Request for quotation for HPC Center Request for Proposal for Supply & Installation of Hardware and Software for High Performance Computing Center V 2.0 (Final) Tender Schedule Publication of RFP: 24th June 2013 Pre-Bid Meeting: 3.00PM on 6th July 2013 Publication of Revised RFP (Final): 20th July 2013 Submission of Bids: By 2.00PM of 5th August 2013 Opening of the Technical Bid: 3.30PM on 5th August 2013 Technical Presentation of Responsive Bidders: 16th August 2013 Opening of the Financial Bid: 3.30PM on 23rd August 2013 IIIT Bhubaneswar IIIT Bhubaneswar 1 Request for quotation for HPC Center A.1 About IIIT Bhubaneswar IIIT Bhubaneswar (IIIT-BH) owes its origins to the initiative of the Government Odisha. It is a result of the desire of the Government to establish a world class institute of Information Technology in the state. The Institute has been registered as a society in Nov 2006. The Management of the institute is in the hands of a Governing Body, consisting of representatives from the Government of Odisha, Leaders from the IT industry and eminent educationists. A.2 Requirements The Institute is interested in setting up a High Performance Computing Center. The architecture of the system is given below. A.2.1 A.2.2 Hardware Requirements Sl No Item Quantity 1 Master Node 1 2 Compute Node 12 4 GPU Node 1 5 Storage Array 1 6 6 KVA UPS with 30 Min Backup 1 Software Requirements A. Cluster Management Software with perpetual license, 3 years support & update , preferably from the OEM IIIT Bhubaneswar 2 Request for quotation for HPC Center A.2.3 B. Intel cluster studio (2/5 concurrent user floating licence consists of components like a) c++ compiler XE debugger b) Fortran Compiler XE 12.1 c) intel integrated performance primitives 7.0 d) trace analyzer and collector 8.0 e) math kernel library 10.3 f) MPI benchmarks 3.2.3 f) Threading building) C. Open MPI software (FREE). D. Licensed Software for resource scheduling and job queuing. Preferred option PBS pro. Any software with similar features will be accepted. E. PGI toolkit with CUDA support and open source CUDA programming toolkit on Linux (For GPU node ) F. Redhat Enterprise Linux / Suse Enterprise Linux for the master and compute nodes . Master Node Specifications Form factor Processor Type RAM Network Connectivity Server hardware compliance Port connectivity CDROM Drive Infiniband Connectivity Power supplies HDD FC HBA Cooling Fan A.2.4 Maximum 2U Two Intel Xeon E5-2600 , 8 core, Sandy bridge processors with minimum 2.0 GHz clock, 20MB L3 Cache, 1600MHz memory speed 4GB per core RDIMM memory modules operating at @1600MHz amounting to 32GB per processor. Advanced ECC with multi-bit error protection. Quad Port 1Gbps, HBA, Infiniband ACPI 2.0 Compliant; PCI 3 Compliant; WOL Support; USB 2.0 Support or equivalent Minimum of 1 * internal USB 2.0 port One internal CDROM drive One no FDR Infini band HCA card. Redundant Power Supply and FAN Two 2TB NLSAS/NLSATA drive in RAID 1 scalable to 4 Dual Port FC HBA for connecting storage Inbuilt cooling fan/ Hot pluggable will be acceptable Compute Node Specifications Processor Type RAM Network Connectivity IIIT Bhubaneswar Two Intel Xeon E5-2600, 8 core, Sandy bridge processors with minimum 2.0GHz clock, 20MB L3 Cache, 1600MHz memory speed 4GB per core RDIMM memory modules operating at @1600MHz amounting to 32GB per processor. Advanced ECC with multi-bit error protection. Dual Port 1 Gbps Network Adapter 3 Request for quotation for HPC Center Server hardware compliance Port connectivity Infiniband Connectivity Power supplies HDD Cables and accessories Cooling Fan A.2.4 ACPI 2.0 Compliant; PCI 3 Compliant; WOL Support; USB 2.0 Support or equivalent Minimum of 1 * internal USB 2.0 port Each server node to be provided with FDR Infini band HCA card. Should be configured with adequate redudnant power supply 2TB NLSAS/NLSATA Capacity All necessary cables connectors and accessories as required need to be included Inbuilt cooling fan/ Hot pluggable will be acceptable GPU Node Specifications Processor Type Two Intel Xeon E5-2600, 8 core, Sandy bridge processors with minimum 2.0GHz clock, 20MB L3 Cache, 1600MHz memory speed RAM 4GB per core RDIMM memory modules operating at @1600MHz amounting to 32GB per processor. Advanced ECC with multi-bit error protection. Network Connectivity Dual Port 1Gbps Network Adapter and Infiniband switch for cluster