- IIIT Bhubaneswar

Request for quotation for HPC Center
Request for Proposal for
Supply & Installation of
Hardware and Software for
High Performance Computing Center
V 2.0 (Final)
Tender Schedule
Publication of RFP: 24th June 2013
Pre-Bid Meeting: 3.00PM on 6th July 2013
Publication of Revised RFP (Final): 20th July 2013
Submission of Bids: By 2.00PM of 5th August 2013
Opening of the Technical Bid: 3.30PM on 5th August 2013
Technical Presentation of Responsive Bidders: 16th August 2013
Opening of the Financial Bid: 3.30PM on 23rd August 2013
IIIT Bhubaneswar
IIIT Bhubaneswar
1
Request for quotation for HPC Center
A.1
About IIIT Bhubaneswar
IIIT Bhubaneswar (IIIT-BH) owes its origins to the initiative of the Government
Odisha. It is a result of the desire of the Government to establish a world class
institute of Information Technology in the state. The Institute has been registered as
a society in Nov 2006. The Management of the institute is in the hands of a
Governing Body, consisting of representatives from the Government of Odisha,
Leaders from the IT industry and eminent educationists.
A.2
Requirements
The Institute is interested in setting up a High Performance Computing Center. The
architecture of the system is given below.
A.2.1
A.2.2
Hardware Requirements
Sl No
Item
Quantity
1
Master Node
1
2
Compute Node
12
4
GPU Node
1
5
Storage Array
1
6
6 KVA UPS with 30 Min
Backup
1
Software Requirements
A.
Cluster Management Software with perpetual license, 3 years
support & update , preferably from the OEM
IIIT Bhubaneswar
2
Request for quotation for HPC Center
A.2.3
B.
Intel cluster studio (2/5 concurrent user floating licence consists of
components like a) c++ compiler XE debugger b) Fortran Compiler XE
12.1 c) intel integrated performance primitives 7.0 d) trace analyzer
and collector 8.0 e) math kernel library 10.3 f) MPI benchmarks 3.2.3
f) Threading building)
C.
Open MPI software (FREE).
D.
Licensed Software for resource scheduling and job queuing.
Preferred option PBS pro. Any software with similar features will be
accepted.
E.
PGI toolkit with CUDA support and open source CUDA programming
toolkit on Linux (For GPU node )
F.
Redhat Enterprise Linux / Suse Enterprise Linux for the master and
compute nodes .
Master Node Specifications
Form factor
Processor Type
RAM
Network Connectivity
Server hardware
compliance
Port connectivity
CDROM Drive
Infiniband Connectivity
Power supplies
HDD
FC HBA
Cooling Fan
A.2.4
Maximum 2U
Two Intel Xeon E5-2600 , 8 core, Sandy bridge
processors with minimum 2.0 GHz clock, 20MB
L3 Cache, 1600MHz memory speed
4GB per core RDIMM memory modules
operating at @1600MHz amounting to 32GB
per processor. Advanced ECC with multi-bit
error protection.
Quad Port 1Gbps, HBA, Infiniband
ACPI 2.0 Compliant; PCI 3 Compliant; WOL
Support; USB 2.0 Support or equivalent
Minimum of 1 * internal USB 2.0 port
One internal CDROM drive
One no FDR Infini band HCA card.
Redundant Power Supply and FAN
Two 2TB NLSAS/NLSATA drive in RAID 1 scalable
to 4
Dual Port FC HBA for connecting storage
Inbuilt cooling fan/ Hot pluggable will be
acceptable
Compute Node Specifications
Processor Type
RAM
Network Connectivity
IIIT Bhubaneswar
Two Intel Xeon E5-2600, 8 core, Sandy bridge
processors with minimum 2.0GHz clock, 20MB
L3 Cache, 1600MHz memory speed
4GB per core RDIMM memory modules
operating at @1600MHz amounting to 32GB
per processor. Advanced ECC with multi-bit
error protection.
Dual Port 1 Gbps Network Adapter
3
Request for quotation for HPC Center
Server hardware
compliance
Port connectivity
Infiniband Connectivity
Power supplies
HDD
Cables and accessories
Cooling Fan
A.2.4
ACPI 2.0 Compliant; PCI 3 Compliant; WOL
Support; USB 2.0 Support
or equivalent
Minimum of 1 * internal USB 2.0 port
Each server node to be provided with FDR Infini
band HCA card.
