 143 2.5 176 21 143 2.2 166 21 133 2.2 166 21 133 2.2 1.1 1.5 1.8 1.5 1.6 1.6 1.5 Cash Flow Statement Y/E March PBT before EO Items Depreciation Interest Direct Taxes Paid (Inc)/Dec in WC CF from Operations Others CF from Oper. Incl. Others 2012 3,243 479 1,497 -923 1,566 5,863 -373 5,490 2013 1,470 561 1,822 -976 -3,738 -862 -6 -868 2014 1,551 705 2,536 -1,126 -3,957 -291 198 -93 2015 2,611 881 2,987 -1,221 -3,206 2,052 -523 1,529 2016E 3,237 893 0 -1,295 -2,644 191 0 191 2017E 3,826 958 0 -1,416 -1,233 2,135 0 2,135 (Inc)/Dec in FA Free Cash Flow Investment in liquid assets & Others CF from Investments -493 4,997 168 -325 -1,349 -2,217 140 -1,210 -1,441 -1,534 101 -1,340 1,165 2,694 83 1,249 -1,004 -812 0 -1,004 -2,304 -169 0 -2,304 -2,304 -268 0 -2,304 -2,612 -1,629 -355 0 -4,596 3,945 -1,983 -357 0 1,605 4,101 -2,634 -150 0 1,317 1,065 -3,047 -175 0 -2,157 3,000 0 -327 0 2,673 3,000 0 -405 0 2,595 3,000 0 -475 0 2,525 569 1,460 2,029 -473 2,029 1,556 -116 1,556 1,440 623 1,440 2,063 1,861 2,060 3,921 2,426 3,921 6,347 2,256 6,347 8,604 (Inc)/Dec in Debt Interest Paid Dividend Paid Others CF from Fin. Activity Inc/Dec of Cash Add: Beginning Balance Closing Balance E: MOSL Estimates February 2016 (INR Million) 2018E 4,486 1,022 0 -1,660 -1,813 2,035 0 2,035 57 February 2016 Update | Sector: Capital Goods Larsen & Toubro BSE SENSEX 23,192 S&P CNX 7,048 Stock Info Bloomberg Equity Shares (m) 52-Week Range (INR) 1, 6, 12 Rel. Per (%) M.Cap. (INR b) M.Cap. (USD b) Avg Val ( INR m) Free float (%) LT IN 935.5 1,893 /1,017 5 /-22/-12 1,036.5 15.2 3,452 100 Financials Snapshot (INR b) Y/E March Sales EBITDA Adj PAT * EPS (INR)* EPS Gr. (%) BV/Sh (INR) RoE (%) RoCE (%) P/E (x)* P/BV (x) * Consolidated 2015 2016E 2017E 920 113 44 47 -4.2 437.3 11.2 6.5 23.5 2.7 1,016 113.2 41.0 43.8 -7.1 469.2 9.7 5.7 25.3 2.5 1,158 144.8 53.9 57.6 31.3 510.5 11.8 6.7 19.2 2.4 Estimate change TP change Rating change Shareholding pattern (%) As On Dec-15 Sep-15 Dec-14 Promoter 0.0 0.0 0.0 DII 38.4 37.1 36.1 FII 18.6 20.5 20.3 Others 43.0 42.4 43.6 FII Includes depository receipts Stock Performance (1-year) February 2016 CMP: INR1,108 TP: INR1,440 (+30%) Best play on the capex recovery in India Buy All set to benefit from capex recovery in India: L&T is well positioned to benefit from the capex recovery cycle in key business segments like railways (INR8.6t capex over the next five years), T&D (INR2.6t capex in the 13th Five-Year Plan), and defense (capex of INR2.6t over medium term). Over the years, L&T has continuously evolved through developing new skill sets and competencies to benefit from emerging trends. This has also enabled it to weather the volatility better than peers. Improvement in asset utilization to drive return ratios of the company: Over the years, L&T has invested heavily in creating manufacturing assets like shipyards, BTG, forgings—which as of now does not contribute meaningfully to the bottomline, owing to muted demand and underutilization of assets. Manufacturing businesses present interesting possibilities in the longer term, including defense privatization. Several of these businesses are difficult to replicate and L&T is strongly positioned as a dominant player. The management intends to improve the consolidated ROE from current levels of 14% to 20% in the medium term. Capital structure correction a key focus area: L&T’s increased capital allocation toward subsidiaries and associate companies has been an area of discomfort. We understand that L&T is attempting to rationalize its capital allocation through monetization of matured assets (e.g. Kattupalli Port), exit from non-core activities and fund infusion by Canada Pension Plan (INR20b in two tranches). The intent is ‘portfolio churn’ and to capture value accretion at the initial stages of