interconnect Server hardware compliance Port connectivity Infiniband Connectivity HDD ACPI 2.0 Compliant; PCI 3 Compliant; WOL Support; USB 2.0 Support or equivalent Minimum of 1 * internal USB 2.0 port Each server node to be provided with FDR Infini band HCA card. 2TB NLSAS/NL SATA Capacity Cables and accessories All necessary cables connectors and accessories as required need to be included Cooling Fan Inbuilt cooling fan/ Hot pluggable will be acceptable GPU 1 No of NVIDIA Tesla K20. The server should support 2 No of GPUGPU IIIT Bhubaneswar 4 Request for quotation for HPC Center A.2.5 Rack, KVM and form factor for Compute and GPU nodes Space ,Power Cooling Rack and KVM,monitor keyboard and Mouse A.2.6 All Compute nodes ( CPU and GPU) should be housed in a maximum of 10 U rack space ,power and cooling requirements must be specified with use of gold power supplies 42U OEM rack from the same server, storage vendor and OEM KVM functionality with remote management softwares along with rack mountable monitor keyboard and Mouse solution Data Storage Specification Heterogeneous Support The storage array should support industryleading Operating System platforms & clustering including Windows Server (Enterprise Edition) and Linux. Storage Capacity 12 TB usable space after RAID 5 implementation using NL/MDL SAS drives Scalability Offered storage enclosure should be scalable up to a minimum of 80 number of drives Controllers Dual, redundant, hot-pluggable; active-active array controllers. Cache memory Minimum of 2GB cache per controller in a single unit after removing the operating system overhead. Cache shall be backed up in case of power failure for 7 days or equivalent functionality. Multiprotocol support 4 number of native FC ports running at 8Gbps speed and 4 number of Native ISCSI ports running at 1Gbps speed. RAID Support Should support Raid 0, 1 , 10 , 3, 5, and Raid 6 with Dual Parity Protection Availability No Single Point of configuration including Array Controller card, Cache memory, FAN, Power supply etc. Balanced Performance Multi-path and load balancing software shall be provided, if vendor does not support MPIO functionality of Operating system. LUN support Minimum of 512 Logical Units. Should support creation of more than 12TB volume at controller level. IIIT Bhubaneswar 5 Request for quotation for HPC Center A.2.7 Snapshot/Clones Array based Snapshot and clone functionality and shall be configured for minimum of 60 snapshot licenses Management software Storage shall be offered with necessary management software. Warranty Warranty: Shall have 3-years onsite warranty OEM Support OEM shall have spares and support center in Eastern region. Infiniband Switch Infiniband A.2.8 Criteria of OEM Selection OEM should have at least 10 HPC system listed within top 500 in the supercomputer list in top500.org Published in June 2013 OEM must have a regional office in Eastern India for sale and support with at least one HPC installation of similar system within Orissa Systems being offered should have minimum 5 installations in India Quotations must be accompanied with tender specific OEM authorization for the server hardware and the PBS pro or equivalent software quoted OEM should have more than 5 years presence in India supporting HPC customers OEM Warranty for minimum 3 years on all hardware is a must. 1 2 3 4 5 6 A.3 Minimum 24 Port FDR Infiniband switch for cluster interconnect with 16 No of cables. Proof of office location Work order OEM authorization Proof from OEM OEM undertaking Deliverables • • • IIIT Bhubaneswar Delivery of the Equipment within 8 weeks of placing the order Installation Testing and Commissioning 6 Request for quotation for HPC Center • • • A.4 Training of HPC operation for period of 10 days Comprehensive Onsite Warranty for all hardware and software from the OEM for 3 years Comprehensive Onsite support for hardware and software from the HPC integrator for 3 years. Mode of Payment • • • 80% of the contract value will be paid after successful execution of the work. 10% of the contract value will be paid after successful completion of training. Balance 10% will be released after 30 days of successful completion of training subject to smooth operation of the equipment supplied and submission of a Bank Guarantee (BG) of 10% of the total ordered amount for the entire warranty period as per the format given at B.6. The BG