Energy East Project Consolidated Application Volume 4: Pipeline Design May 2016 Submitted to: The Secretary National Energy Board 517 10th Ave SW Calgary, Alberta T2R 0A8 CA PDF Page 1 of 11 Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Contents VOLUME 4: PIPELINE DESIGN 1.0 OVERVIEW ............................................................................................................................ 1-1 2.0 GENERAL DESIGN ............................................................................................................... 2-1 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 3.0 Safety and Environmental Protection ............................................................ 2-1 Route Selection Criteria ................................................................................. 2-1 Quality Management ...................................................................................... 2-2 Engineering Design Details ........................................................................... 2-3 2.4.1 Class Location .............................................................................. 2-3 2.4.2 Depth of Cover ............................................................................. 2-3 2.4.3 Pipe Wall Thickness .................................................................... 2-4 2.4.4 Line Pipe Specifications .............................................................. 2-5 2.4.5 Valves and Fittings ...................................................................... 2-5 2.4.6 Corrosion Control Elements ........................................................ 2-6 In-Line Inspection Facilities .......................................................................... 2-7 Watercourse Crossings................................................................................... 2-8 2.6.1 Trenchless Crossings ................................................................... 2-9 2.6.2 Trenched Crossings.................................................................... 2-11 Geohazard Assessment ................................................................................ 2-12 2.7.1 Geohazard Assessments ............................................................. 2-12 2.7.2 Mitigation Options for Slope Stability and Other Geohazards ................................................................................. 2-13 2.7.3 Design Confirmation.................................................................. 2-15 Buoyancy Control ........................................................................................ 2-15 Acid Rock Management .............................................................................. 2-15 Designated Protected Areas ......................................................................... 2-16 Valve Placement .......................................................................................... 2-17 2.11.1 Valve Placement Factors............................................................ 2-17 2.11.2 Valve Placement Process ........................................................... 2-18 Pipeline Integrity .......................................................................................... 2-19 PIPELINE-SPECIFIC INFORMATION ................................................................................... 3-1 3.1 3.2 May 2016 Alberta Segment............................................................................................. 3-1 3.1.1 Routing Alternatives .................................................................... 3-3 3.1.2 Design Considerations ................................................................. 3-3 3.1.3 Mainline Valve Placement ........................................................... 3-4 3.1.4 Watercourse Crossings................................................................. 3-4 3.1.5 Geohazard Assessment ................................................................ 3-5 3.1.6 Designated Protected Areas ......................................................... 3-6 Ontario East Segment .................................................................................... 3-7 3.2.1 Routing Alternatives .................................................................... 