National Ship Repair Industry Conference
Our U.S. Navy’s
Military Sealift Command
Rear Admiral T. K. Shannon
UNCLAS
Military Sealift Command
Commander
March 11, 2014
1
We Deliver!
Thanks to Industry for Cape Ray Work
2
UNCLAS
Military Sealift Command
We Deliver!
Building Trust
Future Missions?
1949: Two missions
2014: 20+ missions
Special Warfare
Support Ships
Sub Tenders
Rescue & Salvage Ships
Command Ships
TRUST
High-Speed Vessels
Fast Combat Support Ships
Large, Medium-Speed, Roll-On/Roll-Off
Acoustic Survey Ships
Hospital Ships
Fast Sealift Ships – Surge; Ocean Surveillance Ships
Ready Reserve Force (Cargo Ships 1977; Crane Ships 1984; OPDS Ships 1986)
Prepositioning Ships
Ammunition Ships
Dry Cargo/Ammunition
Combat Stores Ships
Ocean-Going Tugs
Fleet Replenishment Oilers
Cable-Laying/Repair Ships; Oceanographic Survey Ships; Missile Range Instrumentation Ships
Build & Charter Tankers, Dry Cargo Ships, Tankers, Troop ships (Last one retired in 1973)
1949
1958-62
1971-72
1973-75
1977-80
1984
1986-89
1992-97
2000-01
2002 2003 2006 2007
2012
UNCLAS
Military Sealift Command
We Deliver!
2013
SHIPS & MISSIONS
SBX, HST,
AFSB(I),
JHSV, MLP
Changes since last year
• HQ Consolidation/Global Review
• Optimized Fleet Response Plan: CSGs on 36-month cycle to stabilize
maintenance, training, crew life - brings more predictability to MSC
maintenance for GO/GO ships
• JHSVs - Aluminum welding and ship-fitting skillsets; water jet
maintenance; annual dry-docking requirement
• Domestic oil production up – order book increase for tankers and
offshore craft – currently 85 U.S.-flagged tankers – 15 are MSC T-AOs
– more tanker maintenance
– increased competition for dock space
• Conversion work for repurposing platforms
• Your ideas about any of these points are always welcome
4
UNCLAS
Military Sealift Command
We Deliver!
MSC M&R Budget
• MSC Spent $537.9M in FY 2013
• Competitively bid, fixed-price contracts
• Sequestration and declining budgets will
mean more competition for both new
construction and maintenance dollars
5
UNCLAS
Military Sealift Command
We Deliver!
Out-Year Engineering Requirements Analysis
• Identifies essential and beneficial upgrades
• Allows budgeting/planning for ops past service life (avg. 45 years)
• Consists of 3 phases, integrated into a single report:
• Logistics Supportability Study - Determines equipment
replacement based on service life and spare parts availability
• Hull/ Structural Analysis - Calculates steel corrosion rates,
predicts steel renewal schedule, identifies high stress areas, and
predicts fatigue life
• Shipboard Survey – Consists of operational tests, material
condition surveys, maintenance and repair trend review, and
crew interviews
Issues are prioritized with a recommended solution,
cost estimate, and impact assessment
6
UNCLAS
Military Sealift Command
We Deliver!
Maintenance Plans
(Government-Owned/Government-Operated)
Our standard logistics ship overhaul cycle includes:
- Drydocking Availabilities every 2.5 years (45-60 days)
- Mid-term Availabilities every 18 months (30-45 days)
- Quarterly Voyage Repair periods (2 weeks pier-side).
Inspections and Surveys at regular intervals:
- Continuous ABS surveys (5-year cycle)
- Annual USCG inspections
- Ship Material Assessment and Readiness Testing
(every 5 years by MSC engineers)
- Annual Safety Management and Environmental Audits
Continuous maintenance pier-side whenever practical
NOTE: High-Speed Vessels require annual dry-docking
7
UNCLAS
Military Sealift Command
We Deliver!
Maintenance Plans
(Government-Owned/Contractor-Operated)
Overhauls
Full Operational Status ships – Drydocking Availabilities:*
- Every 5 years (45-60 days) with underwater inspections at 2.5 years
- Every 3 years to support sponsor cargo requirements
- Every 2.5 years for CONUS 30-month cargo maintenance
Reduced Operating Status ships – Drydocking Availabilities:
- Every 5 years (45-60 days) ABS waiver of mid-term drydocking
Inspections and Surveys at regular intervals
ABS surveys:
- Continuous 5-year cycle
Annual USCG inspections
Annual Internal Safety Management System audits:
- 30-month ABS/USCG
Continuous maintenance pier-side whenever practical
*High-Speed Vessels require dry-docking every year
8
UNCLAS
Military Sealift Command
We Deliver!
