Viable tidal power through smarter solutions 13 November 2015 1967 13 November 2015 0,4% 550000 T Om tidevannskraft og energibruer 13 November 2015 TideTec Viable tidal power through smarter solutions Viable Tidal Power History: Founded in 2003 by Per Kollandsrud R&D and patent development 2003 ‐ 2013 Arne Kollandsrud hired as MD in 2013 1,9m Euro EU Eurostar project in 2014 Commercialisation in 2018 13 November 2015 TideTec Team Core team: Arne Kollandsrud, Managing Director and Owner Joachim Amland - M.Sc Technical Director and Owner Sai Win - M.Sc Engineer Innovator Business development Engineering Realising the TideTec dream 5 yr Mgmt Consultant (EY and DNVGL) 15 yr rocket scientist Current partners: What is tidal power? Tidal Energy $$$ Sources: *World Energy Council, 2013, **IRENA, 2014 $$ $ Tidal power plants today produce power one‐way. Projected tidal plants with two‐way production have sub‐optimal production Conventional Tidal Turbines 60% Efficiency 13 November 2015 90% Efficiency TideTec technology improves efficiency of the most cost effective Tidal turbine technology by having optimal efficiency both ways TideTec turbine technology 90% Efficiency 13 November 2015 90% Efficiency Energy producing bridge Tidetec is developing technology for energy producing bridges by harnessing tidal energy Case: Norge 13 November 2015 Skisse av prosjektet: Energibro i Nordnorge Eksempel: Grovfjord SVV vurderer brooppgradering Energipotensiale er beregnet til 17 GWh Pilotanlegg på 200‐600 kW kan produsere 0,7‐ 1,5 GWh Lokalt verksted som samarbeidspartner Variabel åpning for båttrafikk Turbinen(e) vil være 1,5‐2,5 m i diameter Toppåpning for vedlikehold og optimalisering Locational analysis for barrage project 7.Andørja 3.Kirkenes 2.Ullsfjord 5.Sørstraumen 1.Grovfjord 4.Ottersøy 9.Inderøy 13 November 2015 6.Efjord 8.Beisfjord Criteria • • • • • • • • • The need for bridge Local businesses The need for electricity Distance from grid Sound geometry Tidal constituents Current velocity Potential energy output Business partners Current turbine retrofitting project video (large array) 13 November 2015 TideTecs’ visjoner 13 November 2015 Safe*Coast – Integrating Flood protection, electricity production and transport infrastructure (1/2) TideTec projects Needs: 13 November 2015 Case study of impoundment that combines 0,7m reduction of flooding level in London with 300 GWh yearly power production and transport infrastructure 2025 300 GWh Safe*Coast 1,9 mEUR *Preliminary numbers to be verified in EuroStars project 0,7 m Confidential Timeline for TideTec team, business development and market Market Business model 2017 Timeline 2016 2019 2020 TideTec Commercialisation Prototype and initial sertification Team 2018 Type approval and production facilities First tender for large scale project Engineering Engineering Engineering Prototype manufacturing Prototype manufacturing Prototype manufacturing Classification society Classification society Classification society Turbine producer Turbine producer Venture capital Venture capital Project finance Venture capital 13 November 2015 Tender consortium 2025 Oppsummering TideTec jakter industrielle og finansielle partnere Vi ser etter en lokasjon for pilotanlegg: – Høy tidevannsforskjell – Liten bro som er moden for utskiftning – Liten dybde (5‐20 m) Evt: Barrierebro som skal åpnes (kulvertrør) Konsulentoppdrag for energiproduserende bruer 13 November 2015 Contact [email protected] [email protected] www.tidetec.no 13 November 2015 Thank you for your attention!
© Copyright 2026 Paperzz