project life cycle. The management is making efforts to improve the consolidated ROE from the current 14% to 20% over the next three years. Also, infotech/technology services business IPO is expected by July 2016. L&T Realty has 35msf of projects under development, which will aid value unlocking. Overseas order contribution to decline from 38% in FY14 to ~18% in FY18: FY14 was the inflexion point in L&T’s attempt to diversify geographically, with intake at INR380b (32% of E&C v/s 18% in FY13). New geographies of Saudi and Qatar accounted for majority of the intake, while traditional countries like Oman and UAE were stable. We calculate that L&T’s market share increased from ~1-2% till CY11 to 4-5% in CY13/14 in the Middle East. Going forward, we believe L&T will continue to focus on traditional geographies; thus, the contribution will decline to normative levels of ~17-18%. Given the sharp decline in crude prices, we believe the opportunity pie—particularly in hydrocarbons—has shrunk. Given the huge losses of INR12b+ in FY15 in hydrocarbons and possibilities of liquidated damages, management is expected to be very cautious in picking up new orders. 58 Larsen & Toubro Valuation and Rating We maintain Buy with a SOTP based price target of INR1,440/sh (E&C business at 20x FY18E). Our target PER multiple of 20x is lower than the 25x average multiple during FY07-11, a period when the domestic project ordering was quite robust. Manufacturing businesses like Power BTG, Shipbuilding and Special Forgings are expected to witness improvement in order intake in FY18, led by pick-up in project awards in Power BTG, Defence and Nuclear segments. Exhibit 33: L&T SOTP value Method Construction Business L&T Standalone L&T Hydrocarbons International Ventures (L&T FZE) Service Segments Infotech / Technology Finance Sevices incl. general insurance Valuation multiple Value (INR b) Value (INR/sh) FY18E PER (x) 18.0 967 1,033 FY18E EPS 18.0 10 11 FY18E PBV (x) 1.0 11 12 FY18E PER (x) 11.0 209 223 1.5 132 90 FY18E PBV (x) Rationale Lower multiple on slowdown in order inflow At par to mid-tier IT companies At discount to peer group given relatively lower ratios Sapura Shipping L&T Realty Asset Ownership / Project Developer Infrastructure Development Projects Power Development Projects Manufacturing Ventures Power Equipments FY18E PBV (x) 1.5 1 2 FY18E PER (x) 15.0 35 38 FY18E PBV (x) 0.5 42 45 At 0.5x Book Value to capture the macro volatility FY18E PBV (x) 1.0 27 29 At Book Value, given Case 2 bid 15.0 20 22 Shipbuilding / Container Port Special Steel and Heavy Forgings FY18E PBV (x) 1.0 20 21 Expect industry project awards to sustain at 1518GW pa Increased possibility of Defence (Naval) orders 1.0 8 9 Less: Holding Company Discount of 20% Total FY18E PER (x) FY18E PBV (x) Possibility of Nuclear project awards to commence in FY17 -96 1,441 Source: MOSL, Company February 2016 59 Larsen & Toubro Exhibit 34: Revenue contribution from overseas projects to increase as key projects start contributing to topline Revenue (INRb) 24.5 26.2 Overseas Rev as a % to total Rev 34.5 34.4 33.4 30.4 32.4 Exhibit 35: EBITDA and EBITDA margins Adj EBIDTA (INR b) 14.8 12.6 12.3 11.1 12.5 13.1 171 113 FY15 FY18E 108 FY14 145 99 FY13 FY17E 87 FY12 113 47 FY11 FY16E 64 FY11 FY12 FY13 FY14 FY15 FY16E FY17E FY18E FY19E FY20E FY10 1,316 1,162 1,012 853 720 619 624 597 9.9 465 377 13.3 9.6 21.8 9.8 13.5 EBIDTA Margin (%) Source: MOSL, Company Source: MOSL, Company Exhibit 36: Expect order inflow from domestic market to improve as capex activity picks up momentum Exhibit 37: Overseas orders to decline led by weakness in crude oil prices YoY growth 943 1,084 1,214 1,336 67 152 FY15 FY16E FY17E FY18E FY11 FY12 FY13 FY14 FY15 Source: MOSL, Company FY16E FY17E 9 FY18E Source: MOSL, Company Total