2 - Allied Grain Systems

Grain Bin
Sidewall
15’ [4.57m] - 60’ [18.29m] Diameter
CONSTRUCTION AND OWNER’S MANUAL
P/N 017061
rev 2-09 [1]
The Symbol shown below is used to call your attention to
instructions concerning your personal safety. Watch this
symbol - it points out important safety precautions. It means
“ATTENTION” - Become Alert! Your Personal Safety Is
Involved! Read the message that follows and be alert to the
possibility of personal injury or death.
2
Be Alert!
Your Personal Safety Is Involved
A copy of this manual should be available at all times to the owner/operator. Additional
copies may be requested from the company at the address shown on the back cover.
Please reference part number #017061 when requesting additional copies.
Please Contact MFS/YORK/STORMOR or Your Dealer
If You Have Any Questions Concerning This Manual
Keep This Manual In A Safe Place Available For Future Reference
Grain Bin Sidewall 017061 2-09 [1]
A GENUINE
GLOBAL INDUSTRIES, INC.
PRODUCT
PREFACE
You have purchased the finest grain storage bin manufactured today. The following
information is intended as a guide in caring for your bin before construction, proper
construction of your bin, and safe and proper use of your bin after construction.
General Safety Statement
Your safety and the safety of others associated with grain system equipment is of
prime concern to us at MFS/YORK/STORMOR. We wrote this manual to help you
to better understand how to safely build and use this MFS/STORMOR
Grain Bin Sidewall.
It is your responsibility as the owner, builder, operator, or supervisor, to know what
specific requirements, precautions, and hazards exist and to make these known to all
personnel working with the equipment or in the area, so that they too may take any
necessary safety precautions that may be required!
Failure to read this Manual and its Safety Instructions by all personnel is a misuse of
the equipment. We want you as our partner in safety!
All personnel, including construction personnel, must read and understand all of the
MFS/STORMOR Operator’s Manual before starting Grain Bin Sidewall construction!
Grain Bin Sidewall 017061 2-09 [1]
3
Contents
Warranty .................................................................6
1
Safety ......................................................... [7]
Warning Decals ............................................................. 7
Minimum Conductor Clearances ................................ 9
4
2
Specifications .......................................... [10]
Grain Bin Dimensions ................................................ 12
3
Concrete / Site Location ................................[15]
Foundation Plan ......................................................... 16
4
Pre-Assembly .......................................... [20]
5
Sidewall Assembly .................................. [25]
Typical Sidewall Assembly, Build Ring 1 ................. 26
Connect 13 Gage and 12 Gage Rings ....................... 28
Bottom Sidewall Ring Bolting ................................... 29
Sidewall Gage Layout ................................................ 30
Ag Door Placement .................................................... 32
Ag Door Assembly ..................................................... 34
Commercial Door Placement..................................... 38
Commercial Door Assembly ...................................... 39
Sidewall Assembly Completion ................................ 44
Base Angle .................................................................. 45
Optional Bin Step ....................................................... 46
Grain Bin Sidewall 017061 2-09 [1]
6
Grain Bin Completion ............................. [47]
Anchor Hold Downs / 1-Ring Base Anchors ............ 47
1-Ring Base Anchor Channel .................................... 48
Anchors on 19-13 Gage Bottom Sidewall Sheets.... 49
Anchors on 12-8 Gage Bottom Sidewall Sheets...... 50
Bin to Anchors, 1-Ring Base Anchor Locations...... 51
Bin to Anchors, Hold Down Bracket Locations ....... 52
Bin to Anchors, Installed ........................................... 53
Ladders........................................................................ 54
7
Operation ................................................. [56]
Part Numbers .................................................... [59]
Index .................................................................. [66]
Grain Bin Sidewall 017061 2-09 [1]
5
Warranty
MFS/YORK/STORMOR DIVISION (the Company) makes the following warranty to
the initial retail purchaser of its products (the Customer).
MATERIALS and WORKMANSHIP:
The Company warrants products manufactured by it to be free from defects in
materials and workmanship in normal use and service for a period of one (1) year
after date of delivery to the Customer.
6
COMPANY’S OBLIGATION and
CUSTOMER’S EXCLUSIVE REMEDY:
The Company’s sole obligation and the Customer’s exclusive remedy under this
warranty is as follows:
If within one (1) year after delivery to the customer the product fails to function properly
due to a defect in either materials or workmanship, the Company will at its option, either
repair the defective part or replace the defective part with a new or reconditioned part.
Labor charges for removing defective parts and installing replacement parts, shipping
charges with respect to such parts, and applicable sales and other taxes, if any, shall
not be covered by this warranty.
CONDITIONS, LIMITATIONS, AND EXCLUSIONS:
There are no warranties or merchantability or fitness for a particular purpose
with respect to any product manufactured or sold by the Company. Motors provided
by the Company are in most instances warranted by the manufacturer thereof and
are not warranted by the Company. The Company shall not be responsible under
this warranty or otherwise for personal injury or for Incidental or Consequential
Damages, including, without limitation, loss of use and lost profits. This warranty
does not apply to defects or damages caused by misuse, improper maintenance,
or improper installation of the Company’s product or any equipment attached to or
used in connection with the Company’s product. The Company reserves the right
to make changes or improvements to its products without incurring any obligation
with respect to previously manufactured products. Field modification of this product
without the expressed written permission of the Company constitutes a misuse of the
product. The Company shall have no liability under this warranty until payment in full
for the product in question has been made by the customer. The foregoing is the sole
warranty made by the Company. No one is authorized to make other warranties on
behalf of the Company.
Grain Bin Sidewall 017061 2-09 [1]
1
1
Safety
Warning Decals
DANGER
Rotating flighting will
kill or dismember.
Flowing material will
trap and suffocate.
Crusted material will
collapse and suffocate.
Keep clear of all augers.
DO NOT ENTER this bin!
If you must enter the bin:
1.
2.
3.
4.
5.
68801.
WARNING
Shut off and lock out all power.
Use a safety harness and safety line.
Station another person outside the bin.
Avoid the center of the bin.
Wear proper breathing equipment or respirator.
Failure to heed these
warnings will result in
serious injury or death.
DON'T
DO
UNLOADING INSTRUCTIONS:
1. Use CENTER FLOOR OUTLET ONLY until NO grain
remains above this outlet.
2. Side floor outlets to be used ONLY when above
condition is satisfied.
3. Lock all side floor outlets to avoid accidental
premature use.
4. See manufacturers instructions for proper use of
factory supplied sidedraw (wall) discharge systems.
Failure to heed these warnings
could result in serious injury, death,
structural damage or collapse of tank.
DC-GBC-2A
DC-GBC-1A
(018027) If augers manufactured by others (018039)
are installed in conjunction with your
bin, we strongly recommend that this
or a similar decal be installed in a visible
location on that equipment if not present.
(018051)
CAUTION
FAILURE TO PROVIDE SUFFICIENT AIR EXHAUST
AREA MAY RESULT IN DAMAGE TO YOUR BIN
Proper aeration or drying exhaust air openings must be provided in
the form of roof vents or open manholes when the bin fan is operating!
We suggest a minimum of 1 Square Foot [0.093m2] opening for each
1000 Cubic Feet per Minute [30m3/min] of air. The operator must be sure
that these openings are not constricted by chaff, ice or other materials
during fan operation.
P/N 018050
(018050) Placed on the inner door panel.
Grain Bin Sidewall 017061 2-09 [1]
(018035) Put on sidewall sheet bundles
before shipped.
[7]
7
1 Safety
CAUTION
THIS BIN IS LIMITED TO ONE OF THE FOLLOWING USAGES AS LISTED BELOW - IMPROPER USAGE WILL
VOID ANY STATED WARRANTY APPLICABLE TO THIS PRODUCT.
S - DESIGNATES STORAGE BIN:
D - DESIGNATES DRYING BIN
SITUATION
MAXIMUM UNLOAD RATE (Bushels per hour)
8
H - DESIGNATES HEAVY DUTY BIN
S
D
H
2,500
7,500
15,000
SUPLEMENTAL HEAT ALLOWED
NO
YES
YES
MAXIMUM AIR FLOW IN CUBIC FEET PER MINUTE PER
BUSHEL GRAIN
1/5
3
7
MAXIMUM ALLOWABLE MOISTURE CONTENT IN PERCENTAGE POINTS ABOVE USDA DRY GRAIN STANDARDS
3
15
Greater than 15
MAXIMUM LOAD/UNLOAD FREQUENCY PER YEAR
2
4
8
STIRRING DEVICES:
36’ DIAMETER AND SMALLER
42’ DIAMETER AND LARGER
NO
NO
YES
YES-2 Augers or less
YES
YES
CONICAL HOPPER UNDER BIN ALLOWED
NO
NO
YES
APPROVED FOR SEISMIC LOAD
NO
NO
YES
RECIRCULATING/CONTINUOUS FLOW DRYER ALLOWED
NO
NO
YES
SEE YOUR CONSTRUCTION/SAFETY MANUAL FOR STANDARD WARRANTY AND OTHER SPECIFICATIONS.
mfs018036
Placed on the inside at the outer door cover.
Grain Bin Sidewall 017061 11-08 [1]
1 Safety
Minimum Conductor Clearances
100’ [3,048mm]
100’ [3,048mm]
minumum
minumum
storage
structure(s)
(geometry
optional)
conveying
machine
100’ [3,048mm]
100’ [3,048mm]
overhead
conductor
and pole
minumum
minumum
underground
conductor
100’ [3,048mm]
100’ [3,048mm]
line of
overhead
conductors
minumum
minumum
line of
overhead
conductors
line of
overhead
conductors
no overhead conductors
conveying machine
overhead
conductor
and pole
8’ [2,438mm]
minimum
a
100’ [3,048mm]
100’ [3,048mm]
minumum
clearance
minumum
clearance
underground
conductor
MINIMUM CONDUCTOR CLEARANCES
Grain Bin Sidewall 017061 2-09 [1]
storage structure(s)
9
2
2
Specifications
This bin is designed along guidelines which allow it to provide the owner years of service
provided it is not used for purposes for which it was not intended. The sidewall gage
specifications for your bin appear on the sidewall sheet layout tables on pages 30 - 31.
The general material specifications for your bin are as follows.
[10]
10 BIN WALLS
All wall sheets are of corrugated, galvanized steel with 2.66” [67.56 mm] corrugation.
Wall sheets have 0.90 oz. [275 g/m2] per square foot zinc coating (G-90 designation).
2.66 corrugation sheets have 32” [812.8 mm] vertical coverage.
Horizontal coverage of wall sheets is 112-1/2” [2857.5 mm].
All light gage sidewall sheets have hill and valley bolting on vertical seams. Heavy gage
sheets have valley only bolting on vertical seams.
All 5/16” and 3/8” bin bolts are electro-galvanized grade 8.2 with self-sealing injection
molded washers.
DOORS
On 2.66 corrugated bins, a single 32” [813 mm] door is standard on all sizes and a (2) ring
64” [1626 mm] walk door is available as an option on most diameters. Further details on
both doors are found in the door installation pages of this manual, on pages 32 - 43.
The standard location for a 2.66” bin 32” door is in the second ring from the bottom, and
the standard location for the 64” door is in the second and third ring from the bottom.
All 64” doors have (3) inner panels and an outer door cover. All 32” doors have (2) inner
panels and an outer door cover.
For allowable door placements see the tables on pages 32 - 33. (1) ring doors are
placed in the second sidewall ring from the bottom. (2) ring doors are placed in the
second and third sidewall rings from the bottom.
On 24’ [7.36 m] diameter and smaller 2.66” corrugated bins, a (2) ring door with auger
panel opening is available. An auger shield is required at extra cost. All welds are of
non-rusting silicone bronze.
Grain Bin Sidewall 017061 2-09 [1]
2 Specifications
DESIGN CRITERIA
Bins are designed to store free-flowing, noncorrosive whole grains with a bulk density of
48 lbs/ft3 [768.5 kg/m3] (60 lbs/bushel) or less.
Bins are designed to be filled through the center roof opening only, and to be emptied
from the center. Any off-center loadings should be used only for clean-out after discharge
has been complete to the angle of repose.
Sectional sweep augers with sections no longer than half the radius must be used on the
42’ [12.8 m] diameter and larger bins. The center section should be completely cleaned
out before the next auger section is added.
Have your builder make all non-bin equipment in excess of company’s
recommendations, like LEGS, WALK-WAYS, SPOUTING and CONVEYORS self
supporting.
WARNING! DO NOT OVERFILL THE BIN ROOF AREA! Overfilling the
bin roof area prevents proper air movement through roof vents and may also
cause roof damage or failure!
You must furnish the adequate ventilation area to match the Cubic Foot per Minute
output of the aeration fan installed on your bin. A rule of thumb would be, no more than
1000 Cubic Feet per Minute [30m3/min] per 1 Square Foot [0.093m2] vent opening.
WARNING! When you run your aeration fans, make certain your VENTS
ARE OPEN and kept clean of all debris and frozen matter. An aeration system
can, without proper management, create a greater load on a roof than
equipment or snow and can damage the roof.
WARNING! Installation of accessories or equipment in or on a grain
bin that would overstress the structure in any manner will void the Warranty.
If you do not have specific recommendations from Mfs/York/Stormor, where
additional loading is involved. Please contact Mfs/York/Stormor Engineering
Department before installing any such appurtenances or equipment.
Grain Bin Sidewall 017061 2-09 [1]
11
2 Specifications
Grain Bin Dimensions
Grain Bin Wall Diameter
(to center of corrugation)
Nominal
Dia.
