Both units are running. Calculate the optimum schedule (i.e., the unit megawatt output for each unit) for various total megawatt values to be supplied by the units. Find the schedule for these total megawatt values : Computer Applications for Power System Homework #2 Name : Jovan Lucky Surya (蘇祥安) Student ID : M971Y210 300 MW 500 MW 700 MW 840 MW Dispatch with Three-Segment Piecewise Linear Incremental Heat Rate Function Given : Two generating units with incremental heat rate curves (IHR) specified as three connected line segments (four points as shown in Figure 3.14). Eq 1: Eq 8 Subtitute Eq 8 to Eq 6 Eq 2 : c. System demand is 700 MW a. System demand is 300 MW Eq 9 Eq 3 Solving for ࣅ: Solving for ࣅ: Substitute Eq 9 to Eq 1: Substitute Eq 3 to Eq 1: Eq 10 Subtitute Eq 2 = Eq 10 Eq 4 Subtitute Eq 2 = Eq 4 Eq 11 Subtitute Eq 11 to Eq 9 Eq 5 Subtitute Eq 5 to Eq 3 d. System demand is 840 MW b. System demand is 500 MW Eq 12 Eq 6 Solving for ࣅ: Solving for ࣅ: Substitute Eq 12 to Eq 1: Substitute Eq 6 to Eq 1: Eq 13 Subtitute Eq 2 = Eq 13 Eq 7 Subtitute Eq 2 = Eq 7 Eq 14 Subtitute Eq 14 to Eq 12 Result Table : Schedule (MW) P1 (MW) 300 MW 80.435 P2 (MW) 219.565 500 MW 135.882 364.118 700 MW 188.056 511.944 840 MW 219.130 620.869
© Copyright 2024 Paperzz