Should be configured with adequate redudnant
power supply
2TB NLSAS/NLSATA Capacity
All necessary cables connectors and accessories
as required need to be
included
Inbuilt cooling fan/ Hot pluggable will be
acceptable
GPU Node Specifications
Processor Type
Two Intel Xeon E5-2600, 8 core, Sandy bridge
processors with minimum 2.0GHz clock, 20MB L3
Cache, 1600MHz memory speed
RAM
4GB per core RDIMM memory modules operating
at @1600MHz amounting to 32GB per processor.
Advanced ECC with multi-bit error protection.
Network Connectivity
Dual Port 1Gbps Network Adapter and Infiniband
switch for cluster interconnect
Server hardware
compliance
Port connectivity
Infiniband Connectivity
HDD
ACPI 2.0 Compliant; PCI 3 Compliant; WOL
Support; USB 2.0 Support or equivalent
Minimum of 1 * internal USB 2.0 port
Each server node to be provided with FDR Infini
band HCA card.
2TB NLSAS/NL SATA Capacity
Cables and accessories
All necessary cables connectors and accessories as
required need to be included
Cooling Fan
Inbuilt cooling fan/ Hot pluggable will be
acceptable
GPU
1 No of NVIDIA Tesla K20. The server should
support 2 No of GPUGPU
IIIT Bhubaneswar
4
Request for quotation for HPC Center
A.2.5
Rack, KVM and form factor for Compute and GPU nodes
Space ,Power Cooling
Rack and KVM,monitor
keyboard and Mouse
A.2.6
All Compute nodes ( CPU and GPU) should be
housed in a maximum of 10 U rack space ,power
and cooling requirements must be specified with
use of gold power supplies
42U OEM rack from the same server, storage
vendor and OEM KVM functionality with remote
management softwares along with rack
mountable monitor keyboard and Mouse
solution
Data Storage Specification
Heterogeneous Support
The storage array should support industryleading Operating System platforms & clustering
including Windows Server (Enterprise Edition)
and Linux.
Storage Capacity
12 TB usable space after RAID 5 implementation
using NL/MDL SAS drives
Scalability
Offered storage enclosure should be scalable up
to a minimum of 80 number of drives
Controllers
Dual, redundant, hot-pluggable; active-active
array controllers.
Cache memory
Minimum of 2GB cache per controller in a single
unit after removing the operating system
overhead. Cache shall be backed up in case of
power failure for 7 days or equivalent
functionality.
Multiprotocol support
4 number of native FC ports running at 8Gbps
speed and 4 number of Native ISCSI ports
running at 1Gbps speed.
RAID Support
Should support Raid 0, 1 , 10 , 3, 5, and Raid 6
with Dual Parity Protection
Availability
No Single Point of configuration including Array
Controller card, Cache memory, FAN, Power
supply etc.
Balanced Performance
Multi-path and load balancing software shall be
provided, if vendor does not support MPIO
functionality of Operating system.
LUN support
Minimum of 512 Logical Units. Should support
creation of more than 12TB volume at controller
level.
IIIT Bhubaneswar
5
Request for quotation for HPC Center
A.2.7
Snapshot/Clones
Array based Snapshot and clone functionality
and shall be configured for minimum of 60
snapshot licenses
Management software
Storage shall be offered with necessary
management software.
Warranty
Warranty: Shall have 3-years onsite warranty
OEM Support
OEM shall have spares and support center in
Eastern region.
Infiniband Switch
Infiniband
A.2.8
Criteria of OEM Selection
OEM should have at least 10
HPC system listed within top
500 in the supercomputer list
in top500.org Published in June
2013
OEM must have a regional
office in Eastern India for sale
and support with at least one
HPC installation of similar
system within Orissa
Systems being offered should
have minimum 5 installations in
India
Quotations must be
accompanied with tender
specific OEM authorization for
the server hardware and the
PBS pro or equivalent software
quoted
OEM should have more than 5
years presence in India
supporting HPC customers
OEM Warranty for minimum 3
years on all hardware is a must.
1
2
3
4
5
6
A.3
Minimum 24 Port FDR Infiniband switch for cluster
interconnect with 16 No of cables.
