National Ship Repair Industry Conference Our U.S. Navy’s Military Sealift Command Rear Admiral T. K. Shannon UNCLAS Military Sealift Command Commander March 11, 2014 1 We Deliver! Thanks to Industry for Cape Ray Work 2 UNCLAS Military Sealift Command We Deliver! Building Trust Future Missions? 1949: Two missions 2014: 20+ missions Special Warfare Support Ships Sub Tenders Rescue & Salvage Ships Command Ships TRUST High-Speed Vessels Fast Combat Support Ships Large, Medium-Speed, Roll-On/Roll-Off Acoustic Survey Ships Hospital Ships Fast Sealift Ships – Surge; Ocean Surveillance Ships Ready Reserve Force (Cargo Ships 1977; Crane Ships 1984; OPDS Ships 1986) Prepositioning Ships Ammunition Ships Dry Cargo/Ammunition Combat Stores Ships Ocean-Going Tugs Fleet Replenishment Oilers Cable-Laying/Repair Ships; Oceanographic Survey Ships; Missile Range Instrumentation Ships Build & Charter Tankers, Dry Cargo Ships, Tankers, Troop ships (Last one retired in 1973) 1949 1958-62 1971-72 1973-75 1977-80 1984 1986-89 1992-97 2000-01 2002 2003 2006 2007 2012 UNCLAS Military Sealift Command We Deliver! 2013 SHIPS & MISSIONS SBX, HST, AFSB(I), JHSV, MLP Changes since last year • HQ Consolidation/Global Review • Optimized Fleet Response Plan: CSGs on 36-month cycle to stabilize maintenance, training, crew life - brings more predictability to MSC maintenance for GO/GO ships • JHSVs - Aluminum welding and ship-fitting skillsets; water jet maintenance; annual dry-docking requirement • Domestic oil production up – order book increase for tankers and offshore craft – currently 85 U.S.-flagged tankers – 15 are MSC T-AOs – more tanker maintenance – increased competition for dock space • Conversion work for repurposing platforms • Your ideas about any of these points are always welcome 4 UNCLAS Military Sealift Command We Deliver! MSC M&R Budget • MSC Spent $537.9M in FY 2013 • Competitively bid, fixed-price contracts • Sequestration and declining budgets will mean more competition for both new construction and maintenance dollars 5 UNCLAS Military Sealift Command We Deliver! Out-Year Engineering Requirements Analysis • Identifies essential and beneficial upgrades • Allows budgeting/planning for ops past service life (avg. 45 years) • Consists of 3 phases, integrated into a single report: • Logistics Supportability Study - Determines equipment replacement based on service life and spare parts availability • Hull/ Structural Analysis - Calculates steel corrosion rates, predicts steel renewal schedule, identifies high stress areas, and predicts fatigue life • Shipboard Survey – Consists of operational tests, material condition surveys, maintenance and repair trend review, and crew interviews Issues are prioritized with a recommended solution, cost estimate, and impact assessment 6 UNCLAS Military Sealift Command We Deliver! Maintenance Plans (Government-Owned/Government-Operated) Our standard logistics ship overhaul cycle includes: - Drydocking Availabilities every 2.5 years (45-60 days) - Mid-term Availabilities every 18 months (30-45 days) - Quarterly Voyage Repair periods (2 weeks pier-side). Inspections and Surveys at regular intervals: - Continuous ABS surveys (5-year cycle) - Annual USCG inspections - Ship Material Assessment and Readiness Testing (every 5 years by MSC engineers) - Annual Safety Management and Environmental Audits Continuous maintenance pier-side whenever practical NOTE: High-Speed Vessels require annual dry-docking 7 UNCLAS Military Sealift Command