Wall
Dia.
Nominal
Dia.
Wall
Dia.
15’
14’ 11-1/16”
33’
32’ 9-5/16”
18’
17’ 10-7/8”
36’
35’ 9-3/4”
21’
20’ 10-11/16”
42’
41’ 9-3/8”
B
12
24’
23’ 10-1/2”
48’
47’ 8-5/16”
27’
26’ 18-5/16”
54’
53’ 8-9/16”
30’
29’ 10-1/8”
60’
59’ 8-3/16”
Grain
Grain
Bin Roof
Bin Eave
Height “B” Height “C”
A
C
Dia.
Roof
Height
No. of
Rings
Eave
Height
15
4' 2"
4
10' 8"
18
5' 1"
5
13' 4"
21
6' 1"
6
16' 0"
24
7' 0"
27
8' 0"
7
18' 8"
30
8' 11"
8
21' 4"
33
9' 11"
GRAIN BIN DIMENSIONS
24' 0"
26' 8"
10' 10"
10
42
12' 1"
11
29' 4"
48
13' 11"
12
32' 0"
54
15' 7"
13
34' 8"
60
17' 6"
14
37' 4"
36
a
9
Grain Bin Peak Height “A”
Bin Diameter
No. of
Rings
15'
18'
21'
4
14' - 11"
15' - 10"
16' - 10"
17' - 9"
18' - 9"
19' - 8"
20' - 7"
21' - 7"
22' - 8"
24' - 7"
26' - 0"
5
17' - 7"
18' - 6"
19' - 6"
20' - 5"
21' - 5"
22' - 4"
23' - 3"
24' - 3"
25' - 4"
27' - 3"
28' - 8"
30' - 6"
6
20' - 3"
21' - 2"
22' - 2"
23' - 1"
24' - 1"
25' - 0"
25' - 11"
26' - 11"
28' - 0"
29' - 11"
31' - 4"
33' - 2"
7
22' - 11"
23' - 10"
24' - 10"
25' - 9"
26' - 9"
27' - 8"
28' - 7"
29' - 7"
30' - 8"
32' - 7"
35' - 0"
35' - 10"
8
25' - 7"
26' - 6"
27' - 6"
28' - 5"
29' - 5"
30' - 4"
31' - 3"
32' - 3"
33' - 4"
35' - 3"
36' - 8"
38' - 6"
9
28' - 3"
29' - 2"
30' - 2"
31' - 1"
32' - 1"
33' - 0"
33' - 11"
34' - 11"
36' - 0"
37' - 11"
39' - 4"
41' - 2"
10
30' - 11"
31' - 10"
32' - 10"
33' - 9"
34' - 9"
35' - 8"
36' - 7"
37' - 7"
38' - 8"
40' - 7"
43' - 0"
43' - 10"
11
33' - 7"
34' - 6"
35' - 6"
36' - 5"
37' - 5"
38' - 4"
39' - 3"
40' - 3"
41' - 4"
43' - 3"
44' - 8"
46' - 6"
12
36' - 3"
37' - 2"
38' - 2"
39' - 1"
40' - 1"
41' - 0"
41' - 11"
42' - 11"
44' - 0"
45' - 11"
47' - 4"
49' - 2"
13
38' - 11"
39' - 10"
40' - 10"
41' - 9"
42' - 9"
43' - 8"
44' - 7"
45' - 7"
46' - 8"
48' - 7"
51' - 0"
51' - 10"
14
41' - 7"
42' - 6"
43' - 6"
44' - 5"
45' - 5"
46' - 4"
47' - 3"
48' - 3"
49' - 4"
51' - 3"
52' - 8"
54' - 6"
24'
27'
30'
33'
36'
42'
48'
54'
60'
27' - 10"
WARNING! All 13 and 14 ring 2.66 Grain Bins are designed to be used
for storage only and not for drying!
Grain Bin Sidewall 017061 2-09 [1]
2 Specifications
SI Grain Bin Dimensions
Grain Bin Wall Diameter
(to center of corrugation)
Nominal
Dia.
Wall
Dia.
Nominal
Dia.
Wall
Dia.
15’ [4.57m]
4,548 mm
33’ [10.06m]
10,005 mm
18’ [5.49m]
5,458 mm
36’ [10.97m]
10,916 mm
21’ [6.40m]
6,367 mm
42’ [12.80m]
12,735 mm
24’ [7.32m]
7,277 mm
48’ [14.63m]
14,553 mm
27’ [8.23m]
8186 mm
54’ [16.46m]
16,372 mm
30’ [9.14m]
9,096 mm
60’ [18.29m]
18,191 mm
B
Grain
Bin Roof
Height “B”
A
C
GRAIN BIN DIMENSIONS
a
Grain
Bin Eave
Height “C”
Dia.
Roof
Height
No. of
Rings
Eave
Height
15’ [4.57m]
1,270 mm
4
3,251 mm
18’ [5.49m]
1,549 mm
5
4,064 mm
21’ [6.40m]
1,854 mm
6
4,877 mm
24’ [7.32m]
2,134 mm
7
5,690 mm
27’ [8.23m]
2,438 mm
8
6,502 mm
30’ [9.14m]
2,718 mm
9
7,315 mm
33’ [10.06m]
3,023 mm
10
8,128 mm
36’ [10.97m]
3,302 mm
11
8,941 mm
42’ [12.80m]
3,683 mm
12
9,754 mm
48’ [14.63m]
4,242 mm
13
10,566 mm
54’ [16.46m]
4,750 mm
14
11,379 mm
60’ [18.29m]
5,334 mm
Grain Bin Peak Height “A”
[mm]
Bin Diameter
No. of
Rings
15'
18'
21'
24'
27'
30'
33'
36'
42'
48'
54'
60'
4
4,548
4,825
5,130
5,410
5,715
6,005
6,275
6,578
6,908
7,494
7,924
8,484
5
5,360
5,638
5,943
6,223
6,528
6,817
7,088
7,390
7,721
8,307
8,737
9,296
6
6,173
6,451
6,755
7,036
7,341
7,630
7,900
8,203
8,533
9,120
9,549
10,109
7
6,986
7,263
7,568
7,849
8,153
8,443
8,713
9,016
9,346
9,932
10,362
10,922
8
7,799
8,076
8,381
8,661
8,966
9,256
9,526
9,829
10,159
10,745
11,175
11,735
9
8,612
8,889
9,194
9,474
9,779
10,069
10,339
10,642
10,972
11,558
11,988
12,548
10
9,424
9,702
10,007
10,287
10,592
10,881
11,152
11,454
11,785
12,371
12,801
13,360
11
10,237
10,515
10,819
11,100
11,405
11,694
11,964
12,267
12,597
13,184
13,613
14,173
12
11,050
11,327
11,632
11,913
12,217
12,507
12,777
13,080
13,410
13,996
14,426
14,986
13
11,863
12,140
12,445
12,725
13,030
13,320
13,590
13,893
14,223
14,809
15,239
15,799
14
12,676
12,953
13,258
13,538
13,843
14,133
14,403
14,706
15,036
15,622
16,052
16,612
WARNING! All 13 and 14 ring 2.66 Grain Bins are designed to be used
for storage only and not for drying!
Grain Bin Sidewall 017061 2-09 [1]
13
2 Specifications
BOLT IDENTIFICATION AND TORQUE VALUES
g. 8.2
Bolt Size
Approximate Torque Required
5/16” grade 8.2
25 ft-lbs, 33 Nm, 3.4 kgf-m
3/8” grade 8.2
44 ft-lbs, 59 Nm, 6.6 kgf-m
Have your contractor demonstrate that he/she is giving you the correct torque.
14
Approximate torque levels for the fasteners that bolt your bin together are listed here. For
all these “bearing type” sidewall sheet connections, a “snug tight” condition is sufficient
to ensure structural soundness, where “snug-tight” is defined as the tightness attained by
several impacts on an impact wrench, or the full effort of a worker with an ordinary spud
wrench that brings the connected sheets into firm contact. A properly tightened bolt must
have its seal washer fully seated in the hole and the sheets fully drawn together to produce
a water-tight seal.
WARNING! ALWAYS LOAD OR UNLOAD THE BIN FROM THE CENTER!
This creates an even load on the structure. Only use your intermediate sumps
for clean-up. Off-center loading and unloading creates excessive STRESSES
and can cause failure. All bins should be filled at the center of the peak ring
with an auger or spout of adequate length to allow grain to drop straight down
into the bin. A leveling device is strongly recommended.
CHECK DELIVERY
Your bin has been carefully checked before shipment. However, you should check your
shipment upon arrival using the provided Packing List to insure it is complete.
CAUTION: All galvanized steel is subject to oxidation, sometimes called “white rust”
when exposed to moisture from any source. Plenty of care should be taken to protect
sidewall sheets and roof sheets. INSIDE STORAGE IS ADVISABLE. When on the job
site, sheets should be place on edge far enough apart to let air to circulate freely.
WARNING! Don’t cut openings in bins! This reduces the structural
strength of the unit and can cause partial or complete failure.
Grain Bin Sidewall 017061 2-09 [1]
3
3
Concrete / Site Location
BIN SITE LOCATION
Check your site locations for possible problems with the following:
1 High wind or Snow load area
4 Local codes/permits
7 Railroads
2 Waterways and run off
5 Power lines
8 Seismic load
3 Poor soil conditions/soil problems
6 Highways
9 Hopper Bins
CHOOSING A BIN SITE
Consideration should be given to convenience in loading and unloading and accessibility to existing and
planned facilities. The site should be level, on firm soil, with adequate drainage. Any fill used in leveling
the site MUST BE well compacted to prevent uneven settling from weight of the foundation, bin and
contents. After the site is completely level, use 1” to 2” [25mm - 50mm] of fill sand to act as a cushion
under the concrete slab.
Standard foundation drawings and specs are furnished by MFS/YORK/STORMOR showing soil
bearing pressures required. It is the obligation of the purchaser to obtain a soil bearing test
and ascertain that the foundation has sufficient strength for a capacity filled bin. Unless
the finished foundation is level and true, and the site properly graded for water drainage, failure
of the foundation could result. This is not covered by the MFS/YORK/STORMOR warranty.
At the time your soil is being compacted and the foundation is being poured, make certain that the work
is being done in exact accordance with your soil engineer’s specifications. Remember - if your soil isn’t
right, your foundation could TIP AND CRACK - if your foundation isn’t right, your bin could fail.
The foundation drawings on the following pages are intended as a guide only and are not to be
interpreted as “firm” instruction. If at a later date, the bin
is increased in height, the foundation may not be adequate.
Anchor bolts should be to specifications and be set when pouring the foundation as improper
anchoring will give you a WEAK structure.
The bin is ROUND and to keep it round, the anchor bolts should follow a SCRIBED CIRCLE
with the correct chord dimensions between the anchor bolts.
Instructions
The base ring of the bin must rest firmly on the foundation with absolutely no overhang.
1. Lay out the foundation by driving a small pipe to mark the center of
the pad. The top of the pipe should be the height of the foundation.
2. Using the pipe for a center pivot, you can use a chain with a sharp
stake attached to the outer end to scribe on the ground the foundation
diameter. (A board may be used instead of the chain.)
3. After pouring the concrete, and while it is still soft, locate your
anchor bolts. Use the center pipe and chain again to mark the correct
diameter to set the anchor bolts. Use a measured chain (or chord) to
get the correct spacing between holes.
Grain Bin Sidewall 017061 2-09 [1]
[15]
15
3 Concrete / Site Location
Foundation Plan
“C1”
16
“C5”
Slab
Diameter
NOTE: For foundation specifications
particular to the diameter and height
of your bin, see the following pages
in this section.
Diameter
“A”
“C3”
FOUNDATION PLAN
BIN SIDEWALL
ANCHOR HOLD DOWN BRACKET
BASE ANGLE
5/8" NUT, WASHER, AND
LARGE WASHER
GRADE
WIRE MESH
6 X 6 X 10/10
2"
SANDFILL
2"
2"
"W"
1 1/2"
"D"
4"
3"
5/8" X 9"
ANCHOR BOLTS
2-3/8" DIA REINF BARS
K0100001
FLAT SLAB
Grain Bin Sidewall 017061 2-09 [1]
3 Concrete / Site Location
IMPORTANT: Develop a layout plan for the bin, bin accessories, and
auxiliary equipment and then build the bin foundation in proper accordance
with the layout plan!
Anchor Bolt Plan Dimensions
15’ - 36’ Diameter - up to 9 rings - 1 anchors per sidewall sheet
Bolt Chordal Spacing
Bin Dia.
Slab Dia.