Proof of office location
Work order
OEM authorization
Proof from OEM
OEM undertaking
Deliverables
•
•
•
IIIT Bhubaneswar
Delivery of the Equipment within 8 weeks of placing the order
Installation
Testing and Commissioning
6
Request for quotation for HPC Center
•
•
•
A.4
Training of HPC operation for period of 10 days
Comprehensive Onsite Warranty for all hardware and software from the
OEM for 3 years
Comprehensive Onsite support for hardware and software from the HPC
integrator for 3 years.
Mode of Payment
•
•
•
80% of the contract value will be paid after successful execution of the
work.
10% of the contract value will be paid after successful completion of
training.
Balance 10% will be released after 30 days of successful completion of
training subject to smooth operation of the equipment supplied and
submission of a Bank Guarantee (BG) of 10% of the total ordered amount
for the entire warranty period as per the format given at B.6. The BG must
be either issued by a scheduled bank situated at Bhubaneswar or endorsed
from the Bhubaneswar branch of the issuing bank. The BG must reach IIITBH through Speed Post only from the Bhubaneswar branch.
A.6
Evaluation Methodology
A.6.1
Pre-qualification
The criteria for pre-qualification is as follows
Sl No
Criterion
Supporting Document
1
The Bidder should have an
average annual financial turnover
of Rs. 5 crores or more, during
last 3 years. In case the Bidder
has implemented HPC in a deal in
foreign currency paid directly to
the OEM, the value may be
added to the turnover.
Copy of Audited Balance sheet and
Profit and Loss Statement
2
Solvency certificate for the
current financial year
Certificate from the Auditor stating
the liquidity position for the current
financial year
3
Bidder should be registered with
the Registrar of Companies
should be in existence in the IT
services business for at the least
5 years in India.
Copy of Certificate of Incorporation
from Registrar of Companies
4
Bidder should be registered with
Service Tax Authority
Copy of the Service Tax registration
certificate along with upto date tax
return.
5
Bidder should be registered with
Sales Tax Authority.
Copy of the Sales Tax registration
certificate along with upto date VAT
IIIT Bhubaneswar
Certificate from the Auditor for the
year 2012-A.8.
Proof of foreign currency deals for
HPC implementation
7
Request for quotation for HPC Center
clearance certificate.
6
The Bidder should have
successfully completed 2 HPC
installation
Work order / agreement,
completion certificate
7
The Bidder should not have been
blacklisted by the Central
Government, or the Government
of Odisha or undertakings of
Government of Odisha in the last
two years.
A self certified letter from the
designated official of the company
in the company’s letter head.
8
The Bidder must submit EMD
amounting to `1.00 lakhs as per
details given in Section A.7.8
Bank Draft / Pay Order
9
The Bidder must submit Bid
Processing fee amounting to
`10,000 /- as per details given in
Section A.7.9
Bank Draft / Pay Order
Pre-Qualification: Bidders who meet pre-qualification criteria will be considered
for technical evaluation.
A.6.2
Technical Evaluation:
Based on the proposal presented and the presentation, the technical evaluation will
be done on following criteria:
Sl No
Criteria
Max
Marks
1
General Capabilities: Financial capability, Prior Experience
30
2
Compliance with Technical Specifications
40
3
Solution Proposal and additional value proposition
30
The evaluation committee may seek clarifications if information provided is found
to be anomalous.
The Bidders scoring at least 70% marks will be considered for financial evaluation
A.6.3
Financial Evaluation:
The total Grand Total Amount quoted in the financial will be considered as the
financial bid amount. The Bidders must ensure that the financial bid is free from
typographical as well as arithmetical errors. If any such errors are observed, the
evaluation committee will use its judgement to make corrections to the bid or treat it
as non-compliant.
A.6.4
Final Evaluation:
The Bidder quoting the lowest Financial Bid amount will be recommended for
award of contract.
IIIT Bhubaneswar
8
Request for quotation for HPC Center
A.7.
Instructions for Preparation of Proposal
A.7.1
Amendment of RFP Documents
At any time before the submission of Proposals, the IIIT-BH may amend the RFP
by issuing an addendum in writing or by standard electronic means. The addendum
shall be sent to all bidders and will be binding on them. The bidders may
acknowledge receipt of all amendments. To give the bidders, reasonable time in
which to take an amendment into account in their Proposals, the Client/ Purchaser
may, if the amendment is substantial, extend the deadline for the submission of
Proposals.