Invst, incl Advances in Subs % of CE in Subs (Equity + L&A) 36.9 35.9 36.9 30.7 28.3 RoE 41.8 40.7 RoE(Core E&C business ex investment in subs) 38.3 29.5 30.1 30.0 20.0 25.1 13 26 53 76 105 126 140 189 204 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 Source: MOSL, Company February 2016 2 Exhibit 39: RoE excluding investment in subsidiary stands robust Exhibit 38: Investment in subsidiaries 16.8 (10) 393 627 FY14 145 670 669 FY13 537 FY12 (28) (5) 284 15 (20) 260 (6) 127 10 256 12 10 YoY growth 171 131 50 25 FY11 Overseas 284 Domestic Orders 21.0 24.5 18.3 18.9 16.8 22.2 25.9 21.3 14.2 15.6 13.3 15.8 10.3 20.6 12.8 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16E FY17E FY18E Source: MOSL, Company 60 Larsen & Toubro Exhibit 40: Operating metrices (INR billion) Consolidated E&C Business, incl Hydrocarbons Order Intake - Domestic - Overseas FY12 FY13 FY14 FY15 FY16E FY17E FY18E 689 536 153 815 670 145 1,020 628 383 1,227 943 284 1,072 801 271 1,178 930 249 1,253 1,023 230 -6.4% -19.9% 128.1% 18.3% 25.0% -5.0% 24.1% -6.2% 163.7% 21.4% 50.2% -25.8% -12.6% -15.0% -4.6% 9.9% 16.0% -8.2% 6.3% 10.0% -7.5% 465 419 46 597 467 130 624 471 153 619 457 162 688 477 211 795 559 237 881 642 239 23.4% 23.1% 26.0% 28.6% 11.4% 184.3% 7.4% 4.2% 19.0% -0.8% -3.0% 6.0% 11.2% 4.5% 30.0% 15.6% 17.0% 12.4% 10.8% 15.0% 0.9% Analyzing Domestic Intake Large Projects (INR15b+) Base Orders (sub INR15b) 536 143 393 670 145 525 628 67 561 943 411 532 801 200 601 930 380 550 1,023 473 550 Consolidated Order Intake % YoY Consolidated Revenues % YoY 842 1,029 22.2% 745 15.8% 1,272 23.6% 851 14.2% 1,554 22% 920 8.0% 1,400 -10% 1,016 10.4% 1,619 16% 1,158 14.0% 1,714 6% 1,305 12.7% 13.1% 11.3% 11.9% 12.2% 12.0% 13.2% 8.4% 11.6% 8.3% 9.5% 9.7% 10.5% 10.0% 10.7% Standalone EPS* Consolidated EPS 44.9 49.1 38.3 51.8 43.7 49.3 41.1 47.2 33.6 43.8 48.2 57.6 57.4 67.9 Cons. EPS Composition (INR/share) Infotech Finance Manufacturing Developmental Business E&C / Electrical Products, etc 4.7 4.7 -1.1 -2.9 43.9 6.2 5.8 -3.0 -2.9 45.6 6.9 4.0 -7.2 -4.5 50.0 11.9 4.9 -6.5 4.8 32.1 15.8 5.5 -6.0 -6.9 35.4 18.3 5.0 -5.4 -12.6 52.2 20.6 5.9 -4.3 -12.0 57.8 15.6 12.8 25.5 13.3 11.2 25.5 10.3 9.7 22.7 12.8 11.8 22.7 13.7 12.7 22.7 Order Intake, % YoY - Domestic - Overseas Revenues - Domestic - Overseas Revenues, % YoY - Domestic - Overseas EBIDTA Margins E&C, Consolidated E&C, Standalone 642 16.8 14.2 RoE (%) [Standalone] 17.0 15.3 RoE (%) [Consolidated] Wkg. Capital (% of sales) - Adj for 17.0 26.5 Subs Adv * Standalone EPS, excluding dividend received from subsidiary companies February 2016 61 Larsen & Toubro Financials and valuations Income Statement Y/E March Net Revenues Growth Rate (%) Manufacturing Expenses Staff Cost S G &A Expenses EBITDA Change (%) Adj EBIDTA EBITDA Margin (%) Depreciation EBIT Net Interest Other Income Profit before Tax Tax Effective Tax Rate (%) Reported Profit Less:Addl tax on dividend by Subs Less: Minority Interest Add: Profits of Associates EO Adjustments Adjusted Profit Growth (%) Cons. Profit (Reported) (INR Million) 2012 642,307 31.0 472,185 49,950 33,577 86,885 83.6 86,885 13.5 15,803 71,082 11,019 8,290 68,353 22,826 33.4 46,095 87 348 462 568 45,555 269.4 46,123 2013 744,980 16.0 546,888 62,446 36,359 99,287 14.3 99,287 13.3 16,371 82,917 21,243 10,557 72,231 23,790 32.9 51,808 130 722 384 3,368 47,973 5.3 51,341 2014 851,284 14.3 616,948 80,276 46,517 107,543 8.3 107,543 12.6 14,458 93,085 31,414 9,819 71,490 26,076 36.5 48,817 208 -382 93 3,402 45,680 -4.8 49,083 2015 920,046 8.1 672,937 79,222 54,531 113,356 5.4 113,356 12.3 26,225 87,131 28,507 10,072 68,696 22,836 33.2 49,337 0 1,710 21 3,477 44,171 -3.3 47,648 2016E 1,016,017 10.4 751,845 90,731 60,219 113,222 -0.1 113,222 11.1 25,903 87,319 30,076 11,760 69,003 23,461 34.0 48,638 0 4,547 