3-7 3.2.2 Design Considerations ................................................................. 3-9 Page i CA PDF Page 2 of 11 Contents 3.3 3.4 3.5 3.6 3.7 3.8 Page ii Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design 3.2.3 Mainline Valve Placement ......................................................... 3-10 3.2.4 Watercourse Crossings............................................................... 3-10 3.2.5 Geohazard Assessment .............................................................. 3-11 3.2.6 Designated Protected Areas ....................................................... 3-14 Québec Segment .......................................................................................... 3-16 3.3.1 Routing Alternatives .................................................................. 3-17 3.3.2 Design Considerations ............................................................... 3-17 3.3.3 Mainline Valve Placement ......................................................... 3-24 3.3.4 Watercourse Crossings............................................................... 3-24 3.3.5 Geohazard Assessment .............................................................. 3-28 3.3.6 Designated Protected Areas ....................................................... 3-35 New Brunswick Segment ............................................................................. 3-38 3.4.1 Routing Alternatives .................................................................. 3-40 3.4.2 Design Considerations ............................................................... 3-40 3.4.3 Mainline Valve Placement ......................................................... 3-43 3.4.4 Watercourse Crossings............................................................... 3-43 3.4.5 Geohazard Assessments ............................................................. 3-43 3.4.6 Designated Protected Areas ....................................................... 3-48 Cromer Lateral ............................................................................................. 3-49 3.5.1 Routing Alternatives .................................................................. 3-50 3.5.2 Design Considerations ............................................................... 3-50 3.5.3 Launcher and Receiver Facilities ............................................... 3-53 3.5.4 Mainline Valve Placement ......................................................... 3-53 3.5.5 Watercourse Crossings............................................................... 3-53 3.5.6 Geohazard Assessment .............................................................. 3-54 3.5.7 Designated Protected Areas ....................................................... 3-54 Montréal Lateral........................................................................................... 3-54 3.6.1 Routing Alternatives .................................................................. 3-57 3.6.2 Design Considerations ............................................................... 3-57 3.6.3 Launcher and Receiver Facilities ............................................... 3-60 3.6.4 Mainline Valve Locations .......................................................... 3-60 3.6.5 Watercourse Crossings............................................................... 3-61 3.6.6 Geohazard Assessment .............................................................. 3-61 3.6.7 Designated Protected Areas ....................................................... 3-63 Lévis Lateral ................................................................................................ 3-64 3.7.2 Design Considerations ............................................................... 3-65 3.7.3 Launcher and Receiver Facilities ............................................... 3-66 3.7.4 Mainline Valve Placement ......................................................... 3-67 3.7.5 Watercourse Crossings............................................................... 3-67 3.7.6 Geohazard Assessment .............................................................. 3-67 3.7.7 Designated Protected Areas ....................................................... 3-68 Saint John Connection ................................................................................. 