must be either issued by a scheduled bank situated at Bhubaneswar or endorsed from the Bhubaneswar branch of the issuing bank. The BG must reach IIITBH through Speed Post only from the Bhubaneswar branch. A.6 Evaluation Methodology A.6.1 Pre-qualification The criteria for pre-qualification is as follows Sl No Criterion Supporting Document 1 The Bidder should have an average annual financial turnover of Rs. 5 crores or more, during last 3 years. In case the Bidder has implemented HPC in a deal in foreign currency paid directly to the OEM, the value may be added to the turnover. Copy of Audited Balance sheet and Profit and Loss Statement 2 Solvency certificate for the current financial year Certificate from the Auditor stating the liquidity position for the current financial year 3 Bidder should be registered with the Registrar of Companies should be in existence in the IT services business for at the least 5 years in India. Copy of Certificate of Incorporation from Registrar of Companies 4 Bidder should be registered with Service Tax Authority Copy of the Service Tax registration certificate along with upto date tax return. 5 Bidder should be registered with Sales Tax Authority. Copy of the Sales Tax registration certificate along with upto date VAT IIIT Bhubaneswar Certificate from the Auditor for the year 2012-A.8. Proof of foreign currency deals for HPC implementation 7 Request for quotation for HPC Center clearance certificate. 6 The Bidder should have successfully completed 2 HPC installation Work order / agreement, completion certificate 7 The Bidder should not have been blacklisted by the Central Government, or the Government of Odisha or undertakings of Government of Odisha in the last two years. A self certified letter from the designated official of the company in the company’s letter head. 8 The Bidder must submit EMD amounting to `1.00 lakhs as per details given in Section A.7.8 Bank Draft / Pay Order 9 The Bidder must submit Bid Processing fee amounting to `10,000 /- as per details given in Section A.7.9 Bank Draft / Pay Order Pre-Qualification: Bidders who meet pre-qualification criteria will be considered for technical evaluation. A.6.2 Technical Evaluation: Based on the proposal presented and the presentation, the technical evaluation will be done on following criteria: Sl No Criteria Max Marks 1 General Capabilities: Financial capability, Prior Experience 30 2 Compliance with Technical Specifications 40 3 Solution Proposal and additional value proposition 30 The evaluation committee may seek clarifications if information provided is found to be anomalous. The Bidders scoring at least 70% marks will be considered for financial evaluation A.6.3 Financial Evaluation: The total Grand Total Amount quoted in the financial will be considered as the financial bid amount. The Bidders must ensure that the financial bid is free from typographical as well as arithmetical errors. If any such errors are observed, the evaluation committee will use its judgement to make corrections to the bid or treat it as non-compliant. A.6.4 Final Evaluation: The Bidder quoting the lowest Financial Bid amount will be recommended for award of contract. IIIT Bhubaneswar 8 Request for quotation for HPC Center A.7. Instructions for Preparation of Proposal A.7.1 Amendment of RFP Documents At any time before the submission of Proposals, the IIIT-BH may amend the RFP by issuing an addendum in writing or by standard electronic means. The addendum shall be sent to all bidders and will be binding on them. The bidders may acknowledge receipt of all amendments. To give the bidders, reasonable time in which to take an amendment into account in their Proposals, the Client/ Purchaser may, if the amendment is substantial, extend the deadline for the submission of Proposals. A.7.2 Cost incidental to Proposals Preparation Bidders shall bear all costs associated with the preparation and submission of their proposals. IIIT-BH is not bound to accept any proposal, and reserves the right to annul the selection process at any time prior to Contract award, without thereby incurring any liability to the bidders. A.7.3 Site Conditions Bidders should contact the Employer's representative for their visit, if required to obtain additional information. Bidders should ensure that IIIT-BH’s representatives are advised of the visit well in time to allow them to make appropriate