ODOT DESIGN BUILD SCOPE OF SERVICES PID: _94460_____ State Project Number: _467278________ County:_FRA____ Route:___70____ Section:_Hilliard-Rome Interchange__ Table of Contents: Section 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 April 2013 Page Project Identification Pre-bid Meeting Addenda Process Pre-qualification Design Consultant Scope of Work Field Office General Provisions for The Work Hazardous Materials Environmental Right of Way (ROW) Utilities Design and Construction Requirements: Maintenance Of Traffic (MOT) Design and Construction Requirements: Location & Design Design and Construction Requirements: Traffic Control Design and Construction Requirements: Project Bill of Materials Project Schedule Requirements Plan Submittals and Review Requirements Buildable Units Index of Attachments Page 1 of 32 2 2 2 2 3 4 5 5 11 12 15 15 16 20 23 27 28 28 30 32 1. PROJECT IDENTIFICATION PID: _94460_____ State Project Number: _467278___ County: _FRA_______ Route: ___70______ Section: _Hilliard-Rome Interchange__ Local Route Name: _Hilliard-Rome Road_________________________________ Highway Functional Classification & Federal Aid System: _Urban Principal Arterial___ Structure Identification: Bridge Number: ___N/A______ Over: ___________ Structure File Number: __N/A_______ 1.1 Design Designation: See Attachment C-1 for traffic information Location: Hilliard-Rome Road Interchange Hilliard Rome Road Design Speed: 45 mph Legal Speed: 45 mph Design Functional Classification: Urban Principal Arterial NHS 1.2 I-70 70 mph 65 mph Design Functional Classification: Urban Interstate NHS Existing plans: Existing plans are available for review at the following ftp site: ftp://ftp.dot.state.oh.us/pub/Districts/D06/download/FRA94460/ Please contact Dirk Gross (614.752.5576); [email protected] These are NOT as-built plans. The Design-Build Team (DBT) is advised to verify the preceding referenced plans to determine if they accurately depict existing field conditions. 2 PRE-BID MEETING This meeting is to discuss and clarify all issues that the project may have. Location: ODOT District 6 Office, Columbus Pike Conference Room, 400 E. William Street, Delaware, Ohio 43015 Date: __TBD_________________________________ Time: __TBD ________________________________ 3 ADDENDA PROCESS All questions prior to the letting date shall be directed to: Web submittal form: http://www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Pages/PBQs.aspx 4 PRE-QUALIFICATION It is required that the bidder be an ODOT pre-qualified Contractor who has engaged the services of an ODOT pre-qualified Consultant to perform all the design and construction work required in these Conceptual Documents. If the Consultant and/or the Sub- April 2013 Page 2 of 32 Consultant(s) submitted do not meet all the required qualifications, the Office of Contracts may reject the bid. 5 CONTRACTOR’S CONSULTANT The Contractor must name the Consultant and all Sub-Consultant(s) in the space(s) provided below. If the Contractor is going to submit an electronic bid, then the Consultant and all Sub-Consultant(s) must be listed on the following web-page: http://www.dot.state.oh.us/DIVISIONS/PRODMGT/CONSULTANT/Pages/default.aspx . The Contractor must list relevant prequalification categories for prime and subconsultants to show that the prequalification requirements listed below are satisfied. All Consultant names and addresses must be the same as that on file with the Department. The following work types must be performed by members of the Consultant Team (combination of Consultant and Sub-Consultant(s)): Roadway Design - Complex Traffic Signal Design – Basic Highway Lighting Design - Limited Consultant Firm Name: _________________________________________________ Address: _________________________________________________ List work types the Consultant will perform: _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ Sub-Consultant Firm Name: _________________________________________________ Address: _________________________________________________ List work types the Sub-Consultant will perform: _______________________________________________________________________ _______________________________________________________________________ Sub-Consultant Firm Name: _________________________________________________ Address: _________________________________________________ List work types the Sub-Consultant will perform: _______________________________________________________________________ _______________________________________________________________________ April 2013 Page 3 of 32 Restrictions on Participation in Design-Build Contracts: Any Consultant who provided services to the Department that have been directly utilized in this design-build proposal or Scope of Services document will NOT be eligible to participate in this design-build contract for this project, either as a prime consultant or as a sub-consultant. This includes following firms: Mead & Hunt, Inc., TranSystems Corporation of Ohio, and Lawhon & Associates. 6 SCOPE OF WORK Project Limits: From Project Length: I-70 2800’ To Westchester Woods Blvd. . . Work Length shall be determined by the DBT. The Consultant shall provide for the engineering services, design, and preparation of detail construction plans for the construction of the proposed project. The Contractor shall provide for the furnishing of materials, construction and completion in every detail of all the work described in the Conceptual Documents in order to fulfill the intent of the contract. Project Description: This project is part of ODOT’s ramp clear initiative, which has been created to eliminate mainline queuing at ramp diverge locations. The primary purpose of this project is to provide capacity improvements to address queuing on the WB exit ramps from I-70 to Hilliard-Rome Road, which backs up traffic onto mainline I70. As described in Attachment C-2, this project involves the following key elements: · Realignment of the WB exit ramp to NB Hilliard-Rome Road · Widening the WB exit ramp to NB Hilliard-Rome Road from 1 to 3 lanes · Realignment of the WB exit ramp to SB Hilliard-Rome Road · Widening the WB exit ramp to SB Hilliard-Rome Road from 1 to 2 lanes · Installation of new traffic signal @ the WB ramps intersection · Modified signal @ Renner Road intersection · Modified signal @ Meijer/Walmart drive · The alignment of Hilliard-Rome Road must be designed in such a way to avoid right-of-way impacts and provide the number of lanes as shown in Attachment R-1. · Widening Hilliard-Rome Road with full depth asphalt, including shoulders · Resurfacing Hilliard-Rome Road - The remainder of the existing lanes shall be resurfaced in accordance with Section 14.3. The limits of the resurfacing work shall be from the north approach slab of the I-70 bridge (STA 102+50 from FRA70-5.25 plans) to the south edge of Westchester Woods Blvd (STA 145+50 from FRA-CR3-14.06 plans). Completion date: Warranties: April 2013 October 15, 2014 None Page 4 of 32 7 FIELD OFFICE Field office Type C , as required by Construction and Material Specification Item 619, shall be available and completely functional no later than 1 week prior to the start of construction work. 8 GENERAL PROVISIONS FOR THE WORK 8.1 Governing Regulations: All services, including but not limited to survey, design and construction work, performed by the DBT and all subcontractors (including subconsultants), shall be in compliance with all applicable ODOT Manuals and Guidelines. The fact that the bid items for this Design-Build project are general rather than specific shall not relieve the DBT of the requirement that all work performed and all materials furnished shall be in reasonable conformity with the specifications. The Contractor’s Consultant shall reference in the plans the appropriate Construction and Material Specifications Item Number for all work to be performed and all materials to be furnished. The attention of the Bidder is directed to the provisions of section 100 of the Construction and Material Specifications as modified in the design-build proposal. It will be the responsibility of the DBT to acquire and utilize the necessary ODOT manuals that apply to the design and construction work required to complete this project. The current edition, including updates released on or before the prebid meeting date, of the following ODOT Manuals and Guidelines shall be met or exceeded in the performance of the design and construction work required to complete this project: Bridge Design Manual Location and Design Manuals Volume One - Roadway Design Volume Two - Drainage Design Volume Three - Plan Preparation Pavement Design & Rehabilitation Manual Specifications for Geotechnical Explorations Survey Manual Construction and Material Specifications Proposal Notes for Construction and Material Specifications Supplemental Specifications for Construction and Material Specifications Item Master Manual for Abandoned Underground Mines - Inventory and Risk Assessment Pavement Design and Rehabilitation Manual State Highway Access Management Manual Standard Construction Drawings April 2013 Page 5 of 32 Plan Insert Sheets Traffic Engineering Manual Ohio