Lawrence Heights Revitalization – Phase 1A Subdivision Functional Servicing Report For Toronto Community Housing Corporation N o v e m b e r 2 0 1 4 – 1 4 -9 8 2 5 i Table of Contents 1.0 Introduction 1 1.1 Background ..................................................................................................................... 1 1.2 Study Area/Proposed Development ................................................................................. 1 2.0 Grading 2 3.0 Water Supply 2 4.0 5.0 3.1 Existing Watermain Services ........................................................................................... 2 3.2 Watermain Works in Right-Of-Ways ................................................................................ 3 3.3 Proposed Watermain Services to Block 1A ..................................................................... 3 Sanitary Sewers 3 4.1 Existing Sanitary Sewer Services Around Subdivision Block 1A ...................................... 3 4.2 Proposed Sanitary Sewer Works in Subdivision Right-of-Ways ....................................... 4 4.3 Proposed Sanitary Services to Block 1A.......................................................................... 5 4.4 Analysis of Existing Downstream Sanitary Sewers .......................................................... 5 Storm Drainage 6 5.1 Existing Storm Sewer Services ........................................................................................ 6 5.2 Proposed Storm Sewer Works in Right-Of-Ways ............................................................ 6 5.3 Proposed Storm Services to Block 1A ............................................................................. 7 6.0 Utilities 7 7.0 Conclusion 8 Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 ii List of Appendices Appendix A: Storm Sewer Design Sheet Sanitary Sewer Design Sheet Downstream Sanitary Sewer Analysis Design Sheet Appendix B: Figures Figure 1: Vicinity Map Figure 2: Overland Flow Route Figure 3: Watermain Network Figure 4: Sanitary Sewer System Figure 5: Downstream Sanitary Sewer System Analysis Figure 6: Storm Sewer System Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 1 1.0 Introduction 1.1 Background Dillon Consulting Limited (Dillon) was retained by Toronto Community Housing (TCH) to complete the detailed design for Lawrence Heights Revitalization Plan (LHRP) – Phase 1. This Functional Servicing Report (FSR) summarizes the proposed works for the subdivision work for Block 1A within the right-of-ways (ROWs) of Ranee Avenue, Flemington Road, and Street A. This FSR should be read in conjunction with the Stormwater Management (SWM) Report that is also submitted as part of this Block 1A Subdivision package. Both of these reports will provide support for the Site Plan Application (SPA) design of Block 1A, which was previously submitted to the City, dated April 2014. Much of the background information to support the design of the proposed Block 1A came from a FSR and SWM Report that were prepared by Dillon, dated May 2012, which addressed the overall servicing and SWM needs for the Phase 1 of LHRP. Also referenced was the Lawrence-Allen Revitalization Study Infrastructure Master Plan (IMP) by MMM Group, dated September 2011. This report offered existing external flow information that contributes to the sequence 1A servicing systems. The sequencing of the subdivision has changed since these two reports. 1.2 Study Area/Proposed Development The proposed development, Block 1A, is located at the southwest corner of Ranee Avenue and Allen Road, in the City of Toronto. The site is bounded by Allen Road to the east, Ranee Avenue to the north, and Flemington Road to the west. Figure 1 shows the location of the proposed subdivision Block 1A of LHRP. This report will describe the subdivision work required for servicing Block 1A within the ROWs as denoted in the below figure. It should be noted that the subdivision of Block 1A is subjected to an interim condition, and an ultimate condition. The interim condition is referred to the time before the future Phase 3 of the LHRP, and the ultimate condition is referred to the time when future Phase 3 is in place. Flemington Road is proposed to be re-graded and will follow the current alignment for the interim condition. In the ultimate condition Flemington Road will be re-aligned. Street A is designed to intersect with the current Flemington Road in the interim alignment under the interim condition; however, it will be adjusted to intersect with Flemington Road in its ultimate alignment. The cul-de-sac will also be adjusted in the ultimate condition. The storm and sanitary sewers are designed to the ultimate alignment of Flemington Road to minimize removals in the future when subsequent phases are constructed. In the interim condition, the existing watermain will be replaced with a watermain from Flemington Road southerly to approximately STA 0+080. The watermain on Flemington will not be fully replaced southerly until the ultimate condition. Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 2 The servicing of the proposed subdivision 1A is designed so as to minimize removals in the future. In the interim condition, the design aims to install as much of the ultimate condition work as possible. Refer to Figure 1 for the site location. 2.0 GRADING The subdivision of Block 1A is bounded by Ranee to the north, Allen to the east, Flemington to the west, and a new ROW “Street A” to the south. The proposed grading will follow the existing grading pattern of the subdivision ROWs as much as possible. Ranee Avenue currently has a high point at the intersection with Flemington, then it slopes steeply towards the Allen underpass. There is an existing low point approximately 60m west of the intersection of Ranee and Flemington. Ranee Avenue will not be re-graded. Flemington is currently sloped south from the intersection with Ranee Avenue, and is proposed to be re-graded and re-paved for approximately 150m south of Ranee for the interim condition. At the north end of Flemington, the proposed grading is lower than the existing ground in order to accommodate the grading within Block 1A, therefore a retaining wall is required along the west property line. Street A is proposed to be graded sloping west towards Flemington. It will intersect with Flemington’s existing alignment in the interim condition. In the ultimate condition, Flemington will be re-aligned. Figure 2 shows the overland flow pattern of the subdivision 1A. 3.0 WATER SUPPLY 3.1 Existing Watermain Services On Ranee Avenue, east of Flemington, there is an existing 400mm diameter cast iron watermain that runs east-west along the north side. To the west of Flemington, there is an existing 300mm diameter watermain on the south side of Ranee Avenue. These are connected to the existing 300mm diameter cast iron watermain that runs north-south on the west side of Flemington Road. This 300mm diameter watermain services the existing units on the west side of Flemington. The water services to these units will be maintained during construction until they are re-connected to the new watermain. Within the Block 1A area, there is an existing 150mm diameter watermain that is fed from the existing 300mm diameter watermain on Flemington and that loops through the proposed site area. There are a number of existing hydrants around the proposed subdivision of 1A. These will be kept in service. Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 3 3.2 Watermain Works in Right-Of-Ways The sizing of the proposed watermains of LHRP was modeled and reported in MMM’s IMP. The proposed subdivision for Block 1A will follow the IMP’s test results and recommendations. The existing 300mm cast iron watermain on Flemington Road will be replaced with a new 300mm PVC watermain from Station 0+000 to approximately Station 0+080. From there the existing 300mm cast iron watermain will continue along Flemington Road in its current alignment, until such time as Flemington is realigned during future phases of this development. A proposed 200mm PVC watermain will connect to the Flemington Road watermain and service Street A, terminating at a new fire hydrant. Replacement of a portion of the existing 300mm cast iron watermain on Flemington Road with a new 300mm PVC watermain is proposed for the subdivision to satisfy the demand expected from the development of Block 1A. The new watermain is proposed to be placed in the pavement on the west side of Flemington Road. The existing 300mm cast iron watermain will be kept in service during construction for the units on the west side of Flemington. The new watermain will be installed to the existing services via a tee connection at the southwest corner of Ranee Avenue and Flemington Road. The new pipe will continue southerly along Flemington Road and connect to the existing watermain at approximately Station 0+080 A new branch of 200mm watermain will be installed from the new cross fitting and will run east, under the north sidewalk of Street A, ultimately terminating at a new fire hydrant. See Figure 3 for the watermain network. 