3-69 3.8.1 Routing Alternatives .................................................................. 3-69 3.8.2 Design Considerations ............................................................... 3-69 May 2016 CA PDF Page 3 of 11 Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design 3.8.3 3.8.4 3.8.5 3.8.6 3.8.7 Contents In-Line Inspection (ILI) Facilities ............................................. 3-71 Mainline Valve Placement ......................................................... 3-71 Watercourse Crossings............................................................... 3-72 Geohazard Assessment .............................................................. 3-72 Designated Protected Areas ....................................................... 3-72 LIST OF APPENDICES Appendix 4-1 Appendix 4-2 Appendix 4-3 Appendix 4-4 Appendix 4-5 Appendix 4-6 Appendix 4-7 Appendix 4-8 Appendix 4-9 Appendix 4-10 Appendix 4-11 Appendix 4-12 Appendix 4-13 Appendix 4-14 Typical Drawings Design Confirmation Letter Addendum to Design Confirmation Letter Golder Associates Inc. Summary of Geohazards Golder Energy East Pipeline (New-Build Portion), Geologic Hazard Phase II Assessment BGC Preliminary Phase 1 Geohazard Assessment Preliminary Report – Hydrotechnical Conditions Energy East Pipeline (New-Build Portion), Hydrotechnical Hazards Phase II Assessment Acid Rock Drainage Mitigation Plan (Québec and New Brunswick) Acid Rock Drainage Mitigation Plan (Saint-Onésime/Picard Realignment) Terrain Mapping Rock and Acid Rock Geotechnical Investigation Engineering Assessment for Valve Placement HSR Data – Stantec Report Alberta Segment Appendix 4-15A CCI HDD Feasibility Report – Red Deer River and South Saskatchewan River Appendix 4-15B CCI HDD Geotechnical Evaluation – Red Deer River and South Saskatchewan River Ontario East Segment Appendix 4-16 Appendix 4-17 Appendix 4-18 Appendix 4-19 Appendix 4-20 Appendix 4-21 May 2016 Class Location Changes Relative to Population Density – Ontario East Segment (1 of 3) Class Location Changes Relative to Population Density – Ontario East Segment (2 of 3) Class Location Changes Related to Population Density – Ontario East Segment (3 of 3) Entec HDD Preliminary Feasibility Review – Raisin River Entec HDD Preliminary Feasibility Review – Delisle River Entec HDD Preliminary Feasibility Review – Rigaud River Page iii CA PDF Page 4 of 11 Contents Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Québec Segment Appendix 4-22 Appendix 4-23 Appendix 4-24 Appendix 4-25 Appendix 4-26 Appendix 4-27 Appendix 4-28 Appendix 4-29 Appendix 4-30 Appendix 4-31 Appendix 4-32 Appendix 4-33 Appendix 4-34 Appendix 4-35 Appendix 4-36 Appendix 4-37 Appendix 4-38 Appendix 4-39 Appendix 4-40 Appendix 4-41 Appendix 4-42 Appendix 4-43 Appendix 4-44 Appendix 4-45 Appendix 4-46 Appendix 4-47A Appendix 4-47B Appendix 4-48A Appendix 4-48B Appendix 4-49A Appendix 4-49B Appendix 4-50 Appendix 4-51 Appendix 4-52 Appendix 4-53A Appendix 4-53B Appendix 4-54A Appendix 4-54B Appendix 4-55 Appendix 4-56A Page iv Class Locations Relative to Population Density (1 of 23) Class Locations Relative to Population Density (2 of 23) Class Locations Relative to Population Density (3 of 23) Class Locations Relative to Population Density (4 of 23) Class Locations Relative to Population Density (5 of 23) Class Locations Relative to Population Density (6 of 23) Class Locations Relative to Population Density (7 of 23) Class Locations Relative to Population Density (8 of 23) Class Locations Relative to Population Density (9 of 23) Class Locations Relative to Population Density (10 of 23) Class Locations Relative to Population Density (11 of 23) Class Locations Relative to Population Density (12 of 23) Class Locations Relative to Population Density (13 of 23) Class Locations Relative to Population Density (14 of 23) Class Locations Relative to Population Density (15 of 23) Class Locations Relative to Population Density (16 of 23) Class Locations Relative to Population Density (17 of 23) Class Locations Relative to Population Density (18 of 23) Class Locations Relative to Population Density (19 of 23) Class Locations Relative to Population Density (20 of 23) Class Locations Relative to