Manual of Uniform Traffic Control Devices Real Estate Administration Policies and Procedures Manual: Appraisal Acquisition Property Management Relocation ROW Plans Utilities Wireless Communication Tower Manual Environmental Services Handbooks and Guidelines Waterway Permit Manual Design Mapping Specifications CADD Engineering Standards Manual Geotechnical Bulletins Project Development Process Manual (Appendix B) 8.2 Basis of Payment: All Items covered by Construction and Material Specifications, Supplemental Specifications, Proposal and Special Provision notes with unit price as a basis of payment will be paid for under the appropriate Lump Sum bid item, unless a unit line price item has been established in the Scope Of Services. The DBT shall be required to furnish the Department with a complete breakdown of the lump sum bid items. The breakdown shall include materials to be used in the work, and shall be in sufficient detail to provide ODOT with a means to check partial payment requests. The DBT shall provide subsummaries and a general summary with the final construction plans. The units of work used to perform the cost breakdown shall be correlated to the CPM schedule. Evidence of “Front-Cost Loading” will be grounds for rejection of a submittal. The following is the list of bid items and what is to be included in each. Please note this is not all inclusive and additional pay items may be included as required. Work not specifically itemized in the bid documents will be included in Item 690E20240 SpecialRoadway. 203E99000 SPECIAL-EARTHWORK 1 LS This item includes the embankment, excavation, subgrade stabilization and subgrade preparation. 690E20240 SPECIAL-MISC: ROADWAY 1 LS This item includes the guardrail, permanent erosion control (including final top soil), curb ramps, and other items associated with the construction. 832E15000 STORM WATER POLLUTION PREVENTION PLAN April 2013 Page 6 of 32 1 LS This item includes all work associated with development, design, NPDES required inspection, modification, revision, updates, amendments and reporting related to the SWPPP. 832E99100 SPECIAL- CONSTRUCTION EROSION CONTROL 300,000 EACH Provide temporary sediment and erosion controls as per Supplemental Specification 832. 611E97800 SPECIAL- DRAINAGE 1 LS This item includes underdrains, manholes, inlets, all drainage pipes and associated items. 442E99000 SPECIAL- FLEXIBLE PAVEMENT 1 LS This item includes all subbase, base and pavement and any associated items used in the construction of the flexible pavement. 452E99000 SPECIAL-NON-REINFORCED CONCRETE PAVEMENT 1 LS This item includes all subbase, base and pavement and any associated items used in the construction of the concrete pavement. 630E99000 SPECIAL-SIGNS AND SUPPORTS 1 This item includes all work described in Attachment C-4, Conceptual Signing Plan. LS 632E99000 SPECIAL-TRAFFIC SIGNALS 1 LS This item includes installation of the new signal at the westbound I-70 ramp intersection, and modification of other signals. Also includes establishing signal coordination between the new and existing signals. 625E99000 SPECIAL-LIGHTING 1 LS This item includes all work associated with modifications to existing roadway lighting. 641E99000 SPECIAL-PAVEMENT MARKING 1 This item includes all work associated with striping the new lane configuration. LS 614E99000 SPECIAL-MAINTAINING TRAFFIC 1 LS This item includes all work associated with the maintenance of traffic on the ramps, primary and secondary roads including temporary pavement, barrier and temporary signing, striping and signals, maintenance of existing pavement within the work limits (including areas within traffic shifted areas), and any other items needed to properly maintain traffic within the work zone. The DBT shall take over maintenance responsibility of existing/proposed pavement within the entire work limits (to include shifts, tapers, etc. outside the project limits) at the point in time when they do any work impacting traffic. Once the DBT takes over the maintenance responsibility of pavement as described above they will retain maintenance responsibility of pavement for the remaining life of the contract. 8.3 Final Payment: The DBT shall prepare and submit the following prior to the request for final payment: April 2013 Page 7 of 32 1. 2. 8.4 All original project files and notes utilized in the preparation of the survey, design and construction of the project Record-Drawings Plans as required in section 8.4 below. Record-Drawing Plans: A. General: At the completion of the work, prior to final acceptance of the construction, the Consultant shall furnish the Department Record-Drawing construction plans. When the Record-Drawing plans are completed the Consultant shall professionally endorse (sign and seal) the title sheet. Record-Drawing plans shall be submitted using the following method: - Tiff Images created according to the documentation on the Office of Contracts website (http://www.dot.state.oh.us/DIVISIONS/CONTRACTADMIN/CONTRACTS/Pages/TIF F.aspx) In addition to the information shown on the construction plans, the Record-Drawing plans shall show the following: 1. 2. 3. 4. All deviations from the original approved construction plans which result in a change of location, material, type or size of work. Any utilities, pipes, wellheads, abandoned pavements, foundations or other major obstructions discovered and remaining in place which are not shown, or do not conform to locations or depths shown in the plans. Underground features shall be shown and labeled on the Record-Drawing plan in terms of station, offset and elevation. The final option and specification number selected for those items which allow several material options under the specification (e.g., conduit). Additional plan sheets may be needed if necessary to show work not included in the construction plans. Notation shall also be made of locations and the extent of use of materials, other than soil, for embankment construction (rock, broken concrete without reinforcing steel, etc.). The Plan index shall show the plan sheets which have changes appearing on them. Two copies of the Record-Drawing plans shall be delivered to the Project Engineer for approval upon completion of the physical work but prior to the request for final payment. After the Department has approved the Record-Drawing plans, the original tracings and the associated electronic files shall be delivered to the District Production Administrator. Acceptance of these plans and delivery of the original tracings and the associated electronic files is required prior to the work being accepted and the final estimate approved. April 2013 Page 8 of 32 The delivered original tracings shall be prepared in conformance with the Location and Design Manual, Volume 3, Section 1200 - Plan Preparation. B. CADD files supplied by Consultant: X Yes No If marked yes, the Consultant shall comply with ODOT’s CADD Standards, and supply files in accordance with the CADD Engineering Standards Manual. All data shall be provided to the Department according to the provisions as detailed under the appropriate CADD links accessed from the Department’s Office of Production’s web site. This includes, but is not limited to, the level assignments, symbols, lines and line styles that are to be used, line weights, cells, placement of text and file naming conventions. The web site can be accessed at the following URL address: http://www.dot.state.oh.us/Divisions/ProdMgt/Production/CADD/Pages/default.aspx http://www.dot.state.oh.us/Divisions/ProdMgt/Production/Pages/default.aspx The following can be accessed from the above URL addresses: 1. 2. 3. ODOT CADD Standard files by selecting the “Microstation Downloads” link ODOT’s Location and Design, Volume 3 by selecting the “L&D Manual Vol. 3" link ODOT’s GEOPAK Standards by selecting the “GEOPAK Downloads” link The Department will accept CADD files on CD ROM or DVD electronic media. 1. The Consultant shall submit all CADD information produced in the process of plan development. All CADD information shall be submitted in the current version of MicroStation (*.dgn) format as indicated in the CADD Engineering Standards Manual. This requirement ensures that ODOT receives an end product that is directly usable on ODOT’s CADD systems without additional work. The responsibility to provide the Department with correct and complete CADD data rests with the consultant. 