arrangements for supply of information. All costs related to the visits shall be borne by the interested bidder. A.7.4 Technical Proposal In preparing the Technical Proposal, the bidders are expected to examine the documents comprising this RFP in detail. Material deficiencies in providing the information requested may result in rejection of a Proposal. The bidder is required to submit the Technical proposal in formats as given in Section-B The Technical Proposal shall not include any financial information. A.7.5 Financial Proposal a. In preparing the Financial Proposal, the bidders are expected to take into account the requirements and conditions of the RFP document. The Financial Proposal should follow Standard Forms. b. The Bidder is required to provide information for all components of its cost c. The bidder is required to submit the financial proposal in formats Section-C. A.7.6 Earnest Money Deposit and Bid Processing Fee a) An Earnest Money Deposit (EMD) of amount mention in pre-qualification criteria in the form of Demand Draft / Pay Order from a nationalized Bank must be submitted in a separate envelope, along with the Proposal as mentioned in this RFP. b) Proposals not accompanied with EMD and Bid Processing Fee, shall be rejected as non-responsive and will not be opened at all. c) No interest shall be payable by the Client for the sum deposited as EMD. d) The EMD of the unsuccessful bidders would be returned within one month of signing of the contract e) The EMD shall be forfeited in case of the following events: IIIT Bhubaneswar 9 Request for quotation for HPC Center i. ii. A.7.9 If Proposal is withdrawn by bidder during the validity period or any extension agreed by the bidder thereof. If the bidder tries to influence the evaluation process. Bid Processing Fee A Bid Processing Fee of amount mentioned in pre-qualification criteria in the form of a Bank Draft / Pay Order in the name of IIIT Bhubaneswar payable at Bhubaneswar from a nationalized Bank must be submitted in a separate envelope, along with the Proposal as mentioned in this RFP. A.7.10 Submission, Receipt and Opening of Proposals a. The original proposal, both Technical and Financial Proposals shall contain no interlineations or overwriting, except as necessary to correct errors made by the bidders themselves. The person who has signed the proposal must initial such corrections. Submission letters for both Technical and Financial Proposals should respectively be in the formats. b. An authorized representative of the bidder shall initial all pages of the original Technical and Financial Proposals. The authorization shall be in the form of a written power of attorney accompanying the Proposal or in any other form demonstrating that the representative has been duly authorized to sign. c. Two copies of the Technical and one copy of financial proposal should be submitted. d. The signed Technical and Financial Proposals shall be marked "ORIGINAL". The original and all copies of the Technical Proposal shall be placed in a sealed envelope clearly marked "TECHNICAL PROPOSAL" followed by the name of the Assignment/job and also the name and address of the Bidder. e. Similarly, the original Financial Proposal shall be placed in a sealed envelope clearly marked "FINANCIAL PROPOSAL" followed by the name of the Assignment/job and also the name and address of the Bidder. All the separate envelopes containing the Technical Proposals, Financial Proposals, EMD and Bid processing fees shall be placed into an outer envelope and sealed. This outer envelope shall bear the submission address, reference number and shall be clearly marked "DO NOT OPEN, BEFORE [Date and Time of Financial Bid Submission]”. The Bidders shall seal and mark the original and each copy of the Bid strictly as stipulated .The Client shall not be responsible for misplacement, loss or premature opening if the outer envelope is not sealed and/or marked as stipulated. This circumstance may be case for proposal rejection. f. Telegraphic / Tele fax / Telex / E-mail submissions / quotations will not be accepted. g. If the Financial Proposal is not submitted in a separate sealed envelope duly marked as indicated above, this will constitute grounds for declaring the Proposal non-responsive and will be rejected. h. The Proposals must be sent to the address/addresses indicated in the Data sheet and received by the Client