3.3 Proposed Watermain Services to Block 1A Block A consists of a Market Condo Building, and a Rental Building. The Market Condo Building on the north end of the site and the rental building on the south end of the site will be serviced by two separate 200mm diameter watermain services, which will be connected to the 300mm watermain on Flemington Road. 4.0 SANITARY SEWERS 4.1 Existing Sanitary Sewer Services Around Subdivision Block 1A Block 1A has existing sanitary sewers on all four sides of the site. To the north of Block 1A, there is an existing 250mm diameter sanitary sewer on Ranee Avenue that conveys existing external flow from the area north of Ranee Avenue. This existing 250mm diameter sanitary sewer cuts into the proposed Block 1A where it then runs south in an easement parallel to Allen Road. The 250mm diameter sanitary sewer then connects to an existing 525mm diameter sanitary sewer that runs south in an easement parallel to Allen Road. To the south of Block 1A, where Javelin Lane and Flemington Road intersect, there is an existing 250mm diameter sanitary sewer that conveys flows from the existing units along Flemington Road, the existing community inside Javelin Lane, and the area to the south of the intersection of Javelin Lane and Flemington Road. The flow from these areas also connect to Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 4 the existing 525mm diameter sanitary sewer that runs south in the easement parallel to Allen Road. To the east of Block 1A, there is an existing 525mm diameter sanitary sewer that crosses Allen Road, and connects to the existing 525mm diameter sanitary sewer that runs south along the easement parallel to Allen Road. The existing 525mm diameter sanitary sewer that crosses Allen Road conveys flows from a large area to the northeast of Allen Road. It should be noted that this large flow is connected to the sanitary sewer system west of Allen Road only in the interim condition. In the ultimate condition, this flow is meant to be serviced by the future sanitary sewers in the Phase 1 area that is to the east of Allen Road. Refer to Figure 4 for the existing sanitary sewer system. 4.2 Proposed Sanitary Sewer Works in Subdivision Right-Of-Ways The proposed sanitary sewer system for the Block 1A subdivision starts with a 300mm diameter sanitary sewer at the north end of the subdivision, and ends with a 375mm diameter sanitary sewer on Street A that outlets to the existing 525mm diameter sanitary sewer at the southeast corner of Block 1A. The proposed sanitary sewer system for the subdivision of Block 1A will service the Block 1A, as well as existing-external flows from: • • • • the north of Ranee Avenue; the west of Ranee Avenue; the community inside Javelin Lane; the community to the south of Flemington Road and Javelin Lane. A 300mm diameter sanitary sewer is proposed on Ranee Avenue to convey the existing external flows from the areas north and west of Ranee Avenue. The flow then heads south via a proposed 375mm diameter sanitary sewer down Flemington Road, which will also service the proposed Block 1A. At Javelin Lane and Flemington Avenue (MH4A), existing external sanitary flow from Javelin Lane and the units south of Flemington will connect to the proposed 375mm diameter sanitary sewer, which flows east on Street A towards the existing 525 mm diameter sanitary sewer outlet at the southeast corner of Block 1A. The existing external sanitary flow from the east side of Allen Road (122.91 L/s, referencing MMM’s IMP’s sanitary design sheet) enters the existing downstream sanitary sewers along the easement downstream of MH6A (at an existing sanitary maintenance hole just north of the proposed MH6A). Under existing conditions, the existing sanitary sewers down the easement are over capacity (103% full according to MMM IMP’s design sheets). Block 1A’s contribution to the existing sanitary sewers down the easement parallel to Allen Road adds approximately 4 L/s to the system. The existing sewers become about 104% full. Once the servicing of Phase 1 east of Allen Road is in place, this external sanitary flow will be directed east, and the existing sanitary sewers in the easement downstream of MH6A will be relieved of the 122.91 L/s, leaving the downstream sanitary sewers at 40% full. Due to Block 1A’s minimal additional flow to the existing sewers just downstream of MH6A, and since the remainder of Phase 1 (east of Allen Road) will be serviced shortly after Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 5 Block 1A, downstream improvements to these existing sanitary sewers is not warranted. Refer to Figure 4 for the proposed sanitary sewer system. 