2. The Consultant shall submit all GEOPAK information produced in the process of plan development according to L&D Volume 3, Section 1500. The submission shall include all files generated by GEOPAK as the result of the plan processing and these files shall include but are not limited to the following: a. Coordinate databases (*.gpk) b. Digital terrain models (*.tin) c. Original cross section (XS) cell design files d. Edited observation files (*.obs) e. ASCII text files containing all raw point data (PT #, X, Y, Z, Linking Code/Mapping Code) f. ASCII text files containing all adjusted point data (PT #, X, Y, Z, Linking Code/Mapping Code, Attribute data if any) April 2013 Page 9 of 32 g. h. i. ASCII text file(s) listing chain data for all existing and proposed horizontal alignments; including the centerline of construction, the centerline of right of way and ramp baselines. ASCII text file(s) listing vertical alignment data for all existing and proposed profiles. ASCII text files listing the Northing, easting, station, offset and elevation for all existing and proposed monuments. A separate file name should be used for each horizontal or vertical alignment. The CADD Engineering Standards Manual provides specific requirements for the content of the required ASCII reports and provides directions on how to create these reports using GEOPAK software. These requirements and procedures may be updated from time to time with notification in the Design Reference Resource Center (DRRC) website which is located at the following URL, http://www.dot.state.oh.us/drrc/. Organizations exchanging ODOT CADD data are responsible for ensuring they are using the current version of these requirements, CADD reference manuals, ODOT cell files and ODOT seed files. 8.5 Post-Letting Conference: Within 7 days after bid opening, the apparent low bidder DBT shall contact the Office of Estimating of the Division of Construction Management to discuss the Lump Sum estimate with the Department. 8.6 Partnering Agreement: The Contractor is invited to enter into an informal cooperative partnership agreement with the Department on this project. The objective of this agreement is the timely completion of the work and a quality product that will be a source of pride to both the Department and the Contractor. This Partnering Agreement will not affect the terms and conditions of the contract. It is a document which is solely intended to establish an environment of cooperation between the parties. 8.7 Communication: All communication during design and construction shall be with the District Project Manager and the District Project Engineer. District’s Project Manager’s Name: Dirk Gross Phone number: 614-752-5576 E-mail: [email protected] Fax: 740-833-8100 . The District Project Engineer shall be named at the pre-design meeting. At the pre-design meeting, the Contractor shall name a Project Manager who will act as a liaison between the DBT and the Department. 8.8 Permits: Contractor will be required to obtain a permit from the State or local government having jurisdiction, to perform any non-construction work within the existing Right of Way and/or limited access. April 2013 Page 10 of 32 8.9 Entry On Private Property: The DBT, acting as The Department’s agent, may enter upon any lands within the State for the purpose of inspecting, surveying, leveling, digging, drilling, or doing any work deemed necessary in the execution of any survey authorized by the Director of Transportation in accordance with Section 5517.01 of the Ohio Revised Code and Section 102.6 (inclusive of Sections 102.61 through 102.66) of ODOT’s Survey Manual. Prior to performing said survey, the DBT will send notification letters indicating the date and duration of entry to the affected property owners no less than forty-eight hours nor more than 30 days prior to the date of entry for said survey in accordance with 102.6 of ODOT’s Survey Manual. The DBT shall forward copies of all notification letters distributed to ODOT’s Project Manager. Any subsequent claims for compensation due to damages incurred while said survey was being performed will be negotiated between the DBT and the affected property owners with final approval from ODOT’s Project Manager. Crop and property damage minimization and reimbursement information, together with the crop damage reimbursement formula and Special Waiver of Damage form, will be provided to the DBT by ODOT’s Project Manager. Any subsequent entries onto private property for the purpose of obtaining additional survey or soil information prior to the submission of the bid will be made in accordance with the procedures outlined in this section. 9 HAZARDOUS MATERIALS An ESA Screening, in accordance with the ODOT Environmental Site Assessment Guidelines (ODOT, 2009), was completed to determine the likelihood of hazardous substances within the project area. The ESA Screening report is provided to the DBT as Attachment R-2. Environmental studies have shown petroleum contaminated soil (PCS) are present on the following properties: · 5660 Trabue Road, · 1520 HilliardǦRome Road, and · 1499Ǧ1515 HilliardǦRome Road The Contractor is required to manage PCS in accordance with the following: · · · April 2013 All excavations within the aforementioned limits shall be paid for under the original plan bid items. The Contractor shall provide the Engineer with ten (10) days’ notice prior to any excavations within the aforementioned limits to permit arranging for the necessary testing services. All excavated materials generated from the properties listed above require characterization by the Engineer. The Engineer will characterize the excavated material and determine how the PCS will be handled, managed and disposed of. The Engineer will provide the Contractor with the characterization laboratory test results. Page 11 of 32 All material excavated form the properties listed above may be stored in any of the following ways provided the contractor develops and implements an acceptable containment and storage plan to the engineer for approval: o Temporary storage of the excavated material in a lined and covered roll-off box. o On an impermeable membrane. The membrane shall be surrounded by bales of straw to prevent the stockpiled materials from coming in contact with surrounding soils. Place an impermeable membrane over the stockpile to prevent contact with precipitation and/or surface run-off. o Direct load the excavated contaminated material into trucks for disposal at an appropriate facility. The contractor is required to legally dispose of all regulated waste generated as a result of the work. Disposal includes any required permits, approvals, or fees related to the materials handled on the properties listed above. Any additional testing or characterization required by the disposal facility is included in the items of work occurring on the properties listed above. Regulated materials will be paid at the LS Bid Item: 203E99100 Special Earthwork – Misc:PCS disposal 10 ENVIRONMENTAL The Department has obtained Environmental Clearance for this project. The complete Categorical Exclusion is provided as Attachment R-3. 10.1 Waterway Permits: The 404/401waterway permits for this project have yet to be authorized by the US Army Corps of Engineers and/or the Ohio Environmental Protection Agency. The DBT shall not perform any work in and/or place any fill in streams or wetlands until permits are authorized by the US Army Corps of Engineers and the Ohio Environmental Protection Agency. The permits will be provided to the DBT by ODOT as soon as they become available. The DBT shall perform the work per the 404/401 permits including all special conditions of the permits. Any work outside the limits covered under 404/401 permit obtained by ODOT shall require additional permitting. Any additional permitting will be the responsibility of the DBT to obtain. As indicated in the Ecological Survey Report (Attachment R-4), there are two jurisdictional ditches within the project area. These are indicated as Ditch 1 and Ditch 2. It has been determined that the project should meet the requirements of the US Army Corps of Engineers (USACE) Nationwide Permit Program due to the minor impacts to Jurisdictional Ditch 1 at the southeast corner of Hilliard-Rome and Renner roads, as well as Jurisdictional Ditch 2 at the northwest quadrant of the WB entrance ramp to I-70. The environmental coordination and permitting for the project assumes that impacts to Ditch 1 and Ditch 2 are limited to the amount of disturbance and fill necessary to replace and/or extend the existing culverts to accommodate widened pavement. The remainder of April 2013 Page 12 of 32 these ditches is assumed to remain in their current location and elevation. Therefore, these ditches may not be relocated, filled, or excavated. Any work adjacent to the ditch must not extend below the Ordinary High Water Mark (OHWM) of the ditch channel. The OHWM can be calculated using the 2 year depth of flow in the stream as required by Section 1105.6.13 of the L&D Manual. It is required that the bidder be aware of Section 404/401 Permits/Certifications for all projects impacting "waters of the US". The level of permit, that is Nationwide versus Individual 404 and 401, is determined by the exact amount of impact to "waters of the US", (i.e., acreage of fill activities in a stream or wetland or linear feet of work in a stream) and in some cases the waters impacted. All individual 404 Permits require 401 Water Quality Certification. Nationwide Permits are activity specific permits used to authorize projects with minor impacts. Projects with more than minor impacts require individual review by the U.S. Army Corps of Engineers and the Ohio Environmental Protection Agency. The DBT should be aware of the Nationwide Permits and conditions as issued for the State of Ohio and should design projects to meet the requirements of these permits to avoid the requirements for Individual 404/401 Permits if possible. The Nationwide Permits for the State of Ohio can be found at the various Corps of Engineers' web sites. The Huntington District's web site can be found at: http://www.lrh.usace.army.mil/. Coordination of the waterway permits can take up to nine (9) months for Individual 404/401 permits. Therefore it is imperative that the DBT submit plans (i.e., plan & profile, cross-section and detail sheets for any bridges, culverts, or fill areas in waters) to the District, for permit determination, as soon as possible. The review of plans, any required coordination or the processing of permit applications must be accomplished by the Office of Environmental Services prior to the commencement of construction activities. The DBT shall be responsible for completing applications for 404 Permits and 401 Water Quality Certification, if they are required. At no time will the DBT coordinate waterway permit issues directly with the permitting agencies unless directed to do so by the Office of Environmental Services. All Waterway Permit requirements are found in the Waterway Permits Manual. 