Population Density (21 of 23) Class Locations Relative to Population Density (22 of 23) Class Locations Relative to Population Density (23 of 23) PLACEHOLDER ‒ HMM Trenchless Crossing Feasibility Report – Rivière des Outaouais Entec HDD Preliminary Feasibility – Rivière du Nord Entec HDD Preliminary Feasibility Review – Rivière l’Assomption Entec HDD Preliminary Feasibility Review – Rivière l’Assomption (Follow up) Entec HDD Preliminary Feasibility Review – Rivière Bayonne Entec HDD Preliminary Feasibility Review – Rivière Bayonne (Follow up) Entec HDD Preliminary Feasibility Review – Rivière Chicot Entec HDD Preliminary Feasibility Review – Rivière Chicot (Follow up) Entec HDD Preliminary Feasibility Review – Rivière Maskinongé Entec HDD Preliminary Feasibility Review – Rivière du Loup Entec HDD Preliminary Feasibility Review – Rivière Saint-Maurice Entec HDD Preliminary Feasibility Review – Rivière Batiscan Entec HDD Preliminary Feasibility Review – Rivière Batiscan (Follow up) Entec HDD Preliminary Feasibility Review- Sainte-Anne Entec HDD Preliminary Feasibility Review- Sainte-Anne (Follow up) Entec HDD Preliminary Feasibility Review – Rivière Jacques Cartier Entec HDD Preliminary Feasibility Review – Rivière Beaurivage May 2016 CA PDF Page 5 of 11 Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Contents Appendix 4-56B Entec HDD Preliminary Feasibility Review – Rivière Beaurivage (Follow up) Appendix 4-57A Entec HDD Preliminary Feasibility Review – Rivière Chaudière Appendix 4-57B Entec HDD Preliminary Feasibility Review – Rivière Chaudière (Follow up) Appendix 4-58A Entec HDD Preliminary Feasibility Review – Rivière Etchemin Appendix 4-58B Entec HDD Preliminary Feasibility Review – Rivière Etchemin (Follow up) Appendix 4-59A Entec HDD Preliminary Feasibility Review – Rivière du Sud Appendix 4-59B Entec HDD Preliminary Feasibility Review – Rivière du Sud (Follow up) Appendix 4-60A Entec HDD Preliminary Feasibility Review – Rivière Bras-Saint-Nicolas Appendix 4-60B Entec HDD Preliminary Feasibility Review – Rivière Bras-Saint-Nicolas (Follow up) Appendix 4-61A Entec HDD Preliminary Feasibility Review – Rivière Trois-Saumons Appendix 4-61B Entec HDD Preliminary Feasibility Review – Rivière Trois-Saumons (Follow up) Appendix 4-62A Entec HDD Preliminary Feasibility Review – Rivière Ouelle Appendix 4-62B Entec HDD Preliminary Feasibility Review – Rivière Ouelle (Follow up) Appendix 4-63A Entec HDD Preliminary Feasibility Review – Grande Rivière Appendix 4-63B Entec HDD Preliminary Feasibility Review – Grande Rivière (Follow up) Appendix 4-64A Entec HDD Preliminary Feasibility Review – Rivière du Loup Appendix 4-64B Entec HDD Preliminary Feasibility Review – Rivière du Loup (Follow up) Appendix 4-65A Entec HDD Preliminary Feasibility Review – Rivière Madawaska Appendix 4-65B Entec HDD Preliminary Feasibility Review – Rivière Madawaska (Follow up) Appendix 4-66 St. Lawrence River Tunnel Feasibility/DBM Report Appendix 4-67 St. Lawrence River Crossing Geotechnical Investigation and Geotechnical Data Report Appendix 4-68A Entec Letters Affirming Trenchless Crossing Assessments – Rivière Bayonne Appendix 4-68B Entec Letters Affirming Trenchless Crossing Assessments – Rivière Chicot Appendix 4-68C Entec Letters Affirming Trenchless Crossing Assessments – Rivière Ouelle Appendix 4-68D Entec Letters Affirming Trenchless Crossing Assessments – Rivière du Loup Appendix 4-68E Entec Letters Affirming Trenchless Crossing Assessments – Rivière Madawaska New Brunswick Segment Appendix 4-69 Appendix 4-70 Appendix 4-71 Appendix 4-72 Appendix 4-73 May 2016 Class Locations Relative to Population Density (1 of 8) Class Locations Relative to Population Density (2of 8) Class Locations Relative to Population Density (3 of 8) Class Locations Relative to Population Density (4 of 8) Class Locations Relative to Population Density (5 of 8) Page v CA PDF Page 6 of 11 Contents Appendix 4-74 Appendix 4-75 Appendix 4-76 Appendix 4-77A Appendix 4-77B Appendix 4-77C Appendix 4-78A Appendix 4-78B Appendix 4-78C Appendix 4-79A Appendix 4-79B Appendix 4-79C Appendix 4-79D Appendix 4-80A Appendix 4-80B Appendix 4-80C Appendix 4-80D Appendix 4-80E Appendix 4-81A Appendix 4-81B Appendix 4-81C Appendix 4-81D Appendix 4-81E Appendix 4-82A