STANDARD MAXI BIKE RACK I N S TA L L AT I O N PAGE 1 OF 8 ASY1-0 069 I N S T R U C T I O N 126” 78” D E A M D L E I A Bike Rack Upper Shelf, 30 degrees downslope. B Bike Rack Platform, carpeted. C Bike Rack Open Back Stiffiner, carpeted. D Open Back Stiffiner E Open Back Stiffiner Cover F Bike Rack Kickplate Basic Upright H Open Back Trim I Upright End Cover G A H L C J G B J Bike Rack Base Shoe K Bike Rack Base End Cover L Bike Rack Bike Holder, 30 degrees downslope M Extension Upright End Cover K F P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV STANDARD MAXI BIKE RACK I N S TA L L AT I O N 1 Snap chalklines on the floor for fixture alignment. each kickplate is recessed 1-5/8” from the base shelf. THis will place the chalklines at the front of each base shoe to aid in aligning the uprights as the gondola is erected. NOTE! Re-Check the chalkline for accuracy...Madix is not responsible for damages caused by moving an assembled fixture. PAGE 2 OF 8 ASY1-0 069 I N S T R U C T I O N 2 Layout parts as shown above with kickplates and open back stiffeners end to end. Uprights should overlap as shown in side view so that the bottom of each upright will stand at the break in the kickplates. P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV SA TAA NF DEA SR D BM AI XKI EB I KRE AR ACCKK I N S TA L L AT I O N PAGE 3 OF 8 ASY1-0 069 I N S T R U C T I O N 3 3 Insert one 58” shoe into each upright....shoes do have to be locked in at this time and pinned. 4 Install a carpeted open back stiffener, OBS-4-C, at the base as shown...there is no top or bottom to the OBS. 5 NOTE! Leave all OBS joining screws slightly loose to permit raising of OBS for access to the upright levelers. 5 Install a second open back stiffener, OBSWC-4, no carpet, at the top of the basic upright. (78” or 126”) NOTE! Leave all OBS joining screws slightly loose to permit proper leveling. 4 Open side of OBS must be on the same side as the 58” Base Shoe P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV SAT A NFDEA R M AI XKI EB I KRE AR AC CKK SD B I N S TA L L AT I O N PAGE 4 OF 8 ASY1-0 069 I N S T R U C T I O N 6 The unit should now look like this. 7 Continue installing base shoes, uprights, lower and middle OBS's to the end of the run. Make sure base shoes are properly positioned. 6 8 Install all kickplates... kickplates snap in from the front... DO NOT SLIDE DOWN FROM THE TOP! Note! Electrical knockout should be located to the right side of kickplate center. 9 Run upright levelers out Electrical Knockout 1/2" on both end uprights, pull forward to bring kickplate to chalkline and plumb using carpenters level against the face of the uprights while adjusting the base shoe levelers. 8 9 1/2” 1/2" P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV SAT A NFDEA RS D B M AI XKI EB I KRE ARCA CKK I N S TA L L AT I O N 10 Attach nylon line to end ASY1-0 069 I N S T R U C T I O N 10 Use a piece of scrap wood here upright as shown... attach line at corresponding slot on the opposite end upright and stretch line so that it is tight and secure. 11 PAGE 5 OF 8 HIGHEST UPRIGHT Working with the remaining uprights in succession bring kickplates up to chalkline and plumb uprights, adjusting base shoe levelers as required. 12 12 Examine all the upright slots at nylon line to determine the highest upright in the run, excluding the end uprights. 11 13 Raise or lower base shoe 13 levelers as required to bring all upright slots to same point at nylon line. Raise and replumb both end uprights as required if any slotting is above the leveling point at nylon line. 14 ADJUST ALL UPRIGHT LEVELERS TO 1/4" CLEARANCE ABOVE THE FLOOR. 15 Install third open back 15 14 1/4" stiffener, OBSWC-4, in the hole located 22 5/16” down from the top of the 66” extension upright and tighten the joining screws. P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV SA TAA NF DEA SR D B M AI XKI EB I KRE AR ACCKK I N S TA L L AT I O N PAGE 6 OF 8 ASY1-0 069 I N S T R U C T I O N 16 16 Tighten the OBS joining screws at middle and bottom levels. Raise bottom OBS to highest possible position before tightening screws. Snap on OBS covers at the second and third levels as shown. 17 18 Repeat steps 3 through 16 for second bike gondola. 18 Install upright end covers and open back trim as shown...TRIM PIECES SNAP DIRECTLY ON, BEGINNING AT THE TOP. 78” OR 126” 72” or 120” P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV SAT A NFDEA R M AI XKI EB I KRE AR ACCKK SD B I N S TA L L AT I O N PAGE 7 OF 8 ASY1-0 069 I N S T R U C T I O N 19 19 In the end sections, install a middle level bike rack shelf on the 60” base side, inserting bracket in to the top slot of the 78” upright. Install a top level bike rack shelf at 49” from top of middle level bracket to bottom of upper level bracket. Install the remaining upper level shelves at the same height. Position and secure lock clip as in step 23... one lock clip per upright. 20 20 In predrilled location at front end of bracket, secure upper level bike rack shelves together using 1/4”-20x3/4” Phillips truss head machine screw and 1/4”-20 hex nut. 21 21 Install bike rails on upper level bike shelves. The rails must be angled and spaced correctly per the diagram. P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV SATAA NF DEA S RD B M AI XKI EB I KRE AR ACC K I N S TA L L AT I O N PAGE 8 OF 8 ASY1-0 069 I N S T R U C T I O N 22 Install the remaining mid- dle level bike shelves, inserting brackets into the top slot of the 78”and 126” upright and securing with lock clips as shown at step 23. 25 23 In predrilled location at the front end of the bracket, secure middle level bike rack shelves together using 1/4”-20x3/4” Phillips truss head machine screw and 1/4”-20 hex nut as shown at step 25. 24 Install bike rails on middle level bike shelves... the rails must be angled and spaced correctly per the diagram at step number 26. 25 Install 58” base end cov- ers at each end of he run as shown. The 58” base end cover is secured at midpoint and rear at inside top using two #8 x 1/2” Phillips pan head TEK screws.. Screws are hidden by the base deck. 26 26 Prior to installing 58” base decks, square up base shoes by measuring diagonals from rear corner to opposite front corner. Adjust so that both diagonals are equal... install 58” base decks. ASSEMBLY COMPLETE P. O . B O X 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9 P. O . B O X 1 7 7 / G O O D W A T E R , A L A B A M A 3 5 0 7 2 / 2 5 6 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2 REV# ECN# REVISION BY AJB DAT E 8/13/05 REV# ECN# REVISION REV BY DAT E
© Copyright 2026 Paperzz