Jacksonville District U.S. Army Corps of Engineers FY07 Dredging Activities along the Gulf Coast of Florida Jonas White, Jacksonville District, USACE Coastal Projects JACKSONVILLE TALLAHASSEE Florida Pinellas County Clearwater Beach Island Sand Key Treasure Island Long Key Manatee County Anna Maria Island Bradenton Beach Bridge St. ORLANDO TAMPA SARASOTA Sarasota County Longboat Key Venice Beach Lido Key WEST PALM BEACH NAPLES Lee County Captiva Island, Gasparilla Island, Estero Island Monroe County Key West Smathers Beach MIAMI Scheduled FY07 Dredging Work in Jacksonville District (Beach Nourishment) Beach Nourishment FY06 SEP Captiva Island Beach Nourishment (Lee County) (Award Feb 07 ) FY07 OCT NOV DEC JAN FEB MAR APR FY08 MAY 80,000 CY JUN JUL AUG SEP OCT Captiva Island (SPP) Captiva and (BEC) 4.5 Miles BA Project: Captiva Island (BEC) Vicinity of Lee County Type Work: Beach Nourishment Width: 0 – 100 Feet Length: 1.0 Miles Quantity: 80,000 CY Type of Material: Sand Placement Area: Beach Distance to Placement Area: 4 miles Type of Equipment: Hopper Small Business Set Aside: No, unrestricted Last Dredged: 2005 Environmental Window: No Advertisement Date: 18 December 2006 Bid Opening Date: 2 February 2007 Award Date: 15 February 2007 NTP Issued: 15 March 2007 Dredging Complete: 1 June 2007 Dredging Days: 45 GASPARILLA ISLAND D BOCA GRAN Lee County E PA S S Shore Protection Projects (SPP) PINE ISLAND CAPTIVA ISLAND SANIBEL ISLAND Gulf of Mexico ESTERO ISLAND MATANZAS PASS FORT MYERS BEACH Estero Estero Island Island Gasparilla Gasparilla Island Island 2007: Nourishment of Gasparilla Island – 2.8 miles with 800,000 cy of sand O&M Projects (2007) JACKSONVILLE TALLAHASSEE Florida ORLANDO TAMPA Tampa Harbor SARASOTA WEST PALM BEACH Manatee Harbor GIWW NAPLES MIAMI Key West Harbor Scheduled FY07 Dredging Work in Jacksonville District Spreadsheet (Hopper) Anticipated Hopper Work Hopper Dredge Maintenance Dredging Key West Harbor (Award Sep 06) Manatee Harbor (Award Dec 06 ) FY06 SEP FY07 OCT NOV DEC JAN FEB 97,000 CY 60,000 CY MAR APR FY08 MAY JUN JUL AUG SEP OCT Key West Harbor Project: Key West Harbor Type Work: Maintenance Dredging Depth: 34 Feet Width: Ranges from 100 to 2,000 feet Length: 8 Miles Quantity: 97,000 CY Type of Material: Sand and Silt Placement Area: ODMDS Distance to Placement Area: 11 Miles Type of Equipment: Hopper Small business Set Aside: No, unrestricted Last Dredged: 2005 Environmental Window: No Award Date: 23 September 2006 Dredging Begins: 15 November 2006 Dredging Complete: 15 January 2007 Dredging Days: 61 Manatee Harbor Project: Manatee Harbor Type Work: Maintenance Dredging Manatee Harbor Depth: 40 Feet Width: 400 Feet Length: Approximately 3 miles. Quantity: 60,000 CY Type of Material: Sand, Clay and shell Placement Area: ODMDS Distance to Placement Area: 34 miles Type of Equipment: Hopper Small Business Set Aside: No, unrestricted Last Dredged: 2002 Environmental Window: No Advertisement Date: 6 July 2006 Bid Opening Date: 30 November 2006 Award Date: 30 December 2006 Dredging Begins: 30 January 2007 Dredging Complete: 2 March 2007 Days to Dredge: 30 Scheduled FY07 Dredging Work in Jacksonville District Spreadsheet (Cuttersuction Part I) (Anticipated Cuttersuction Pipeline Work) Hydraulic Pipeline Dredge New Work Tampa Harbor (Big Bend) (Award Jul 07) FY06 SEP FY07 OCT NOV DEC JAN FEB MAR APR FY08 MAY JUN JUL /////////////////////Migratory Birds//////////////////////// Environmental Monitoring AUG SEP OCT 4,000,000 CY Ybor Ybor Channel Channel N N Port Port Sutton Sutton Tampa Harbor Egmont Cut 41’ 41’ xx 200’ 200’ Authorized Authorized 34’ 34’ xx 200’ 200’ Existing Existing CLEARWATER CLEARWATER 41’ 41’ X X 400’ 400’ PORT PORT TAMPA TAMPA Gulf Gulf of of Mexico Mexico ST. ST. PETERSBURG PETERSBURG 43’ 43’ X X 500’ 500’ 4433 ’’ LOCATION LOCATION MAP MAP LOCATION LOCATION MAP MAP CCHH AANN NNEE LL LOCATION MAP NASSAU NASSAU NASSAU