21 3,096 41,016 -7.1 44,112 2017E 1,158,396 14.0 841,537 103,445 68,658 144,756 27.9 144,756 12.5 32,352 112,404 36,814 14,901 90,491 32,577 36.0 57,914 0 4,084 21 0 53,851 31.3 53,851 Y/E March Equity Capital Reserves and Surplus Net Worth Debt Deferred Tax Liability Minority Interest Capital Employed 2012 1,225 287,811 289,036 471,501 44,995 17,535 827,898 2013 1,231 337,366 338,597 619,936 1,837 26,529 986,899 2014 1,854 375,262 377,116 801,529 3,375 31,792 1,213,812 2015 1,859 407,232 409,091 905,714 -1,847 49,986 1,362,944 2016E 1,859 437,108 438,967 1,022,712 -1,847 54,533 1,514,366 2017E 1,859 475,768 477,627 1,049,007 -1,847 58,617 1,583,405 2018E 1,859 521,807 523,666 1,058,385 -1,847 63,221 1,643,426 Gross Fixed Assets Less : Depreciation Add : Capital WIP Net Fixed Assets Investments Inventory Sundry Debtors Cash & Bank Loans & Advances Other Current Assets Current Assets Current Liabilities Net Current Assets Capital Deployed E: MOSL Estimates 255,174 61,380 149,127 342,921 87,895 42,299 204,054 35,221 74,922 153,396 757,623 360,755 396,869 827,898 379,822 75,670 113,068 417,220 87,675 51,874 230,149 35,715 84,536 201,930 924,213 442,209 482,004 986,899 411,347 88,824 143,237 465,760 81,090 55,275 263,846 40,966 134,755 254,934 1,150,574 483,612 666,962 1,213,812 454,711 107,331 155,237 502,618 96,121 65,182 300,894 57,562 193,020 246,883 1,335,860 571,655 764,206 1,362,944 534,711 133,234 155,237 556,714 96,121 71,981 332,280 109,400 213,154 272,635 1,492,815 631,284 861,531 1,514,366 614,711 165,586 155,237 604,362 96,121 82,068 347,107 117,427 243,024 310,841 1,602,671 719,749 882,922 1,583,405 674,711 203,582 155,237 626,367 96,121 92,467 391,090 113,065 273,818 350,228 1,731,888 810,950 920,938 1,643,426 Balance Sheet February 2016 2018E 1,305,178 12.7 940,326 116,553 77,357 170,942 18.1 170,942 13.1 37,995 132,947 40,363 15,559 108,143 40,013 37.0 68,130 0 4,604 21 0 63,548 18.0 63,548 (INR Million) 62 Larsen & Toubro Financials and valuations Ratios Y/E March Basic (INR) Standalone EPS Adj Growth (%) Consolidated EPS Adj Growth (%) Con. EPS (Fully Diluted) Growth (%) Cash EPS Book Value Dividend Per Share Div. Payout (Incl. Div Tax ) % Valuation (x) P/E (Standalone) P/E (Consolidated) P/E (Consolidated) (Fully Diluted) Price / CEPS EV/EBITDA EV/ Sales Price / Book Value Dividend Yield Return Ratio (%) RoE RoCE Turnover Ratios Debtors (Days) Inventory (Days) Asset Turnover (x) Leverage Ratio Current Ratio (x) D/E (x) 2012 2013 2014 2015 2016E 2017E 2018E 47.5 22.1 49.1 269.4 49.1 269.4 66.2 311.8 11.1 22.5 49.3 3.7 51.8 5.3 51.8 5.3 69.4 365.3 11.5 22.2 52.9 7.4 49.3 -4.8 49.3 42.8 64.9 406.9 14.2 28.9 50.2 -5.1 47.2 -4.2 47.2 -4.2 75.2 437.3 13.0 27.5 42.7 -15.0 43.8 -7.1 43.8 -7.1 71.5 469.2 10.2 23.4 58.2 36.4 57.6 31.3 57.6 31.3 92.1 510.5 14.0 24.3 68.4 17.5 67.9 18.0 67.9 18.0 108.5 559.8 16.4 24.2 20.9 22.5 22.5 17.1 16.6 2.2 3.0 1.3 22.1 23.5 23.5 14.7 16.6 2.1 2.7 1.2 26.0 25.3 25.3 15.5 17.2 2.0 2.5 0.9 19.0 19.2 19.2 12.0 13.6 1.9 2.4 1.3 19.0 16.3 16.3 10.2 11.6 1.7 2.2 1.5 17.0 8.8 15.3 8.3 12.8 7.2 11.2 6.5 9.7 5.7 11.8 6.7 12.7 7.5 116.0 24.0 0.8 112.8 25.4 0.8 113.1 23.7 0.7 119.4 25.9 0.7 119.4 25.9 0.7 109.4 25.9 0.7 109.4 25.9 0.8 2.1 0.9 2.1 1.0 2.4 1.2 2.3 1.2 2.4 1.3 2.2 1.3 2.1 1.1 2012 46,123 15,803 -3,231 -134,620 -75,925 -77,087 -153,012 4,263 -73,037 9,155 143,215 7,275 -11,916 147,729 -1,233 36,455 35,222 2013 52,057 16,371 -43,158 -84,641 -59,372 -90,670 -150,042 220 -90,237 5,057 148,436 8,994 -12,385 150,102 493 35,222 35,715 2014 49,020 14,458 1,538 -179,708 -114,692 -62,998 -177,690 6,585 -56,413 4,822 181,593 5,263 -15,322 176,355 5,251 35,715 40,966 2015 47,648 26,225 -5,221 -80,647 -11,995 -63,083 -75,078 -15,032 -78,114 -1,570 104,185 18,194 -14,103 106,705 16,596 40,966 57,562 2016E 