4.3 Proposed Sanitary Services to Block 1A As Block 1A consists of two buildings, each of the buildings will require their own sanitary service connection. The Market Condo Building on the north end of the site will be serviced by a 300mm diameter sanitary sewer connection, and the rental building on the south end of the site will be serviced by a 250mm diameter sanitary sewer connection. These sanitary sewer connections will connect to the 375mm diameter sanitary sewer on Flemington Road. 4.4 Analysis of Existing Downstream Sanitary Sewers As part of the Block 1A Subdivision Design Package, the existing sanitary sewers and subtrunk downstream of Block 1A were analyzed with an estimated flow from the future phases of LHRP. The analysis was based on the information found in the MMM’s IMP, and Dillon’s Phase 1 FSR (May 2012). Through discussions with the City, it was decided that the existing downstream sanitary sub-trunk sewers (MMM’s “Sub-Trunk 2”) south of Lawrence Avenue to the sanitary trunk connection at Bathurst Street and Hillhurst Boulevard will be upsized by one sewer size from MMM’s IMP in order to service the anticipated future flows of LHRP. Once additional information is available with regards to the expected future flows, the sanitary sub-trunk analysis can be finalized. Refer to Figure 5 for the downstream sanitary sewers to be upsized. Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 6 5.0 5.1 STORM DRAINAGE Existing Storm Sewer Services The existing storm sewer network contains a number of concrete sewers and maintenance hole structures within the adjacent roadways and throughout the proposed development areas. An existing 1200mm concrete sewer (and 900mm diameter storm sewer at a steep slope) on Ranee Avenue conveys the minor flow to the east, where it connects to the 2100mm diameter storm trunk underneath William R. Allen Road. Ranee Avenue has a high point at the intersection with Flemington, and a low point and easement between existing lots approximately 60m west of the mentioned intersection. There exists a set of double catch basins (DCB) at the low point. It is our understanding that the easement would convey overtopping flows from Ranee Avenue to the existing 1200mm diameter storm sewer. At the south side of the easement, there is an existing catchbasin (CB) and the start of another existing 1200mm diameter storm sewer that cuts through the proposed Block 1A lands and connects to the Allen Road storm trunk. It is believed that this existing 1200mm diameter storm sewer was installed as part of the Allen Road underpass project, where the road grade became too steep and the highpoint at the intersection of Ranee Avenue and Flemington Road was introduced. Existing sewer information suggests that the existing 1200mm diameter storm sewer that cuts through Block 1A services the existing park and parking lot inside Javelin Lane, a section of Flemington Road, the existing Zachary Court, and the flow that overtops Ranee Avenue at the low point. Topographic elevations and information suggest that there are no storm sewers connected to the existing CB to the south of the easement. The topographic information suggests that the existing CB services the surface runoff of the existing park and parking lot area inside Javelin Lane. However, field observation indicates that this existing CB is covered with more than 0.3m of dirt, hence the surface runoff of this area is escaping via the parking lot driveway, connected to Flemington Road. The City has indicated that this area does not experience flooding. Once a CCTV inspection is performed on the existing 1200mm diameter storm sewer, we can refine the storm by-pass design as required. Further south of the intersection of Flemington and Javelin Lane, there exists a 250mm diameter concrete sewer on Flemington Road. The existing storm sewer system then goes through Pengarth Court and heads south along an easement parallel to Allen Road before it enters the 2100mm diameter storm trunk. Refer to Figure 6 for the existing storm sewer system. 