10.2 National Pollutant Discharge Elimination System (NPDES) permit: The DBT shall submit to the ODOT Project Manager the total number of acres of earth disturbance activities for both off project and on project work in a timely manner. This information will be used to develop the NOI if required. The NOI will be submitted to the OEPA within 10 days after this information is received from the DBT. Approval from the OEPA takes 21 days and the ODOT Project Manager has 10 days to file the NOI so these 31 days will be counted for in the project. All temporary erosion control is the responsibility of the Contractor even if a SWPPP is not required. Earth disturbing activity is not permitted prior to the OEPA permit April 2013 Page 13 of 32 approval. For projects that require an NOI, the SWPPP must be in place prior to the initiation of any earth disturbing activity. All temporary erosion control work and the SWPPP if required will be per SS832. For information about OEPA's NPDES permit requirements see http://www.epa.state.oh.us/dsw/storm/index.html. Items used to implement the DBT's Erosion Control requirements are paid from an encumbered amount included in the proposal as a non-bid reference number. The proposal specifies the unit prices for the erosion control items. Payments for erosion control items that exceed the encumbered amount will be made by an Extra Work Change Order using the specified unit prices. The specified unit prices are fixed for the contract and may not be negotiated or adjusted for inflation or claimed changed condition. 10.3 Removal of Temporary Erosion Control Items All temporary erosion control items shall be removed before the project is accepted. Removed materials shall become the property of the Contractor and shall be disposed of in accordance with the appropriate C&MS specifications. 10.4 ESA The project is being implemented via design/build contracting method. The design/build scope will include a plan note referring to the potential for encountering Petroleum Contaminated Soil (PCS) during soil excavation in the vicinity of the Shell Gas Station and car wash located at 1500 Hilliard Rome Road. 10.5 Other Resources, Drinking Water The following plan note will be made to further protect drinking water wells: This project is located near the Shell Gasoline Station at 1500 Hilliard Rome Road, the St. James Lutheran Church at 5660 Trabue Road and the Perkins Restaurant at 1451 Hilliard Rome Road. In order to minimize the potential to contamination of these drinking water resources project related refueling and maintenance activities shall not be performed within the vicinity of these locations. The Contractor shall immediately take steps to mitigate any event, such as a spill of fuels, oils, or chemicals, that could threaten to contaminate the drinking water supply. If the spill is a reportable amount, the Contractor should contact the Emergency Management Coordinator at the Franklin County Emergency Management Agency at 614-794-0213 for cleanup of the spill. 10.6 Public Involvement ODOT will issue a press release describing the initial phase (ramps) of the project. ODOT will address all comments received with furtherance of project design and development. Following the initial press release, ODOT will send an informational mailing to the adjacent property owners or hold a Public Meeting to discuss the other proposed improvements. ODOT and local officials will continue updating the public throughout project duration. April 2013 Page 14 of 32 11 RIGHT OF WAY (ROW) All necessary construction work for the project will be performed within the existing right of way. Existing right of way lines will be located by the DBT based on requirements specified in Chapter 4733-37 of the Ohio Revised Administrative Code (Board Rules) governed by regulations outlined in Chapter 4733, Ohio Revised Code (Regulation Laws). It is the responsibility of the DBT to research existing right of way information from all available sources including but not limited to ODOT records, County road records, Commissioners’ Journals and records of other County offices to the extent necessary to provide an accurate basis for the establishment of the existing right of way. The DBT will stake and flag the existing right of way in the field prior to the start of construction and will maintain said stakes and flags throughout the duration of the project. The Consultant will identify and show all right of way encroachments on the construction plans at the Conceptual Review Submission. ODOT’s Project Manager will be responsible for clearing all encroachments on Federal-aid projects in accordance with standard encroachment removal 12 UTILITIES Utilities Special Provisions in addition to the Governing Regulations listed in section 8.1 of this document and section 153.64 of the Ohio Revised Code. 12.1 Existing Utilities: The District Utility Coordinator, in concurrence with the registered Underground Utility Protection Services- Ohio Underground Protection Service (OUPS) and Oil and Gas Producers Underground Protection Service (OGPUPS) and other utility owners that are non-members of any utility protection services, has determined that utilities are located in the area of the project: See Attachment R-5. 12.2 Utility Coordination Responsibilities: As soon as it is feasible after the final plan is approved by the Department, the DBT shall stake the existing ROW (and new ROW if additional is acquired) in the field and shall perform clearing and grubbing within that ROW as required by the specifications and the proposal documents, in order to allow utility relocation and reduce potential delays. ROW stakes shall be maintained and updated as needed throughout the project length. The DBT shall be cognizant of the project's impact on utility facilities. In the event utility rearrangements are required, the project shall not be designed to preclude legal occupancy of the highway ROW by the rearranged utility facilities. The DBT shall coordinate all existing utilities with construction activities on this project. The DBT shall insure that potential delays in coordination and relocation of the affected utilities are minimized. The DBT shall copy the ODOT Project Manager and the District April 2013 Page 15 of 32 Utility Coordinator on all correspondence or phone calls between the DBT and each utility. This shall include the submittal of plans to each utility. A meeting at or near the preliminary review shall be held between the DBT, the District Utility Coordinator and the utility owners to determine if any significant utility relocations can be eliminated or mitigated. Any betterment to the utility's facility and ineligible, or unnecessary, work shall not be a part of the project's expense but the utility company’s fiscal requirement. Determination of eligibility can be coordinated through the District Utility Coordinator. Payment for betterments or ineligible costs shall be made by the appropriated utility through ODOT to the Contractor. The cost of all utility coordination shall be bid as a Lump Sum Item. 12.3 Subsurface Utilities Engineering (SUE): Yes X No If marked yes, the DBT shall use a state approved subsurface utilities engineering location service to field verify all underground utilities prior to beginning of any design work and shall incorporate the results in the design. DBT shall have the SUE perform the following Quality Levels: __________________ Note: ODOT has provided SUE Quality Level B plans (see Attachment R-5). 13 DESIGN AND CONSTRUCTION REQUIREMENTS : MAINTENANCE OF TRAFFIC (MOT) Maintenance of Traffic (MOT) Special Provisions: All MOT components proposed by the DBT shall comply with the applicable Governing Requirements documents contained in Section 8.1. Any and all costs associated with components that do not comply shall be borne by the DBT. 13.1 General: Maintenance of Traffic (MOT) for this project shall be implemented in a manner that minimizes both construction duration and impact to the traveling public. Section 13 defines specific requirements and restrictions for both travel lanes and ramps. All temporary MOT devices shall comply with the National Cooperative Highway Research Program (NCHRP) 350 Hardware report. 