Bolt Circle “A”
Anchor Bolt
Qty
C1
C3
C5
5
107-27/32”
--
--
6
109-11/16”
--
--
7
110-11/16”
--
--
--
--
--
--
--
--
--
--
--
--
15’
15’ 11-1/2”
15’ 3-1/2”
[4.57 m]
[4,865 mm]
[4,661 mm]
18’
18’ 11-3/8”
18’ 3-3/8”
[5.49 m]
[5,775 mm]
[5,572 mm]
21’
21’ 11-1/8”
21’ 3-1/8”
[6.40 m]
[6,683 mm]
[6,480 mm]
24’
24’ 11-1/16”
24’ 3-1/16”
[7.31 m]
[7,596 mm]
[7,393 mm]
27’
27’ 10-3/4”
27’ 2-3/4”
[8.23 m]
[8,503 mm]
[8,299 m]
30’
30’ 10-5/8”
30’ 2-5/8”
[9.14 m]
[9,414 mm]
[9,211 mm]
33’
33’ 10-3/8”
33’ 2-3/8”
[10.06 m]
[10,322 mm]
[10,119 mm]
36’
36’ 10-1/4”
36’ 2-1/4”
[10.97 m]
[11,236 mm]
[11,030 mm]
15’
15’ 11-1/2”
15’ 3-1/2”
[4.57 m]
[4,865 mm]
[4,661 mm]
[2,739 mm]
[2,786 mm]
[2,811 mm]
111-3/8”
8
[2,828 mm]
111-3/4”
9
[2,838 mm]
112-1/16”
10
[2,846 mm]
112-1/4”
11
[2,851 mm]
112-13/32”
12
[2,855 mm]
15’ - 36’ Diameter - 10 to 14 rings - 2 anchors per sidewall sheet
18’
18’ 11-3/8”
18’ 3-3/8”
[5.49 m]
[5,775 mm]
[5,572 mm]
21’
21’ 11-1/8”
21’ 3-1/8”
[6.40 m]
[6,683 mm]
[6,480 mm]
24’
24’ 11-1/16”
24’ 3-1/16”
[7.31 m]
[7,596 mm]
[7,393 mm]
27’
27’ 10-3/4”
27’ 2-3/4”
[8.23 m]
[8,503 mm]
[8,299 m]
30’
30’ 10-5/8”
30’ 2-5/8”
[9.14 m]
[9,414 mm]
[9,211 mm]
33’
33’ 10-3/8”
33’ 2-3/8”
[10.06 m]
[10,322 mm]
[10,119 mm]
36’
36’ 10-1/4”
36’ 2-1/4”
[10.97 m]
[11,236 mm]
[11,030 mm]
42’
42’ 9-7/8”
42’ 1-7/8”
[12.80 m]
[13,052 mm]
[12,849 mm]
48’
48’ 9-1/2”
48’ 1-1/2”
10
56-23/32”
[1,441 mm]
--
--
12
56-25/32”
155-1/8”
[1,442 mm]
[3,940 mm]
--
14
56-25/32”
159-1/16”
[1,442 mm]
[4,040 mm]
16
56-25/32”
161-21/32”
[1,442 mm]
[4,106 mm]
56-3/4”
163-3/8”
18
---
[1,441 mm]
[4,150 mm]
--
20
56-23/32”
164-5/8”
256-13/32”
[1,441 mm]
[4,181 mm]
[6,513 mm]
22
56-11/16”
165-1/2”
260-7/8”
[1,440 mm]
[4,203 mm]
[6,626 mm]
24
56-11/16”
166-3/16”
264-11/32”
[1,440 mm]
[4,221 mm]
[6,714 mm]
42’ - 60’ Diameter - up to 14 rings - 2 anchors per sidewall sheet
[14.63 m]
[14,871 mm]
[14,669 mm]
54’
54’ 9-1/8”
54’ 1-1/8”
[16.46 m]
[16,691 mm]
[16,488 mm]
60’
60’ 8-3/4”
60’ 0-3/4”
[18.29 m]
[18,510 mm]
[18,307 mm]
56-5/8”
167-3/32”
[1438 mm]
[4244 mm]
[6837 mm]
32
56-19/32”
167-5/8”
272-7/32”
[1437 mm]
[4258 mm]
[6914 mm]
36
56-9/16”
168-1/32”
274-11/32”
[1437 mm]
[4268 mm]
[6968 mm]
40
56-9/16”
168-1/4”
275-13/16”
[1437 mm]
[4274 mm]
[7006 mm]
28
269-5/32”
Wire Mesh
Bin Size
15’
[4.57 m]
18’
[5.49 m]
21’
[6.40 m]
24’
[7.31 m]
Wire Mesh Sq. Ft.
184
[17.1 m2]
263
[24.5 m2]
356
[33.1 m2]
462
[43.0 m2]
Grain Bin Sidewall 017061 2-09 [1]
Bin Size
27’
[8.23 m]
30’
[9.14 m]
33’
[10.06 m]
36’
[10.97 m]
Wire Mesh Sq. Ft.
583
[54.2 m2]
718
[66.8 m2]
866
[80.5 m2]
1029
[95.6 m2]
Bin Size
42’
[12.80 m]
48’
[14.63 m]
54’
[16.46 m]
60’
[18.29 m]
Wire Mesh Sq. Ft.
1396
[129.7 m2]
1819
[169.0 m2]
2299
[214.0 m2]
2834
[263.3 m2]
17
3 Concrete / Site Location
Foundation Specifications
Foundation Specifications for Bins up to 9 Rings Tall
Foundation
Dimension “D”
Bin Dia.
15’
[4.57 m]
15”
[5.49 m]
15”
21’
[6.40 m]
24’
[381 mm]
12”
[381 mm]
12”
15”
[381 mm]
[7.31 m]
15”
27’
[8.23 m]
30’
Concrete Total
Cubic Yards
#3 Reinf. Bar
lin/ft
[305 mm]
4-3/4
[3.7 m3]
96
[305 mm]
6
3
115
[35.1 m]
12”
[305 mm]
7-3/4
[6.0 m ]
134
[40.9 m]
[381 mm]
12”
[305 mm]
9-1/2
[7.3 m3]
152
[46.4 m]
15”
[381 mm]
12”
[305 mm]
11-1/2
[8.8 m3]
170
[51.9 m]
[9.14 m]
18”
[457 mm]
18”
[457 mm]
16-3/4
[12.9 m3]
187
[57.0 m]
[10.06 m]
18”
[457 mm]
18”
[457 mm]
19-1/2
[15.0 m3]
[10.97 m]
18”
[457 mm]
18”
[457 mm]
22-1/4
[12.80 m]
18”
[457 mm]
18”
[457 mm]
28-1/4
48’
[14.63 m]
18”
[457 mm]
18”
[457 mm]
35-1/2
[27.2 m ]
54’
[16.46 m]
24”
[610 mm]
24”
[610 mm]
53-1/4
[40.8 m3]
333
[101.5 m]
60’
[18.29 m]
24”
[610 mm]
24”
[610 mm]
62-3/4
[48.0 m3]
371
[113.1 m]
18’
18
Foundation
Dimension “W”
33’
36’
42’
[4.6 m ]
3
[29.3 m]
206
[62.8 m]
3
224
[68.3 m]
3
262
[79.9 m]
3
299
[91.2 m]
[17.1 m ]
[21.6 m ]
Foundation Specifications for Bins 10 to 12 Rings Tall
15’
[4.57 m]
15”
[381 mm]
24”
[5.49 m]
15”
[381 mm]
24”
[6.40 m]
15”
[381 mm]
24”
[7.31 m]
15”
[381 mm]
24”
27’
[8.23 m]
15”
[381 mm]
24”
[610 mm]
15-1/4
30’
[9.14 m]
18”
[457 mm]
30”
[762 mm]
33’
[10.06 m]
18”
[457 mm]
30”
36’
[10.97 m]
18”
[457 mm]
42’
[12.80 m]
18”
[14.63 m]
18”
[16.46 m]
24”
[18.29 m]
24”
18’
21’
24’
48’
54’
60’
[610 mm]
6-3/4
[610 mm]
8-1/2
[610 mm]
10-1/2
[610 mm]
12-3/4
[5.2 m3]
89
[27.2 m]
[6.5 m ]
108
[33.0 m]
3
127
[38.8 m]
3
[9.8 m ]
145
[44.2 m]
3
[11.7 m ]
165
[50.3 m]
21-3/4
[16.7 m3]
181
[55.2 m]
[762 mm]
24-3/4
[19.0 m3]
199
[60.7 m]
30”
[762 mm]
28-1/4
[21.6 m3]
218
[66.5 m]
[457 mm]
30”
[762 mm]
35-1/4
[26.6 m3]
256
[78.1 m]
[457 mm]
30”
[762 mm]
43-1/4
293
[89.4 m]
[610 mm]
33”
[838 mm]
62
[610 mm]
34”
[864 mm]
73-1/2
3
[8.1 m ]
3
[33.1 m ]
3
[47.5 m ]
3
[56.2 m ]
329
[100.3 m]
366
[111.6 m]
Foundation Specifications for Bins 13 to 14 Rings Tall
24’
[7.31 m]
18”
[457 mm]
32”
[813 mm]
16-1/2
[12.7 m3]
142
[43.3 m]
27’
[8.23 m]
18”
[457 mm]
32”
[813 mm]
19-1/4
[14.8 m3]
160
[48.8 m]
30’
[9.14 m]
18”
[457 mm]
34”
[864 mm]
23-1/4
[17.8 m3]
[10.06 m]
18”
[457 mm]
34”
[864 mm]
26-1/2
[10.97 m]
18”
[457 mm]
38”
[965 mm]
31-3/4
42’
[12.80 m]
18”
[457 mm]
38”
[965 mm]
39-1/2
48’
[14.63 m]
18”
[457 mm]
40”
[1,016 mm]
54’
[16.46 m]
24”
[610 mm]
42”
60’
[18.29 m]
24”
[610 mm]
44”
33’
36’
178
[54.3 m]
3
196
[59.8 m]
3
214
[65.3 m]
3
[30.2 m ]
251
[76.6 m]
49-1/2
[37.9 m3]
288
[87.8 m]
[1,067 mm]
70-1/2
[54.0 m3]
325
[99.1 m]
[1,118 mm]
84
[20.3 m ]
[24.3 m ]
[64.3 m3]
361
[110.1 m]
Grain Bin Sidewall 017061 2-09 [1]
3 Concrete / Site Location
FOUNDATION NOTES:
1. The foundation site should be well drained and free of vegetation and/or debris.
2. Foundation(s) should be on undisturbed soil or engineered compacted backfill.
3. A soil and foundation (Geotechnical) investigation should be conducted for each site to
confirm the soil bearing capacity.
4. Foundation Design is based on the specified allowable soil bearing capacity.
5. The concrete shall have a minimum compressive strength of 3,000 psi at 28 days. a
6. Concrete should be allowed to cure 7 days before starting tank assembly and 28 days
before filling the bin.
7. Concrete should be kept level to ±1/8” in 10’ and 1/2” across the diameter. b High spots or
debris should be removed before setting the bin.
8. Anchor bolts need to be properly located based on the information provided in order to
keep the tank round, and to ensure structural integrity of the bin while guaranteeing effective
transfer of wall forces down to the foundation. Minimum recommended cast-in-place anchors
for standard conditions shall be A307 9” x 3” hooked bolts of the required diameter: 3/4”
for Commercial Flat-Bottom Bins (1” required for 60’ and larger bins with a side draw) and
Commercial Hopper Tanks, 5/8” for Unstiffened Grain Bins, and 1/2” for Unstiffened Hopper
Bins. The hook of the bolt must be placed below horizontal rebar for proper transfer of forces.
Alternately, a hex-head bolt with flat washers or an epoxy adhesive anchor of equivalent
strength may be used. Check with epoxy anchor vendor or manufacturer for strength ratings
and for proper installation instructions.
9. All reinforcing rod for concrete reinforcement shall conform to ASTM A615, Grade 60.
10. Rebar should lap a distance equal to (Rebar Dia. x 24). Minimum allowable lap is 18” - i.e: #6
Rebar has a diameter of 6/8”: 24 x .75” = 18”, or an 18” lap. c
11. Estimates for Rebar do NOT include allowances for the lap.
12. The stiffener and sidewall must be supported over tunnels.
13. Concrete yardage figures do NOT include any allowances for aeration trenches or tunnels.
14. Ring reinforcement must be continuous around the tunnels.
15. To help minimize potential frost heave, the bottom of the footings should be at or below the
frost line. Alternately, the footings could be supported on non-expansive fill materials (such as
crushed stone or gravel) which are not susceptible to frost heave, extending below the frost
line; however, some local building codes do require the footing to extend below the frost line.
16. Foundation Design is based on an allowable soil bearing capacity of 3,000 psf for unstiffened
Grain Bins and 3,500 psf for Commercial Stiffened Bins. d
17. The foundation details in this manual are to be considered general in nature and are intended
only as a guide. This design is for standard external loading conditions: 90 mph wind speeds
and seismic zone 0 earthquake loads. It is the owner’s responsibility to provide an appropriate
site and foundation design for the adequate support of the grain bin. MFS/YORK/STORMOR
assumes no responsibility for results arising from these suggestions. Check with the MFS
engineering department to obtain contact information for foundation design and soil testing
professionals.
a [The concrete shall have a compressive strength of 20.67 MPa at 28 days]
b [Concrete should be kept level to ±3 mm in 3000 mm and 12 mm across the diameter]
c [Minimum allowable lap is 450 mm - i.e: #6 Rebar has a diameter of 19 mm: 24 x 19 mm = 450 mm, or a 450 mm lap.]
d [Found. design is based on an allowable soil bearing capacity of 143.64 kPa for unstiffened grain bins and 167.6 kPa for stiffened bins.]
Grain Bin Sidewall 017061 2-09 [1]
19
4
Pre-Assembly
4
SIDEWALL SHEET IDENTIFICATION
The bin wall sheets are color coded at the ends on the bottom corners of the sheets for
simple reference as follows:
[20]
20
Color
Sidewall
Gage
Color
Sidewall
Gage
Color
Sidewall
Gage
Green / Gray
19 gage
Yellow
14 gage
Brown
10 gage
Gray
18 gage
Yellow / Black
13 gage
White
8 gage
Red
17 gage
Black
12 gage
Blue / Yellow
15 gage
Orange
11 gage
Color coding is on the bottom (2) corners of the sidewall sheet and a stamped sheet
identification mark is in the middle of the sheet between the color codes on the inside face.