5.2 Proposed Storm Sewer Works in Right-Of-Ways The proposed storm sewer system for the Subdivision of Block 1A starts from the north end of the site, and connects to the existing storm sewer south of the intersection of Flemington and Street A. The proposed storm sewers’ alignment follows the ultimate alignment of Flemington Road in order to minimize throw-away costs when the future phases are constructed. Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 7 A bio-swale is proposed in the east boulevard of Flemington Road to convey and store the 100-year storm event for the boulevard so that the runoff will not overtop into the adjacent townhouse terraces. The placement of the bio-swale is between the sidewalk and the property line. The proposed 750mm diameter storm sewer on Flemington Road is sized for quantity control. The runoff on Flemington Road will be quality treated before entering the existing storm sewer system. Street A is proposed to use a super pipe, 1050 mm diameter, for quantity control, and an endof-pipe quality control before it enters the existing storms sewer system on Flemington Road. As the existing 1200mm storm sewer south of Ranee Avenue cuts through Block 1A, part of the storm sewer design for the proposed subdivision of Block 1A includes re-aligning of the storm by-pass. The proposed storm by-pass is intended to convey the minor storm of the park and parking lot area inside Javelin Lane, the minor storm of a section of Flemington Road just north of the by-pass (approximately 0.12 ha), and the flow that overtops Ranee Avenue to the north of the mentioned easement. It is proposed that the storm by-pass will wrap around Block 1A to the north, and connect to the existing storm MH entering in the existing 1200mm diameter storm sewer to the Allen Road storm trunk. Refer to Figure 6 for the proposed storm sewer system. For more details on the quality and quantity control of the proposed storm system, please refer to the SWM Report that is also part of this submission package. 5.3 Proposed Storm Services to Block 1A Storm runoff will be collected onsite during rain events through the multiple trenches and area drains within the property. The runoff collected in Block 1A will be directed internally through the building to the storm water holding tank located on the east side of the P1 parking level. The tank will connect to the existing storm MH at the existing 1200mm diameter storm sewer outletting to the Allen Road trunk sewer. 6.0 UTILITIES Coordination with RTG is ongoing, with regards to final utility requirements for this project. The proposed road cross-sections currently show suggested corridors for other utilities within the ROW. Once RTG has confirmed the final utility requirements, the cross-sections will be updated accordingly. Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 8 7.0 CONCLUSION Based on the information available to-date, we have proposed grading and servicing for the subdivision of Block 1A for the LHRP. We herein submit the Functional Servicing Report, in conjunction with the enclosed Stormwater Management Report and design drawings for the City’s review and comment. Respectfully Submitted, DILLON CONSULTING LIMITED Teresa Yuen, P.Eng. Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 Appendix A A B C Storm Sewer Design Sheet Sanitary Sewer Design Sheet Downstream Sanitary Sewer Analysis Design Sheet Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 LAWRENCE HEIGHTS - EXISTING STORM SEWER ANALYSIS STORM SEWER DESIGN SHEET Intensity Option # Project Name: Lawrence Heights Phase 1A Project Number: 149825 1) Intensity (i) = a/(t+b)^c a= b= c= Road /Stations Location From MH To MH Area (ha) Run. Coef. 2.78AC Accum. 