PLAN A PLAN B W1 - SEAWATER FROM FLEETWOOD FISH DOCK FILTERED AND PUMPED AT SEAWATER PUMPING STATION. COMPOUND INCLUDES SEAWATER PUMPING STATION (CONTAINING PUMPS), STANDBY GENERATOR, SWITCHGEAR AND TRANSFORMER, ACCESS ROAD AND CAR PARKING AREA. W3 - SEAWATER TRANSMITTED TO BOOSTER PUMP STATION WHERE PRESSURE IS INCREASED BEFORE BEING PUMPED TO WELL HEADS. BOOSTER PUMP STATION COMPOUND COMPRISES THE PUMP STATION ITSELF (CONTROL ROOM, ELECTRICAL CONTROL EQUIPMENT, SWITCHGEAR, STANDBY GENERATOR, AND 2 TRANSFORMERS), A DE-BRINE FACILITY, ACCESS ROADS AND CAR PARKING AREA. W4- AT THE 7 WELLHEADS, SEAWATER PUMPED VIA CEMENT CASED BOREHOLES UNDERGROUND TO DISSOLVE SALT AND CREATE 19 CAVERNS IN AREAS FOR CAVERN DEVELOPMENT (SEE CAVERN CREATION PROCESS DIAGRAM BELOW). W5 - BRINE FROM WASHING PROCESS RETURNED TO DE-BRINE FACILITY WHICH INCLUDES A RESERVOIR TANK USED TO VENT DISSOLVED GASES AND COLLECT SEDIMENT. SEDIMENT DISPOSED OF TO AN EXISTING CAVERN AND BRINE MONITORED AT DE-BRINE FACILITY PRIOR TO DISCHARGE. G1 - GAS PROCESSED AT GAS COMPRESSOR COMPOUND FOR ENTRY TO THE CAVERNS AND TO THE NATIONAL TRANSMISSION SYSTEM. COMPOUND INCLUDES COMPRESSORS, DEHYDRATION UNITS, AIR COOLED HEAT EXCHANGERS, FILTERS, SEPARATORS, STORAGE TANKS AND UTILITY SYSTEMS, ADDITIONAL BUILDINGS CONTAINING ELECTRICAL AND INSTRUMENT EQUIPMENT AND A VENT STACK FOR EMERGENCY AND ROUTINE MAINTENANCE USE. W2 - SEAWATER PUMPED THROUGH PIPES AT LEAST 8 METRES BELOW THE BED OF THE RIVER WYRE. G4 - INTERCONNECTOR METERING STATION HOUSES AUTOMATIC METERING AND GAS ANALYSIS INSTRUMENTATION. VACANT HIGHER LICKOW FARM REFURBISHED TO PROVIDE OFFICE ACCOMMODATION. EXISTING DERELICT BARN DEMOLISHED AND REDEVELOPED TO INCLUDE ADMIN, TRAINING AND HEALTH & SAFETY ACCOMODATION. ANOTHER ADJACENT BARN DEMOLISHED. IRISH SEA G3 - GAS DISTRIBUTED FROM GAS COMPRESSOR COMPOUND VIA AN INTERCONNECTOR METERING STATION TO THE NATIONAL TRANSMISSION SYSTEM NEAR NATEBY, APPROXIMATELY 12 KILOMETRES TO THE EAST. W6 - UP TO 80 MEGA-LITRES A DAY OF BRINE PUMPED IN PIPE FROM DE-BRINE FACILITY BACK BENEATH THE RIVER WYRE. G2 - GAS STORED UNDERGROUND IN CAVERNS IN AREAS FOR CAVERN DEVELOPMENT. NEW ROAD CONSTRUCTED FROM A588 TO SITE. NEW OBSERVATION PLATFORM CONSTRUCTED AT SEA WALL CROSSING. RIVER WYRE W7- BRINE PIPELINE CROSSES FYLDE PENINSULA, THE SEA WALL AND RUNS 2.3KM OFFSHORE TO A 2 PORT SINGLE DIFFUSER IN THE IRISH SEA. PLAN B PLAN A 30" CONDUCTOR PIPE ALLUVIUM ALLUVIUM ALLUVIUM ALLUVIUM MUDSTONES MUDSTONES MUDSTONES MUDSTONES ELECTRICAL CABLES LAID UNDERGROUND AND AT LEAST 8 METRES BELOW THE BED OF THE RIVER WYRE TO CONNECT THE GAS COMPRESSOR COMPOUND SUB STATION WITH THE STANAH SUB STATION 20" CASING NATURAL GAS INJECTION NITROGEN CAP 390 METRES 390 METRES 390 METRES NATURAL GAS BRINE NITROGEN CAP SALT SALT SALT BRINE 0 SALT MUDSTONES 500 1000m 1 : 25 000 WATER MUDSTONES MUDSTONES MUDSTONES CAVERN CREATION PROCESS DIAGRAM Notes Client Status Project ENVIRONMENTAL STATEMENT APPLICATION BOUNDARY Scales Current Issue Signatures 1:25,000 01 FIRST ISSUE Original Size A3 Datum DATUM NOV 11 Grid Issue Description Date 50mm on Original GRID Author J.NORMAN Checker A.SAUNDERS PREESALL UNDERGROUND GAS STORAGE FACILITY Title Approver D.HOARE C Copyright reserved Filename: 1.9-WX40004-UE31D-01-PROCESS-DIAGRAM.DWG PROCESS DIAGRAM Hyder Consulting (UK) Limited 330 Firecrest Court Centre Park Warrington WA1 1RG Tel: +44 (0)1925 800700 Fax: +44 (0)1925 572462 Figure No. Project No. Issue 1.9 WX40004 01 Plot Date: 21/Nov/2011 3:21:57 PM File Location: K:\PROJECTS\WX40004-FLEETWOOD SOLUTION MINING\E-OUR-DRAWINGS\2011 ENVIRONMENTAL STATEMENT CAD DRAWINGS\1.9-WX40004-UE31D-01-PROCESS-DIAGRAM.DWG V1
© Copyright 2026 Paperzz