REGULATION OF THE PRESIDENT OF THE REPUBLIC OF INDONESIA NUMBER 71 YEAR 2006 CONCERNING ASSIGNMENT TO PT. PERUSAHAAN LISTRIK NEGARA (PERSERO) TO ACCELERATE THE DEVELOPMENT OF ELECTRIC POWER GENERATION USING COAL BY THE GRACE OF GOD ALMIGHTY PRESIDENT OF THE REPUBLIC OF INDONESIA, Considering: a. b. c. that in order to accelerate the diversification of energy for power generation to a nonpetroleum fuels in order to meet the needs of electric power, it is necessary to accelerate the construction of power plants that use coal and is ready to operate in 2009; that the accelerated development of power referred to in letter a okum require certainty in the process of land procurement; Based on the considerations referred to in letters a and b, it assigns PT. Perusahaan Listrik Negara (Persero) as the Holder of Electricity Business Authority to accelerate the construction of power plants using coal in Presidential Decree; Given: 1. 2. 3. 4. 5. 6. Article 4 section (1) of the Constitution of the Republic of Indonesia Year 1945; Act No. 15 of 1985 on Electricity (State Gazette of the Republic of Indonesia Year 1985 Number 74, Supplement to State Gazette of Republic of Indonesia Number 3317); Government Regulation Number 10 Year 1989 on Electricity Supply and Utilization (State Gazette of the Republic of Indonesia Year 1989 Number 24, Additional State Gazette of the Republic of Indonesia Number 3395) as has been twice amended by Government Regulation Number 26 Year 2006 (State Gazette of the Republic of Indonesia Year 2006 No. 56, the Republic of Indonesia State Gazette Number 4628); Government Regulation Number 23 Year 1994 on the Transfer Form Public Corporation (PERUM) Listrik Negara to become PT. Perusahaan Listrik Negara (Persero) (State Gazette Year 1994 Number 34); Presidential Decree Number 80 Year 2003 on Guidelines for Procurement of Goods / services of the Government (State Gazette of the Republic of Indonesia Year 2003 Number 120, Additional State Gazette of the Republic of Indonesia Number 4330), as amended by Presidential Decree No. 8 of 2006; Presidential Regulation Number 36 Year 2005 on Land Procurement for Development Implementation for Public Interest as amended by Presidential Regulation Number 65 Year 2006; DECIDED: To Stipulate : REGULATION OF THE PRESIDENT OF THE ASSIGNMENT TO PT. PERUSAHAAN LISTRIK NEGARA (PERSERO) TO ACCELERATE THE DEVELOPMENT OF GENERATING ELECTRICITY USING COAL, Article 1 Unofficial translation by Repit Suliyono----------------------------- http://repit.wordpress.com/ [email protected] (1) (2) (3) The Government assigns to PT. Perusahaan Listrik Negara (Persero), hereinafter referred to PT PLN (Persero), to organize the procurement of the construction of power plants using coal at the site and with the operating schedule of the project as contained in the Appendix hereto. Procurement of development of power plants as referred to in section (1) including the development of related transmission. In the event of adjustment of the operating schedule of the project as referred to in section (1) determined by the Coordinating Team to Accelerate Power Plant Development. Article 2 (1) (2) (3) (4) (5) In the case of PT PLN (Persero) conduct development of power as referred to in Article 1 with the cost of the funds that are not binding, carried out through an open auction method. In the case of PT PLN (Persero) conduct development of power referred to in Article 1 at a cost of binding funds, it can be done through the