A.7.2
Cost incidental to Proposals Preparation
Bidders shall bear all costs associated with the preparation and submission of their
proposals. IIIT-BH is not bound to accept any proposal, and reserves the right to
annul the selection process at any time prior to Contract award, without thereby
incurring any liability to the bidders.
A.7.3
Site Conditions
Bidders should contact the Employer's representative for their visit, if required to
obtain additional information. Bidders should ensure that IIIT-BH’s representatives
are advised of the visit well in time to allow them to make appropriate arrangements
for supply of information. All costs related to the visits shall be borne by the
interested bidder.
A.7.4
Technical Proposal
In preparing the Technical Proposal, the bidders are expected to examine the
documents comprising this RFP in detail. Material deficiencies in providing the
information requested may result in rejection of a Proposal.
The bidder is required to submit the Technical proposal in formats as given in
Section-B
The Technical Proposal shall not include any financial information.
A.7.5
Financial Proposal
a. In preparing the Financial Proposal, the bidders are expected to take into
account the requirements and conditions of the RFP document. The
Financial Proposal should follow Standard Forms.
b. The Bidder is required to provide information for all components of its cost
c. The bidder is required to submit the financial proposal in formats Section-C.
A.7.6
Earnest Money Deposit and Bid Processing Fee
a) An Earnest Money Deposit (EMD) of amount mention in pre-qualification
criteria in the form of Demand Draft / Pay Order from a nationalized Bank
must be submitted in a separate envelope, along with the Proposal as
mentioned in this RFP.
b) Proposals not accompanied with EMD and Bid Processing Fee, shall be
rejected as non-responsive and will not be opened at all.
c) No interest shall be payable by the Client for the sum deposited as EMD.
d) The EMD of the unsuccessful bidders would be returned within one month
of signing of the contract
e) The EMD shall be forfeited in case of the following events:
IIIT Bhubaneswar
9
Request for quotation for HPC Center
i.
ii.
A.7.9
If Proposal is withdrawn by bidder during the validity period or any
extension agreed by the bidder thereof.
If the bidder tries to influence the evaluation process.
Bid Processing Fee
A Bid Processing Fee of amount mentioned in pre-qualification criteria in the form
of a Bank Draft / Pay Order in the name of IIIT Bhubaneswar payable at
Bhubaneswar from a nationalized Bank must be submitted in a separate envelope,
along with the Proposal as mentioned in this RFP.
A.7.10
Submission, Receipt and Opening of Proposals
a. The original proposal, both Technical and Financial Proposals shall contain
no interlineations or overwriting, except as necessary to correct errors made
by the bidders themselves. The person who has signed the proposal must
initial such corrections. Submission letters for both Technical and Financial
Proposals should respectively be in the formats.
b. An authorized representative of the bidder shall initial all pages of the
original Technical and Financial Proposals. The authorization shall be in the
form of a written power of attorney accompanying the Proposal or in any
other form demonstrating that the representative has been duly authorized to
sign.
c. Two copies of the Technical and one copy of financial proposal should be
submitted.
d. The signed Technical and Financial Proposals shall be marked
"ORIGINAL". The original and all copies of the Technical Proposal shall be
placed in a sealed envelope clearly marked "TECHNICAL PROPOSAL"
followed by the name of the Assignment/job and also the name and address
of the Bidder.
e. Similarly, the original Financial Proposal shall be placed in a sealed
envelope clearly marked "FINANCIAL PROPOSAL" followed by the name
of the Assignment/job and also the name and address of the Bidder. All the
separate envelopes containing the Technical Proposals, Financial Proposals,
EMD and Bid processing fees shall be placed into an outer envelope and
sealed. This outer envelope shall bear the submission address, reference
number and shall be clearly marked "DO NOT OPEN, BEFORE [Date and
Time of Financial Bid Submission]”. The Bidders shall seal and mark the
original and each copy of the Bid strictly as stipulated .The Client shall not
be responsible for misplacement, loss or premature opening if the outer
envelope is not sealed and/or marked as stipulated. This circumstance may
be case for proposal rejection.
f. Telegraphic / Tele fax / Telex / E-mail submissions / quotations will not be
accepted.
g. If the Financial Proposal is not submitted in a separate sealed envelope duly
marked as indicated above, this will constitute grounds for declaring the
Proposal non-responsive and will be rejected.
h. The Proposals must be sent to the address/addresses indicated in the Data
sheet and received by the Client no later than the time and the date indicated
in the Data sheet, or any extension to this date. Any proposal received by the
Client after the deadline for submission shall be returned unopened.