We Deliver! Maintenance Plans (Government-Owned/Contractor-Operated) Overhauls Full Operational Status ships – Drydocking Availabilities:* - Every 5 years (45-60 days) with underwater inspections at 2.5 years - Every 3 years to support sponsor cargo requirements - Every 2.5 years for CONUS 30-month cargo maintenance Reduced Operating Status ships – Drydocking Availabilities: - Every 5 years (45-60 days) ABS waiver of mid-term drydocking Inspections and Surveys at regular intervals ABS surveys: - Continuous 5-year cycle Annual USCG inspections Annual Internal Safety Management System audits: - 30-month ABS/USCG Continuous maintenance pier-side whenever practical *High-Speed Vessels require dry-docking every year 8 UNCLAS Military Sealift Command We Deliver! Projected Maintenance Availabilities (East/Gulf Coast) Ship Type Fleet Oiler (T-AO) #Availabilities 10 14 Maintenance Type ROH/DD MTA Time Frame Feb 2014 - Jul 2017 Jan 2014 - Sep 2017 Dry Cargo/Ammo (T-AKE) 4 4 ROH/DD MTA Aug 2015 - Jun 2018 Nov 2016 - Mar 2018 Fast Combat Spt (T-AOE) 2 2 ROH/DD MTA Jan 2014 - Apr 2017 Jun 2016 - Oct 2018 Rescue & Salvage (T-ARS) 4 3 ROH/DD MTA Feb 2014 - Jul 2018 Oct 2014 - Jan 2018 Fleet Ocean Tug (T-ATF) 1 1 ROH/DD MTA Jan 2015 - Apr 2018 Aug 2016 Hospital (T-AH) 1 3 ROH/DD MTA Oct 2016 - Feb 2017 Mar 2014 - Dec 2015 NOTE: All are subject to change due to mission/tasking requirements. MTA = Mid-Term Availability ROH = Regular Overhaul DD = Drydocking UNCLAS Military Sealift Command We Deliver! 9 Projected Maintenance Availabilities (East/Gulf Coast) (continued) Ship Type #Availabilities Maintenance Type Time Frame SM (T-AGS/T-AGM) 7 OVHL/DD Feb 2014 - Oct 2019 ROCON (former MPF) 5 OVHL/DD Oct 2014 - Oct 2018 MPS (T-AK) 21 OVHL/DD Feb 2014 - Oct 2019 LMSR (T-AKR) 10 OVHL/DD Feb 2014 - Oct 2019 JHSV 9 OVHL/DD/PSA Oct 2014 - Oct 2018 HST 1 OVHL/DD/Conversion Sep 2014 - Apr 2015 NOTE: All are subject to change due to mission/tasking requirements. MTA = Mid-Term Availability OVHL = General Overhaul DD = Drydocking 10 UNCLAS Military Sealift Command We Deliver! Projected Maintenance Availabilities (West Coast) Ship Type Fleet Oiler (T-AO) #Availabilities 13 20 Maintenance Type ROH/DD MTA Time Frame _ Oct 2014 - Apr 2016 Aug 2014 - Mar 2017 Dry Cargo/Ammo (T-AKE) 18 11 ROH/DD MTA Feb 2014 - Oct 2018 Jun 2014 - Aug 2018 Fast Combat Spt (T-AOE) 4 2 ROH/DD MTA Aug 2014 - Apr 2017 Feb 2016 - Jul 2016 Rescue & Salvage (T-ARS) 2 3 ROH/DD MTA Aug 2016 - Nov 2017 Oct 2015 - Mar 2018 Fleet Ocean Tug (T-ATF) 2 1 ROH/DD MTA Mar 2014 - Nov 2016 Aug 2015 - Sep 2015 Hospital Ship (T-AH) 1 2 ROH/DD MTA Jan 2015 - May 2015 Jan 2016 - Apr 2017 Sub Tender (AS) 1 ROH/DD Oct 2014 - Jan 2015 NOTE: All are subject to change due to mission/tasking requirements. MTA = Mid-Term Availability ROH = Overhaul DD = Drydocking 11 UNCLAS Military Sealift Command We Deliver! Projected Maintenance Availabilities (West Coast) (continued) Ship Type #Availabilities Maintenance Type Time Frame _ SM (T-AGS/T-AGM) 2 OVHL/DD Feb 2014 - Oct 2019 JHSV 4 OVHL/DD/PSA Oct 2013-Oct 2018 LMSR (T-AKR) 3 OVHL/DD Oct 2013-Oct 2018 NOTE: All are subject to change due to mission/tasking requirements. MTA = Mid-Term Availability OVHL = General Overhaul DD = Drydocking 12 UNCLAS Military Sealift Command We Deliver! MSC Delivers! Join the MSC conversation: www.facebook.com/MSCdelivers www.twitter.com/MSCsealift MSCSealift.dodlive.mil www.msc.navy.mil 13 UNCLAS Military Sealift Command We Deliver!
© Copyright 2026 Paperzz