Viable tidal power through smarter solutions

Viable tidal power through smarter solutions
13 November 2015
1967
13 November 2015
0,4%
550000 T
Om tidevannskraft og energibruer
13 November 2015
TideTec
Viable tidal power through smarter solutions
Viable Tidal Power
History:
 Founded in 2003 by Per Kollandsrud
 R&D and patent development 2003 ‐ 2013
 Arne Kollandsrud hired as MD in 2013
 1,9m Euro EU Eurostar project in 2014
 Commercialisation in 2018
13 November 2015
TideTec Team
Core team:
Arne Kollandsrud,
Managing Director and Owner
Joachim Amland - M.Sc
Technical Director and Owner
Sai Win - M.Sc
Engineer
Innovator
Business development
Engineering
Realising the TideTec dream
5 yr Mgmt Consultant (EY and DNVGL)
15 yr rocket scientist
Current partners:
What is tidal power?
Tidal Energy
$$$
Sources: *World Energy Council, 2013, **IRENA, 2014
$$
$
Tidal power plants today produce power one‐way. Projected tidal plants with two‐way production have sub‐optimal production Conventional Tidal Turbines
60% Efficiency
13 November 2015
90% Efficiency
TideTec technology improves efficiency of the most cost effective Tidal turbine technology by having optimal efficiency both ways
TideTec turbine technology
90% Efficiency
13 November 2015
90% Efficiency
Energy producing bridge
Tidetec is developing technology for energy producing bridges by harnessing tidal energy
Case: Norge
13 November 2015
Skisse av prosjektet: Energibro i Nordnorge
Eksempel: Grovfjord
SVV vurderer brooppgradering
Energipotensiale er beregnet til 17 GWh
Pilotanlegg på 200‐600 kW kan produsere 0,7‐
1,5 GWh Lokalt verksted som samarbeidspartner
Variabel åpning for båttrafikk
Turbinen(e) vil være 1,5‐2,5 m i diameter
Toppåpning for vedlikehold og optimalisering
Locational analysis for barrage project
7.Andørja
3.Kirkenes
2.Ullsfjord
5.Sørstraumen
1.Grovfjord
4.Ottersøy
9.Inderøy
13 November 2015
6.Efjord
8.Beisfjord
Criteria
•
•
•
•
•
•
•
•
•
The need for bridge
Local businesses
The need for electricity
Distance from grid
Sound geometry
Tidal constituents
Current velocity
Potential energy output
Business partners
Current turbine retrofitting project video (large array)
13 November 2015
TideTecs’ visjoner
13 November 2015
Safe*Coast – Integrating Flood protection, electricity production and transport infrastructure (1/2)
TideTec projects
Needs:
13 November 2015
Case study of impoundment that combines 0,7m reduction of flooding level in London with 300 GWh yearly power production and transport infrastructure 2025
300 GWh
Safe*Coast 1,9 mEUR
*Preliminary numbers to be verified in EuroStars project
0,7 m
Confidential
Timeline for TideTec team, business development and market
Market
Business model
2017
Timeline
2016
2019
2020
TideTec
Commercialisation
Prototype and initial sertification
Team
2018
Type approval and production facilities
First tender for
large scale project
Engineering
Engineering
Engineering
Prototype manufacturing
Prototype manufacturing
Prototype manufacturing
Classification society
Classification society
Classification society
Turbine producer
Turbine producer
Venture capital
Venture capital
Project finance
Venture capital
13 November 2015
Tender consortium
2025
Oppsummering
 TideTec jakter industrielle og
finansielle partnere
 Vi ser etter en lokasjon for pilotanlegg:
– Høy tidevannsforskjell
– Liten bro som er moden for utskiftning
– Liten dybde (5‐20 m)
 Evt: Barrierebro som skal åpnes
(kulvertrør)
 Konsulentoppdrag for energiproduserende bruer
13 November 2015
Contact
[email protected]
[email protected]
www.tidetec.no
13 November 2015
Thank you for your attention!