2.78AC 2 2) Intensity (i) = a*t^b Q2 a= 21.800 b= -0.780 Template Created by: Windsor Office Phone: 3) Insert Intensity Q100 59.700 -0.800 T of In (min) T of F (min) T of Conc. (min) Intensity (mm/hr) Exp. Flow (L/s) 3.30 10.00 0.00 10.00 88.19 290.72 3.30 10.00 0.00 10.00 250.32 825.19 3.30 10.00 0.00 10.00 - 534.47 i= Total Area (ha)= Capacity (L/s) Outlet 9.32Invert Elevation= Sewer Design / Profile Pipe Dia. Velocity Length (m/s) (m) (mm) Slope (%) %FULL BY-PASS Existing External Area from North of Ranee through easement Q2 EX.MH137 2.42 0.490 3.30 Q100 EX.MH137 2.42 0.490 3.30 Q100-2 EX.MH137 2.42 0.490 3.30 (Flow overtopping Ranee at easement) Existing Q2 from Javelin Lane Area EX.MH137 1.00 Block 1A 0.500 1.39 1.39 Controlled flow of north part of Flemington EX.MH137 0.12 0.750 0.25 0.25 10.00 0.00 10.00 88.19 122.58 432.00 (Controlled flow from SWM) 1089.05 3879.19 EX.MH137 MH15 0.00 4.94 0.29 10.00 88.19 MH15 MH16 0.00 4.94 0.45 10.29 86.21 1086.31 MH16 MH17 0.00 4.94 0.43 10.74 83.39 MH17 MH18 0.00 4.94 0.43 11.17 MH18 EX.STMH2 0.00 4.94 0.48 TANK / PLUG EX.STMH2 2.35 2.35 EX.STMH2 EX.MH136 0.00 7.29 0.94 0.900 10.00 3.43 60.6 1200 0.99 28.1% 2063.01 1.82 49.2 1200 0.28 52.7% 1082.38 3118.98 2.76 70.4 1200 0.64 34.7% 80.90 1078.92 1232.89 1.09 28.0 1200 0.10 87.5% 11.60 78.56 1075.67 1232.89 1.09 31.4 1200 0.10 87.2% 0.14 10.00 - 12.5 200 2.00 94.9% 0.18 12.08 76.11 44.00 46.38 1.48 (Controlled Flow from Cistern) 1116.27 2756.82 2.44 26.0 1200 0.50 40.5% LAWRENCE HEIGHTS - EXISTING STORM SEWER ANALYSIS STORM SEWER DESIGN SHEET Intensity Option # Project Name: Lawrence Heights Phase 1A Project Number: 149825 1) Intensity (i) = a/(t+b)^c a= b= c= Road /Stations Location From MH 2 2) Intensity (i) = a*t^b Q2 a= 21.800 b= -0.780 To MH Area (ha) Run. Coef. 2.78AC Accum. 2.78AC T of In (min) T of F (min) T of Conc. (min) Intensity (mm/hr) Template Created by: Windsor Office Phone: 3) Insert Intensity Q100 59.700 -0.800 Exp. Flow (L/s) i= Total Area (ha)= Capacity (L/s) Outlet 2.07Invert Elevation= Sewer Design / Profile Pipe Dia. Velocity Length (m/s) (m) (mm) Slope (%) %FULL BLOCK 1A Flemington MH22 MH21 0.16 0.750 0.33 0.33 10.00 0.00 10.00 20.70 (Controlled Flow obtained from SWM) Bioswale - MH20 0.13 0.230 0.08 0.08 10.00 0.00 10.00 7.70 (Controlled Flow obtained from SWM) Street A MH20 MH21 0.27 0.560 0.42 0.50 10.00 0.00 10.00 33.00 (Controlled Flow obtained from SWM) MH21 MH24 0 0.000 0.00 0.84 0.34 10.00 88.19 Flemington EX.STMH1 MH24 1.4 0.500 1.95 1.95 10.00 0.06 10.00 88.19 151.87 59.76 1.22 4.7 250 1.01 254.1% Flemington MH24 EX.STMH2 0.11 0.580 0.18 2.96 10.00 0.30 10.34 85.90 164.75 59.76 1.22 22.1 250 1.01 275.7% 61.40 123.98 1.12 23.1 375 0.50 (This adds up all the controlled flows for Flemington + Street A + Bioswale) 49.5% LAWRENCE HEIGHTS REVITALIZATION PLAN - PHASE 1A SUBDIVISION SANITARY SEWER DESIGN SHEET Project Name: Lawrence Heights Ph 1A Project No:149825 City of Toronto Location LOCATION ROAD/STN FROM TO MH MH The Peaking Factor was derived: Using Harmon Formula= Y From a Table= N Value from table= INDIVIDUAL POP AREA (ha.) CUMULATIVE POP AREA (ha.) Residential Average Daily Flow= 450 L/Cap.D (Y or N) Peak Extraneous Flow= Flow Characteristics PEAKING POP FLOW PEAK EXTR. FACTOR Q(p) FLOW Q(i) M (L/s) (L/s) 0.260 EXTERNAL FLOWS (L/s) PEAK DESIGN FLOW Q(d) (L/s) CAPACITY (L/s) L/Ha.S Sewer Design/Profile Wall LENGTH PIPE DIA. Thickness (m) (mm) (mm) SLOPE (%) VELOCITY (m/s) % FULL Ranee Ave 1A 2A 0.0 0.09 0 0.09 4.500 0.000 0.022 42.040 42.06 80.91 40.6 300 19 0.70 1.14 52% Flemington Rd 2A 3A 0.0 0.12 0 0.21 4.500 0.000 0.054 15.810 57.90 68.38 50.5 300 19 0.50 0.97 85% Flemington Rd 3A 4A 791.0 1.16 791 1.37 3.863 15.916 0.357 0.670 74.79 96.03 79.3 375 19 0.30 0.87 78% Flemington Rd Ex MH 4A 0.0 0.00 0 0.00 4.500 0.000 0.000 9.340 9.34 42.05 14.7 250 19 0.50 0.86 22% Flemington Rd 4A 5A 0.0 0.03 791 1.40 3.863 15.916 0.365 84.14 96.03 6.8 375 19 0.30 0.87 88% Street A 5A 6A 0.0 0.22 791 1.62 3.863 15.916 0.422 84.20 96.03 91.8 375 19 0.30 0.87 88% LAWRENCE HEIGHTS REVITALIZATION - EXTERNAL DOWNSTREAM SANITARY SEWER ANALYSIS SANITARY SEWER DESIGN SHEET (PROPOSED) Project Name: LHR Project No: 149825 City / Municipality of Toronto Location LOCATION ROAD/STN EAST OF ALLEN ROAD EX. EXT. AREAS NORTH OF RANEE PROP. PHASE 1 FLEMINGTON RD / RONDALE RD FLEMINGTON RD FROM TO MH MH MH4244209168 MH4216809532 (MH4-1A) MH4210609547 MMM's MH1-1A MMM's MH1-1A MH4210609547 MH4202209538 (MH4-2A) The Peaking Factor was derived: Using Harmon Formula= Y (Y or N) From a Table= N Value from table= Flow Characteristics INDIVIDUAL CUMULATIVE PEAKING POP FLOW POP AREA POP AREA FACTOR Q(p) (ha.) 1975 2090.0 0.0 0.0 32.37 9.54 0.00 0.00 FROM PROPOSED FUTURE PHASE 2 GOING INTO MH4202209538]. Calculate the Flow from the incoming PH2 flow only. FROM PARTS OF PROPOSED FUTURE PHASE 4. Calculate the Flow from the incoming PH4 flow only. FUT.PHASE 2 MH2-1A MH4202209538 (MH4-2A) 3067.3 10.65 FLEMINGTON RD