Appendix 4-82B Appendix 4-82C Appendix 4-82D Appendix 4-82E Appendix 4-83A Appendix 4-83B Appendix 4-83C Appendix 4-83D Appendix 4-83E Appendix 4-84A Appendix 4-84B Appendix 4-84C Appendix 4-84D Appendix 4-84E Appendix 4-85A Appendix 4-85B Appendix 4-85C Appendix 4-85D Page vi Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Class Locations Relative to Population Density (6 of 8) Class Locations Relative to Population Density (7 of 8) Class Locations Relative to Population Density (8 of 8) Entec HDD Preliminary Feasibility Review – Rivière Iroquois CCI HDD Feasibility Report – Rivière Iroquois Stantec/CH2M Geotechnical Report for HDD Crossings – Rivière Iroquois Entec HDD Preliminary Feasibility Review – Petite Rivière Iroquois CCI HDD Feasibility Report – Petite Rivière Iroquois Stantec/CH2M Geotechnical Report for HDD Crossings – Petite Rivière Iroquois Entec HDD Preliminary Feasibility Review – Rivière Verte CCI HDD Feasibility Report – Rivière Verte Contingency Crossing Drawing – Rivière Verte Stantec/CH2M Geotechnical Report for HDD Crossings – Rivière Verte Entec HDD Preliminary Feasibility Review – Salmon River (North) CCI HDD Feasibility Report – Salmon River (North) Contingency Crossing Drawing – Salmon River (North) Trenchless Crossing Assessment – Salmon River (North) – HDD Drawings Stantec/CH2M Geotechnical Report for HDD Crossings – Salmon River (North) Entec HDD Preliminary Feasibility Review – Tobique River CCI HDD Feasibility Report – Tobique River Contingency Crossing Drawing – Tobique River Trenchless Crossing Assessment – Tobique River – HDD Drawings Stantec/CH2M Geotechnical Report for HDD Crossings – Tobique River Entec HDD Preliminary Feasibility Review – Coal Creek CCI HDD Feasibility Report – Coal Creek Contingency Crossing Drawing – Coal Creek Trenchless Crossing Assessment – Coal Creek – HDD Drawings Stantec/CH2M Geotechnical Report for HDD Crossings – Coal Creek Entec HDD Preliminary Feasibility Review – Canaan River CCI HDD Feasibility Report – Canaan River Contingency Crossing Drawing – Canaan River Trenchless Crossing Assessment – Canaan River – HDD Drawings Stantec/CH2M Geotechnical Report for HDD Crossings – Canaan River Entec HDD Preliminary Feasibility Review – Long Creek CCI HDD Feasibility Report – Long Creek Contingency Crossing Drawing – Long Creek Trenchless Crossing Assessment – Long Creek – HDD Drawings Stantec/CH2M Geotechnical Report for HDD Crossings – Long Creek Entec HDD Preliminary Feasibility Review – Kennebecasis River CCI HDD Feasibility Report – Kennebecasis River Contingency Crossing Drawing – Kennebecasis River Trenchless Crossing Assessment – Kennebecasis River – HDD Drawings May 2016 CA PDF Page 7 of 11 Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Appendix 4-85E Appendix 4-86A Appendix 4-86B Appendix 4-86C Appendix 4-86D Appendix 4-86E Appendix 4-87A Appendix 4-87B Appendix 4-87C Appendix 4-87D Appendix 4-87E Appendix 4-88A Appendix 4-88B Appendix 4-89A Appendix 4-89B Appendix 4-90A Appendix 4-90B Appendix 4-91A Appendix 4-91B Appendix 4-92A Appendix 4-92B Contents Stantec/CH2M Geotechnical Report for HDD Crossings – Kennebecasis Entec HDD Preliminary Feasibility Review – Black River CCI HDD Feasibility Report – Black River Contingency Crossing Drawing – Black River Trenchless Crossing Assessment – Black River – HDD Drawings Stantec/CH2M Geotechnical Report for HDD Crossings – Black River Entec HDD Preliminary Feasibility Review – Mispec River CCI HDD Feasibility Report – Mispec River Contingency Crossing Drawing – Mispec River Trenchless Crossing Assessment – Mispec River – HDD Drawings Stantec/CH2M Geotechnical Report for HDD Crossings – Mispec River CCI HDD Feasibility Report – Grand Rivière Stantec/CH2M Geotechnical Report for HDD Crossings – Grand Rivière CCI HDD Feasibility Report – Miramichi River (South Branch Southwest) Stantec/CH2M Geotechnical Report for HDD Crossings – Miramichi River (South Branch Southwest) CCI HDD Feasibility Report – Cains River Stantec/CH2M Geotechnical Report for HDD Crossings – Cains River CCI HDD Feasibility Report – Salmon River South Stantec/CH2M Geotechnical Report for HDD Crossings – Salmon South River CCI HDD Feasibility Report – Hammond River Stantec/CH2M Geotechnical Report for HDD Crossings – Hammond River Montréal Lateral Appendix 4-93 Appendix 4-94 Appendix 4-95 Appendix 4-96 Appendix 4-97 Class Locations Relative to Population Density - Alternative Route 1 Class Locations Relative to Population Density - Alternative Route 1 Class Locations Relative to Population Density – Alternative Route 1 Class Locations Relative to Population Density – Alternative Route 1 Class Locations Relative to Population Density – Alternative Route 1 and 2 (2 on 1 map) Appendix 4-98 Class Locations Relative to Population Density - Alternative Route 2 (1 of 2) Appendix 4-99 Class Locations Relative to Population Density – Alternative Route 2 (2 of 2) Appendix 4-100 Entec HDD Preliminary Feasibility Review – Rivière des Milles Îles (Alternative Route 1 and 2) Appendix 4-101A Entec HDD Preliminary Feasibility Review – Rivière des Prairies (Alternative Route 1) Appendix 4-101B Entec HDD Preliminary Feasibility Review – Rivière des Prairies (Alternative Route 2) May 2016 Page vii CA PDF Page 8 of 11 Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Contents Lévis Lateral Appendix 4-102 Appendix 4-103A Appendix 4-103B Class Locations Relative to Population Density – Lévis Lateral Entec HDD Preliminary Feasibility Review – Rivière Etchemin Lévis Entec HDD Preliminary Feasibility Review – Rivière Etchemin Lévis (Follow up) LIST OF FIGURES Figure 3-1 Figure 3-2 Figure 3-3 Figure 3-4 Figure 3-5 Figure 3-6 Figure 3-7 Figure 3-8 Figure 3-9 Figure 3-10 Parallel and Non-Parallel Easement along the Alberta Segment (CA Rev.0) ..................................................................................................... 3-2 Parallel and Non-Parallel Easement along the Ontario East Segment (CA Rev.0) ..................................................................................................... 3-8 Parallel and Non-Parallel Easement along Québec Segment (CA Rev.0) ................................................................................................... 3-18 Comparative Route Map – Québec Segment (West of St. Lawrence River) (CA Rev.0) ....................................................................................... 3-19 Comparative Route Map – Québec Segment (East of the St. Lawrence River) (CA Rev.0).................................................................. 3-20 Parallel and Non-Parallel Easement – New Brunswick Segment (CA Rev.0) ........................................................................................................... 3-39 Route Comparison Map – New Brunswick (CA Rev.0).............................. 3-41 Parallel and Non-Parallel Easement – Cromer Lateral (CA Rev.0) ............ 3-51 Parallel and Non-Parallel Easement – Montréal and Lévis Laterals (CA Rev.0) ................................................................................................... 3-56 Pipe Rack and Route – Updated Saint John Connection ............................. 3-70 LIST OF TABLES Table 1-1 Table 2-1 Table 2-2 Table 2-3 Table 2-4 Table 2-5 Table 2-6 Table 3-1 Table 3-2 Table 3-3 Table 3-4 Page viii List of Appendices to Volume 4 ‒ Pipeline Design ....................................... 1-2 Minimum Depth of Cover (CA Rev. 0) ......................................................... 2-3 Pipe Minimal Wall Thickness (CA Rev. 0) ................................................... 2-4 Preliminary Pipe Design Parameters (CA Rev. 0) ......................................... 2-5 Material Grades for Valve Assembly Pipe and Fittings (CA Rev. 0) ............ 2-5 Preliminary Launcher and Receiver Locations ‒ NPS 42 Pipeline (CA Rev. 0) .................................................................................................... 2-7 Pipeline Launcher and Receiver Specifications ‒ NPS 42 (CA Rev. 0) ........ 2-8 Preliminary Section Locations and Pipeline Lengths – Alberta Segment (CA Rev.0) ......................................................................... 3-1 Parallel vs Non-Parallel Right-of-Way ‒ Alberta Segment (CA Rev. 0) ...... 3-1 Preliminary Line Pipe Lengths by Wall Thickness – Alberta Segment (CA Rev.0) ..................................................................................................... 3-3 Trenchless Watercourse Crossings – Alberta Segment (CA Rev.0).............. 