13.2 MOT Restrictions/Design Criteria: A. Except as described in Note C below, the minimum number of lanes in each direction to remain open during construction is as follows: 1. A minimum of two (2) lanes in each direction on Hilliard-Rome Road shall be maintained at all times except: · During off Peak periods (9:00AM - 3:00PM; 7:00PM – 5:00 AM), when Hilliard-Rome Road may be reduced to one lane in each direction. 2. Lane reductions on Hilliard-Rome Road from 2 to 1 are not allowed 5:00AM – 9:00AM and 3:00PM – 7:00PM. April 2013 Page 16 of 32 B. C. D. E. F. G. H. I. J. 13.3 3. All turn lanes Access to all driveways must be maintained at all times. No lane closures shall be permitted on mainline I-70. All ramps at I-70 and Hilliard Rome Road shall remain open to traffic for the duration of the project. Minimum lane width: 11 ft. Maximum duration of detour: No detour required . Design Speed for tapers and reverse curves: Existing posted speed limit Uncurbed Edge of Pavements: Any existing, temporary, or proposed edges of pavement shall be a minimum of 1.5 feet away from the edge of a travel lane and shall not exceed allowable dropoff conditions set forth in Standard Construction Drawing MT-101.90. Portable Barriers: Minimum 1.5 foot clearance between barrier and edge of travel lane. Crash Compliance: All work zone traffic control devices shall be compliant with either NCHRP 350 or MASH-08 requirements. Additional Description of Required Work and special provisions: The DBT shall prepare and submit, for each buildable unit, a Maintenance of Traffic plan (MOTP) to the Department for approval at least 7 calendar days prior to beginning construction on the buildable unit #1, 14 calendar days prior to beginning construction of subsequent buildable units. The MOTP shall address all aspects of MOT and it shall contain specific MOT phasing plans and it shall comply with the requirements listed below. The MOT requirements, listed below, shall be incorporated into the MOTP. A. Cover page/title sheet sealed by an Ohio registered professional engineer B. A schedule showing MOT phases and durations. All long-term (as defined in TEM 606-3) lane closures and lane restrictions shall be included and identified. All complete directional roadway closures shall also be identified. C. Discussion of sequence of operations and MOT procedures D. Plans at 40-scale showing: a. The work area b. Begin/end tapers c. Work in vicinity of entrance ramps, as per TEM 607-13 and TEM 607-15 d. Temporary pavements and/or structures e. Location of signs (existing, proposed, covered, and modified) f. Locations of typical sections g. References to applicable Standard Construction Drawings (SCD), Plan Insert Sheets (PIS), and Plan Notes E. Plans at an appropriate scale showing: a. Detailed detour plans, incorporating detour routes provided in the Appendix b. PCMS locations F. Typical sections showing lane widths, pavements markings, drums, portable barrier (PB), limiting stations, work area, drop-offs, etc. April 2013 Page 17 of 32 G. Sign details for proposed signs and overlays/modifications of existing signs H. Haul routes Any changes to or modifications of the MOTP shall be submitted to the Department for approval a minimum of 14 calendar days prior to desired implementation of the proposed change(s). The Department may approve or reject the modifications or request additional information. 13.4 Traffic Engineering Manual (TEM) Notes shall apply: 642-3 Maintaining Traffic At All Times 642-12 Maintain Traffic 642-14 Trench for Widening 642-15 Overnight Trench Closing (no more than 1.5 inches) 642-19 Dust Control 642-28 Earthwork for Maintaining Traffic 642-29 Floodlighting 642-30 Work Zone Impact Attenuator for 24" wide hazards 642-31 Work Zone Impact Attenuator for hazards over 24" wide but less than 36" wide 642-48 Work Zone Raised Pavement Marker 642-49 Work Zone Raised Pavement Markers on Concrete Surfaces 642-51 Concrete Barrier Delineation 642-52 Guardrail Delineation 642-55 Law Enforcement Officer (with Patrol Car) for assistance during construction operations 13.5 Other General Maintenance of Traffic Requirements 13.5.1 Traffic Control Devices Quality The DBT shall provide, erect, and maintain drums, signs, barriers, and other traffic control devices used for maintenance of traffic in acceptable condition, in accordance with ODOT‟s Quality Guidelines for Temporary Traffic Control Devices. 13.5.2 Construction Equipment & Materials Construction vehicles used by the DBT and truck traffic required by the DBT shall comply with any and all load restrictions and vehicle delineation requirements. As per CMS 614.03, contractor equipment and materials shall always be stored in locations that do not pose a safety risk to the traveling public. 13.5.3 Pavement Markings and Delineation Existing pavement markings in conflict with the implementation of the MOTP shall be removed in accordance with CMS 614.11G. Temporary work zone striping shall be Class I paint except on new permanent surfaces. Removable tape shall be used on new permanent surfaces. In addition to meeting the CMS 614 specifications for work zone pavement markings, work zone pavement markings shall be reapplied at least once per year April 2013 Page 18 of 32 or as directed by the Engineer. Reapplication of pavement markings shall be performed prior to each over-winter condition. For the purpose of this project, “Moving Operation” shall be limited to pavement marking striping. 13.6 Law Enforcement Officers (LEOs) LEO’s without patrol cars shall be required for the following situations: · · 13.7 LEOs shall be provided at a traffic signal when impacting the normal function of the signal or the flow of traffic, or when traffic needs to be directed through an energized traffic signal contrary to the signal display (e.g. directing motorists through a red light). LEOs shall not be used where the OMUTCD intends that flaggers be used. LEOs shall be used during construction operations at and within 150 feet of signalized intersections. Notification and Coordination 13.7.1 MOT Phase Changes: Notification & Coordination Requirements At least fourteen (14) days prior to any construction activities, lane closures, or road closures, the contractor shall advise the District Office of Communications via email at [email protected] and the District Work Zone Traffic Manager via email at [email protected] of the anticipated start date of any construction activities, including but not limited to the placing of work zone signs. The notification shall also include the project number, PID, name and phone number of the contractor, a point of contact and the anticipated impact on traffic. The contractor shall immediately inform the District Office of Communications and the District Work Zone Traffic Manager of any and all delays and/or changes regarding the construction initiation date. Throughout the duration of the project, the contractor shall notify the project engineer and the others listed in this section in writing of all traffic restrictions and upcoming maintenance of traffic changes. The contractor shall ensure the written notification is submitted in a timely manner to allow the project engineer to meet the required time frames set forth in the table below. This notification shall be received by the project engineer prior to the physical setup of any applicable signs or message boards. Information shall include but is not limited to all construction activities that impact or interfere with traffic and shall list the specific location, type of work, road status, date and time of restriction, duration of restriction, number of lanes maintained, detour routes if applicable, and any other information requested by the project engineer and the District 6 Communications Office. Any unforeseen conditions not specified in the plans requiring traffic restrictions shall also be reported to the project engineer, the District 6 Communications Office, and the District Work Zone Traffic Manager using the Notification Time Frame Table. 13.7.2 Public Outreach and Notification: April 2013 Page 19 of 32 The District 6 Communications Office will notify the public, the local emergency services, affected schools and businesses, and any other impacted local public agency of any of the above mentioned items, via media sources. 13.7.3 Points of Contact ODOT District 6 Communications Office Nancy Burton (740) 833-8063 [email protected] ODOT District 6, District 6 Work Zone Traffic Manager Duane Soisson (740) 833-8162 [email protected] ODOT District 6, Franklin County Manager Mitch Blackford (614) 387-2291 [email protected] 14 DESIGN AND CONSTRUCTION REQUIREMENTS : LOCATION & DESIGN Location & Design Special Provisions in addition to the Governing Regulations listed in section 8.1 of this document: 14.1 Survey A. ODOT Survey Responsibilities: The Department survey crews have provided the following survey information, listed below: 1. 2. 3. 