44,112 25,903 0 -45,488 24,527 -80,000 -55,473 0 -80,000 -3,096 116,998 4,547 -11,139 107,311 51,838 57,562 109,400 2017E 53,851 32,352 0 -13,364 72,839 -80,000 -7,161 0 -80,000 0 26,295 4,084 -15,191 15,188 8,027 109,400 117,427 Cash Flow Statement Y/E March PBT before EO Items Add : Depreciation Change in diff tax liability (Inc)/Dec in WC CF from Operations (Inc)/Dec in FA Free Cash Flow (Pur)/Sale of Investments CF from Investments (Inc)/Dec in Net Worth (Inc)/Dec in Debt Change in Minority Interest Dividend Paid CF from Fin. Activity Inc/Dec of Cash Add: Beginning Balance Closing Balance E: MOSL Estimates February 2016 (INR Million) 2018E 63,548 37,995 0 -42,378 59,165 -60,000 -835 0 -60,000 0 9,378 4,604 -17,509 -3,527 -4,362 117,427 113,065 63 Disclosures This document has been prepared by Motilal Oswal Securities Limited (hereinafter referred to as Most) to provide information about the company(ies) and/sector(s), if any, covered in the report and may be distributed by it and/or its affiliated company(ies). This report is for personal information of the selected recipient/s and does not construe to be any investment, legal or taxation advice to you. This research report does not constitute an offer, invitation or inducement to invest in securities or other investments and Motilal Oswal Securities Limited (hereinafter referred as MOSt) is not soliciting any action based upon it. This report is not for public distribution and has been furnished to you solely for your general information and should not be reproduced or redistributed to any other person in any form. This report does not constitute a personal recommendation or take into account the particular investment objectives, financial situations, or needs of individual clients. Before acting on any advice or recommendation in this material, investors should consider whether it is suitable for their particular circumstances and, if necessary, seek professional advice. The price and value of the investments referred to in this material and the income from them may go down as well as up, and investors may realize losses on any investments. Past performance is not a guide for future performance, future returns are not guaranteed and a loss of original capital may occur. MOSt and its affiliates are a full-service, integrated investment banking, investment management, brokerage and financing group. We and our affiliates have investment banking and other business relationships with a some companies covered by our Research Department. Our research professionals may provide input into our investment banking and other business selection processes. Investors should assume that MOSt and/or its affiliates are seeking or will seek investment banking or other business from the company or companies that are the subject of this material and that the research professionals who were involved in preparing this material may educate investors on investments in such business. The research professionals responsible for the preparation of this document may interact with trading desk personnel, sales personnel and other parties for the purpose of gathering, applying and interpreting information. Our research professionals are paid on the profitability of MOSt which may include earnings from investment banking and other business. MOSt generally prohibits its analysts, persons reporting to analysts, and members of their households from maintaining a financial interest in the securities or derivatives of any companies that the analysts cover. Additionally, MOSt generally prohibits its analysts and persons reporting to analysts from serving as an officer, director, or advisory board member of any companies that the analysts cover. Our salespeople, traders, and other professionals or affiliates may provide oral or