To determine the number of sheets per ring, divide the bin diameter by (3):
ie: 36 diameter bin divided by 3 = 12 sheets per ring.
Sidewall Sheet Identification example
9 3/8”
4 11/16”
[238mm]
[119mm]
19 gage - 13 gage sheets
12 gage - 8 gage sheets
Sidewall sheets in this example viewed from the inside of the bin.
a
SIDEWALL SHEET IDENTIFICATION EXAMPLE
Grain Bin Sidewall 017061 2-09 [1]
4 Pre-Assembly
SIDEWALL HARDWARE AND WHERE IT IS USED:
5/16” x 1” Bin bolts with seal washer (018905) and nuts (018913) Used at bin wall 19 gage - 13 gage sheets
5/16” x 1 ¼” Bin bolts with seal washers (018904) and nuts (018913) Used to bolt base angles together, with 5/16” flange nuts (028002)
Used to bolt the base angle to the bin wall with 5/16” flange nuts (028002) Used on 19 gage - 13 gage bottom sheets.
Used at all roof locations on bins with an eave ring package,
with 5/16” hex nut (018913) and 5/16” flange nut (028002)
42’-60’ dia. bins only: Used to connect the eave clips to the sidewall,
with 5/16” hex nut (018913)
42’-60’ dia. bins only: Used to connect the supplemental eave clips to
the sidewall, with 5/16” hex nut (018913)
5/16” seal washer (018910)
Used at 1-ring base anchor-to-sidewall sheet connection on
19 gage - 13 gage sheets
3/8” x 1” bin bolts with seal washers (018980) and nuts (018983) Used on 12 gage - 8 gage bin wall sheets
3/8” x 1 1/4” bin bolts with seal washers (018981) and nuts Used to bolt the base angle to the bin wall, with 3/8” flange nut (90005027),
12 gage - 8 gage bottom sheets
3/8” x 1 3/4” bin bolts (018982), 3/8” flange nuts (90005027), and seal washers (018976) Used at 1-ring base anchor-to-sidewall sheet connection with 12 gage - 8 gage sheets
5/16” or 3/8” x 1” Bin bolts with seal washer and nuts Used around the door
5/8” nuts, washers, and large washers Used at the anchor bolts to secure the bin to the foundation
Sealer tape (018008) Used at VERTICAL bin wall seams (1 strip)
Used at the door frame both vertically and horizontally around it
Base angle connector (010080) Used to join base angle ring at connections
Roof eave clips (15’-36’ - 011464) (42’-60’ - 010078) Used at the top ring of the sidewall sheets (on the outside of the bin).
Installs to top ring of bin wall sheets (on outside).
The top hole puts roof in lowered position for storage facility,
and bottom hole puts roof in raised position for drying facility.
Roof supplemental eave clips (010073) 42’-60’ dia. bins only: Used at the top ring of sidewall sheets (on the outside
of the bin) Installs to the top ring of bin wall sheets (on outside)
Eave clip washer (010077) 42’-60’ dia. bins only: Used to secure the connection between the
eave clips and roof sheets
Bin hold down bracket (012869) Used to secure the bin to the foundation
Grain Bin Sidewall 017061 2-09 [1]
21
4 Pre-Assembly
1 & 2 RING AG DOOR HARDWARE AND WHERE IT IS USED:
5/16” Slotted truss head machine screws (038800) and flange hex nuts (028002) Used to install the door drip cap
Used to install door cover hinges and the door handle bar hinges
Outer door clip (010087) Used at the sidewall near the door to hold the outer door cover when it is open
5/16” Metal backed neoprene washer (038811) Used to install the drip cap at the drip cap middle hole location only
22
COMMERCIAL DOOR HARDWARE AND WHERE IT IS USED:
Outer door clip (010087) (1 qty) Used at the sidewall near the door to hold the outer door cover when it is open
Hinge bracket (012891) (4 qty) Used to install the inner and outer door covers
Square jamb washer (012895) (16 qty) Used at stiffener to door frame locations
Corrugated rubber sealer (018003) (3 qty) Used at the outer door jamb plate to sidewall installation
1/2” x 3/4” x 10’ [3,048mm] Door sealer strip (018187) Used at the eyebrow plate to sidewall installation
Outer door handle (018194) (1 qty) Door handle cam (018195) (1 qty) Used at the outer door handle installation
1/2” x 3/4” bolts (018907) and nuts (018912) (8 qty) Used to install the hinge brackets to the door frame
1/2” acorn nuts (018963) (4 qty) Used at the outer door frame to latch door handles
Hairpin Cotter (018969) (4 qty) Used at the hinge bracket clevis pins
#10-24 x 1/2” machine screws (018972) and hex nuts (048274) (2 qty) Used to install the outer door handle
1/2” x 7” clevis pin (018989) (4 qty) Used at the inner and outer door hinges installation
1/2” x 1-3/4” bolt (90000052) (4 qty) Used to install the acorn nuts to the inner door frame
5/8” x 2” bolts (90000078) (4 qty) Used to install the door half frames to the jamb plates
Grain Bin Sidewall 017061 2-09 [1]
4 Pre-Assembly
5/8” x 3” bolt (90000226) Used to install the bin door gussets to the door frame
3/8” x 1” slotted round head bolts (90000140), 3/8” flanged hex nuts (900005027) Used to install the door cover braces to the outer door
Used with seal washers (018976) at eyebrow plates to door half frames
installation
5/8” hex nuts (90005045) Used to install the door half frames to the sidewall
Used at the bin door gusset to door frame locations
1/2” lock washer (90010041) Used at the inner door handle to inner door cover connection
1/2” flat washer (90010045) Used at the door frame to sidewall installation when 3” long bolts are used
Clear silicone caulking (9060597)
Used around the door half frames
(see the commercial door section, half frames installation example)
WARNING! UNDER NO CIRCUMSTANCES SHALL ANY
OTHER BOLT BE SUBSTITUTED FOR THOSE SUPPLIED BY
MFS/YORK/STORMOR!
Grain Bin Sidewall 017061 2-09 [1]
23
4 Pre-Assembly
DOORS
All bins come equipped with either a 64” [1626mm] walk-in door or a 32” [813mm] crawl door.
Details for both of these doors are found in the door installation pages of this manual.
See pages 32 - 43.
CHECK THE SHIPPING LIST
Make certain that all the components are available by checking the shipping list. Any
shortages should be reported immediately to the MFS/YORK/STORMOR sales office.
24
WARNING! Before construction of the bin is started: 1) Read and
understand this manual. 2) Predetermine the locations of the access door,
anchor bolts, ladder, manway, roof steps, fans (see below), and other
auxiliary equipment.
underfloor
unload auger
access door
(typical)
floor planks
(bin with
full floor)
(2 fans)
fan location
120°
maximum
(1 fan)
fan location
a
FAN PLACEMENT
Grain Bin Sidewall 017061 2-09 [1]
5
5
Sidewall Assembly
GENERAL ASSEMBLY INSTRUCTIONS
1
Plan for the location of the door, bin ladders, roof steps, manway, fans,
unload auger, accessories, and other equipment.
2
Complete the foundation. See the foundation section in the front part of the manual.
3
Arrange the sidewall sheets near the pad in preparation for assembly.
4
Assemble the top ring of sidewall sheets, making certain that sidewall sheets
overlap in the same direction.
5
Install the eave ring or (and) eave clips. Raise the peak ring to the correct
height on the center support (center jack) and assemble the roof.
6
Continue by raising the bin and installing additional sidewall sheet rings making
certain that sidewall sheets overlap in the same direction.
7
If your bin is equipped with them, install sidewall ladders or spiral stairs in the
proper location as the sidewall is being built.
8
Install the door in the second ring from the bottom (1 ring door) or second and
third ring from the bottom (2 ring door).
9
Install the bin hold down brackets to the base of the bottom sidewall sheets.
Install the base angle around the entire bin, applying the (optional) base sealer at
the same time if the bin comes with it. Lower the bin over the anchor bolts and
securely fasten it to the anchors.
[25]
25
Assembly
10 If your bin comes equipped with a floor, build the floor using the manual included
with your floor bundle.
11 Install any bin optional equipment.
12 Make certain all connections are tight.
Important: The remainder of this manual provides the necessary details
and drawings to enable you to successfully complete the construction of your
MFS/YORK/STORMOR grain bin sidewall. Please familiarize yourself with this
manual before starting construction!
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
Typical Sidewall Assembly, Build Ring 1
IMPORTANT!
Follow the steps below throughout the
entire sidewall construction!
1
set out sheets, then build the top ring
26
TYPICAL INSTRUCTIONS
1 All sidewall sheets are color coded
for ease of construction. During
installation, position the sidewall
sheets so that the color codes are
on the bottom.
2 See the sidewall sheet layout tables on
pages 30 - 31 for sidewall sheet gage
and placement.
Sort the sidewall sheets by gage
according to the color code and sidewall
layout tables (pages 30 - 31). Stand the
sidewall sheets on edge in the order in
which they will be used on the bin pad
near the location where the sidewall will
be built. Read and follow the directions
on this page and the next page when
building the sidewall.
3 Always overlap the sidewall sheets
Sealer Tape at Sidewall Seams
in the same direction as shown
(example b, page 27).
4 Use (1) row of sealer tape at all vertical
seams and horizontally for 6” - 12”
[152mm - 305mm] from the end of each
sheet (example a). Wipe sheets clean
before applying the tape.
no sealer tape
needed here
outside
of bin
(dashed line indicates tape
on other side of sheet)
sidewall sheet
sealer tape
5 Bolt sidewall sheets together with
the bolt head and seal washer to the
outside of the bin and the nut to the
inside. Torque should be applied
to nut rather than the bolt head to
avoid damaging the seal washer. At
anchor hold down bracket locations,
the bolt direction is as indicated in
the examples on pages 49 - 53.
sealer tape
no sealer tape
needed here
(all vertical seams and 6” - 12”
[152mm - 305mm]
from the end of each sheet)
(50’ [15.2m] roll - 018008)
inside
of bin
Horizontal Sheet Seams
6 Stagger the sheets as shown in
example d on page 27 so the vertical
sheet seams will align with the centers
of the sheets in the ring above.
outside of bin
5/16” or 3/8”
hex nut
7 At horizontal seams, bolt lower
sheets to the inside of upper sheets
(example a).
8 (15’-36’ bins only) The top sidewall
upper sidewall sheet
5/16” or 3/8” bin bolt w/seal washer
(see the bolting info on page 21)
inside of bin
lower sidewall sheet
ring is punched differently. It is
punched for the roof.
a
SEALER TAPE ILLUSTRATION & HORIZONTAL SHEET SEAMS
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
2
start sidewall assembly
Build the top sidewall ring (examples b - d
and page 20). See the sidewall sheet
layout tables on pages 30 - 31. Make
certain you use the proper number
and style of sheets so the bin diameter
remains correct.
3
NOTE: The number of
assemble the roof
See your bin roof manual now and
assemble the roof onto the top ring of
sidewall sheets.
Sidewall Sheet Overlap
sidewall sheets shown in
examples b and c is correct
only for a 30’ diameter bin.
Top Sidewall Ring
overlap
the top set of holes have continuous
punching at:
15’ - 36’ = 3 1/8” [79mm] centers
42’ - 105’ = 9 3/8” [238mm] centers
sidewall sheet
Position sheets so that the color codes are on
the bottom corners of the sidewall sheets.
b
SHEET OVERLAP (1) DIRECTION ONLY
c
BUILD THE TOP SIDEWALL RING
Upper Sidewall Layout
the top set of holes have continuous punching at:
15’ - 36’ = 3 1/8” [79mm] centers
42’ - 105’ = 9 3/8” [238mm] centers
top ring
2nd ring
3rd ring
4th ring
56-1/4”
[1,429mm]
d
TOP 4 ROWS OF SIDEWALL SHEETS
Grain Bin Sidewall 017061 2-09 [1]
place the sign sheet in this ring
27
5 Sidewall Assembly
Connect 13 Gage and 12 Gage Rings
NOTE: Use 5/16” bin bolts at the
horizontal seam between 13 gage
and 12 gage sidewall sheets.
28
outside of bin
13 gage sidewall ring
5/16” bin bolt
with seal washer
12 gage sidewall ring
5/16”
standard nuts
inside of bin
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
outside - “hill” bolts to be installed
later with 1-Ring Anchor
Bottom Sidewall Ring Bolting
Do not install these bolts
in the bottom ring vertical
sidewall seam until
1-Ring Base Anchors are in
place (see pages 47 - 53).
bins with
19 gage - 13 gage
sheets in the
bottom ring
29
bins with
12 gage - 8 gage
sheets in the
bottom ring
Sidewall sheets in this example viewed from the inside of the bin.
a
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
Sidewall Gages Layout
WARNING! Be certain to use the layout that is correct for your bin type
and your bin diameter!
30
SIDEWALL LAYOUT TABLE INSTRUCTIONS
The grain bin being assembled is a storage bin, a drying bin, or a heavy duty bin. Select
the sidewall gage layout table that goes with your bin. Use the correct layout (column)
in that table for your bin diameter! Use that sidewall gage layout to select the right gage
of sidewall sheets to use for each sidewall ring. Sidewall rings are numbered from top to
bottom starting with ring number 1 and ending with the last ring number in the bin assembly.
Layouts are given for bins up to the maximum number of sidewall rings.
