Mounting systems for solar technology K2 SYSTEMS Customer training – S-Rock 15° EN AGENDA S-ROCK 15° 1. 2. 3. 4. System & articles Assembly Dimensioning – row distance Layout & ballasting S-ROCK 15° 2 FLAT ROOF SYSTEMS K2 S-ROCK 15° Application: ¬ Flat roofs up to 5° ¬ Foil and bitumen roofs with and without a parapet wall ¬ Module length: 1638 – 1685mm Advantages: ¬ 1 component ¬ Railless system – logistically advanced (shipped on palettes) ¬ 15° elevation angle ¬ 2 universal module clamps (25-50 mm frame height) ¬ Integrated solution for module cable management ¬ Ballasting directly in the component ¬ Optimized load application – verified by structural engineers & wind tunnel tested S-ROCK 15° 3 FLAT ROOF SYSTEMS S-ROCK 15° ¬ Screwed fastenig for Block Connector from structural facings sector for fixed & non-fixed bearing ¬ UV-resistable caps for T-Tray ¬ Pilot-whole for Windbreaker & Connector ¬ Prove of Lightning protection available June 2016 S-ROCK 15° 4 SYSTEM & ARTICLES S-ROCK 15° S-Rock front - 2002245 S-Rock Windbreaker 2002247 S-ROCK 15° S-Rock - 2002244 S-Rock Block connector Set 2002295 S-Rock end - 2002246 S-Rock T-Tray Set 2002331 5 SYSTEM & ARTICLES S-ROCK 15° MiniClamp EC Set 34-50 mm - 2000059 MiniClamp EC Set 25-35 mm - 2002348* MiniClamp MC Set 34-50 mm - 1006413 MiniClamp MC Set 25-35 mm - 2002347* self-tapping screw 1005207 BSM Wings (old:SD) 2001740/2001739 Omega Cable Clip 1005394 Cable Routing Clip 2002322 *available after InterSolar 2016 S-ROCK 15° 6 ASSEMBLY S-ROCK 15° S-ROCK 15° 7 ASSEMBLY S-ROCK 15° 1. Add building protection mats & clamps to the S-Rock S-ROCK 15° 8 ASSEMBLY S-ROCK 15° 2. Measure / mark right angle for the module field and place S-Rocks on the roof according to module width S-ROCK 15° 3. Place the modules on the S-Rocks row after row and fasten the clamps. 9 ASSEMBLY S-ROCK 15° 4. Fix module cable with Cable Routing Clip or Omega Clip (depending on module cable length) S-ROCK 15° 4.1 Alternative: fix Cable Routing Clip on module frame 10 ASSEMBLY S-ROCK 15° 5. Mount Block Connector 6. Mount Windbreaker S-ROCK 15° 11 ASSEMBLY S-ROCK 15° 7. Ballast the system with paving stones 7.1 Higher ballasting required: T-Tray Set S-ROCK 15° 12 DIMENSIONING – ROW DISTANCE - GLOBALLY S-ROCK 15° Row distance: 1.76 m No shadowing S-ROCK 15° 13 DIMENSIONING – ROW DISTANCE - EUROPE S-ROCK 15° Row distance: 1.76 m No shadowing S-ROCK 15° 14 DIMENSIONING – ROW DISTANCE - GERMANY S-ROCK 15° Row distance: 1.76 m Flensburg Shadow in Nov, Dec & Jan Partly Shadowed No shadowing S-ROCK 15° 15 DIMENSIONING – ROW DISTANCE - EUROPE S-ROCK 15° Row distance: 1.76 m Shadow in Nov, Dec & Jan Partly shadowed No shadowing S-ROCK 15° 16 DIMENSIONING – ROW DISTANCE S-ROCK 15° Individual S-Rock Length: ¬ Row distance < 1.76m: available within ~ 2-3 weeks, special conditions ¬ Row distance > 1.76m: special static design & wind tunnel test required S-ROCK 15° 17 LAYOUT & BALLASTING S-ROCK 15° At the moment: ¬ Layout & Ballasting exclusively done by K2 After Juli: ¬ Layout & Ballasting in K2 Base online ¬ Possible for everybody S-ROCK 15° 18 Thank you S-ROCK 15° 19
© Copyright 2026 Paperzz