written market commentary or trading strategies to our clients that reflect opinions that are contrary to the opinions expressed herein, and our proprietary trading and investing businesses may make investment decisions that are inconsistent with the recommendations expressed herein. In reviewing these materials, you should be aware that any or all of the foregoing among other things, may give rise to real or potential conflicts of interest. MOSt and its affiliated company(ies), their directors and employees and their relatives may; (a) from time to time, have a long or short position in, act as principal in, and buy or sell the securities or derivatives thereof of companies mentioned herein. (b) be engaged in any other transaction involving such securities and earn brokerage or other compensation or act as a market maker in the financial instruments of the company(ies) discussed herein or act as an advisor or lender/borrower to such company(ies) or may have any other potential conflict of interests with respect to any recommendation and other related information and opinions.; however the same shall have no bearing whatsoever on the specific recommendations made by the analyst(s), as the recommendations made by the analyst(s) are completely independent of the views of the affiliates of MOSt even though there might exist an inherent conflict of interest in some of the stocks mentioned in the research report Reports based on technical and derivative analysis center on studying charts company's price movement, outstanding positions and trading volume, as opposed to focusing on a company's fundamentals and, as such, may not match with a report on a company's fundamental analysis. In addition MOST has different business segments / Divisions with independent research separated by Chinese walls catering to different set of customers having various objectives, risk profiles, investment horizon, etc, and therefore may at times have different contrary views on stocks sectors and markets. Unauthorized disclosure, use, dissemination or copying (either whole or partial) of this information, is prohibited. The person accessing this information specifically agrees to exempt MOSt or any of its affiliates or employees from, any and all responsibility/liability arising from such misuse and agrees not to hold MOSt or any of its affiliates or employees responsible for any such misuse and further agrees to hold MOSt or any of its affiliates or employees free and harmless from all losses, costs, damages, expenses that may be suffered by the person accessing this information due to any errors and delays. The information contained herein is based on publicly available data or other sources believed to be reliable. Any statements contained in this report attributed to a third party represent MOSt’s interpretation of the data, information and/or opinions provided by that third party either publicly or through a subscription service, and such use and interpretation have not been reviewed by the third party. This Report is not intended to be a complete statement or summary of the securities, markets or developments referred to in the document. While we would endeavor to update the information herein on reasonable basis, MOSt and/or its affiliates are under no obligation to update the information. Also there may be regulatory, compliance, or other reasons that may prevent MOSt and/or its affiliates from doing so. MOSt or any of its affiliates or employees shall not be in any way responsible and liable for any loss or damage that may arise to any person from any inadvertent error in the information contained in this report. MOSt or any of its affiliates or employees do not provide, at any time, any express or implied warranty of any kind, regarding any matter pertaining