STORAGE BIN GAGES
ring
number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15'
18'
21'
24'
27'
30'
33'
36'
42'
48'
54'
60'
19
19
19
19
19
19
19
19
17
17
15
14
19
19
19
19
19
19
19
19
17
17
17
17
19
19
19
19
19
18
18
18
17
17
17
17
18
18
18
17
17
17
17
17
15
15
15
15
17
17
17
15
15
15
15
15
14
14
14
14
17
15
15
15
14
14
14
14
14
14
13
13
15
15
14
14
14
14
14
14
13
13
13
13
14
14
14
13
13
13
13
13
12
12
12
12
13
14
13
13
13
12
12
12
12
12
11
11
12
13
13
12
12
12
12
12
11
11
11
11
–
12
12
12
12
11
11
11
11
11
10
10
–
12
12
11
11
11
11
10
10
10
8
8
–
–
–
10
10
10
10
10
10
8
8
8
–
–
–
–
8
8
8
8
8
8
8
8
All bins can be equipped with a 1 ring crawl door or a 2 ring door except as noted below.
The more lightly dotted table columns are there to aid with table navigation only.
Bins having a bottom sidewall ring in a table cell of this shade may only be equipped with
a 1 ring crawl door or 2 ring DIN door.
Bins having a bottom sidewall ring in a table cell of this shade may be equipped with a
1 ring crawl only.
Bins having a bottom sidewall ring in a table cell of this shade may be equipped with a
commercial door only.
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
DRYING BIN GAGES
ring
number
1
2
3
4
5
6
7
8
9
10
11
12
15'
18'
21'
24'
27'
30'
33'
36'
42'
48'
54'
60'
19
19
19
19
19
19
19
19
17
17
–
–
19
19
19
19
19
19
18
18
17
17
–
–
19
19
19
18
18
17
17
17
17
15
–
–
18
18
18
17
17
15
15
15
15
14
–
–
17
17
17
15
15
15
14
14
14
14
–
–
17
15
15
14
14
14
14
14
14
13
–
–
15
14
14
14
14
14
13
13
13
13
–
–
–
14
14
13
13
13
13
13
12
12
–
–
–
13
13
13
12
12
12
12
12
12
–
–
–
13
12
12
12
12
12
12
11
11
–
–
–
12
12
12
12
11
11
11
11
10
–
–
–
12
12
11
11
11
11
10
10
8
–
–
HEAVY DUTY BIN GAGES
ring
number
1
2
3
4
5
6
7
8
9
10
11
12
15'
18'
21'
24'
27'
30'
33'
36'
42'
48'
54'
60'
19
19
19
18
18
18
17
17
15
15
–
–
18
18
18
17
17
17
15
15
14
15
–
–
17
17
17
15
15
15
15
15
14
14
–
–
15
15
15
15
15
14
14
14
13
13
–
–
14
14
14
14
14
14
13
13
13
13
–
–
14
14
14
14
14
13
13
13
12
12
–
–
13
13
13
13
13
13
12
12
11
11
–
–
–
13
13
12
12
12
12
12
10
10
–
–
–
12
12
12
12
11
11
11
10
10
–
–
–
11
11
11
11
11
11
11
10
10
–
–
–
11
11
11
11
11
10
10
8
8
–
–
–
11
11
10
10
10
8
8
8
8
–
–
On 42’ and 48’ drying bins specifically designed for supporting stirring machines with
(3) augers, the top ring will be 15 gage rather than the standard 17 gage.
Sidewall Gage Schedule Revision Date: 3/05
WARNING! 1 ring doors are placed in the second sidewall ring from
the bottom. 2 ring doors are placed in the second and third sidewall rings
from the bottom.
Grain Bin Sidewall 017061 2-09 [1]
31
5 Sidewall Assembly
Ag Door Placement
DOOR PLACEMENT INSTRUCTIONS
32
If your door is a Commercial
Door ignore the Ag Door
instructions and turn now to
page 38. Commercial Door
instructions start on that page.
The door placement pages show how to incorporate the door into the sidewall sheet
layout. Select the correct door layout to use with the type of door that was ordered with
the bin. Note whether the door sidewall ring being assembled has single punched sheets
(19ga through 13ga) or double punched sheets (12ga through 8ga), or a combination
of both. 1 ring doors are placed in the second ring from the bottom and 2 ring doors
are placed in the second and third rings from the bottom.
At the door location replace standard sheets with special length door sheets as shown
in your door layout drawing. In layout drawings, SP indicates a row of single punched
sheets and DP indicates a row of double punched sheets. The dimensions for the
special length sheets are an overall nominal length.
1 Ring Door in a Single Punched Row
The door layouts on this page
are shown as though they were
being viewed from the outside of
the grain bin.
SP
SP
87 1/2”
[2,223mm]
96 7/8”
SP
[2,461mm]
SP/DP
a
SIDEWALL LAYOUT AT THE LOCATION OF A 1 RING DOOR IN A SINGLE PUNCHED ROW
1 Ring Door in a Double Punched Row
SP/DP
DP
89”
96 7/8”
[2,261mm]
[2,461mm]
DP
DP
b
SIDEWALL LAYOUT AT THE LOCATION OF A 1 RING DOOR IN A DOUBLE PUNCHED ROW
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
2 Ring Door in Single Punched Rows
31 1/4”
40 5/8”
[794mm]
[1,032mm]
SP
SP
87 1/2”
[2,223mm]
96 7/8”
SP
[2,461mm]
SP/DP
33
c
SIDEWALL LAYOUT AT THE LOCATION OF A 2 RING DOOR IN SINGLE PUNCHED ROWS
2 Ring Door in Single / Double Punched Rows
31 1/4”
40 5/8”
[794mm]
[1,032mm]
SP
SP
89”
[2,261mm]
96 7/8”
DP
[2,461mm]
DP
d
SIDEWALL LAYOUT AT THE LOCATION OF A 2 RING DOOR IN SINGLE/DOUBLE PUNCHED ROWS
2 Ring Door in a Double Punched Rows
32 3/4”
40 5/8”
[832mm]
[1,032mm]
SP/DP
DP
89”
[2,261mm]
96 7/8”
DP
[2,461mm]
DP
e
SIDEWALL LAYOUT AT THE LOCATION OF A 2 RING DOOR IN DOUBLE PUNCHED ROWS
Grain Bin Sidewall 017061 2-09 [1]
The door layouts on this page
are shown as though they were
being viewed from the outside of
the grain bin.
5 Sidewall Assembly
Ag Door Assembly (1 RING - 013958 / 2 RING 013997)
4
1 & 2 ring door assembly
34
NOTE: See the sidewall layout tables
and door layout drawings, pages
30 - 33 for placement. Install the
door cover to the frame at the hinges
as shown (example b). Apply sealer
tape to all (4) sides of the door sheet
The bin door sheet is to be lapped
at the top and bottom of the door
sheet in the same way that standard
sidewall sheets are lapped.
(see example c on page 35)
during installation. Assemble the
door into the opening created by the
small special size sidewall sheets in
the second (32” door [813 mm]) or
the second and third rings from the
bottom (64” door [1,626 mm]). See the
following Ag Door drawings.
(4) 5/16” flange nuts
(028002)
door frame assembly
The outer door cover assemblies
(013954/013996) includes the
following: the outer door cover, hinges,
door support cross arm, locking hasp,
owner and operator’s manual, door
decals, and the necessary hardware
to install the cover.
(4) 5/16” x 3/4”
truss bolts
(038800)
door handle
bar lock
(018992)
a
2 RING 64” [1,626mm] DOOR INSTALLATION
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
door frame assembly
door cover assembly
Horizontal Sheet Seams
outside of bin
upper sidewall sheet
5/16” or 3/8”
hex nut
5/16” truss
bolts with
flange nut
(038800)
(028002)
(2) places top
and bottom
b
INSTALL THE OUTER DOOR COVER
5/16” or 3/8”
bin bolt with
seal washer
c
inside of bin
lower sidewall sheet
HORIZONTAL SHEET SEAMS LAP
drip cap
(013596)
metal backed neoprene washer
(this location only)
(038811)
5/16” truss bolt
and flange nut
(038800)
(028002)
d
Grain Bin Sidewall 017061 2-09 [1]
INSTALL THE DRIP CAP AT THE TOP OF THE DOOR
35
5 Sidewall Assembly
hinge arm - LH & RH
(013918 / 013919)
handle pivot
bracket
(013922)
top panel
(013913)
36
handle pivot bracket
ass’y - LH & RH
(013923/013924)
1 ring door frame
(013940 DP 15’ - 36’
013941 DP 42’ - 60’)
hinge bracket
(011673)
drip cap
(013596)
handle
(013928)
hinge
(013933 / 013934)
hinge rod
(011696)
bottom panel
(013912)
probe panel door
(013920)
probe opening flap
(013921)
handle bracket
(013932)
bar lock assembly
(018993)
hasp
(018994)
1/2” bolt, flat washer,
lock washer, and
acorn nut
(018996), (90010040),
(90010041), (018963)
door cover assembly
(013954)
clear silicone caulking
(90605097)
e
1 RING 32” DOOR PART BREAKDOWN
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
hinge arm - LH
(013918)
hinge arm - RH
(013919)
top panel
(014069)
2 ring door frame
(013937 DP 15’ - 36’
013963 DP 42’ - 60’
014066 TP 15’ - 36’
014067 TP 42’ - 60’)
hinge bracket
(011673)
drip cap
(013596)
handle pivot
bracket
(013922)
hinge rod
(010191)
handle pivot bracket
ass’y - LH & RH
(013923/013924)
middle panel
(014070)
handle
(013928)
bottom panel
(014071)
hasp
(018994)
probe panel door
(013920)
probe opening flap
(013921)
handle bracket
(013932)
clear silicone caulking
(90605097)
f
1/2” bolt, flat washer,
lock washer, and
acorn nut
(018996), (90010040),
(90010041), (018963)
2 RING 64” DOOR PART BREAKDOWN
Grain Bin Sidewall 017061 2-09 [1]
bar lock assembly
(018992)
door cover assembly
(013996)
[door panel only (013935)]
37
5 Sidewall Assembly
Commercial Door Placement
5
position the door opening as shown
NOTE: If the Ag door came
38
with your bin, ignore the
commercial door instructions
and turn now to page 32 for
door assembly.
Position the commercial door opening
in the second row of sidewall sheets
from the bin base. (example a) When
installing the final sidewall sheets, make
certain the sidewall sheet rows continue
to line up with each other.
inside view
commercial
door
opening
97 5/8”
[2,480 mm]
80 3/8”
[2,042 mm]
bottom 3 sidewall rings shown
a
SIDEWALL SHEET LAYOUT AT THE COMMERCIAL DOOR LOCATION
eyebrow plate
1/2” x 3/4” sealer strip
(018187)
b
INSTALL SEALER TAPE TO THE EYEBROW PLATES
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
Commercial Door Assembly
6
outside view
install the eyebrow plates
jamb plates
Install a foam sealer strip to the top
and bottom eyebrow plates as shown
in example b. Bolt the top and bottom
eyebrow plates loosely to the top and
bottom door opening (example d).
39
7
install the jamb plates to the sidewall
Install the foam corrugation sealer strips
to the outside of the jamb plates as shown
in example c. Bolt jamb plates loosely to
the sidewall sheets to the left and right of
the door opening as shown in example d.
Sandwich the corrugation sealer strips
between the jamb plates and the
sidewall sheets. After the jamb plates
are installed, (1) side of the corrugated
sealer strip will extend beyond the edge
of the sidewall sheet.
corrugated sealer strip
(018003)
INSTALL THE CORRUGATED SEALER STRIP
c
k0000122
inside view
NOTE: The sidewall sheet punching
shown in example d is not correct
for your bin. The correct sidewall
punching for your bin is shown in
example a on the previous page.
jamb plate
use 5/16”
bolts, nuts
& seal washers
bottom
sidewall ring
eyebrow plates
loosely install all 5/16” bolts with seal
washers and nuts in jamb plates
d
Grain Bin Sidewall 017061 2-09 [1]
INSIDE VIEW, INSTALLING JAMB PLATES TO THE SIDEWALL
5 Sidewall Assembly
8
apply caulking around the half frames
5/8” nut (90005045)
Lay both door half frames so that they
lie with open faces of the jambs facing
down. On each frame half, apply a line of
caulking on the top surface of the jambs,
on the top of the headers, and on the
bottom of the sills. Apply the caulking in
such a way as to completely seal around
the edges of the door frame halves.
caulking
5/8” washer (90010045)
(only as spacers when 3”
long bolts are used on the
heaviest gage doors)
40
outside
9
door
frame half
install the half frames at the opening
Carefully set both half frames into
place on the inside and outside of
the bin (example a). (Note: The half
frames may be of different weight,
i.e. (1) of 10 [3.4mm] gage steel and
(1) of 1/4” [6.4mm] steel. Use the
heavier half on the inside of the
bin for inside stiffened bins or on
the outside for outside stiffened
bins.) The caulking will most likely be
smeared some as the half frames are
being set into place. Try to minimize the
smearing and be certain to maintain
the seal around each frame half. Bolt
inner and outer half frames loosely to
the jamb plates.
caulking
inside
door
frame half
5/8” washer (90010045)
(only as spacers when 3”
long bolts are used on the
heaviest gage doors)
5/8” x 2” bolt (90000078)
or 5/8” x 3” bolt (90000226)
a
INSTALL INNER AND OUTER DOOR HALF FRAMES
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
3/8” x 1” slotted round head
bolt (90000140)
frame
3/8” seal washer
(018976)
3/8” flanged
hex nut (90005027)
10
bolt half frames to the eyebrow plates
Bolt both half frames loosely to eyebrow
plates as shown (examples b - c). Then
tighten all bolts.
eyebrow plate
b
inside view
eyebrow plate
see example b detail
c
BOLT DOOR HALF FRAMES THROUGH EYEBROW PLATES
Grain Bin Sidewall 017061 2-09 [1]
EYEBROW PLATE FASTENERS DETAIL
41
5 Sidewall Assembly
11
install the door fastening hardware
42
Bolt the hinge brackets to the door frame
jambs for the inner and outer door
covers (examples a and b). On the
inside and outside of the bin install the
hinge brackets on the same side of the
door as shown in example c. On the
inside of the bin, use acorn nuts at the
door jamb top and bottom on the side
of the frame half opposite the hinge
brackets for latching the inner door as
shown (example c).