MH4202209538 (MH4-2A) MH4196509499 0.0 0.00 FUTURE BLK 38 (PH4) MH4196509499 550.8 0.87 FLEMINGTON RD MH4196509499 MH4194309441 0.0 0.00 FUTURE BLK 32 (PH4) MH4194309441 819.9 1.07 FLEMINGTON RD MH4194309441 MH41957019360 0.0 0.00 FLEMINGTON RD MH41957019360 MH4195109298 (MH4-3A) 0.0 0.00 FROM THE WEST OF ALLEN RD - PROPOSED FUTURE PHASE 3A (INCL. BLKS 29 & 30 FROM AUG 28 2014 PHASE BREAKUP) FROM THE WEST OF ALLEN RD - PROPOSED FUTURE PHASE 1A WILL ENTER HERE FUT. BLKS 29 & 30 MH4190409153 885.6 1.20 EX. EXT. AREAS NORTH OF RANEE MMM's EXT. MH1A to EXT MH2A MH4190409153 142.0 8.41 MODIFIED FUTURE PH3A MH3A-2A MH4190409153 3655.8 11.85 PROP. PHASE 1: BLK1A MH4190409153 790.0 0.94 FLEMINGTON RD MH4190409153 MH4192409221 0.0 0.00 FLEMINGTON RD MH4192409221 MH4195109298 (MH4-3A) 0.0 0.00 REPLING RD / FLEMINGTON MH4195109298 (MH4-3A) MH4188009326 FUTURE BLK 31 MH4188009326 REPLING RD MH4188009326 MH4182009351 (MMM'S MH4-4A) FROM PARTS OF PROPOSED FUTURE PHASE 4. Calculate the Flow from the incoming PH4 flow only. MMM 39,40,41,42,43,44,34 FUTURE BLOCK 28 (PH4) FUTURE BLK, 35, 36 (PH4) REPLING RD MMM UNK BLK FUTURE BLK 37 (PH4) REPLING RD REPLING RD/EASEMENT MMM's MH4-5A MMM's MH4-5A MH4182009351 (MMM'S MH4-4A) MH4175909376 MH4169507401 MH4182009351 (MMM'S MH4-4A) MH4182009351 (MMM'S MH4-4A) MH4182009351 (MMM'S MH4-4A) MH4175909376 MH4175909376 MH4175909376 MH4169507401 MH4162509429 Residential Average Daily Flow= 240 Residential Average Daily Flow= 2.270 L/Cap.D 450 L/Cap.D L/Ha.S 0.26 L/Ha.S Sewer Design/Profile PEAK EXTR. FLOW Q(i) PEAK DESIGN FLOW Q(d) CAPACITY LENGTH PIPE DIA. Wall Thickness SLOPE % (ha.) M (L/s) (L/s) (L/s) (L/s) (m) (mm) (mm) (%) Full 1975 2090 4065 4065 32.372 9.54 41.92 41.92 3.571 3.327 3.327 38.870 36.216 36.216 2.481 2.481 2.481 59.54 41.35 98.24 98.24 52.97 201.60 201.60 39.4 63.3 85.1 300 450 450 19 19 19 0.30 0.50 0.50 78% 49% 49% 3067 7132 551 7683 820 8503 8503 10.65 52.57 0.87 53.44 1.07 54.51 54.51 3.434 3.099 3.952 3.067 3.854 3.024 3.024 54.863 83.235 11.338 122.745 16.457 102.825 102.825 2.769 5.250 0.226 13.893 0.278 5.755 5.755 57.63 148.03 11.56 136.64 16.74 168.12 168.12 201.60 68.5 450 19 0.50 73% 201.60 62.3 450 19 0.50 68% 201.60 201.60 81.7 62.8 450 450 19 19 0.50 0.50 83% 83% 886 142 3656 790 5473 5473 1.20 8.41 11.85 0.94 22.40 22.40 3.833 17.681 0.312 3.368 3.864 3.208 3.208 64.130 15.897 89.088 89.088 3.081 0.244 3.637 3.637 17.99 57.84 67.21 16.14 150.57 150.57 201.60 201.60 71.0 80.9 450 450 19 19 0.50 0.50 75% 75% 0.0 0.00 13976 76.91 2.809 173.513 9.392 300.28 434.17 75.9 600 19 0.50 69% 589.9 0.0 0.93 0.00 590 14566 0.93 77.84 3.936 2.791 12.094 180.972 0.242 9.634 12.34 307.99 434.17 65.3 600 19 0.50 71% 1292.0 228.0 1010.0 0.0 500.0 571.0 0.0 0.0 4.66 1.00 1.60 0.00 1.02 1.70 0.00 0.00 1292 228 1010 17096 500 571 18167 18167 4.66 1.00 1.60 85.10 1.02 1.70 87.82 87.82 3.726 4.127 3.797 2.721 3.974 3.944 2.694 2.694 25.070 4.901 19.975 212.284 10.350 11.729 225.242 225.242 1.212 0.260 0.416 10.939 0.265 0.442 12.229 12.229 26.28 5.16 20.39 340.60 10.61 12.17 354.85 354.85 434.17 65.9 600 19 0.50 78% 434.17 434.17 68.4 75.4 600 600 19 19 0.50 0.50 82% 82% 3110.4 83.0 8.05 0.96 3110 21361 8.05 96.83 3.429 2.624 55.551 220.470 2.093 12.478 57.64 407.97 544.76 85.4 675 19 0.42 75% FROM THE WEST OF ALLEN RD - PROPOSED FUTURE PHASE 3B - SOUTH WILL ENTER HERE LAWRENCE AVE. (PH3B) LAWRENCE AVE. MH3B-4A MH4162509429 START OF SUBTRUNK SOUTH OF LAWRENCE AVE. (USING MMM'S MH NUMBERS) MH4162509429 MH4165009511 LAWRENCE HEIGHTS REVITALIZATION - EXTERNAL DOWNSTREAM SANITARY SEWER ANALYSIS SANITARY SEWER DESIGN SHEET (PROPOSED) Project Name: LHR Project No: 149825 City / Municipality of Toronto Location LOCATION The Peaking Factor was derived: Using Harmon Formula= Y (Y or N) From a Table= N Value from table= Flow Characteristics INDIVIDUAL CUMULATIVE PEAKING POP FLOW POP AREA POP AREA FACTOR Q(p) Residential Average Daily Flow= 240 Residential Average Daily Flow= 2.270 L/Cap.D 450 L/Cap.D L/Ha.S 0.26 L/Ha.S Sewer Design/Profile PEAK EXTR. FLOW Q(i) PEAK DESIGN FLOW Q(d) CAPACITY LENGTH PIPE DIA. Wall Thickness SLOPE % (L/s) 431.12 6.12 442.95 13.13 458.52 (L/s) 600.41 (m) 267.5 (mm) 900 (mm) 19 (%) 0.11 Full 72% 768.05 250.0 900 19 0.18 58% 957.93 84.7 900 19 0.28 48% 156.412 458.52 974.88 107.6 900 19 0.29 47% 127.542 158.319 480.13 1130.54 107.6 900 19 0.39 42% 2.590 3.852 2.575 3.874 2.561 4.215 2.559 128.539 8.828 133.684 