to this report, including without limitation the implied warranties of merchantability, fitness for a particular purpose, and non-infringement. The recipients of this report should rely on their own investigations. This report is intended for distribution to institutional investors. Recipients who are not institutional investors should seek advice of their independent financial advisor prior to taking any investment decision based on this report or for any necessary explanation of its contents. Most and it’s associates may have managed or co-managed public offering of securities, may have received compensation for investment banking or merchant banking or brokerage services, may have received any compensation for products or services other than investment banking or merchant banking or brokerage services from the subject company in the past 12 months. Most and it’s associates have not received any compensation or other benefits from the subject company or third party in connection with the research report. Subject Company may have been a client of Most or its associates during twelve months preceding the date of distribution of the research report MOSt and/or its affiliates and/or employees may have interests/positions, financial or otherwise of over 1 % at the end of the month immediately preceding the date of publication of the research in the securities mentioned in this report. To enhance transparency, MOSt has incorporated a Disclosure of Interest Statement in this document. This should, however, not be treated as endorsement of the views expressed in the report. Motilal Oswal Securities Limited is registered as a Research Analyst under SEBI (Research Analyst) Regulations, 2014. SEBI Reg. No. INH000000412 There are no material disciplinary action that been taken by any regulatory authority impacting equity research analysis activities Analyst Certification The views expressed in this research report accurately reflect the personal views of the analyst(s) about the subject securities or issues, and no part of the compensation of the research analyst(s) was, is, or will be directly or indirectly related to the specific recommendations and views expressed by research analyst(s) in this report. The research analysts, strategists, or research associates principally responsible for preparation of MOSt research receive compensation based upon various factors, including quality of research, investor client feedback, stock picking, competitive factors and firm revenues Disclosure of Interest Statement Analyst ownership of the stock Served as an officer, director or employee Companies where there is interest No No A graph of daily closing prices of securities is available at www.nseindia.com and http://economictimes.indiatimes.com/markets/stocks/stock-quotes Regional Disclosures (outside India) This report is not directed or intended for distribution to or use by any person or entity resident in a state, country or any jurisdiction, where such distribution, publication, availability or use would be contrary to law, regulation or which would subject MOSt & its group companies to registration or licensing requirements within such jurisdictions. For U.S. Motilal Oswal Securities Limited (MOSL) is not a registered broker - dealer under the U.S. Securities Exchange Act of 1934, as amended (the"1934 act") and under applicable state laws in the United States. In addition MOSL is not a registered investment adviser under the U.S. Investment Advisers Act of 1940, as amended (the "Advisers Act" and together with the 1934 Act, the "Acts), and under applicable state laws in the United States. Accordingly, in the absence of specific exemption under the Acts, any brokerage and investment services provided by MOSL, including the products and services described