1/2” hex nut
(018912)
hinge bracket
(012891)
1/2” x 1 3/4” bolt
(90000052)
outside view
a
INSTALL DOOR HINGE BRACKETS
end view
hinge bracket
(012891)
NOTE: For the
sake of simplicity,
the sidewall and
jamb plates are
not shown in
this view.
b
PLACE ALL HINGES ON THE SAME SIDE
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
12
install the doors
Doors come assembled. Note door
and handle assembly (example c).
Caulk and completely seal along the
upper and lower left and right edges
of the outer door frame.
NOTE: The door door frame halves
should already be installed to the
jamb plates and bin sidewall at this
point in the door assembly!
clevis pin
(018989)
A
NOTE: Each hinge plate is to be installed
on the correct sides of the inner and outer
door covers as shown below. This example
shows the proper hinge plate installation.
hair
cotter
pin
(018969)
hinge
bracket
(012891)
croos arm spacer
(011697)
inner door angle
(012888)
clevis pin
(018989)
door handle
cam
(018195)
hinge
bracket
(012891)
hinge plate
(012927)
E
#10-24x.5”
mach.
screw
(018972)
and nut
(018974)
B
outer door
cover
(012886)
door cover
strap
(012921)
9 places
D
LH
inner door handle
(012898)
and cover
(012931)
5 places
C
INSIDE OF BIN
(inner door)
1/2” x 1-3/4”
bolt
(90000052)
B
hinge plate
(012927)
door cover
brace
(012899)
door frame
NOTE: The jamb plates and
the bin sidewall are not
shown for clarity!
hair
cotter
pin
(018969)
1/2”
acorn
nut
(018963)
OUTSIDE OF BIN
(outer door)
A
C
2 places
inner door
cover
(012887)
D
9 places
E
6 places
RH
(012897)
1/4”x3/4” carr.
blt.,
• 3/8” x 1” sltd rnd head (90010040)
• 3/8” flat washer (90010020)
• 3/8” hex nut (018983)
• 3/8” x 1” sltd rnd head (90010040)
• 3/8” hex nut (018983)
k070000137
c
4343
• 1/2” x 1-3/4” carr blt (90000149)
• 1/2” x 1/2” bushing
• 1/2” flat washer (90010020)
• 1/2” lock washer (90010041)
• 1/2” hex nut (018912)
• 3/8” hex nut (018983)
• 3/8” flat washer (90010020)
• 3/8” x 1-1/4” bin blt w/sw (018981)
COMMERCIAL DOOR, OUTER AND INNER DOOR FRAMES EXPLOSION EXAMPLE
Grain Bin Sidewall 017061 2-09 [1]
• 3/8” hex nut (018983)
• 3/8” x 1-1/4” bin blt w/sw (018981)
5 Sidewall Assembly
Sidewall Assembly Completion
13
install the bottom sidewall ring
44
42” [1067 mm]
sheet
After the bin door is installed, complete
your bottom sidewall sheet ring
installation. If your bottom sheets have
floor flashing holes, make certain they
will be at the correct height to match
floor supports.
NOTE: Entrance
collars are optional
77” [1956 mm]
sheet
Option
install the entrance collar
Entrance collar sheets are available
as an option for an aeration fan. Bolt
these (3) sheets together along with
a section of base angle (example a).
Install the transition to the entrance
collar and bolt this assembly to the
bottom sidewall ring.
Option
base angle
entrance
collar
k0000046
a
BOLT TOGETHER THE ENTRANCE COLLAR ASSEMBLY
install the entrance collar adaptor
If your bin uses an entrance collar
adapter follow these instructions. If
13” [330mm] floor supports are used
field drill the holes in the entrance
collar for the adaptor. The adaptor
should fit flush on the inside and at
the top. Adaptor holes will be toward
the bottom (example b).
entrance collar
adaptor
entrance collar
b
INSTALL THE ENTRANCE COLLAR ADAPTOR
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
Base Angle
14
complete entire base angle installation
Finish installing the base angle all the
way around the bottom ring using the
base angle connectors (example c).
All base hardware should be packaged
separately.
45
sidewall
5/16” x 1 1/4” bin bolt with seal washer (018904)
used with 19 gage - 13 gage bottom sheets.
3/8” x 1 1/4” bin bolt with seal washer (018981)
used with 12 gage - 8 gage bottom sheets.
base angle
connector
(010080)
5/16” or 3/8”
flange nut
base angle
k0000050
c
INSTALL THE BASE ANGLE CONNECTORS AND ALL THE BASE ANGLES
Grain Bin Sidewall 017061 2-09 [1]
5 Sidewall Assembly
Optional Bin Step
Option
NOTE:
A bin step may be
used in various places around a
bin per the application and the
customer’s discretion.
46
install the optional bin step
A bin step may be used in various
places around a bin per the application
and the customer’s discretion. To
install a bin step, field drill step holes
and bolt the step to the sidewall sheet
(example a).
field drill
bin step
(080408)
a
INSTALL THE OPTIONAL BIN STEP
Grain Bin Sidewall 017061 2-09 [1]
6
6
Grain Bin Completion
Anchor Hold Downs / 1-Ring Base Anchors
Instructions
See the next 6 pages for Anchor Hold Down Bracket, and 1-Ring Base Anchor Installation
examples and further instructions.
The Bin Hold Down Brackets, and 1-Ring Base Anchors for unstiffened farm bins can be installed per
the following criteria:
• Bins 15’ - 36’ [4.57m - 10.97m] diameter 1-9 rings tall shall have
(1) 1-Ring Base Anchor per sidewall sheet.
• 15’ - 36’ [4.57m - 10.97m] diameter 10-14 rings tall shall have (1) Hold Down Bracket and
(1) 1-Ring Base Anchor per sidewall sheet.
• 42’-60’ [12.80m - 18.29m] for all heights shall have (1) Hold Down Bracket and
(1) 1-Ring Base Anchor per sidewall sheet.
The brackets and base anchors need to be used in conjunction with an oversized washer supplied
by MFS to cover the hole. The anchor bolt is sold separately from the standard bin. The bolt needs
to include a nut and standard flat washer. All anchor bolts are 5/8” [16mm] diameter and 9” [229mm]
long with a 3 3/4” [95mm] leg “L” bolt. The material shall match an ASTM A307 threaded fastener
specification. The bolt projection should be no more than 2 1/2” [64mm].
(1) 1-Ring Base Anchor will be used at the vertical seam. If both base anchors and hold-down
brackets are required, the base anchor will be used at the vertical seam and the hold-down bracket
will be used at the center of the sheet.
If you have any questions, do not hesitate to contact MFS/YORK/STORMOR.
Grain Bin Sidewall 017061 2-09 [1]
[47]
47
6 Grain Bin Completion
1-Ring Base Anchor Channel
Connect 1-Ring Base Anchor Channel to Base Plate
48
1-Ring Base Anchor
channel (001447)
anchor
base plate
(001448)
3/8” x 1”
bin bolt
with
seal washer
(018980)
3/8”
flange nut
(90005027)
Grain Bin Sidewall 017061 2-09 [1]
6 Grain Bin Completion
1-Ring Base Anchors on
19 - 13 Gage Bottom Sidewall Sheets
(Single row, hill-and-valley, on vertical sidewall seam)
15a
1-ring base anchors to sidewall sheets
Connect 1-ring base anchor to bottom
sidewall ring with a 5/16” x 1” bin bolt,
5/16” seal washer, and 5/16” hex nut
at every outside hill location.
5/16”
seal washer
(018910)
5/16”
hex nut
(018913)
49
5/16” x 1”
bin bolt
(018905)
(at every outside
hill location)
5/16” x 1”
bin bolt
and hex bolt
(already installed)
inside of bin
Grain Bin Sidewall 017061 2-09 [1]
outside of bin
6 Grain Bin Completion
1-Ring Base Anchors on
12 - 8 Gage Bottom Sidewall Sheets
(Double row, valley - only, on vertical seam)
15b
install 1-ring base anchor to sidewall
50
the bottom sidewall ring. Use 3/8” hex
nuts and seal washers on the already
installed 3/8” x 1 3/4” bin bolts; use
a 3/8” x 1” bin bolt, hex nut, and seal
washer on bottom hill hole (and at the
2) Connect the 1-Ring Base Anchor with floor flashing location).
1) Install 3/8” x 1 3/4” bin bolts and
flange nuts onto the 1-Ring Base Anchor
at the 1st, 4th, 8th, and 11th sidewall
sheet valley locations.
11th valley
3/8” x 1 3/4”
bin bolt
(018982)
and
flange nut
(90005027)
3/8” seal
washer
(018976)
8th valley
3/8” hex nut
(018983)
3/8” x 1”
bin bolt with seal
washer and hex nut
(already installed)
outside of bin
4th valley
3/8” hex nut
(018983)
3/8” x 1”
bin bolt
(018980)
1st valley (from bottom)
3/8” seal
washer
(018976)
Grain Bin Sidewall 017061 2-09 [1]
6 Grain Bin Completion
Bin to Anchors, 1-Ring Base Anchor Locations
(at sidewall seams)
1-Ring Base Anchor Locations
(at sidewall seam)
bin sidewall
standard 5/8”
flat washer
(90010045)
5/8” nut
(90005045)
51
1-ring
base
anchor
(012869)
(2) large 5/8” flat
washers (018986)
base angle
5/8” [16mm] x 9” [229mm] (018988)
anchor bolt, sold
separately from bin
concrete
anchor
base plate
(001448)
5/8” nut
(90005045)
standard
5/8” flat
washer
(90010045)
(2) large
5/8” flat
washers
(018986)
1-ring
base anchor
channel
(001447)
5/8” x 9” anchor bolt (018988),
sold separately from the bin
Grain Bin Sidewall 017061 2-09 [1]
3/8” x 1” bin bolt
(018980)
and flange nut
(9005027)
6 Grain Bin Completion
Bin to Anchors, Hold Down Bracket Locations
(midway between sidewall seams, as required)
Hold Down Bracket Locations
(midway between sidewall seams, as required)
bin sidewall
standard 5/8”
flat washer
(90010045)
5/8” nut
(90005045)
52
(2) large 5/8” flat
washers (018986)
concrete
bin hold down
bracket
(012869)
base angle
5/8” [16mm] x 9” [229mm] (018988)
anchor bolt, sold separately from bin
5/8” nut
(90005045)
standard
5/8” flat
washer
(90010045)
(2) large
5/8” flat
washers
(018986)
bin hold down
bracket
(012869)
base angle
5/8” x 9” anchor bolt (018988),
sold separately from the bin
Grain Bin Sidewall 017061 2-09 [1]
6 Grain Bin Completion
Bin to Anchors, Installed
(bins with 1-ring base anchors and bin hold down brackets)
53
1-ring base anchor
at sidewall seam
midway between sidewall seams
bin hold down
bracket
(012869)
BINS WITH (1) 1-RING
BASE ANCHOR AND (1)
HOLD-DOWN BRACKET
a
LOCATE HOLD DOWN BRACKETS BETWEEN BASE ANCHORS AT SIDEWALL SEAM LOCATIONS
Grain Bin Sidewall 017061 2-09 [1]
6 Grain Bin Completion
Ladders
16
ladder installation
54
Install the ladder to the bin sidewall as
you build the tank from top to bottom
(examples a - g). Be certain all brackets
and splices are properly spaced and
securely tighten all bolts. Use the
correct bin bolts and nuts at all splices
and sidewall connections. Install the
safety cage to the ladder using the clip
and bolt assemblies provided.
NOTE: OSHA Regulation Subpart D., Section 1910.27 (d) (iv)
states in part: “Cages shall extend
down the ladder to a point not less
than seven (7’ feet [2135 mm]) nor
more than eight (8’ feet [2438 mm])
above the base of the ladder.”
LADDER CLIP AND BOLT,
PREASSEMBLED
ladder section
outside ladder bracket
clip and bolt
assembly
(088028)
ladder cage d-ring
ladder cage upright
a
TOP VIEW OF LADDER CLIP AND BOLT
LADDER CLIP AND BOLT,
ASSEMBLED
outside ladder with cage shown
b
OUTSIDE LADDER WITH CAGE ASSEMBLY
088028
ladder clip and bolt part number
NOTE how the clip
flattens out.
c
TOP VIEW OF LADDER CLIP AND BOLT
Grain Bin Sidewall 017061 2-09 [1]
6 Grain Bin Completion
TOP VIEW OF LADDER SPLICE
ladder splice
(088029)
ladder side rail
ladder splice
(088029)
d
55
TOP VIEW OF LADDER SPLICE
5/16” X 1” bin bolt
(018905)
& hex nut
(018913)
TOP VIEW OF INSIDE LADDER
inside ladder
bracket
e
TOP VIEW OF INSIDE LADDER
ladder section
TOP VIEW OF OUTSIDE LADDER
outside ladder
bracket
g
f
TOP VIEW OF THE OUTSIDE LADDER
Grain Bin Sidewall 017061 2-09 [1]
LADDER CONNECTION ASSEMBLY
7
7
Operation
CHECK THE FOLLOWING BEFORE THE FIRST BIN USE
[56]
56
1
All bolts are in place and properly tightened.