4. Centerline control and bench marks Beginning and ending centerline points for the project At least two bench marks for the project (the datum used was that which the project was originally laid out by) Lidar Generated Aerial Planimetric Drawings, Orthophotos and TIN Files B. Survey Responsibilities: All survey data shall be submitted using ODOT’s standard field codes and GEOPAK’s standard mapping codes. Reduced point data, in comma delimited ASCII text format, will be provided for all surveyed points. This data will include: point number, x coordinate, y coordinate, elevation and point ID. Customized GEOPAK information is available on the ODOT CADD web site. Monumentation shall not be disturbed. If the Contractor does disturb the monumentation, then it shall be replaced, in-kind, by a Registered Surveyor, with a current registration, recognized by the Ohio State Board of Registration for Professional Engineers and April 2013 Page 20 of 32 Surveyors. Costs associated for this item shall be borne by the Contractor. Copies of all monumentation changes shall be forwarded to the District Real Estate Administrator. All control points, provided by ODOT, shall be included in the ASCII file supplied by the DBT to ODOT. They should retain the original point numbers and coordinate values as assigned by ODOT. The DBT shall provide the following items prior to final acceptance of the RecordDrawing plans: 1. Copies of all field notes (written or electronic) which shall include the following information: a. DateG b. Crew membersG c. Weather conditions, including temperature, barometric pressure, etc.G d. Instrument(s) used (Serial Number)G e. Raw observation field dataG f. Other notes as needed 2. Copies of all Deeds, Plats, Maps and other written evidence used to establish points related to the project including summaries of all parole evidence acquired as a part of the survey operation. 3. Listing of all found monumentation (Horizontal and Vertical). 4. Listing of all monumentation set as part of the project (Horizontal and Vertical) including reference ties for recovery. 5. All monumentation shall be located utilizing NAD 83 (Horizontal Data), NAVD 88 (Vertical Data). 6. Short report indicating adjustment factors and methods, signed and certified by a Registered Surveyor (State of Ohio). The Registered Surveyor (State of Ohio) shall include in the report the datum used and all associated adjustments used. 14.2 Vertical and Horizontal Alignment: A. It is the intent of this project to maintain the existing horizontal and vertical alignment to the greatest extent possible. All vertical and horizontal alignment shall follow the ODOT Location and Design Manual. The DBT shall refer to the Preliminary Design Concept. B. Cross sections are required at 50’ intervals. 14.3 Pavement: Initial soil boring logs and subgrade analysis has been provided by the Department and is included as Attachment R-6: April 2013 Page 21 of 32 Ramps 10” Item 452 Non-Reinforced Concrete Pavement 6” Item 304 Aggregate Base Note: Shoulders shall be full-depth pavement buildup. Concrete ramp pavement for Ramp C (westbound I-70 to northbound Hilliard Rome Road) shall continue to where the theoretical extended edge of paved right shoulder for Hilliard Rome Road meets the edge of the Ramp C left shoulder, the transition joint then crossing perpendicular to the ramp lanes to the right shoulder. Hilliard-Rome widening 1 ½” Item 442 – Asphalt Concrete Surface Course, 12.5 mm, Type A (446), As Per Plan. Add Plan Note: Item 442 asphalt mix shall require a PG76-22M binder. Item 407 - Tack Coat for Intermediate Course 1 ¾” Item 442 - Asphalt Concrete Intermediate Course, 19mm (446) 10 Item 301 – Asphalt Concrete Base, PG64-22 6” Item 304 - Aggregate Base Note: Shoulders shall be full-depth pavement buildup. Hilliard-Rome Road Sawcut at the existing edge line, remove existing shoulder and provide full depth widening. The remainder of the existing lanes shall be resurfaced by planing off 1.5” of existing asphalt pavement and placing 1.5” Item 442- Asphalt Concrete Surface Course. Apply intermediate tack coat. The limits of the resurfacing work shall be from the north approach slab of the I-70 bridge (STA 102+50 from FRA-70-5.25 plans) to the south edge of Westchester Woods Blvd (STA 145+50 from FRA-CR3-14.06 plans). 14.4 Roadway: Roadway design will follow the ODOT Location and Design Manual. The Design Vehicle for the I-70 ramps, Hilliard Rome Road, and Renner Road shall be a WB-62 Interstate Semi-Trailer. The Design Vehicle for the Meijer Drive, Westpointe Plaza Drive, and commercial driveways shall be a SU-30 Single Unit Truck. Radius returns for commercial driveways shall be no less than existing. SUBGRADE COMPACTION, STABILIZATION, AND PROOF ROLLING The DBT shall prepare suitable subgrade conforming to C&MS 204. Stable subgrade is defined as subgrade where proof rolling results in permanent rutting of 1/2 inch or less and elastic (rebound) movement of 1/2 inch or less. For areas where the proposed subgrade is at the same elevation as the existing subgrade or is below the existing subgrade, the DBT shall use the guidelines in ODOT Geotechnical Bulletin 1, Plan Subgrades, Section H, to identify any unsuitable existing subgrade soil and rock. For April 2013 Page 22 of 32 areas where the proposed subgrade shall be constructed using embankment materials, the restrictions listed in C&MS 203.03 on embankment materials shall apply. The DBT shall determine the method, location and dimensions (including depth) of subgrade stabilization as necessary to furnish suitable subgrade. The DBT shall utilize one of the accepted stabilization methods listed in GB-1 when performing subgrade stabilization. The Department will not require global subgrade stabilization of the entire project. Where subgrade stabilization is required, stabilize to 18 inches beyond the edge of the surface of the paved shoulders. There are no unit price items for subgrade stabilization, excavation and replacement of subgrade, proof rolling or any other subgrade related work. Therefore all subgrade work will be paid for under the appropriate ITEM SPECIAL-MISC: ROADWAY. 14.5 Drainage: Yes X ; No . All associated materials and work are to be included. The DBT is also to provide the Notice of Intent (NOI) and Best Management Practices (BMPs) as per current ODOT and City of Columbus standards. Existing drainage patterns shall be maintained. This included open ditch drainage along the ramps and Hilliard-Rome Road between I-70 and Renner Road. All existing catch basins, inlets and manholes within the work limits shall be raised/adjusted to accommodate resurfacing. Any existing drainage conduits that are not in conflict with new construction may be reused. 14.6 Design Exceptions: Yes ; No X . 14.7 Interchange Modification/Justifications Studies: The Department has completed an IMS for this project. Please see Attachment R-7a and R-7b. 15 DESIGN AND CONSTRUCTION REQUIREMENTS : TRAFFIC CONTROL 15.1 Pavement Markings and Delineators Special Provisions in addition to the Governing Regulations listed in section 8.1 of this document: A. Pavement Marking Requirements and Locations: Pavement markings shall conform to Section 640 of the CMS and shall be placed in accordance with current design standards. Pavement markings on Hilliard Rome Road shall instead use City of Columbus standard widths – 5” for lane and edge lines, 10” for channelizing line and 20” for stop bars and transverse lines. Item 646 Epoxy Pavement Marking shall be used for the concrete surfaces. Item 644 Thermoplastic Pavement Marking shall be used on all asphalt surfaces. April 2013 Page 23 of 32 B. Raised Pavement Markers Requirements and Locations: All Raised Pavement Markers shall conform to Item 621 and shall be placed in accordance with current design standards and Standard Construction Drawings. 15.2 Signing Special Provisions in addition to the Governing Regulations listed in section 8.1 of this document: A. Flat Sheet Signs: Yes 1. Remove and reuse or remove and replace all existing flat sheet signs with new signs within the project limits as indicated on Attachment C-4 Conceptual Signing Plan. Attachment R-8 Existing Signing and Lighting Inventory has been provided for reference. Size the signs in accordance with the OMUTCD to match the proposed lane use configuration. Removed flat sheet signs shall become the property of the Contractor. 2. B. Extrusheet Signs: Yes X X ; No ; No . . 1. Remove and reuse or remove and replace all existing extrusheet sheet signs with new signs within the project limits as indicated on Attachment C-4 Conceptual Signing Plan. Attachment R-8 Existing Signing and Lighting Inventory has been provided for reference. Size the signs in accordance with the OMUTCD. 2. Tourist-Oriented Directional Signs (TODS) and logo signs are installed and maintained by Ohio Logos, Inc., under contract with and in locations approved by ODOT. Under the terms of the contract, Ohio Logos can be required to temporarily remove or relocate the signs during construction. They can also be required to permanently remove or relocate the signs. Contact Ohio Logos at 1800-860-5646 to coordinate removals or relocations of TODS and logo signs. 