8.168 138.382 1.475 139.158 162.495 24.561 187.057 6.311 193.367 3.314 196.682 485.31 33.39 495.76 14.48 506.77 4.79 510.86 1130.54 107.6 900 19 0.39 43% 1187.10 5.0 900 19 0.43 42% 1007.94 98.0 900 19 0.31 50% 868.20 99.0 900 19 0.23 59% 135.48 1.14 136.62 0.83 137.45 36.47 173.92 5.09 2.559 4.283 2.558 4.280 2.556 3.379 2.499 3.989 139.158 0.833 139.590 0.856 140.033 33.307 161.529 5.185 196.682 2.588 199.269 1.884 201.153 82.787 283.940 11.554 510.86 3.42 513.88 2.74 516.21 116.09 620.49 16.74 743.27 102.1 975 19 0.11 69% 1287.39 101.5 975 19 0.33 40% 5130.01 101.2 975 19 5.24 10% 3990.09 104.5 975 19 3.17 16% 17991 46954 314 47292 214.40 393.41 4.70 398.44 2.699 2.290 4.070 2.287 134.868 265.431 3.550 267.240 486.688 782.183 10.669 793.601 621.56 1222.64 14.22 1235.86 1831.83 101.8 1050 19 0.45 67% 1831.83 32.6 1050 19 0.45 67% 0.02 1.27 0.01 6.58 0.01 47292 395 47687 449 48136 398.46 1.27 399.74 6.58 406.33 2.287 4.025 2.284 3.998 2.280 267.240 4.416 269.351 4.986 271.745 793.646 2.883 796.552 14.937 811.511 1461.03 7.30 1240.93 19.92 1510.62 1831.83 14.9 1050 19 0.45 80% 1831.83 87.5 1050 19 0.45 68% 1831.83 9.0 1050 19 0.45 82% 0.00 48136 406.33 2.280 271.745 811.511 1510.62 3871.78 1.0 1500 19 0.30 39% ROAD/STN FROM TO EX.SHERMOUNT AVE. Meadowbrook Rd. Input EX. MEADOWBROOK RD. Englemount Ave. Input EX. REDDICT CT. MH MH4165009511 EX-MB1 MH999A EX-EA1 MH998A MH MH999A MH999A MH998A MH998A MH997A 66.0 310.0 492.0 350.0 284.0 (ha.) 12.84 1.15 1.82 4.05 1.05 21427 310 22229 350 22863 (ha.) 109.67 1.15 112.64 4.05 117.74 M 2.622 4.072 2.606 4.049 2.594 (L/s) 118.005 3.507 123.092 3.937 127.084 (L/s) 138.093 2.611 144.835 9.194 156.412 EX. REDDICT CT. EASEMENT MH997A MH996A 0.0 0.00 22863 117.74 2.594 127.084 EX.DALEMOUNT AVE. MH996A MH995A 73.0 0.84 22936 118.58 2.593 EX. SHELBORNE AVE. Glenmount Ave. Input EX. GLENMOUNT AVE. Shelbourne Ave. Input EX. GLENMOUNT AVE. Coldstream Ave. Input EX. GLENMOUNT AVE. MH995A EX-GA1 MH4 EX.SA1 MH5 EX.CA1 MH2 MH4 MH4 MH5 MH5 MH2 MH2 MH1 159.0 825.0 0.0 759.0 0.0 126.0 0.0 1.84 10.82 0.00 2.78 0.00 1.46 0.00 23095 825 23920 759 24679 126 24805 120.42 10.82 131.24 2.78 134.02 1.46 135.48 EX. GLENMOUNT AVE. Glen Park Ave. Input EX. GLENMOUNT AVE. Glencairn Ave. Input EX. GLENMOUNT AVE. Hillmount Ave. Input (W & E) EX. GLENMOUNT AVE. Viewmount Ave. Input ( E) MH1 EX-GPA1 MH100 EX-GA2 MH101 EX.HA1 & EX-HA2 MH102 EX-VA2 MH100 MH100 MH101 MH101 MH102 MH102 MH103 MH103 0.0 70.0 0.0 72.0 0.0 3548.0 0.0 468.0 0.00 1.14 0.00 0.83 0.00 36.47 0.00 5.09 24805 70 24875 72 24947 3548 28495 468 Viewmount Ave. Input ( W) EX. EASEMENT Prue Ave. Input (W) EX. PRUE AVE. MH103 EX-PA1 MH104 MH103 MH104 MH104 MH105 17991.0 0.0 314.0 24.0 214.40 0.00 4.70 0.33 EX. PRUE AVE. Prue Ave. Input ( E) EX. PRUE AVE. Hillhurst Blvd. Input EX. PRUE AVE. MH105 EX-PA2 MH106 EX-HB1 MH107 MH106 MH106 MH107 MH107 MH108 0.0 395.0 0.0 449.0 0.0 EX. PRUE AVE. MH108 METRO 0.0 Appendix B D Figures Phase 1A Subdivision – Functional Servicing Report Toronto Community Housing Corporation November 2014 – 14-9825 HIGHLAND H ILL PHASE 1A STREET A MI LE N TO D. R NG WILLIAM R. ALLEN RD. N. RANEE AVE. F KEY PLAN FileName:c:\users\32mlm\desktop\lh files\edits\149825-02-cov-des.dwg N.T.S. PROJECT PROJECT NO. 14-9825 TITLE DATE November 2014 VICINITY MAP KEY PLAN FIGURE NO. 1 FileName: g:\cad\149825 lawrence heights\02-civil\05-misc_docs\149825-02-gr (c3d)-interim olf.dwg PROJECT TITLE DATE 11/25/14 LAWRENCE HEIGHTS REVITALIZATION PHASE 1A SUBDIVISION OVERLAND FLOW ROUTE PROJECT NO. 14-9825 FIGURE NO. 2 PROJECT TITLE DATE 11/25/14 LAWRENCE HEIGHTS REVITALIZATION PHASE 1A SUBDIVISION WATERMAIN NETWORK PROJECT NO. 14-9825 FIGURE NO. 3 PROJECT TITLE DATE 11/25/14 LAWRENCE HEIGHTS REVITALIZATION PHASE 1A SUBDIVISION SANITARY SEWER SYSTEM PROJECT NO. 14-9825 FIGURE NO. 4 LEGEND MANHOLE MH 999A MH 998A EX. SAN. SEWER SIZE MH 997A PROP. SAN. SEWER MH996A SEWER TO BE UPSIZED EX MH 4 MH 995A EX. SUB-TRUNK SIZE EX MH 5 MMM IMP. SUB-TRUNKSIZE SUB-TRUNK UPSIZED FROM MMM IMP. EX MH 2 EX MH 1 EX MH 100 EX MH 101 EX MH 102 EX MH 103 EX MH 104 EX MH 105 EX MH 106 EX MH 107 EX MH 108 PROJECT TITLE DATE 11/25/14 LAWRENCE HEIGHTS REVITALIZATION PHASE 1A SUBDIVISION DOWNSTREAM SANITARY SEWER SYSTEM ANALYSIS PROJECT NO. 14-9825 FIGURE NO. 5 PROJECT TITLE DATE 11/25/14 LAWRENCE HEIGHTS REVITALIZATION PHASE 1A SUBDIVISION STORM SEWER SYSTEM PROJECT NO. 14-9825 FIGURE NO. 6
© Copyright 2026 Paperzz