IIIT Bhubaneswar
10
Request for quotation for HPC Center
A.7.11
Period of validity of Bids
Bids shall remain valid for 180 days after the date of submission of the proposal.
A.7.12
Deviations
Deviations by bidders are generally not allowed. However, the client may increase
or decrease the quantities as per its suitability, affordability and budget.
During the implementation phase, the SI may propose deviations and IIIT-BH to
accept or reject depending on the rationale/justification for the deviations.
A.7.13. Right to Waive Minor Irregularities
The Evaluation Committee of IIIT-BH reserves the right to waive minor
irregularities. The Evaluation Committee also reserves the right to waive mandatory
requirements provided that all of the otherwise responsive proposals fail to meet the
same mandatory requirements and/or doing so does not otherwise materially affect
the procurement. This right is at the sole discretion of the Evaluation Committee of
IIIT-BH.
A.7.14
Delay in the Vendor’s Performance
If at any time during the performance of the contract, the vendor should encounter
conditions not attributable to him impeding the timely delivery of the services, the
Vendor shall promptly notify IIIT-BH in writing. IIIT-BH may at its own discretion
may extend the contract time. As soon as practicable, after receipt of the Vendor's
notice, the Client shall evaluate the situation and may at its discretion extend the
Contract time for performance, in which case the extension shall be ratified by the
parties by amendment of the Contract.
Any delay by the Contractor for reasons other than those given in the above
paragraph in the performance of its Contract obligations shall render the Vendor
liable to any or all of the following:
•
•
•
Forfeiture of its performance security;
Imposition of Liquidated Damages
Termination of the Contract for default
A.8.
General Terms and Conditions
A.8.1
Settlement of Disputes
a) Amicable Settlement: Performance of the contract is governed by the terms &
conditions of the contract. In case a dispute arises between the parties regarding
any matter under the contract, either Party of the contract may send a written
Notice of Dispute to the other party. The Party receiving the Notice of Dispute
will consider the Notice and respond to it in writing within 30 days after
receipt. If that party fails to respond within 30 days, or the dispute cannot be
amicably settled within 60 days following the response of that party, point b
(arbitration) shall become applicable.
b) Arbitration: In the case of dispute, interpretation or clarification arising in
respect of this order of supply, RFP etc. the same shall be referred to a Dispute
Resolution Committee to be chaired by the Director, IIIT-BH. The decision of
the Committee shall be final and binding on both the parties.
IIIT Bhubaneswar
11
Request for quotation for HPC Center
A.8.2
Dispute Settlement Jurisdiction
Jurisdiction for filing any suit in case of any dispute shall be local courts at
Bhubaneswar only.
A.8.3
Currency of Payment
Payment shall be made in Indian Rupees only.
A.8.4
Consortium
A consortium of bidders is allowed to bid for this project. The consortium may have
at most two parties. The lead partner must be a HPC Integrator. For the purpose of
evaluation, all the criteria will be applied to the lead vendor only. In case the
consortium is awarded the project, the agreement will be signed with the lead
bidder.
A.8.5
Termination
The Client may, without prejudice to any other remedy for breach of contract, by
written notice of default sent to the Vendor, terminate the Contract in whole or in
part if the Vendor fails to deliver any or all of the obligations within the time; or the
Vendor fails to perform any other obligation(s) under the contract
A.8.6
Force Majeure
For the purposes of this Contract, "Force Majeure" means an event which is beyond
the reasonable control of a Party, is not foreseeable, is unavoidable and not brought
about by or at the instance of the Party claiming to be affected by such events and
which has caused the non-performance or delay in performance, and which makes a
Party's performance of its obligations hereunder impossible or so impractical as
reasonably to be considered impossible in the circumstances, and includes, but is not
limited to, war, riots, civil disorder, terrorism, earthquake, fire, explosion, storm,
flood, elements of nature or other extreme adverse weather conditions, strikes,
rebellions or revolutions, pandemics or labour difficulties, lockouts or other
industrial action, confiscation, acts or regulations of government bodies, court
orders, civil disorders, or any other action by Government agencies. Delays in
delivery or in meeting completion dates due to Force Majeure events will
automatically result in extension of completion dates for a period equal to the
duration of such events, plus an additional period of time that is reasonable under
the circumstances.