2
All ladders, handrails, platforms, and stairways are securely in place.
3
The bin has been properly anchored to the foundation.
4
Unloading equipment operates freely and all control gates are operable.
5
Temperature cables, if used, are fastened to the floor according to the
manufacturer’s recommendation to prevent displacement when filling.
6
The working areas around the bin are clean and with no clutter.
7
All guards and shields are in place.
8
Do not bypass or take shortcuts with electrical safety equipment.
9
Check electrical performance and install lock-outs on equipment.
10 Know who or where to call for immediate help in the event of an emergency
or injury.
FILLING THE BIN
1
Make certain everyone is out of the bin and before you start filling the bin.
2
It is generally acceptable to start aeration fans after a 2’ - 3’ [610mm-914mm]
depth has been obtained.
3
Continue to fill the bin to the desired level based on its use.
4
Maximum grain level should be 1” [2.54 cm] below the eave.
LOADING AND UNLOADING BINS
When you load or unload grain, always do it from the center! This creates an even load on the
structure. Only use your intermediate sumps for CLEAN-UP. Off-center loading or unloading
creates excessive STRESSES and can cause failure!
All bins should be filled at the center of the peak ring with an auger or spout of adequate
length to let grain drop straight down into the bin.
Grain Bin Sidewall 017061 2-09 [1]
7 Operation
USE AND STORAGE
It is beyond the scope of this manual to instruct the operator in proper aeration procedures. We
advise that the operator consult with his state university and local extension service plus draw on his
own experience to best tailor his aeration operation to suit his needs. Below are several comments
that could prove helpful.
1
Proper air exhaust area must be provided during fan operation to prevent roof damage
(note decal installed on the outer door panel). Some sources recommend a minimum of
1 Square Foot [0.093m3] exhaust area for every 1000 CFM [30m3/min.] of air introduced
into the bin. We advocate the use of optional roof vents for this purpose as they are
weather and pest tight and let the operator to keep the roof manhole opening closed to
weather during operation. Vents should be regularly inspected to insure that they have not
been obstructed by chaff or ice during cold weather.
2
Proper air exhaust openings reduce the amount of condensation that occurs on the interior
of the roof sheets during operations. Condensation should be regularly checked to insure
that dripping into the top grain layer is not severe enough to cause spoilage.
3
Grain management is the key to proper drying and aeration of a stored crop. The fruits of your
year’s labor are in your storage bin. The good operator frequently checks the temperature
and moisture content of the grain during drying and storage operations. The result of these
checks allow the operator to modify his drying and storage procedures before any grain
goes out of condition. MFS/YORK/STORMOR recommends probing for moisture content
and temperature at least (1) time a week during storage.
4
It is normally advisable to aerate grain stored after drying for any period of time. It is
desirable to keep the stored grain within 15° F [9° C] of the ambient temperature to reduce
moisture migration and resultant heating spoilage. Most operations, however, will not
reduce the grain temperature below freezing. Reduction of the grain temperature within the
bin during the winter months also reduces insect activity and resulting damage.
5
Certain days are not conducive to aeration as the relative humidity may exceed the
equilibrium moisture content humidity of the stored grain, theoretically adding moisture
back into the kernel. Consult your local extension service for further information.
6
In areas of the country where ambient temperatures are not low enough to reduce winter
insect activity, it may be desirable to fumigate the stored grain. For proper and SAFE
fumigation techniques, consult your local extension service.
7
It is ALWAYS advisable to have (3) PEOPLE involved, (2) on the outside and (1) inside,
when entering a questionable bin/storage circumstance! The person in the bin should
be secured or fastened to a safety rope with the (2) persons outside capable of lifting that
person out without entering the bin. (1) person outside cannot do this, and cannot go for
help and maintain preliminary aid.
Grain Bin Sidewall 017061 2-09 [1]
57
7 Operation
WARNING! DO NOT ENTER THIS BIN WHEN IT IS BEING
LOADED OR UNLOADED!
OBSERVE ALL SAFETY PRECAUTIONS NOTED IN THE
OPERATOR’S MANUAL!
58
UNLOADING THE BIN
1
Grain must be unloaded from the center of the bin to maintain uniform loading on the
sidewalls. Off center unloading may void the warranty of your bin. Center gates must be
opened first and the intermediate sumps must not be used until all the grain that will has
flowed by gravity through the center opening. If your center sump becomes blocked, consult
MFS/YORK/STORMOR Engineering Department for unloading recommendations. Heed
the warning decal on page 7 of this manual and on your access doors when unloading.
2
After all grain has flowed by gravity through the center unload sump, it is acceptable to
open and drain the intermediate sumps to create a valley near the door for installation and
starting of a sweep auger.
3
When inside the bin, installing a sweep auger or cleaning, LOCK OUT all unload equipment
power! NEVER enter a bin when unload equipment is operating, as you may become
entangled in the sweep or the unload auger! Failure to heed this warning may result in
serious personal injury or death!
4
MFS/YORK/STORMOR recommends on bins 42’ diameter and larger where (2) section sweep
augers are used, that the inner sweep section be used to make a preliminary pass around the
bin before using the full length sweep. This will result in more uniform stresses on the walls
and foundation anchorage of these larger bins.
5
Do not unload from the side discharge system and the center bottom discharge at the same
time. (Do not use (2) side-discharge systems to unload at the same time.)
Grain Bin Sidewall 017061 2-09 [1]
Part Numbers
Decals
Base Parts
Part No.
Description
Part No.
Description
018027
suffocation decal
012999
15’ base angle (single punched)
018050
exhaust decal
013001
18’ base angle (single punched)
018051
instructions decal
013002
21’ base angle (single punched)
018039
offside loading decal
013003
24’ base angle (single punched)
068316
rotating flighting decal
013004
27’ base angle (single punched)
018036
grain bin limitations decal
013005
30’ base angle (single punched)
013006
33’ base angle (single punched)
Bin Hardware
013007
36’ base angle (single punched)
012526
42’ base angle (single punched)
Part No.
Description
012527
48’ base angle (single punched)
018905
5/16” x 1” bin bolt with seal washer
012528
54’ base angle (single punched 9-3/8”)
018904
5/16” x 1-1/4” bin bolt with seal washer
012529
60’ base angle (single punched 9-3/8”)
018903
5/16” x 1-3/4” bin bolt with seal washer
010080
base angle connector
018910
5/16” seal washer
012869
bin hold down bracket
018913
5/16” hex nut
018986
large 5/8” flat washer
028002
5/16” flanged hex nut
90010045
standard 5/8” flat washer
018914
5/16” wing nut
018988
5/8” x 9” anchor bolt (sold separately)
018909
5/16” flat washer
90005045
5/8” nut
118935
5/16” lock nut
012999
15’ base angle (double punched)
90005005
1/4” hex nut
013001
18’ base angle (double punched)
018917
1/2” x 1” hex head cap screw
013002
21’ base angle (double punched)
018908
1/2” flat washer
013003
24’ base angle (double punched)
018008
50’ [15.2m] roll sealer tape
013004
27’ base angle (double punched)
118072
roof cap handle
013005
30’ base angle (double punched)
018022
chain tw link #2, zink plated
013006
33’ base angle (double punched)
018021
small S hook, zink plated
013007
36’ base angle (double punched)
018003
3/4” x 24” x 2.66” corrugated sealer
(sold separately from bin)
013008
42’ base angle (double punched)
018980
3/8” x 1” bin bolt
013009
48’ base angle (double punched)
013010
54’ base angle (double punched)
013011
60’ base angle (double punched)
018981
3/8” x 1 1/4” bin bolt
018982
3/8” x 1 3/4” bin bolt
018983
3/8” hex nut
90005027
3/8” flange nut
018910
5/16” seal washer
018976
3/8” seal washer
Grain Bin Sidewall 017061 2-09 [1]
001447
1-ring anchor channel
001448
1-ring anchor base plate
[59]
59
Part Numbers
Standard Sidewall Sheets
Double Punched / 115-5/8” long
19ga
18ga
17ga
15ga
14ga
13ga
12ga
11ga
10ga
15’
011392
011207
010015
011307
010017
011217
000908
18’
011393
011208
010113
011310
010109
011220
21’
011394
011209
010213
011313
010209
011223
24’
011395
011210
010313
011316
010310
27’
011396
011211
010413
011319
010410
30’
011397
011212
010513
011322
33’
011398
011213
010613
011325
36’
011399
011214
010712
42’
011698
011215
48’
011699
011216
54’
60’
8ga
000909
000924
000936
000910
000925
011226
000911
000926
000937
000949
011229
000912
000927
000938
000950
010510
011232
000913
000928
000939
000951
010610
011235
000914
000929
000940
000952
011328
010710
011238
000915
000930
000941
000953
010811
011331
010809
011241
000916
000931
000942
000954
010913
011334
010911
011244
000918
000932
000943
000955
011778
011780
011781
011782
000919
000933
000944
000956
011305
011389
011388
011365
000920
000934
000945
000957
Top Sidewall Sheets
Single Punched / 114-1/8” long
Standard Sidewall Sheets
6060
Standard Sidewall Sheets
Single Punched / 114-1/8” long
Dia.
Dia.
19ga
15’
011522
18ga
012751
17ga
18’
011523
000484
21’
011524
24’
011525
011530
012604
27’
011526
011531
012605
30’
011527
011532
012606
33’
011528
36’
011529
011595
011534
011533
Grain Bin Sidewall 017061 2-09 [1]
Part Numbers
15’ - 36’ Diameters Sidewall Door Sheets
1 Ring and 2 Ring Doors
2nd Ring
96 - 7/8” long
LH
19ga
18ga
17ga
15ga
14ga
13ga
15’
014671
017907
014679
014691
014703
014715
18’
014672
017908
014680
014692
014704
21’
014673
017909
014681
014693
24’
014674
017932
014682
27’
014675
017933
014683
30’
014676
017937
33’
014677
017938
36’
014678
017949
2nd Ring
12ga D
11ga D
014716
001267
001279
014705
014717
001268
001280
014694
014706
014718
001269
001281
014695
014707
014719
001270
001282
001291
014684
014696
014708
014720
001271
001283
001292
014685
014697
014709
014721
001272
001284
001293
014686
014698
014710
014722
001273
001285
001294
87 - 1/2” long
8ga D
6161
001300
89” long
RH
19ga
18ga
17ga
15ga
14ga
13ga
15’
014727
017995
014735
014747
014759
014771
12ga D
11ga D
18’
014728
017996
014736
014748
014760
014772
001321
001333
21’
014729
017997
014737
014749
24’
014730
017998
014738
014750
014761
014773
001322
001334
014762
014774
001323
001335
27’
014731
017999
014739
30’
014732
018064
014740
014751
014763
014775
001324
001336
001345
014752
014764
014776
001325
001337
001346
33’
014733
018065
014741
014753
014765
014777
001326
001338
001347
36’
014734
018066
014742
014754
014766
014778
001327
001339
001348
001354
12ga D
11ga D
10ga D
8ga D
3rd Ring
2 Ring Doors
10ga D
10ga D
8ga D
40 - 5/8” long
LH
19ga
18ga
17ga
15ga
14ga
13ga
15’
014793
018070
014801
014814
014831
014843
18’
014794
018071
014802
014817
014832
014844
001148
001162
21’
014795
018072
014803
014819
014833
014845
001149
001163
24’
014796
018073
014804
014820
014834
014846
001150
001164
001176
27’
014797
018074
014805
014821
014835
014847
001151
001165
001177
001188
30’
014798
018075
014806
014823
014836
014848
001152
001166
001178
001189
33’
014799
018076
014807
014825
014837
014849
001153
001167
001179
001190
36’
014800
018077
014808
014826
014838
014850
001154
001168
001180
001191
RH
19ga
18ga
17ga
15ga
14ga
13ga
12ga
11ga
15’
014855
018081
014863
014875
014887
014899
18’
014856
018082
014864
014876
014888
014900
001199
001211
21’
014857
018083
014865
014877
014889
014901
001200
001212
24’
014858
018084
014866
014878
014890
014902
001201
001213
27’
014859
018085
014867
014879
014891
014903
001202
001214
001223
30’
014860
018086
014868
014880
014892
014904
001203
001215
001224
33’
014861
018087
014869
014881
014893
014905
001204
001216
001225
36’
014862
018088
014870
014882
014894
014906
001205
001217
001226
3rd Ring
31 - 1/4” long
Grain Bin Sidewall 017061 2-09 [1]
32 - 3/4” long
10ga
8ga
Part Numbers
42’ - 60’ Diameters Sidewall Door Sheets
2nd Ring
1 Ring and 2 Ring Doors
6262
96 - 7/8” long
18ga
17ga
15ga
42’
017950
014687
48’
017951
014688
54’
60’
LH
19ga
2nd Ring
14ga
13ga
12ga D
11ga D
10ga D
8ga D
014699
014711
014723
001274
001286
001295
001301
014700
014712
014724
001275
001287
001296
001302
014689
014701
014713
014725
001276
001288
001297
001303
014690
014702
014714
014726
001277
001289
001298
001304
87 - 1/2” long
19ga
17ga
15ga
14ga
13ga
12ga D
11ga D
10ga D
8ga D
42’
018067
014743
014755
014767
014779
001328
001340
001349
001355
48’
018068
014744
014756
014768
014780
001329
001341
001350
001356
54’
014745
014757
014769
014781
001330
001342
001351
001357
60’
014746
014758
014770
014782
001331
001343
001352
001358
3rd Ring
40 - 5/8” long
18ga
17ga
15ga
14ga
13ga
12ga D
11ga D
10ga D
8ga D
42’
018078
014809
014827
014839
014851
001155
001169
001181
001192
48’
018079
014810
014828
014840
014852
001156
001170
001182
001193
54’
014811
014829
014841
014853
001157
001171
001183
001194
60’
014813
014830
014842
014854
001158
001172
001184
001195
LH
2 Ring Doors
89” long
18ga
RH
19ga
3rd Ring
31 - 3/4” long
19ga
32 - 3/4” long
18ga
17ga
15ga
14ga
13ga
12ga
11ga
10ga
8ga
42’
018089
014871
014883
014895
014907
001206
001218
001227
001232
48’
018090
014872
014884
014896
014908
001207
001219
001228
001233
54’
014873
014885
014897
014909
001208
001220
001229
001234
60’
014874
014886
014898
014910
001209
001221
001230
001235
RH
Grain Bin Sidewall 017061 2-09 [1]
Part Numbers
36’ - 60’ Diameters DIN Sidewall Door Sheets
2nd Ring
LH
96 - 7/8” long
19ga
18ga
17ga
15ga
14ga
13ga
12ga D
11ga D
8ga D
36’
001312
42’
001313
48’
001314
001318
001319
54’
016989
016991
016993
016995
001306
001309
001315
60’
016990
016992
016994
016996
001307
001310
001316
2nd Ring
RH
87 - 1/2” long
19ga
18ga
17ga
15ga
89” long
14ga
13ga
12ga D
11ga D
10ga D
36’
001366
42’
001367
48’
2 Ring DIN Door
10ga D
6363
8ga D
001368
001372
54’
016981
016983
016985
016987
001360
001363
001369
001373
60’
016982
016984
016986
016988
001361
001364
001370
17ga
15ga
14ga
12ga D
11ga D
10ga D
3rd Ring
LH
40 - 5/8” long
19ga
18ga
13ga
36’
001244
42’
001245
48’
001240
001246
54’
016997
016999
017016
017019
001237
001241
001247
60’
016998
017013
017017
017020
001238
001242
001248
3rd Ring
RH
31 - 1/4” long
19ga
18ga
17ga
15ga
001250
32 - 3/4” long
14ga
13ga
12ga
11ga
10ga
36’
001259
42’
001260
48’
001255
001261
54’
017021
017025
017027
017029
001252
001256
001262
60’
017023
017026
017028
017030
001253
001257
001263
Grain Bin Sidewall 017061 2-09 [1]
8ga D
8ga
001265
Part Numbers
Ag Door Packages
Part No.