3-4 May 2016 CA PDF Page 9 of 11 Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Table 3-5 Table 3-6 Table 3-7 Table 3-8 Table 3-9 Table 3-10 Table 3-11 Table 3-12 Table 3-13 Table 3-14 Table 3-15 Table 3-16 Table 3-17 Table 3-18 Table 3-19 Table 3-20 Table 3-21 Table 3-22 Table 3-23 Table 3-24 Table 3-25 Table 3-26 Table 3-27 Table 3-28 Table 3-29 May 2016 Contents Potential Watercourse (Hydrotechnical) Erosion Hazard Areas – Alberta Segment (CA Rev.0) ......................................................................... 3-5 Designated Protected Areas – Alberta Segment (CA Rev.0) ........................ 3-6 Preliminary Section Location and Pipeline Lengths – Ontario East Segment (CA Rev.0) ...................................................................................... 3-7 Parallel vs Non-Parallel Right-of-Way ‒ Ontario East Segment (CA Rev. 0) .................................................................................................... 3-7 Preliminary Class Location Lengths – Ontario East Segment (CA Rev.0) ..................................................................................................... 3-9 Class Location Changes Related to Population Density – Ontario East Segment (CA Rev. 0) ..................................................................................... 3-9 Preliminary Line Pipe Lengths by Wall Thickness – Ontario East Segment (CA Rev.0) .................................................................................... 3-10 Trenchless Watercourse Crossings Requiring Site-Specific Design – Ontario East Segment (CA Rev.0) ............................................................... 3-11 Potential Landslide Hazard Areas – Ontario East Segment (CA Rev.0) ..... 3-12 Potential Watercourse (Hydrotechnical) Erosion Hazard Area ‒ Ontario East Segment (CA Rev. 0) .............................................................. 3-13 Designated Protected Areas – Ontario East Segment (CA Rev.0) .............. 3-15 Preliminary Section Locations and Pipeline Lengths ‒ Québec Segment (CA Rev.0) .................................................................................... 3-16 Parallel vs Non-Parallel Right-of-Way ‒ Québec Segment (CA Rev. 0) .................................................................................................. 3-16 Preliminary Class Location Lengths – Québec Segment (CA Rev.0) ......... 3-21 Preliminary Line Pipe Lengths by Wall Thickness – Québec Segment (CA Rev.0) ................................................................................................... 3-21 Class Location Changes Relative to Population Density – Québec Segment (CA Rev.0) .................................................................................... 3-22 Trenchless Watercourse Crossings ‒ Québec Segment (CA Rev. 0) .......... 3-25 Potential Landslide Hazard Areas– Québec Segment (CA Rev.0) .............. 3-30 Potential Watercourse (Hydrotechnical) Erosion Hazard Areas – Québec Segment (CA Rev.0) ....................................................................... 3-35 Designated Protected Areas – Québec Segment (CA Rev.0) ...................... 3-37 Preliminary Section Locations and Pipeline Lengths ‒ New Brunswick Segment (CA Rev.0).................................................................. 3-38 Parallel vs Non-Parallel Right-of-Way ‒ New Brunswick Segment (CA Rev. 0) .................................................................................................. 3-38 Preliminary Class Location Lengths – New Brunswick Segment (Rev.0) ......................................................................................................... 3-40 Class Location Changes Relative to Population Density – New Brunswick Segment (CA Rev.0).................................................................. 3-42 Preliminary Line Pipe Lengths by Wall Thickness ‒ New Brunswick Segment (CA Rev. 0) ................................................................................... 