IIIT Bhubaneswar
12
Request for quotation for HPC Center
B.
Standard formats for Technical Proposal
B.1
Checklist of Documents to be submitted
Sl
No
Document
1
Details of the Bidder and its Authorized Representative
B.2
2
Financial Details
B.3
3
Solvency certificate for the current financial year
4
Registration with Registrar of Companies
5
Bidder should be registered with Service Tax Authority
6
Bidder should be registered with Sales Tax Authority.
7
The Bidder should have successfully completed 2 HPC
installation (Format B4)
8
9
Self Certification for Non-Black Listing by Government
Work Schedule in Detail
10
Details of Items to be Supplied
11
Details of Software and Licenses
12
EMD
13
Bid Processing Fee
IIIT Bhubaneswar
Format
Submitted
(Y/N)
B.4
B.5
13
Request for quotation for HPC Center
B.2
Details of the Bidder and his Authorized Representative
1
Details of the Bidder
Name of the
Organization
Address of the
Organization
Telephone (s)
Fax
Email
Website
PAN No
TAN No
2
Details of the Authorized Person
Name
Address
Telephone
Cell Phone
Fax
Email
3
Number of Offices of the
Bidder in India
4
Address of the
Organization in Odisha
IIIT Bhubaneswar
14
Request for quotation for HPC Center
B.3
Financial Details of Bidder
Sl No
Financial Year
1
2010-11
2
2011-12
3
2012-13
Turnover
Crores
in Turnover
in Profit after
Crores from IT tax in Crores
Services
Average Turnover / Profits
IIIT Bhubaneswar
15
Request for quotation for HPC Center
B.4
Summary of Relevant Experience
Sl
No
Name
Name
of Start
and
the
Date
Address Assignment
of Client
IIIT Bhubaneswar
Implementation Type
Date
of
Orgn.
Value
of No
of
Assignment Locations
16
Request for quotation for HPC Center
B.5
List of Hardware and Software
B.5.1
Hardware Items
B.5.2
Sl
No
Item
1
Master Node
2
Compute Node
3
GPU Node
4
Storage Array
5
6 KVA UPS with
30 Min Backup
Make & Model
Compliance with
Specifications
Data Sheet
Attached (Y/N)
Software Items
Sl
Nn
Item
A.
Cluster Management Software (perpetual
license, 3 years support & update , OEM HAS
TO GIVE)
B.
Intel cluster studio (2/5 concurrent user
floating licence consists of components like a)
c++ compiler XE debugger b) Fortran Compiler
XE 12.1 c) intel integrated performance
primitives 7.0 d) trace analyzer and collector
8.0 e) math kernel library 10.3 f) MPI
benchmarks 3.2.3 f) Threading building)
C.
Open MPI software (FREE).
D.
PBS pro or Equivalent
E.
PGI toolkit with CUDA support and open source
CUDA programming toolkit on Linux (For GPU
node )
F.
Redhat / Suse Enterprise Linux for the master
and compute nodes.
IIIT Bhubaneswar
Make & Version
Data Sheet
Attached
(Y/N)
17
Request for quotation for HPC Center
B.6
Format for Bank Guarantee
In consideration of ____________________ (Employer’s name) (hereinafter referred to as "the
Employer")which expression shall, unless repugnant to the context or meaning thereof include its
successors, administrators and assigns) having awarded to _____________________ (Contractor’s
name & address) (hereinafter referred to as "the Contractor “ which expression shall unless
repugnant to the context or meaning thereof, include its successors, administrators, executors and
assigns) a contract, by issue of Employer’s Notification of Award No. _______________ dt.