direct election method. In implementing the development of power plant quickly as referred to in Article 1, then all the permissions related to Environmental Impact Assessment (EIA), exemptions and compensation of transmission lines, and the land acquisition process will be completed within a maximum period of 120 (one hundred and two twenty) days by the agencies / officials authorized since it was first proposed. The implementation of procurement of development as defined in Article 1, implemented based on the principle of efficient, effective, transparent, fair, and accountable. PT PLN (Persero) submit a report once every 1 (one) month of the implementation of procurement of power plant development as referred to in Article 1 to the Minister of StateOwned Enterprises, Minister of Finance and Minister of Energy and Mineral Resources. Article 3 State Minister for State Owned Enterprises to guide and control development procurement of power plant as referred to in Article 1. Article 4 Development of power plants are done by prioritizing the use of domestic products over quality and price are eligible to compete. Article 5 This Presidential Regulation shall come into force on the date of stipulation to the date of December 31, 2009. Stipulated in Jakarta on July 5, 2006 PRESIDENT OF THE REPUBLIC OF INDONESIA, Signed. DR H. SUSILO BAMBANG YUDHOYONO Unofficial translation by Repit Suliyono----------------------------- http://repit.wordpress.com/ [email protected] APPENDIX PRESIDENTIAL REGULATION NUMBER : 71 Year 2006 DATE : 5 July 2006 LIST OF PLN POWER PLANT PROJECTS IN JAWA – BALI NO LOCATION UNIT CAPACITY (MW) 1 PLTU 1 in Banten 1 600 - 700 2 PLTU 2 in Banten 2 300 - 400 3 PLTU 3 in Banten 3 300 - 400 4 PLTU 1 in West Jawa 3 300 - 400 5 PLTU 2 in West Jawa 3 300 - 400 6 PLTU 1 in Central Jawa 2 300 - 400 7 PLTU 2 in Central Jawa 1 600 - 700 8 PLTU I in East Jawa 2 300 - 400 9 PLTU 2 in East Jawa 1 600 - 700 10 PLTU 3 in East Jawa 2 300 - 400 Unofficial translation by Repit Suliyono----------------------------- http://repit.wordpress.com/ [email protected] LIST OF PLN POWER PLANT PROJECTS OUTSIDE JAWA – BALI NO LOCATION UNIT CAPACITY (MW) I PLTU in Nangroe Aceh Darussalam 2 100 - 150 2 PLTU 1 in North Sumatera 2 100 - 150 3 PLTU 2 in North Sumatera 2 100 - 150 4 PLTU in West Sumatera 2 100 - 150 5 PLTU 1 in Bangka Belitung 2 6 PLTU 2 in Bangka Belitung 2 7 PLTU 3 in Bangka Belitung 2 8 PLTU 4 in Bangka Belitung 2 9 PLTU 1 in Riau 2 10 PLTU 2 in Riau 2 11 PLTU in Riau Islands 2 12 PLTU in Lampung 2 13 PLTU 1 in West Kalimantan 2 14 PLTU 2 in West Kalimantan 2 15 PLTU in South Kalimantan 2 16 PLTU I in Central Kalimantan 2 17 PLTU 2 in Central Kalimantan 2 18 PLTU 1 in North Sulawesi 2 10 10 25 15 7 5 7 100 - 150 25 50 65 65 7 25 Unofficial translation by Repit Suliyono----------------------------- http://repit.wordpress.com/ [email protected] NO LOCATION UNIT CAPACITY (MW) 19 PLTU 2 in North Sulawesi 2 25 20 PLTU in Gorontalo 2 25 21 PLTU in South Sulawesi 2 50 22 PLTU in South East Sulawesi 2 10 23 PLTU 1 in West Nusa Tenggara 2 7 24 PLTU 2 in West Nusa Tenggara 2 25 25 PLTU 1 in East Nusa Tenggara 2 7 26 PLTU 2 in East Nusa Tenggara 2 15 27 PLTU in Maluku 2 7 28 PLTU in North Maluku 2 7 29 PLTU 1 in Papua 2 7 30 PLTU 2 in Papua 2 10 PRESIDENT OF THE REPUBLIC OF INDONESIA, signed. DR H. SUSILO BAMBANG YUDHOYONO Unofficial translation by Repit Suliyono----------------------------- http://repit.wordpress.com/ [email protected]
© Copyright 2025 Paperzz