3. Removed extrusheet signs shall become the property of the Contractor. C. Ground Mounted Post Supports: Yes X ; No . 1. Replace all existing ground mounted post supports with new supports within the project limits as indicated on Attachment C-4 Conceptual Signing Plan. Attachment R-8 Existing Signing and Lighting Inventory has been provided for reference. New sign installations shall be on new supports. No reuse of existing ground mounted supports shall be allowed. Post supports shall comply with City of Columbus specifications (see attachment C-5). 2. Removed ground mounted supports shall become the property of the Contractor. D. Ground Mounted Beam Supports: Yes X ; No April 2013 Page 24 of 32 . 1. Replace all existing ground mounted beam supports with new ones, except at the locations indicated below: 2. Supports subject to multidirectional impacts at intersections shall use the alternate connection on sizes larger than S4 x 7.7. 3. Removed ground mounted beam supports shall become the property of the Contractor. E. Overhead Supports: Yes 15.3 X ; No . 1. Location of all supports shall be as per the Traffic Engineering Manual 2. 3. As indicated on Attachment C-4, one overhead support shall be relocated. At all locations, a minimum vertical clearance of seventeen feet shall be maintained. 4. All sign attachment assemblies shall be replaced. Lighting Special Provisions in addition to the Governing Regulations listed in Section 8.1 of this document: Attachment R-8 Existing Signing and Lighting Inventory has been provided for reference. It is anticipated that the following existing lighting will be affected by the construction of this project and relocated as necessary. This shall be verified for final design by the DBT. The existing poles may be reused. · 3 poles · 1 combination · Power supply 15.4 Traffic Signals Special Provisions in addition to the Governing Regulations listed in Section 8.1of this document: A. Signal Supports: Yes X ; No 1. 2. 4. 5. April 2013 . Shall be per City of Columbus specifications (see attachment C-5). No wood poles, except for use at temporary signal constructed in BU 1. Shall be span wire. Pole height shall provide required signal head clearance above the pavement. Location of the supports shall be as per City of Columbus requirements. Clearance from overhead electric wires shall be as per utility company requirements. Page 25 of 32 B. Vehicle Signal Heads: 1. 2. 3. 4. 5. 6. 7. 8. 9. Shall be made of Polycarbonate or Aluminum, but must be designed for Aluminum. Lenses shall be 12 inch LED. Shall be completely Yellow except for the inside of visors which shall be black. Tri-stud wire entrance fitting Far side mounting of signal heads shall be used as much as practical. For protected/permissive operation of a 5-section signal head (either left or right turn), the recommended location of the signal head is over an extension of the channelizing line, through the intersection, that separates the turn lane and the through lane. Shall have backplates with reflective borders. Shall be tethered on span wires. Optically Programmed Vehicular Signal Heads shall be used for the westbound to northbound I-70 ramp approach, and northbound Hilliard Rome Road at the westbound I-70 ramp intersection. C. Pull box: 1. 2. 3. Shall be concrete, CMS 725.08, 18 inch minimum opening size. Pull boxes for interconnect conduit bank and for entry into controller cabinet shall be 32” and concrete. Pull boxes at signalized intersections shall be 27” concrete. City of Columbus specified for all others (see attachment C-5). Shall not be located in curb ramp areas. Shall not be located where subject to vehicular traffic. D. Conduit: 1. 2. 3. 4. 5. Maximum conduit run length between pull boxes and/or poles is 500 feet. Conduit under roadway pavement shall be 3 inch diameter minimum. Conduit must be sized for the number and size of the conductors contained in the conduit. Cable fill should not exceed 40% of the inside cross sectional area of the conduit. Conduit shall be CMS 725.051. Install concrete encased conduit bank either 4-3” & 1-1.5” or 2-3” & 1-1.5” through limits of the project (see attachment C-5). E. Cable and Wire: 1. 2. 3. April 2013 Unswitched power cable shall not be run inside of conduit, poles or pull boxes containing other signal cables. Lighting cables operating at voltages higher than 120 volts shall not be run inside of conduit, poles or pull boxes with signal cables. Utility company approval shall be obtained for the attachment of any interconnect cables to utility poles, and for the location of power sources. Page 26 of 32 4. 5. All abandoned cables shall be removed from aerial spans, conduit and pull boxes. Direct burial cables will be abandoned in place. Signal messenger wire size shall be 3/8 inch diameter. F. General: 1. 2. 3. 4. G. 16 The existing signal controllers are Econolite and operate on a closed loop system. The system includes the signals from Feder Road to Roberts Road. The EB ramp and the Feder Road signal are coordinated. The controller shall be provided with the latest ASC3 software. All signal installations shall be designed and installed per City of Columbus specifications. The new traffic signal @ the WB ramps intersection shall be coordinated with the adjacent Hilliard-Rome Road traffic signals. The DBT shall generate signal coordination timing for Renner Road and the signalized WB I-70 ramp intersection. The plan shall be submitted to ODOT for review and approval prior to commencing signalized ramp operation. Signal(s) is part of an Intelligent Transportation System (as defined by the Traffic Engineering Manual, Part 13): Yes ; No__X__ DESIGN AND CONSTRUCTION REQUIREMENTS: PROJECT BILL OF MATERIALS 1. As a component of each progress payment, the DBT shall submit a Project Bill of Material that shall include, but not limited to, the following data for material incorporated into the work: Line Item, Primary or Component, Material Code, Material Name, Material Unit, Placed Item Quantity, Assigned Material Quantity, Total Quantity, Conversion Factor, Discrepancies Between Placed Quantity and Assigned Quantity, Basis of Acceptance, and Description of document supplied to the Department. 2. Prior to the Department's approval of the progress payment, the DBT shall remedy all discrepancies between placed material quantity and assigned material quantity 3. The project bill of materials is a supplement to the DBT's responsibility for material certification and substantiation, and does not waive any requirements for the DBT to comply with the testing material documentation submissions in any governing regulations, for example and not limited to: TE24, Material Tickets, QPL, and Certified Test Data. 4. The DBT shall receive the standard bill of materials from ODOT upon receipt of the General and Subsummary quantities spreadsheets as a part of the DBT’s “Approved for Construction” plan set as described in section 18 Plan Submittals and Review requirement. April 2013 Page 27 of 32 17 PROJECT SCHEDULE REQUIREMENTS The current edition of Proposal Note 107, including updates released on or before the prebid meeting date, shall be met or exceeded. 18 PLAN SUBMITTALS AND REVIEW REQUIREMENTS 18.1 Plan Components: All plans submitted by the DBT shall be in conformance with the following ODOT manuals: 1. 2. 3. 18.2 Real Estate Policies and Procedures Manual Section 3100. The DBT shall also identify all topographic features within the existing and proposed Right-Of-Way limits, including underground utilities. Bridge Design Manual. Location and Design Manual, Volume 3: Quality Control: The DBT will be responsible for the professional quality, technical accuracy and adherence to the Governing Regulations listed in section 8.1 of this document, for all plan submittals required under this contract. The DBT shall immediately notify the Department of any apparent discrepancy between the various design and construction manuals and the Conceptual Documents. Unless stated otherwise, review comments do not revise the scope or intent of the project and do not constitute a request for changes beyond the current contracted Scope of Services. In the event the Department determines that any required submission is incomplete, contains inaccuracies which preclude a meaningful review, or does not adhere to the Governing Regulations listed in section 8.1 of this document, the Department will advise the DBT of the shortcomings and direct the DBT to revise and resubmit the plan. No time extension will be granted as a result of such action. The Department will schedule a review meeting or issue review comments as appropriate. In the event the DBT believes that any review comment, or orders issued by the Department, require a change to the scope of the agreed work, the DBT shall first contact the Department for clarification and shall, within 10 days of receipt of the comments or orders, provide written notice to the District Project Manager and Project Engineer concerning the reasons why the DBT believes the scope has been changed. 