no later than the time and the date indicated in the Data sheet, or any extension to this date. Any proposal received by the Client after the deadline for submission shall be returned unopened. IIIT Bhubaneswar 10 Request for quotation for HPC Center A.7.11 Period of validity of Bids Bids shall remain valid for 180 days after the date of submission of the proposal. A.7.12 Deviations Deviations by bidders are generally not allowed. However, the client may increase or decrease the quantities as per its suitability, affordability and budget. During the implementation phase, the SI may propose deviations and IIIT-BH to accept or reject depending on the rationale/justification for the deviations. A.7.13. Right to Waive Minor Irregularities The Evaluation Committee of IIIT-BH reserves the right to waive minor irregularities. The Evaluation Committee also reserves the right to waive mandatory requirements provided that all of the otherwise responsive proposals fail to meet the same mandatory requirements and/or doing so does not otherwise materially affect the procurement. This right is at the sole discretion of the Evaluation Committee of IIIT-BH. A.7.14 Delay in the Vendor’s Performance If at any time during the performance of the contract, the vendor should encounter conditions not attributable to him impeding the timely delivery of the services, the Vendor shall promptly notify IIIT-BH in writing. IIIT-BH may at its own discretion may extend the contract time. As soon as practicable, after receipt of the Vendor's notice, the Client shall evaluate the situation and may at its discretion extend the Contract time for performance, in which case the extension shall be ratified by the parties by amendment of the Contract. Any delay by the Contractor for reasons other than those given in the above paragraph in the performance of its Contract obligations shall render the Vendor liable to any or all of the following: • • • Forfeiture of its performance security; Imposition of Liquidated Damages Termination of the Contract for default A.8. General Terms and Conditions A.8.1 Settlement of Disputes a) Amicable Settlement: Performance of the contract is governed by the terms & conditions of the contract. In case a dispute arises between the parties regarding any matter under the contract, either Party of the contract may send a written Notice of Dispute to the other party. The Party receiving the Notice of Dispute will consider the Notice and respond to it in writing within 30 days after receipt. If that party fails to respond within 30 days, or the dispute cannot be amicably settled within 60 days following the response of that party, point b (arbitration) shall become applicable. b) Arbitration: In the case of dispute, interpretation or clarification arising in respect of this order of supply, RFP etc. the same shall be referred to a Dispute Resolution Committee to be chaired by the Director, IIIT-BH. The decision of the Committee shall be final and binding on both the parties. IIIT Bhubaneswar 11 Request for quotation for HPC Center A.8.2 Dispute Settlement Jurisdiction Jurisdiction for filing any suit in case of any dispute shall be local courts at Bhubaneswar only. A.8.3 Currency of Payment Payment shall be made in Indian Rupees only. A.8.4 Consortium A consortium of bidders is allowed to bid for this project. The consortium may have at most two parties. The lead partner must be a HPC Integrator. For the purpose of evaluation, all the criteria will be applied to the lead vendor only. In case the consortium is awarded the project, the agreement will be signed with the lead bidder. A.8.5 Termination The Client may, without prejudice to any other remedy for breach of contract, by written notice of default sent to the Vendor, terminate the Contract in whole or in part if the Vendor fails to deliver any or all of the obligations within the time; or the Vendor fails to perform any other obligation(s) under the contract A.8.6 Force Majeure For the purposes of this Contract, "Force Majeure" means an event which is beyond the reasonable control of a Party, is not foreseeable, is unavoidable and not brought about by or at the instance of the Party claiming to be affected by such events and which has caused the non-performance or delay in performance, and which makes a Party's performance of its obligations hereunder impossible or so impractical as