COUNTY NASSAU COUNTY COUNTY COUNTY 43’ 43’ xx 200’ 200’ Authorized Authorized 34’ 34’ xx 200’ 200’ Existing Existing Alafia Alafia River River 32’ 32’ X X 200’ 200’ Existing Existing Big Big Bend Bend Channel Channel 41’ 41’ xx 250’ 250’ Authorized Authorized 34’ 34’ xx 200’ 200’ Existing Existing R O OR B B AARR H H PPAA M M A TTA 45’ 45’ X X 700’ 700’ EGMONT EGMONT CUT CUT 45’ 45’ X X 600’ 600’ TAMPA HARBOR O&M INSERT INSERT Tampa Harbor (Big Bend) CMDA-3D CMDA-3D Entrance Entrance Channel Channel East East Channel Channel PORT PORT TAMPA TAMPA Inner Inner Channel Channel Gulf of Mexico LOCATION LOCATION MAP MAP LOCATION LOCATION MAP MAP TTaa mp m paa BBaa yy CC hhaan nnne ell Facilities at Big Bend See See Insert Insert N N LOCATION MAP NASSAU NASSAU BIG BIGBEND BEND NASSAU COUNTY NASSAU COUNTY COUNTY COUNTY BIG BEND CHANNEL TAMPA Tampa Harbor (Big Bend) Project: Tampa Harbor (Big Bend) Type Work: New Work Depth: 41 feet + 2 feet advanced maintenance + 2 feet allowable overdepth. Width: 250 feet Length: 2.2 miles Quantity: 4,000,000 CY Type of Material: Sand, Silt, Clay, Shell and Rock Placement Area: Upland Distance to Placement Area: 3 Miles Type of Equipment: Cuttersuction and Mechanical (but not required) Small business Set Aside: No, unrestricted Last Dredged: 1970 for construction Environmental Window: Yes, Dredging Prohibited 1 April – 31 August Reason for window: Migratory Birds Advertisement Date: 1 April 2007 Bid Opening Date: 1 June 2007 Award Date: 1 July 2007 Dredging Begins: 1 September 2007 Dredging Complete: 1 April 2008 Days to Dredge: 213 Tampa Harbor (Alafia River) Project: Tampa Harbor (Alafia River) Type Work: New Work Depth: 32 feet present, authorized to 42 feet Width: 250 feet Length: 2.0 miles Quantity: 1,000,000 CY Type of Material: Sand, silt and rock Placement Area: ODMDS Distance to Placement Area: 25 miles Type of Equipment: Cuttersuction or Bucket Small business Set Aside: No Last Dredged: 2005 Environmental Window: No Reason for window: NA Advertisement Date: 22 February 2006 Bid Opening Date: 3 May 2006 Award Date: 9 May 2006 Dredging Begins: 31 July 2006 Dredging Complete: 23 September 2008 Tampa Harbor Egmont Cut Project: Tampa Harbor-Egmont Cut Type Work: Maintenance Dredging Depth: 45 feet at the Egmont Channel Width: 700 feet Length: 15 miles in Egmont Channel Quantity: 1,300,000 CY Type of Material: sand Placement Area: Beach Distance to Placement Area: <12 miles Type of Equipment: Hopper or clamshell Small business Set Aside: No Last Dredged: 1998 Environmental Window: No Reason for window: NA EGMONT CUT EGMONT KEY Advertisement Date: 24 January 2006 Bid Opening Date: 11 April 2006 Award Date: 14 April 2006 Dredging Begins: 19 July 2006 Dredging Complete: 20 April 2007 CLEARWATER BEACH ISLAND SAND KEY CLEARWATER Pinellas County Tampa Ship Channel Maintenance Dredging ST. PETERSBURG TREASURE ISLAND LONG KEY Gulf of Mexico EGMONT KEY Egmont Egmont Key Key FT. DESOTO PARK HILLSBOROUGH COUNTY 2007: Complete entrance channel maintenance dredging - 350, 000 cy placed at Ft. Desoto Park Summary PROJECT FREQUENCY Pinellas County SPP (Coastal) Lee County SPP (Coastal) Lee County SPP (Coastal) Tampa Harbor - Alafia River (O&M) yrly (diffnt cuts) Tampa Harbor - Egmont Cut (O&M) yrly (diffnt cuts) Manatee Harbor (O&M) 2- 3 yrs Manatee Harbor 2nd Contr. (O&M) 3 years Key West Harbor (O&M) yearly GIWW - Manatee County (O&M) infrequent - Sarasota County (O&M) infrequent SCHEDULED DREDGING (FY) ESTIMATED QUANTITY ( CY) USED BENEFICIALLY FY07 FY08 FY07 350, 000 800,000 80,000 All All All FY07 FY07 (completed) FY07 FY07 FY07 FY07 FY07 300,000 1,300,000 50,000 1,160,000 97,000 70,000 10,000 None All None None None All All LOCATION PLACED Ft. Desoto Park Gasparilla island Captiva Island ODMDS Egmont Key and Ft. Desoto Park ODMDS ODMDS or Upland ODMDS Anna Maria Island (Coquina Beach) Venice Beach QUESTIONS ?
© Copyright 2026 Paperzz