herein are not available to or intended for U.S. persons. This report is intended for distribution only to "Major Institutional Investors" as defined by Rule 15a-6(b)(4) of the Exchange Act and interpretations thereof by SEC (henceforth referred to as "major institutional investors"). This document must not be acted on or relied on by persons who are not major institutional investors. Any investment or investment activity to which this document relates is only available to major institutional investors and will be engaged in only with major institutional investors. In reliance on the exemption from registration provided by Rule 15a-6 of the U.S. Securities Exchange Act of 1934, as amended (the "Exchange Act") and interpretations thereof by the U.S. Securities and Exchange Commission ("SEC") in order to conduct business with Institutional Investors based in the U.S., MOSL has entered into a chaperoning agreement with a U.S. registered broker-dealer, Motilal Oswal Securities International Private Limited. ("MOSIPL"). Any business interaction pursuant to this report will have to be executed within the provisions of this chaperoning agreement. The Research Analysts contributing to the report may not be registered /qualified as research analyst with FINRA. Such research analyst may not be associated persons of the U.S. registered broker-dealer, MOSIPL, and therefore, may not be subject to NASD rule 2711 and NYSE Rule 472 restrictions on communication with a subject company, public appearances and trading securities held by a research analyst account. For Hong Kong: This report is distributed in Hong Kong by Motilal Oswal capital Markets (Hong Kong) Private Limited, a licensed corporation (CE AYY-301) licensed and regulated by the Hong Kong Securities and Futures Commission (SFC) pursuant to the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong) “SFO”. As per SEBI (Research Analyst Regulations) 2014 Motilal Oswal Securities (SEBI Reg No. INH000000412) has an agreement with Motilal Oswal capital Markets (Hong Kong) Private Limited for distribution of research report in Kong Kong. This report is intended for distribution only to “Professional Investors” as defined in Part I of Schedule 1 to SFO. Any investment or investment activity to which this document relates is only available to professional investor and will be engaged only with professional investors.” Nothing here is an offer or solicitation of these securities, products and services in any jurisdiction where their offer or sale is not qualified or exempt from registration. The Indian Analyst(s) who compile this report is/are not located in Hong Kong & are not conducting Research Analysis in Hong Kong. For Singapore Motilal Oswal Capital Markets Singapore Pte Limited is acting as an exempt financial advisor under section 23(1)(f) of the Financial Advisers Act(FAA) read with regulation 17(1)(d) of the Financial Advisors Regulations and is a subsidiary of Motilal Oswal Securities Limited in India. This research is distributed in Singapore by Motilal Oswal Capital Markets Singapore Pte Limited and it is only directed in Singapore to accredited investors, as defined in the Financial Advisers Regulations and the Securities and Futures Act (Chapter 289), as amended from time to time. In respect of any matter arising from or in connection with the research you could contact the following representatives of Motilal Oswal Capital Markets Singapore Pte Limited: Kadambari Balachandran Email : [email protected] Contact : (+65) 68189233 / 65249115 Office Address : 21 (Suite 31),16 Collyer Quay,Singapore 04931 Motilal Oswal Securities Ltd January 2016 Motilal Oswal Tower, Level 9, Sayani Road, Prabhadevi, Mumbai 400 025 Phone: +91 22 3982 5500 E-mail: [email protected] 36
© Copyright 2026 Paperzz