reasonably to be considered impossible in the circumstances, and includes, but is not limited to, war, riots, civil disorder, terrorism, earthquake, fire, explosion, storm, flood, elements of nature or other extreme adverse weather conditions, strikes, rebellions or revolutions, pandemics or labour difficulties, lockouts or other industrial action, confiscation, acts or regulations of government bodies, court orders, civil disorders, or any other action by Government agencies. Delays in delivery or in meeting completion dates due to Force Majeure events will automatically result in extension of completion dates for a period equal to the duration of such events, plus an additional period of time that is reasonable under the circumstances. IIIT Bhubaneswar 12 Request for quotation for HPC Center B. Standard formats for Technical Proposal B.1 Checklist of Documents to be submitted Sl No Document 1 Details of the Bidder and its Authorized Representative B.2 2 Financial Details B.3 3 Solvency certificate for the current financial year 4 Registration with Registrar of Companies 5 Bidder should be registered with Service Tax Authority 6 Bidder should be registered with Sales Tax Authority. 7 The Bidder should have successfully completed 2 HPC installation (Format B4) 8 9 Self Certification for Non-Black Listing by Government Work Schedule in Detail 10 Details of Items to be Supplied 11 Details of Software and Licenses 12 EMD 13 Bid Processing Fee IIIT Bhubaneswar Format Submitted (Y/N) B.4 B.5 13 Request for quotation for HPC Center B.2 Details of the Bidder and his Authorized Representative 1 Details of the Bidder Name of the Organization Address of the Organization Telephone (s) Fax Email Website PAN No TAN No 2 Details of the Authorized Person Name Address Telephone Cell Phone Fax Email 3 Number of Offices of the Bidder in India 4 Address of the Organization in Odisha IIIT Bhubaneswar 14 Request for quotation for HPC Center B.3 Financial Details of Bidder Sl No Financial Year 1 2010-11 2 2011-12 3 2012-13 Turnover Crores in Turnover in Profit after Crores from IT tax in Crores Services Average Turnover / Profits IIIT Bhubaneswar 15 Request for quotation for HPC Center B.4 Summary of Relevant Experience Sl No Name Name of Start and the Date Address Assignment of Client IIIT Bhubaneswar Implementation Type Date of Orgn. Value of No of Assignment Locations 16 Request for quotation for HPC Center B.5 List of Hardware and Software B.5.1 Hardware Items B.5.2 Sl No Item 1 Master Node 2 Compute Node 3 GPU Node 4 Storage Array 5 6 KVA UPS with 30 Min Backup Make & Model Compliance with Specifications Data Sheet Attached (Y/N) Software Items Sl Nn Item A. Cluster Management Software (perpetual license, 3 years support & update , OEM HAS TO GIVE) B. Intel cluster studio (2/5 concurrent user floating licence consists of components like a) c++ compiler XE debugger b) Fortran Compiler XE 12.1 c) intel integrated performance primitives 7.0 d) trace analyzer and collector 8.0 e) math kernel library 10.3 f) MPI benchmarks 3.2.3 f) Threading building) C. Open MPI software (FREE). D. PBS pro or Equivalent E. PGI toolkit with CUDA support and open source CUDA programming toolkit on Linux (For GPU node ) F. Redhat / Suse Enterprise Linux for the master and compute nodes. IIIT Bhubaneswar Make & Version Data Sheet Attached (Y/N) 17 Request for quotation for HPC Center B.6 Format for Bank Guarantee In consideration of ____________________ (Employer’s name) (hereinafter referred to as "the Employer")which expression shall, unless repugnant to the context or meaning thereof include its successors, administrators and assigns) having awarded to _____________________ (Contractor’s name & address) (hereinafter referred to as "the Contractor “ which expression shall unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) a contract, by issue of Employer’s Notification of Award No. _______________ dt. _____________ and the same having been unequivocally accepted by the Contractor, resulting into a contract valued at ` _____________(Rupees______________only) for ________________(name of work) (hereinafter called “ the contract”) and the Contractor having agreed to provide a Contract Performance Guarantee for the faithful performance of the entire contract equivalent to ` _____________ (Rupees ______________________only) (10 % of the said value of the Contract to the