3-42 Page ix CA PDF Page 10 of 11 Contents Table 3-30 Table 3-31 Table 3-32 Table 3-33 Table 3-34 Table 3-35 Table 3-36 Table 3-37 Table 3-38 Table 3-39 Table 3-40 Table 3-41 Table 3-42 Table 3-43 Table 3-44 Table 3-45 Table 3-46 Table 3-47 Table 3-48 Table 3-49 Table 3-50 Table 3-51 Table 3-52 Table 3-53 Table 3-54 Table 3-55 Table 3-56 Table 3-57 Table 3-58 Page x Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Trenchless Watercourse Crossings – New Brunswick Segment (CA Rev.0) ................................................................................................... 3-44 Potential Watercourse (Hydrotechnical) Erosion Hazard Areas – New Brunswick Segment (CA Rev.0) ......................................................... 3-47 Designated Protected Areas – New Brunswick Segment (CA Rev.0)........ 3-49 Preliminary Location and Pipeline Length – Cromer Lateral ...................... 3-49 Parallel and Non-Parallel ROW along the Cromer Lateral ......................... 3-50 Preliminary Class Location Lengths – Cromer Lateral (CA Rev.0) ........... 3-52 Preliminary Pipe Design Parameters – Cromer Lateral (CA Rev.0) .......... 3-52 Preliminary Line Pipe Lengths by Wall Thickness – Cromer Lateral (CA Rev.0) ................................................................................................... 3-52 Launcher/Receiver Specifications – Cromer Lateral (CA Rev.0) ............... 3-53 Preliminary Location and Pipeline Length ‒ Montréal Lateral (CA Rev.0) ........................................................................................................... 3-55 Parallel and Non-Parallel ROW ‒ Montrèal Lateral (CA Rev. 0) ............... 3-55 Preliminary Class Location Length – Montréal Lateral (CA Rev.0) ........... 3-57 Preliminary Class Location Changes Related to Population Density ‒ Montréal Lateral (Alternative Route 1) (CA Rev. 0) ................................... 3-58 Class Location Changes Relative to Population Density ‒ Montréal Lateral (Alternative Route 2) (CA Rev.0) ................................................... 3-58 Preliminary Line Pipe Lengths by Wall Thickness – Montréal Lateral (CA Rev.0) ................................................................................................... 3-59 Preliminary Valve Locations – Montréal Lateral (CA Rev.0) ..................... 3-60 Trenchless Watercourse Crossings – Montréal Lateral (CA Rev.0)........... 3-62 Potential Watercourse (Hydrotechnical) Erosion Hazard Areas – Montréal Lateral (CA Rev.0) ....................................................................... 3-63 Designated Protected Areas – Montréal Lateral (Alternative Route 1) (CA Rev.0) ................................................................................................... 3-64 Preliminary Location and Pipeline Length – Lévis Lateral (CA Rev.0) ..... 3-64 Parallel and Non-Parallel ROW along the Lévis Lateral ............................. 3-65 Preliminary Class Locations and Pipeline Lengths – Lévis Lateral (CA Rev.0) ................................................................................................... 3-65 Class Location Changes Relative to Population Density – Lévis Lateral (CA Rev.0)....................................................................................... 3-66 Preliminary Line Pipe Lengths by Wall Thickness – Lévis Lateral (CA Rev.0) ................................................................................................... 3-66 Trenchless Watercourse Crossings – Lévis Lateral (CA Rev. 0) ................ 3-67 Potential Landslide Hazard Areas – Lévis Lateral (CA Rev.0) ................... 3-68 Potential Watercourse (Hydrotechnical) Erosion Hazard Area – Lévis Lateral (CA Rev.0)....................................................................................... 3-68 Preliminary Location and Pipeline Length – Saint John Connection (CA Rev. 0) .................................................................................................. 3-69 Preliminary Class Location Changes Related to Population Density – Saint John Connection (CA Rev. 0) ............................................................. 3-71 May 2016 CA PDF Page 11 of 11 Energy East Pipeline Ltd. Consolidated Application Volume 4: Pipeline Design Table 3-59 Table 3-60 May 2016 Contents Preliminary Line Pipe Lengths –Saint John Connection ............................. 3-71 Preliminary Valve Locations – Saint John Connection ............................... 3-72 Page xi
© Copyright 2025 Paperzz