Projected Maintenance Availabilities
(East/Gulf Coast)
Ship Type
Fleet Oiler
(T-AO)
#Availabilities
10
14
Maintenance Type
ROH/DD
MTA
Time Frame
Feb 2014 - Jul 2017
Jan 2014 - Sep 2017
Dry Cargo/Ammo
(T-AKE)
4
4
ROH/DD
MTA
Aug 2015 - Jun 2018
Nov 2016 - Mar 2018
Fast Combat Spt
(T-AOE)
2
2
ROH/DD
MTA
Jan 2014 - Apr 2017
Jun 2016 - Oct 2018
Rescue & Salvage
(T-ARS)
4
3
ROH/DD
MTA
Feb 2014 - Jul 2018
Oct 2014 - Jan 2018
Fleet Ocean Tug
(T-ATF)
1
1
ROH/DD
MTA
Jan 2015 - Apr 2018
Aug 2016
Hospital
(T-AH)
1
3
ROH/DD
MTA
Oct 2016 - Feb 2017
Mar 2014 - Dec 2015
NOTE: All are subject to change due to mission/tasking requirements.
MTA = Mid-Term Availability
ROH = Regular Overhaul
DD = Drydocking
UNCLAS
Military Sealift Command
We Deliver!
9
Projected Maintenance Availabilities
(East/Gulf Coast)
(continued)
Ship Type
#Availabilities Maintenance Type
Time Frame
SM (T-AGS/T-AGM)
7
OVHL/DD
Feb 2014 - Oct 2019
ROCON (former MPF)
5
OVHL/DD
Oct 2014 - Oct 2018
MPS (T-AK)
21
OVHL/DD
Feb 2014 - Oct 2019
LMSR (T-AKR)
10
OVHL/DD
Feb 2014 - Oct 2019
JHSV
9
OVHL/DD/PSA
Oct 2014 - Oct 2018
HST
1
OVHL/DD/Conversion
Sep 2014 - Apr 2015
NOTE: All are subject to change due to mission/tasking requirements.
MTA = Mid-Term Availability
OVHL = General Overhaul
DD = Drydocking
10
UNCLAS
Military Sealift Command
We Deliver!
Projected Maintenance Availabilities
(West Coast)
Ship Type
Fleet Oiler
(T-AO)
#Availabilities
13
20
Maintenance Type
ROH/DD
MTA
Time Frame
_
Oct 2014 - Apr 2016
Aug 2014 - Mar 2017
Dry Cargo/Ammo
(T-AKE)
18
11
ROH/DD
MTA
Feb 2014 - Oct 2018
Jun 2014 - Aug 2018
Fast Combat Spt
(T-AOE)
4
2
ROH/DD
MTA
Aug 2014 - Apr 2017
Feb 2016 - Jul 2016
Rescue & Salvage (T-ARS)
2
3
ROH/DD
MTA
Aug 2016 - Nov 2017
Oct 2015 - Mar 2018
Fleet Ocean Tug (T-ATF)
2
1
ROH/DD
MTA
Mar 2014 - Nov 2016
Aug 2015 - Sep 2015
Hospital Ship (T-AH)
1
2
ROH/DD
MTA
Jan 2015 - May 2015
Jan 2016 - Apr 2017
Sub Tender (AS)
1
ROH/DD
Oct 2014 - Jan 2015
NOTE: All are subject to change due to mission/tasking requirements.
MTA = Mid-Term Availability
ROH = Overhaul
DD = Drydocking
11
UNCLAS
Military Sealift Command
We Deliver!
Projected Maintenance Availabilities
(West Coast)
(continued)
Ship Type
#Availabilities
Maintenance Type
Time Frame
_
SM (T-AGS/T-AGM)
2
OVHL/DD
Feb 2014 - Oct 2019
JHSV
4
OVHL/DD/PSA
Oct 2013-Oct 2018
LMSR (T-AKR)
3
OVHL/DD
Oct 2013-Oct 2018
NOTE: All are subject to change due to mission/tasking requirements.
MTA = Mid-Term Availability
OVHL = General Overhaul
DD = Drydocking
12
UNCLAS
Military Sealift Command
We Deliver!
MSC Delivers!