_____________ and the same having been unequivocally accepted by the Contractor, resulting into a
contract valued at ` _____________(Rupees______________only) for ________________(name of
work) (hereinafter called “ the contract”) and the Contractor having agreed to provide a Contract
Performance Guarantee for the faithful performance of the entire contract equivalent to `
_____________ (Rupees ______________________only) (10 % of the said value of the Contract to
the Employer.
We, ____________________(name & address of bank) (hereinafter referred to as "the Bank" which
expression shall, unless repugnant to the context or meaning thereof, include its successors,
administrators, executors and assigns) do hereby guarantee and undertake to pay the Employer, on
demand any or, alimonies payable by the Contractor to the extent of ` _____________(Rupees
__________________only)as aforesaid at any time up to ___________without any demur,
reservation, contest , recourse or protest and/or without any reference to the Contractor. Any such
demand made by the Employer on the bank shall be conclusive and binding notwithstanding any
difference between the Employer and the Contractor or any dispute pending before any Court,
Tribunal, Arbitrator or any other authority. The Bank undertakes not to revoke this guarantee during
its currency without previous consent of the Employer and further agrees that the guarantee herein
contained shall continue to be enforceable till the Employer discharges this guarantee.
The Employer shall have the fullest liberty without affecting in any way the liability of the Bank
under this guarantee, from, time to time to extend the time for performance of the Contract by the
Contractor. The Employer shall have the fullest liberty without affecting this guarantee, to postpone
from time to time the exercise of any powers vested in them or of any right which they might have
against the Contractor and to exercise the same at any time in any manner and either to enforce or to
forbear to enforce any covenants, contained or implied, in the Contract between the Employer and
the Contractor or any other course or remedy or security available to the Employer. The bank shall
not be released of its obligations under these presents by any exercise by the Employer of its liberty
with reference to the matters aforesaid or any of them or by reason of any other act or forbearance or
other acts of omission or commission on the part of the Employer or any other indulgence shown by
the Employer or by any other matter or thing whatsoever which under law would but for this
provision, have the effect of relieving the Bank. The guarantee shall not be affected by a change in
the constitution of the bank or of the employer.
The bank also agrees that the Employer at its option shall be entitled to enforce this Guarantee
against the Bank as a principal debtor, in the first instance, without proceeding against the Contractor
and notwithstanding any security or other guarantee that the Employer may have in relation to the
Contractor's liabilities.
Notwithstanding anything contained hereinabove our liability under this guarantee is restricted to
`_____________(Rupees ____________________ only) and it shall remain in force up to and
including_____________ and shall be extended from time to time for such period (not exceeding
three years), as maybe desired by M/S IIIT Bhubaneswar on whose behalf this bank guarantee has
been given.
Notwithstanding anything contained herein
i)
Our liability under this
_______________only) ;
guarantee
shall
not
exceed
`
_____________
(Rupees
ii) This bank guarantee shall be valid up to _____________; and
iii) Our liability to make payment shall arise and we are liable to pay the guaranteed amount or any
part thereof under this guarantee, only and only if you serve upon us a written claim or demand in
terms of the guarantee on or before _________(indicate a date six months after validity of
guarantee).
Dated this ________day of ________.
IIIT Bhubaneswar
18
Request for quotation for HPC Center
C. Standard Formats for Financial Proposal
C.1
Hardware Cost
The price of Rack, KVM and Infiniband Switch and other accessories are to be built
to the hardware cost quoted in this section.
Sl
No
Item
Quantity
1
Master Node
1
2
Compute Node
12
3
Storage Node
1
4
Storage Array
1
5
6 KVA UPS
with 30 Min
Backup
1
Rate
Amount
Tax
Applicable
Gross
Amount
Total Hardware Cost
C.2
Software Cost
Sl Item
Nn
Quantity
A.
Cluster Management
1
B.
Intel cluster studio
1
D.
PBS pro Software or
equivalent.
1
E.
PGI toolkit with CUDA
support and open source
CUDA programming
toolkit on Linux (For GPU
node )
1
F.
Redhat / Suse Enterprise
Linux for the master and
compute nodes .
1
Rate
Amount
Tax
Applicable
Gross
Amount
Total Software Cost
C.3
Total Cost
Sl
Nn
Item
A.
Total Hardware Cost
B.
Total Software Cost
Amount
Tax
Applicable
Gross
Amount
Total Cost
IIIT Bhubaneswar
19