15’ - 36’
42’ - 60’
15’ - 36’
bins 1 ring bins 1 ring bins 2 ring
door
door
door
package
package
package
(013958)
(013959)
(013997)
Description
013596
drip cap
1
1
013954
1 ring outer door cover assembly
1
1
013955
15’ - 36’ 1 ring door assembly w/o cover
1
013956
42’ - 60’ 1 ring door assembly w/o cover
6464 013994
013957
1
1
15’ - 36’ 2 ring door assembly w/o cover
42’ - 60’ door assembly w/o cover
013996
2 ring outer door cover assembly
014072
15’ - 36’ 2 ring DIN door assy w/o cover
014073
42’ - 60’ 2 ring DIN door assy w/o cover
018992
2 ring bar-lock door handle assembly
018993
1 ring bar-lock door handle assembly
15’ - 36’
42’ - 60’
bins 2 ring bins 2 ring
DIN door
DIN door
package
package
(014074)
(014075)
1
1
1
1
1
1
1
1
1
1
1
door assembly hardware package
013995
42’ - 60’
bins 2
ring door
package
(013998)
1
1
1
1
1
1
1
1
1
1
1
1
Entrance Collar Sheets, 15’ - 60’ Diameter Bins
Double Punched
Single Punched
(Single Punched (SP) & Double Punched (DP) Sheets)
Length
Description
39 1/8”
15ga Entrance Collar
76 7/8”
15ga Entrance Collar Half
15’
18’
21’
24’
27’
30’
33’
36’
42’
48’
014941
014942
014943
014944
014945
014946
014947
014948
014949
014950
39 1/8”
14ga Entrance Collar
76 7/8”
14ga Entrance Collar Half
014951
014952
014953
014954
014955
014956
014957
014958
014959
014960
39 1/8”
13ga Entrance Collar
603643
603644
603645
603646
603647
603648
603649
603650
603651
603655
014962
014963
014964
014965
014966
014967
014968
014969
014970
001094
001095
001096
001097
001098
001099
001100
001114
001115
001116
001117
76 7/8”
13ga Entrance Collar Half
014961
42 1/8”
12ga Entrance Collar
001093
001111
76 7/8”
12ga Entrance Collar Half
42 1/8”
11ga Entrance Collar
76 7/8”
11ga Entrance Collar Half
42 1/8”
10ga Entrance Collar
76 7/8”
10ga Entrance Collar Half
42 1/8”
8ga Entrance Collar
76 7/8”
8ga Entrance Collar Half
001112
001113
001102
001122
001123
001124
001125
001126
001127
001118
001119
001120
001103
001104
001105
001128
001129
001130
54’
001107
001132
001133
001134
001135
001136
001137
001138
001109
001140
001141
001142
001143
001144
001145
Grain Bin Sidewall 017061 2-09 [1]
60’
Part Numbers
16-1/16” Post Height (F3)
13-3/8” & 18-11/16” Post Height (F2)
8-1/16” Post Height (F1)
Sidewall Low-Back Flashing Sheets
Dia.
19ga
18ga
17ga
15ga
14ga
13ga
12ga
15’
014138
017808
014141
014146
014156
014166
000960
18’
014139
017809
014142
014147
014157
014167
000961
000973
21’
014140
017810
014143
014148
014158
014168
000962
000974
017893
014144
014149
014159
014169
000963
000975
000985
014145
24’
27’
11ga
10ga
8ga
014150
014160
014170
000964
000976
000986
000996
30’
014151
014161
014171
000965
000977
000987
000997
33’
014152
014162
014172
000966
000978
000989
000998
36’
014153
014163
014173
000967
000979
000990
000999
42’
014154
014164
014174
000968
000980
000991
001000
48’
014155
014165
014175
000969
000981
000992
001001
54’
000970
000982
000993
001002
60’
000971
000983
000994
001003
11ga
10ga
8ga
Dia.
19ga
18ga
17ga
15ga
14ga
13ga
12ga
15’
014176
017895
014179
014184
014194
014204
001049
18’
014177
017897
014180
014185
014195
014205
001050
001062
21’
014178
017898
014181
014186
014196
014206
001051
001063
017899
014182
014187
014197
014207
001052
001064
001074
014183
014188
014198
014208
001053
001065
001075
001084
30’
014189
014199
014209
001054
001066
001076
001085
33’
014190
014200
014210
001055
001067
001077
001086
36’
014191
014201
014211
001056
001068
001078
001087
42’
014192
014202
014213
001057
001069
001079
001088
48’
014193
014203
014214
001058
001070
001080
001089
54’
001059
001071
001081
001090
60’
001060
001072
001082
001091
11ga
10ga
8ga
24’
27’
Dia.
19ga
18ga
17ga
15ga
14ga
13ga
12ga
15’
014216
017901
014220
014227
014237
014247
001005
18’
014217
017903
014221
014228
014238
014248
001006
001018
21’
014219
017904
014223
014229
014239
014249
001007
001019
017905
014225
014230
014240
014250
001008
001020
001030
014226
014231
014241
014251
001009
001021
001031
001040
30’
014232
014242
014252
001010
001022
001032
001041
33’
014233
014243
014253
001011
001023
001033
001042
36’
014234
014244
014254
001012
001024
001034
001043
42’
014235
014245
014255
001013
001025
001035
001044
48’
014236
014246
014256
001014
001026
001036
001045
54’
001015
001027
001037
001046
60’
001016
001028
001038
001047
24’
27’
Grain Bin Sidewall 017061 2-09 [1]
6565
Index
bin site location 15
Numbers
1-ring base anchor channel 48,
1-ring base anchors 29,
[66]
66
47,
bin step 46
51
48,
49,
50,
bin to anchor assembly 51,
53
12 - 8 gage bottom sidewall sheets 50
bin to anchors, installed 53
19 - 13 gage bottom sidewall sheets 49
bin unloading 11,
1 and 2 ring ag door hardware 22
bin use and storage 57
1 ring door 32,
bin wall diameter 12 — 13
36 — 37
52
56 — 58
bin wall hardware 21
2 ring door 33 — 35
bin walls 10
A
bin wall sheet identification 20
aeration 11,
57
bin wall specifications 10
ag door assembly 34
bolt direction 26
ag door hardware 22
bolt identification and torque values 14
ag door packages 64
bottom sidewall ring 44
ag door placement 32
bottom sidewall ring bolting 29
anchor base plate 48,
51
anchor bolt plan dimensions 17
C
anchor hold downs 47
caulking 40
anchor hold downs / 1-ring base anchors 47
center gates ,
58
check delivery 14
B
check the following 56
base angle 45,
51
check the shipping list 24
base parts 59
choosing a bin site 15
be alert! 2
commercial door assembly 39
bin anchors, 1-ring base anchor locations 51
commercial door comprehensive example 43
bin anchors, hold down bracket locations 52
commercial door hardware 22
bin design criteria 11
commercial door placement 38
bin eave height 12 — 13
concrete / site location 15
bin hardware 59
concrete compressive strength 19
bin hold down bracket 52,
53
connect 13 gage and 12 gage rings 28
bin loading 11
contents 4
bin peak height 12 — 13
corrugated sealer strip 39
bin roof height 12 — 13
Grain Bin Sidewall 017061 2-09 [1]
Index
D
H
decals 59
hardware 21
design criteria 11
heavy duty bin, wall gages 31
door fastening hardware 42
hold down brackets 47
door half frames 40
horizontal sheet seams 26
door layouts 32 — 33
I
door placement instructions 32
doors 10,
43
24,
32,
33,
34,
35,
36,
37,
inside ladder 55
38,
67
J
door sheets 61 — 63
jamb plates 39
door specifications 10
drying bin, wall gages 31
L
E
ladder cage 54
eave height 12 — 13
ladder clip and bolt 54
entrance collars 44
ladders 54
entrance collar sheets 64
ladder splice 55
eyebrow plates 38,
leveling device 14
41
loading and unloading bins 14,
56
F
fan operation 57
M
fan placement 24
material specifications 10
filling the bin 56
metric grain bin dimensions 13
floor flashing 50
minimum conductor clearances 9
foam sealer strip 39
foundation notes 19
O
one ring base anchor channel 48
foundation plan 16
one ring base anchors 47,
foundation specifications, suggested 17 — 18
operation 56
fumigation 57
optional bin step 46
G
outside ladder 55
general assembly instructions 25
general safety statement 3
geotechnical investigation 19
grain bin completion 47
grain bin dimensions 12
grain leveling device 14
Grain Bin Sidewall 017061 2-09 [1]
P
part numbers 59
peak height 12
pre-assembly 20
48,
49,
50,
51,
53
Index
R
T
rebar 19
top sidewall ring 26 — 27
reinforcing rod 19
top sidewall sheets 60
roof height 12 — 13
torque specifications 14
typical sidewall assembly, build ring 1 26
S
safety 2,
3,
7,
8,
U
9
sealer tape 26
68
section sweep augers 11,
unloading / loading 15
58
unloading the bin 58
sidewall assembly 25
upper sidewall layout 27
sidewall assembly completion 44
use and storage 57
sidewall gage layout 30
sidewall hardware 21
V
ventilation 57
sidewall layout table instructions 30
sidewall low-back flashing sheets 65
W
sidewall sheet identification 20
warranty 6
sidewall sheet overlap 27
wire mesh 17
specifications 10
standard sidewall sheets 60
storage bin, wall gages 30
sumps ,
58
Grain Bin Sidewall 017061 2-09 [1]
Recent Significant Manual Changes:
11-08 [1] Version Changes
1 Multiple text corrections were made throughout the entire manual.
2 Page 14. SI bolt torques were added.
2 Page 21. Hardware information corrected in the top half of the page. Text corrections.
3 Page 28 and 29 were added.
4 Pages 9 and 32 - 33. Drawing improvements were made.
5 Page 47. The instructions on this page were changed. The 1-ring base anchor
was added.
6 Pages 48 - 53 were added.
7 Pages 59 - 65. New part numbers were added. Part number changes were made.
8 Pages 66 - 68. The index was regenerated.
9 SI units were added in a few additional places in the manual.
10 Minor layout changes were made to certain manual pages.
2-09 [1] Version Changes
1 Page 26. Changes were made to example a.
2 Page 31. Text changes were made to this page.
Grain Bin Sidewall 017061 2-09 [1]
69
GLOBAL INDUSTRIES, INC.
for information on other Global Industries products see:
www.globalindinc.com
MFS / YORK / STORMOR
P. O. Box 2105 • 2928 East Highway 30
Grand Island, Nebraska 68801, U.S.A.
(308) 384-9320 • FAX (308) 382-6954
© 2009 Global Industries, Inc. All rights reserved.