18.3 Stage 1 Plan Review Submission: The DBT shall submit the Stage 1 detailed design plan submissions as per Location & Design Manual, Volume 3 for review by ODOT. These submission milestones must be shown on the Progress Schedule. April 2013 Page 28 of 32 Unless indicated below, the Department shall have 21 calendar days from receipt to review complete submissions. This review time must be shown on the required Progress Schedule. Following this review, the DBT shall correct any errors, incorporate modifications, perform required investigations and make related changes to the plans and supporting documents prior to submitting the plans for final review. Plan Review Distribution: The DBT shall supply 4 half size (11" x 17") paper prints to ODOT District 6 Project Engineer and to the parties indicated below. Each affected utility company shall also receive one full size (22"x34") plans. 18.4 Major Design Decision: Separate submittals for concurrence with major design decisions made after the Stage 1 Review are required. Major design decisions involve significant utility relocation, unforeseen acquisition of ROW, traffic operation or geometric decisions that involve two or more viable solutions, and any other decision that impacts the public, operation of the facility or future maintenance. When the DBT becomes aware of additional decisions during the course of the design, they must advise the District Project Manager in writing. 18.5 Stage 2 Plan Review Submission: For each Buildable Unit the Consultant shall submit Stage 2 detailed design plans as per Location & Design Manual, Volume 3 for review by ODOT. All submissions must be shown on the required Progress Schedule. The Department shall have 21 calendar days from receipt to review complete submissions. This review time must be shown on the required Progress Schedule. Following the review the Department will return to the DBT marked plans noted ‘ACCEPTED’, ‘ACCEPTED AS NOTED’ or ‘NOT ACCEPTED’ as described in section 105.02 of the Construction and Material Specifications. The DBT shall correct errors, incorporate changes, perform investigations and make related changes to the plans and supporting documents prior to submitting construction plans. Plan Review Distribution: The DBT shall supply 4 half size (11" x 17") paper prints to ODOT District 6 Project Engineer and to the parties indicated below. Each affected utility company shall also receive one full size (22"x34") plans. 18.6 Construction Plans: After the review comments for the final plan review submission have been complied with, and following approval of the design documentation, the DBT shall prepare plan sets for use during construction. All review comments shall be resolved in writing by the DBT to the satisfaction of the Department before the DBT submits the construction plans. Each plan sheet shall have its last revised date noted on the sheet and clearly marked ‘Approved For Construction’. The ‘Approved For Construction’ plan set shall be signed, dated and sealed by a Professional Engineer. Physical construction shall April 2013 Page 29 of 32 not begin until the plans marked ‘Approved For Construction’ are delivered to each party on the Plan Distribution Table below. No time extensions will be approved by the District Construction Engineer if the plan distribution is not completed and project delays occur as a result. 18.7 Plan Distribution Addresses: to be provided at pre-con 19 BUILDABLE UNITS (BU) Definition: Buildable Units are portions of the projects which can be designed, reviewed and built with only limited controls and assumptions coming from the design of other portions of the project. Often a Buildable Unit will be defined by a geographic area within the plan, but it may also be defined by types of work or construction stages which may require or permit similar, nearby work to be divided into separate Buildable Units. All Buildable Units shall summarize the materials required to construct that portion of the project. The summary shall include the Construction and Material Specifications Item Number, and a description of the materials to be used. General: For the Stage 1 and Stage 2 submittals, the DBT may break the project work into two or more separate BU which can be progressed through design and construction with minimal or known effect on each other and/or which can be dealt with sequentially such that sufficient data is available for design and review of each BU. In order that the design and construction of one BU may proceed without significant approved information from an associated BU, the DBT may develop and propose assumptions which will allow for the first BU to proceed through design and/or construction. These assumptions shall be submitted for review and comment but their accuracy and effort upon the final design are the sole responsibility of the DBT. Should error in these assumptions result in additional work, remedial work or other changes to assure an acceptable design or should they result in the need to remove work and substitute additional work, the Contractor shall be responsible for all such costs including, removal of unacceptable materials from the site, modification, additional work, repairs, etc. as necessary to produce an acceptable result. If the DBT elects to develop Buildable Units, the DBT shall prepare, for review by the Department, a table of Buildable Units for the project with each BU described in detail. If the table is approved, the DBT shall modify the Progress Schedule to show a separate group of activities for BU and these activities shall encompass all of the design and construction work in each BU. Work activities shall be further separated in the Progress Schedule to show a meaningful completion status (i.e. separate activities comprising the placement of a bridge deck on steel beams shall describe; shoring, form building, steel placement, placement of conduit & joints, pouring concrete, forming parapets, pouring or slip forming parapets, provision of membranes, provision of wearing surfaces, curing, repair, form removal, cleaning, etc.). The Final Review Submission and construction plans shall specifically be identified by the Buildable Unit code. If the design of a BU requires input information from an April 2013 Page 30 of 32 adjacent or related BU, the source for that information in previously approved plans shall be cited or the DBT shall provide an estimated value of the data. The input data shall also be carefully identified. In the same way any assumption, calculations or results from the stage and BU which are used as input to another BU shall be similarly identified, and where appropriate, compared back to that BU to verify previous assumptions. Should assumptions not match values calculated later, the DBT shall re-analyze all affected components and determine appropriate changes. Should those elements have already been constructed, the DBT shall recommend repairs, adjustments, modifications or replacement of the existing work as necessary to comply with the Scope of Work. All costs for re-design, re-submissions, modifications, removals, disposal of materials and new work needed to remedy the project and bring it to compliance shall be borne by the Contractor and no time extensions shall be approved for this. April 2013 Page 31 of 32 20 INDEX OF ATTACHMENTS All Attachments have been placed on the D6 FTP server at the following location: ftp://ftp.dot.state.oh.us/pub/Districts/D06/download/FRA94460/ Contractual Documents Attachment C-1 – Certified Traffic/Design Designation Attachment C-2 – Lane Lengths and Descriptions Attachment C-3 – Conceptual Signing Plan Attachment C-4 – City of Columbus Specifications Reference Documents Attachment R-1 – Preliminary Design Concept Attachment R-2 – ESA Screening Attachment R-3 – Categorical Exclusion Attachment R-4 – Ecological Survey Report Attachment R-5 – Subsurface Utility Engineering (level B) Plans Attachment R-6 – Geotechnical Investigation Attachment R-7 – Interchange Modification Study Attachment R-8 – Existing Signing and Lighting Inventory Attachment R-9 – Ramp C Concrete to Asphalt Transition Detail Attachment R-10 – Survey Data The Attachments are provided for informational purposes to assist the Proposers in preparing their proposals, but the Attachments do not represent requirements binding on the Design-Builder with the exception of the Contractual Documents Attachments (Attachments C-1, C-2, C-3, C-4) which are contractual and must be followed in the design build process. The Department makes no representation or warranty as to the accuracy, adequacy, applicability, or completeness of the Reference Documents Attachments (R-1 through R-10). Except to the extent set forth to the contrary in the contract, reliance upon the Reference Documents Attachments shall be at the Proposers risk, and the Department shall have no liability or obligation as a result of the inaccuracy, inadequacy, inapplicability, or incompleteness of the Reference Documents, regardless of the contents thereof. The Design-Builder shall be solely responsible for Project design and construction in accordance with the Contract. Note: The file size of all attachments exceeds 3.6 Gigabytes. A DVD of all Attachments can be made available upon request. April 2013 Page 32 of 32
© Copyright 2026 Paperzz