Employer. We, ____________________(name & address of bank) (hereinafter referred to as "the Bank" which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) do hereby guarantee and undertake to pay the Employer, on demand any or, alimonies payable by the Contractor to the extent of ` _____________(Rupees __________________only)as aforesaid at any time up to ___________without any demur, reservation, contest , recourse or protest and/or without any reference to the Contractor. Any such demand made by the Employer on the bank shall be conclusive and binding notwithstanding any difference between the Employer and the Contractor or any dispute pending before any Court, Tribunal, Arbitrator or any other authority. The Bank undertakes not to revoke this guarantee during its currency without previous consent of the Employer and further agrees that the guarantee herein contained shall continue to be enforceable till the Employer discharges this guarantee. The Employer shall have the fullest liberty without affecting in any way the liability of the Bank under this guarantee, from, time to time to extend the time for performance of the Contract by the Contractor. The Employer shall have the fullest liberty without affecting this guarantee, to postpone from time to time the exercise of any powers vested in them or of any right which they might have against the Contractor and to exercise the same at any time in any manner and either to enforce or to forbear to enforce any covenants, contained or implied, in the Contract between the Employer and the Contractor or any other course or remedy or security available to the Employer. The bank shall not be released of its obligations under these presents by any exercise by the Employer of its liberty with reference to the matters aforesaid or any of them or by reason of any other act or forbearance or other acts of omission or commission on the part of the Employer or any other indulgence shown by the Employer or by any other matter or thing whatsoever which under law would but for this provision, have the effect of relieving the Bank. The guarantee shall not be affected by a change in the constitution of the bank or of the employer. The bank also agrees that the Employer at its option shall be entitled to enforce this Guarantee against the Bank as a principal debtor, in the first instance, without proceeding against the Contractor and notwithstanding any security or other guarantee that the Employer may have in relation to the Contractor's liabilities. Notwithstanding anything contained hereinabove our liability under this guarantee is restricted to `_____________(Rupees ____________________ only) and it shall remain in force up to and including_____________ and shall be extended from time to time for such period (not exceeding three years), as maybe desired by M/S IIIT Bhubaneswar on whose behalf this bank guarantee has been given. Notwithstanding anything contained herein i) Our liability under this _______________only) ; guarantee shall not exceed ` _____________ (Rupees ii) This bank guarantee shall be valid up to _____________; and iii) Our liability to make payment shall arise and we are liable to pay the guaranteed amount or any part thereof under this guarantee, only and only if you serve upon us a written claim or demand in terms of the guarantee on or before _________(indicate a date six months after validity of guarantee). Dated this ________day of ________. IIIT Bhubaneswar 18 Request for quotation for HPC Center C. Standard Formats for Financial Proposal C.1 Hardware Cost The price of Rack, KVM and Infiniband Switch and other accessories are to be built to the hardware cost quoted in this section. Sl No Item Quantity 1 Master Node 1 2 Compute Node 12 3 Storage Node 1 4 Storage Array 1 5 6 KVA UPS with 30 Min Backup 1 Rate Amount Tax Applicable Gross Amount Total Hardware Cost C.2 Software Cost Sl Item Nn Quantity A. Cluster Management 1 B. Intel cluster studio 1 D. PBS pro Software or equivalent. 1 E. PGI toolkit with CUDA support and open source CUDA programming toolkit on Linux (For GPU node ) 1 F. Redhat / Suse Enterprise Linux for the master and compute nodes . 1 Rate Amount Tax Applicable Gross Amount Total Software Cost C.3 Total Cost Sl Nn Item A. Total Hardware Cost B. Total Software Cost Amount Tax Applicable Gross Amount Total Cost IIIT Bhubaneswar 19
© Copyright 2026 Paperzz